Amendment 0002 - VI DPW STX(001).pdf

PDF 10 MB Posted

Attached to
Temporary Bridge and Structural Repairs at 3 Bridges in St. Croix, U. S. Virgin Islands
Solicitation number
693C73-23-B-000007
Issued by

About this file

This federal solicitation seeks sealed bids from certified small business concerns for the Temporary Bridge and Structural Repairs at 3 Bridges project in St. Croix, U.S. Virgin Islands. The project consists of installing three temporary bridges and conducting structural repairs, including embankment construction, aggregate base, approach work, riprap placement, guardrail installation, pavement marking, and other miscellaneous work. The cost of the entire project is expected to fall between $2,000,000 to $5,000,000. Bid documents were issued on or about February 9, 2023, with bid due date and location specified on the SF 1442 form in Block 13a of the solicitation. Prospective contractors must register in the System for Award Management database and complete annual Representations and Certifications in SAM and on related websites. The soliciting agency is the Department of Transportation Federal Highway Administration.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE

0002 03/17/2023

6. ISSUED BY CODE 693C73

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

SUITE E2-3-300

ATTN: ACQUISITIONS

ASHBURN VA 20147

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

1. CONTRACT ID CODE

4. REQUISITION/PURCHASE REQ. NO.

7. ADMINISTERED BY (If other than Item 6)

I

PAGE OF PAGES

1 I 38

5. PROJECT NO. (If applicable)

See Block 14

CODE I 6 93C7 3

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

SUITE E2-3-300

ATTN: CONSTRUCTION

ASHBURN VA 20147

9A. AMENDMENT OF SOLICITATION NO.

693C7323B000007

X

9B. DATED (SEE ITEM 11)

02/09/2023

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

IXI The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers IZl is extended. Dis not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment. and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

E. IMPORTANT:

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Contractor Dis not Dis required to sign this document and return ______ _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project VI DPW STX(00l):

The purpose of this Amendment is to:

1) Revise the Solicitation Bid Schedule (B Pages) due to schedule change and quantities update.

2) Revise the Special Contract Requirements (J Pages) as follows:

a) Revise Subsection 156.07(d).

b) Delete Section 615 and Subsection 703.18.

3) Revise the Plans to delete Structure 2902-04P, King Street (Route 7025), and Queen

Street (Route 7027) from the scope of work. Also, changed Structure 2902-014P to Schedule

Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 1 0A, as heretofore changed, remains unchanged and in full force and effect .

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

(Signature of person authorized to sign)

Previous edition unusable

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

REFERENCE NO. OF DOCUMENT BEING CONTINUED

CONTINUATION SHEET

693C7323B000007 /0002

NAME OF OFFEROR OR CONTRACTOR

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

A, and updated the quantities.

4) Revise Contract Book Cover to delete Structure

2902-004P (Route 7025 - King Street) and Route

7027 - Queen Street from Roadway List. Also, changed Structure 2902-014P (Route 70 -

Centerline Road) to Schedule A

5) Provide a summary of responses to questions/clarifications asked by potential bidders.

6) The Bid Opening date has been extended to

Tuesday, April 4, 2023, at 2:00 p.m. EST.

NSN 7540-01-152-8067

QUANTITY UNIT

(C) (D)

UNIT PRICE

(E)

OF

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR f48 CFRl 53.110

Amendment No. 0002

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

VI DPW STX (001)

Temporary Bridges and Structural Repairs Solicitation: 693C73- 23-B-000007

The purpose of this Amendment is to:

1) Revise the Solicitation Bid Schedule (B Pages) due to schedule change and quantities update.

2) Revise the Special Contract Requirements (J Pages) as follows:

a) Revise Subsection 156.07(d).

b) Delete Section 615 and Subsection 703.18.

3) Revise the Plans to delete Strucure#2902-04P, King Street (Route 7025), and Queen Street

(Route 7027) from the scope of work. Also, changed Structure#2902-014P to Schedule A, and updated the quantities.

4) Revise Contract Book Cover to delete Structure 2902-004P (Route 7025 – King Street) and Route 7027 – Queen Street from Roadway List. Also, changed Structure#2902-014P (Route 70 – Centerline Road) to Schedule A

5) Provide a summary of responses to questions/clarifications asked by potential bidders.

6) The Bid Opening date has been extended to Tuesday, April 4, 2023, at 2:00 p.m. EST.

B Pages changes

Delete the Solicitation Bid Schedule B Pages (B-1 thru B-7) and substitute the amended Bid Schedule B Pages (B-1 thru B-6).

B - 6

BID SUMMARY

Project VI DPW STX(001)

(1) $____________________(1) Schedule A (Base Contract) Bid Total (from Page B-3) =

(2) Schedule B (Government Option 1) Bid Total (from Page B-5) = (2) $____________________

Total Price of Project (for evaluation purposes only)

EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) $____________________

Maximum Time Allowed for the Contract if Schedules A and B are Awarded at the Same Time

If the Government awards the contract as Schedules A + B, the performance period to complete all contract work will be 280 calendar days.

Maximum Time Allowed for Each Schedule of Work if Awarded Separately

If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 195 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.

If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 165 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.

Special Contract Requirements (J Pages) changes

• Delete Subsection 156.07(d) of the Special Contract Requirements, pages J-12-13, and substitute the following:

For work on structure 2902-020P, use a portion of the closed roadway as needed as a staging area.

For work on structure 2902-014P, use the farmland, located at coordinates (17.723375 N,

64.788677 W) as a staging area.

Obtain approval from the CO for the limits of staging areas for each site before using these locations for staging.

Restore staging areas to their original condition as directed by the CO.

• Delete Section 615 of the Special Contract Requirements, page J-20.

• Delete Subsection 703.18 of the Special Contract Requirements, pages J-27-28.

Plan Sheet changes

• Delete the following Plan Sheets:

o A05 o A08 o B01-B03 o D01 o M02 o N01 o P01 o R08-R09 o S03-S05 o S09-S10

• Delete the following Plan Sheets and substitute the respective amended Plan Sheets in “AMEND_Plans.pdf”:

o A01 o A04 o B05-B06 o C01-C05 o D03 o M01 o M04 o N03 o P03 o R01-R07

Contract Booklet Cover changes

• Deleted 2902-004P (Route 7025 – King Street) and Route 7027 – Queen Street from Roadway List.

• Changed 2902-014P (Route 70 – Centerline Road) to Schedule A

PLANS FOR PROPOSED PROJECT

VI DPW STX(001)

US VIRGIN ISLANDS

SAINT CROIX

USVI DEPARTMENT OF PUBLIC WORKS

Project Manager Lead DesignerHighway Design Manager

PLANS PREPARED BY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

NOVEMBER, 2022

ASHBURN, VIRGINIA

EASTERN FEDERAL LANDS HIGHWAY DIVISION

R

E N

O R

A I

N

N

ST F

R

I

D

D E P A

T

NTOFT A SP

T T

O

U

TE

ATESO

AM

E R

IC

A

M

Know what'sbelow.

before you dig.Call

R

Francisco SantalizShoukat NawazJatinder Bains AGREEMENT NO. 693C73-21-K-500025

Symbols And Abbreviations

Location Map

Typical Sections

Tabulation of Quantities

Plans

Erosion And Sediment Control Narrative

Standards And Details

DESCRIPTION

INDEX TO SHEETS

Title Sheet

SHEET

NO

A01

A02-A03

A04

C01

D01-D03

M01

P01-P03

S01-S14

Permanent Signing And Markings Plan

R01-R09 Bridge Plans

N01-N03 Temporary Traffic Control Plans

M02-M04 Erosion And Sediment Control Plans

C02-C05 Summaries And Schedules

B01-B06

A08-A09 Horizontal Alignments

A05-A07 Survey Control Points

2902-014P, 12/18/2019

ROUTE 669 OVER CASTLE BURK GUT, 2902-020P, 12/19/2019

ROUTE 70 OVER UNNAMED GUT,

Route 669 - Golden Grove Road

Route 70 - Centerline Road miscellaneous work.

approach work, guardrail installation and other

Work consists of the installation of 3 temporary bridges, e(max) 8%

C/A None

DESCRIPTION OF PROJECT

IMPROVEMENT:

PROJECT LENGTH: 0.15 Miles

ADT (2022)

ADT (2042)

DHV

%Truck

D

V (MPH)

50/50

1%

SPECIFICATIONS:

DESIGN DESIGNATION:

LANE MILES:

and Bridges on Federal Highway Projects", FP-14.

"Standard Specifications for Construction of Roads

BRIDGE:

ROAD: WIDTH

24'

18'

TYPE

ACP

ACP

64 68

LAGOON

SALT POND

WESTEND

FREDERIKSTED

AIRPORT

PORT

CONTAINER

BAY

SALT RIVER

UDALL

POINT

POND

GREAT

CHRISTIANSTED

HARBOR

CHRISTIANSTED

BUCK ISLAND

CARIBBEAN SEA

CARIBBEAN SEA

N

VI DPW STX(001)

PROJECT

United States Virgin Islands

ST. CROIX

Route 669

8%

None

50/50

1%

Route 70

0.30 Miles

SEA

CARIBBEAN

KEY MAP

VIRGIN ISLANDS

UNITED STATES

THE

NOT TO SCALE

65 00'W 64 30'W

18 00 N18 00 N

18 30 N

64 30'W65 00'W

18 30 N ATLANTIC OCEAN

(PUERTO RICO)

CULEBRA ISLAND

M

IL

E S

T O M

IA

M I

ISLAND

TORTOLA

ISLAND

ST. JOHN

ISLAND

ST. THOMAS

ISLAND

ST. CROIX

UNITED KINGDOMUNITED STATES

VI DPW STX(001)

PROJECT

N

M

I L E S

T O N

E W Y

O R

K

NO SCALE

Schedule Description / Route Number

Structure Number

(feet)

Length

Miles

Lane

(miles)

Length

B Route 669 Over Castle Burk Gut 2902-020P 27.6 N/A N/A

B Gloden Grove Road 669 0.07 0.14

A Route 70 Over Unnamed Gut 2902-014P 25.0 N/A N/A

A Centerline Road 70 0.08 0.16

AMENDMENT NO. 2 1

FEDERAL HIGHWAY ADMINISTRATION

U. S. DEPARTMENT OF TRANSPORTATION

2902-014P

BRIDGES, 2902-020P, 2902-004P,

STRUCTURAL REPAIRS AT 3

TEMPORARY BRIDGE AND

:5

P

M

M a r c h

T it le

S h e e t

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t

\A

M E

N D

A

-V

I D

P W

S T

X (0 tt l.

d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) A01

Agreement No. 693C73-21-K-500025

NO SCALE

N

Maps obtained from USGS TopoView, https://ngmdb.usgs.gov/topoview/viewer/

Schedule A

Structure 2902-014P

Route 70

E 1228097.448

N 618865.109

Schedule B

Structure 2902-020P

Route 669

E 1223261.079

N 619175.947

PROJECT VI DPW STX(001)

U.S. VIRGIN ISLANDS - ST CROIX

BRIDGE LOCATIONS

NO. DATE BY REVISIONS

OFFICE OF FEDERAL LANDS HIGHWAY

LOCATION MAP

USVI (ST. CROIX) - DEPARTMENT OF PUBLIC WORKS

1 03/15/23 FHC AMD #2 - Removed Structure 2902-004P

AMENDMENT NO. 2 1

2 03/15/23 FHC AMD #2 - Changed schedules of remaining structures

:5

A

M a r c h

L o c a ti o n

M a p

P R

O J E

C T

S

S T

A T

E

D O

T \V

I\ S t_ C ro ix

\D P

W S

T X

H

W Y

D

E S

\C A

D D

\d g n \A m e n d m e n t

\A M

E N

D

A

-V

I D

P W

S T

X (0 lo c .d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) A04

CL

See Note 4 profile

Proposed

1V:2H

See Standard 617-32

Install guardrail, MGS system (typ.)

Travelway

NO SCALE

Existing ground

102+65 TO 104+20

100+10 TO 101+84.77

ROUTE 70 (CENTERLINE ROAD)

ROADWAY RECONSTRUCTION

NOTES:

bridge top of deck elevation.

profile slope from the existing elevation to the temporary approved by the CO. Provide a 9 percent or flatter vertical to match the temporary bridge top of deck elevation as

Adjust the top elevations of the embankment construction4.

See Detail E204-02 for benching for embankment.3.

See Bridge Plan sheets for bridge typical sections.2.

areas, in accordance with Sections 624, 625, and 629.

control product to all disturbed areas, except riprap

Furnish topsoil, turf establishment, and rolled erosion1.

Marshall Mix ACP, class A, 1/2" NMSA, 2-inch depth, Type IV roughness

Tack coat

Tack coat

Marshall Mix ACP, class A, 1/2" NMSA, 2-inch depth

Marshall Mix ACP, class A, 1/2" NMSA, 2-inch depth

Aggregate base, grading C or D, 6-inch depth

Separation-stabilization geotextile, class 2, type C

Embankment construction, depth varies. See Notes 3 and 4.

Removal of pavement, asphalt, depth varies

Roadway excavation (existing aggregate base), depth varies

2%2%

Existing aggregate base

Existing asphalt concrete pavement

1V:

2H

U.S. DEPARTMENT OF TRANSPORTATION

TYPICAL SECTIONS

ROUTE 70

SCHEDULE A

USVI (ST. CROIX) - DEPARTMENT OF PUBLIC WORKS

SHEET 1 OF 2

1 03/15/23 FHC AMD #2 - Changed to Schedule A

AMENDMENT NO. 2 1

Limits of disturbance

Varies24'Varies

8" (typ.)

:0

M a r c h

T y p ic a l

S e c ti o n

P R

O J E

C T

S

S T

A T

E

D O

T \V

I\ S t_ C ro ix

\D P

W S

T X

H

W Y

D

E S

\C A

D D

\d g n \A m e n d m e n t

\A M

E N

D

B

-B

-V I

D P

W S

T X

(0 ty p

.d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) B05

CL

See Note 4 profile

Proposed

1V:2H

V :2

H

See Standard 617-32

Install guardrail, MGS system (typ.)

Travelway

NO SCALE

V :1 .5

H geotextile, class 1, type C

Separation-stabilization

Placed riprap, method A, class 4

Excavation limits grading C or D (typ.)

Aggregate base, Existing ground

V :1 .5

H

102+44.95 TO 102+75

ROUTE 70 (CENTERLINE ROAD)

ROADWAY RECONSTRUCTION

NOTES:

bridge top of deck elevation.

profile slope from the existing elevation to the temporary approved by the CO. Provide a 9 percent or flatter vertical to match the temporary bridge top of deck elevation as

Adjust the top elevations of the embankment construction4.

See Detail E204-02 for benching for embankment.3.

See Bridge Plan sheets for bridge typical sections.2.

areas, in accordance with Sections 624, 625, and 629.

control product to all disturbed areas, except riprap

Furnish topsoil, turf establishment, and rolled erosion1.

Existing asphalt concrete pavement

Existing aggregate base

2% 2%

Roadway excavation (existing aggregate base), depth varies

Embankment construction, depth varies. See Notes 3 and 4.

Removal of pavement, asphalt, depth varies

Separation-stabilization geotextile, class 2, type C

Aggregate base, grading C or D, 6-inch depth

Tack coat

Marshall Mix ACP, class A, 1/2" NMSA, 2-inch depth

Marshall Mix ACP, class A, 1/2" NMSA, 2-inch depth

Marshall Mix ACP, class A, 1/2" NMSA, 2-inch depth, Type IV roughness

Tack coat and elevations foundation offsets

See Plan sheet for

U.S. DEPARTMENT OF TRANSPORTATION

TYPICAL SECTIONS

ROUTE 70

SCHEDULE A

USVI (ST. CROIX) - DEPARTMENT OF PUBLIC WORKS

SHEET 2 OF 2

1 03/15/23 FHC AMD #2 - Changed to Schedule A

AMENDMENT NO. 2 1

Limits of disturbance

Varies24'Varies

8" (typ.)

14'

.5 m in

:0

M a r c h

T y p ic a l

S e c ti o n

P R

O J E

C T

S

S T

A T

E

D O

T \V

I\ S t_ C ro ix

\D P

W S

T X

H

W Y

D

E S

\C A

D D

\d g n \A m e n d m e n t

\A M

E N

D

B

-B

-V I

D P

W S

T X

(0 ty p

.d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) B06

SUMMARY OF QUANTITIES - Schedule BSUMMARY OF QUANTITIES - Schedule A

TABULATION OF QUANTITIES

1 03/15/23 FHC AMD #2 - Updated quantities per schedule change

AMENDMENT NO. 2 1

1 1

:1

M a r c h

T a b u la ti o n o f Q u a n ti ti s

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t

\A

M E

N D

C

-C

X X

-V I

D P

W S

T X

(0 q n t.

d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) C01

Sheet 1 of 4

SUMMARIES AND SCHEDULES

AMENDMENT NO. 2 1

:1

M a r c h

S u m m a r ie s a n d S c h e d u le

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t

\A

M E

N D

C

-C

X X

-V I

D P

W S

T X

(0 q n t.

d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) C02

Sheet 2 of 4

AMENDMENT NO. 2 1

:1

M a r c h

S u m m a r ie s a n d S c h e d u le

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t

\A

M E

N D

C

-C

X X

-V I

D P

W S

T X

(0 q n t.

d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) C03

Sheet 3 of 4

AMENDMENT NO. 2 1

:1

M a r c h

S u m m a r ie s a n d S c h e d u le

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t

\A

M E

N D

C

-C

X X

-V I

D P

W S

T X

(0 q n t.

d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) C04

Sheet 4 of 4

AMENDMENT NO. 2 1

:3

M a r c h

S u m m a r ie s a n d S c h e d u le

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t

\A

M E

N D

C

-C

X X

-V I

D P

W S

T X

(0 q n t.

d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) C05

MON W/CAP

MON W/CAP

MON W/CAP

NAIL

SS

SS

FP

FPROTTEN

12" ROTTEN TREE

APPRX CL LID MOVED

36" TREE

30" TREE

30" ROTTEN TREE

36" ROTTEN TREE

Lower Beam Elev. 62.76'

N flared. See Standard 617-19

Install terminal section, type MGS

185 lnft. See Standard 617-32

Replace guardrail, MGS system, 101+84.77

Begin bridge

BEGIN WORK

100+05

N 618822.7000

E 1227967.8141

185 lnft. See Standard 617-32

Replace guardrail, MGS system, See Typical Sections and Note 2.

100+05 to 101+84.77.

Perform roadway reconstruction, bridge. See Bridge Plans

Place temporary

102+44.93

End bridge line (typ.)

Cut/fill

185 lnft. See Standard 617-32

Replace guardrail, MGS system, Proposed CL

EOP (typ.)

Proposed flared. See Standard 617-19

Install terminal section, type MGS

L Existing C

EOP (typ.)

Existing

NOTES:

1. Adjust the limits and locations of all proposed work to meet field conditions as approved by the CO.

2. Adjust the top elevations of the embankment construction to match the temporary bridge top of deck elevation as approved by the CO. Provide a 9 percent or flatter vertical profile slope from the existing elevation to the temporary bridge top of deck elevation.

END WORK

104+20

N 618949.7001

E 1228362.9006

185 lnft. See Standard 617-32

Replace guardrail, MGS system, See Typical Sections and Note 2.

102+44.93 to 104+20.

Perform roadway reconstruction, Centerline Road /

Route 70

PI 103+59.56

Δ = 00°44'23" (RT)

R = 7,500.00' T = 48.42' L = 96.85'

PI 100+98.96

Δ = 00°34'36" (LT)

R = 10,000.00' T = 50.33' L = 100.65'

U n n a m e d

G u t

Elev. bottom 55.13' Offset bottom 40.55' 102+45 Begin riprap wall face

Elev. bottom 62.49' Offset bottom 30.87' 102+75 End riprap wall face

SCALE IN FEET

0 25 50

U.S. DEPARTMENT OF TRANSPORTATION

PLAN

ROUTE 70

STRUCTURE 2902-014P (SCHEDULE A)

USVI (ST. CROIX) - DEPARTMENT OF PUBLIC WORKS

AMENDMENT NO. 2 1

1 03/15/23 FHC AMD #2 - Changed to Schedule A

N72°31'06"E N71°56'30"E N72°40'54"E

.6

PC

.2

PT

.1

.9

.0

P

O B

.3

P

E

' 2

'2

:5

M a rc h

R o u te

P la n

S h e t]

P

R O

J E

C T

S

S T

A T

E D

O T

\V I\ S t_ C ro ix

\D P

W S

T X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t \A

M E

N D

D

-V

I D

P W

S T

X (0 p ln

R

T

.d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) D03

construction limits.

does not leave the project site. Perimeter controls include silt fence and other specified measures outside the

Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment

Phase I Establish Perimeter Controls

Sequence of Construction

Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.

measures.

Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control

Do not allow construction vehicles to track sediment outside the project limits.

No construction access will be permitted through a wetland or waterway.

Officer (CO).

Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.

measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The

The work consists of applying measures throughout the life of the project to control erosion and to minimize the

The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.

General Guidelines

Response Center at 1-800-424-8802.

requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National

Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.

waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of

Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.

maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and

Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.

Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.

Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to

Waste, garbage, sanitary waste

Soaps, solvents used for vehicle washing

Fuels, oils, equipment-related compounds

Wash-water from concrete, paint, curing compounds, and other construction materials

The following discharges are prohibited:

Prohibited Discharges

The Runoff Coefficient will remain the same before and after construction.

No new impervious surface will be created by the reconstructed roadway.

at Route 669, and 0.56 acres at Route 70. The receiving water is the Caribbean Sea.

The disturbed area for the project at each site is approximately 0.44 acres

Soil disturbing activities include clearing and grubbing, and roadway grading.

and other miscellaneous work.

Work consists of the installation of 3 temporary bridges, approach work, guardrail installation, Project Description

Record the inspection date and summary of findings within 24 hours of completing a site inspection.

equipment. Check staples and stakes to make sure they are securely in the ground.

damage and erosion beneath the matting. Replacement of matting may be necessary if damaged by

Rolled erosion control product - inspect matting after every significant rainfall (0.5 inch or higher) event for it reaches half the height of the device. Replace damaged fiber roll within 24 hours of inspection.

Fiber roll - inspect weekly and after each runoff event. Remove sediment deposits from the fiber roll when end of the day.

0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the

Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.

Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices

Maintenance and Inspection Procedures

Remove all other perimeter controls when directed by the CO.

Remove silt fence only after all upslope areas are stabilized and vegetation is well established.

Remove all devices used for dewatering.

Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.

where vegetation has not established.

Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas

Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.

After completion of roadway construction, do the following as directed by the CO:

Phase III Final Construction / Stabilization areas.

Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.

Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to culverts.

and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed

Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade runoff.

At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 625.

Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days roadway.

culverts as called out in the Erosion and Sediment Control plans. Install fiber rolls in ditches along the Apply intermediate controls during rough grading operations. Install fiber roll in areas surrounding the

Phase II Intermediate Controls

U.S. DEPARTMENT OF TRANSPORTATION

CONTROL NARRATIVE

EROSION AND SEDIMENT

1 03/15/23 FHC AMD #2 - Removed data related to Routes 7025 and 7027

AMENDMENT NO. 2 1

:2

M a rc h

U n ti tl e d S h e t

P

R O

J E

C T

S

S T

A T

E D

O T

\V I\ S t_ C ro ix

\D P

W S

T X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t \A

M E

N D

M

-V

I D

P W

S T

X (0 e s c n a r.

d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) M01

MON W/CAP

MON W/CAP

NAIL

SS

SS

FP

FPROTTEN

12" ROTTEN TREE

APPRX CL LID MOVED

36" TREE

30" TREE

30" ROTTEN TREE

36" ROTTEN TREE

Lower Beam Elev. 62.76'

N

101+84.77

Begin bridge

BEGIN WORK

100+05

N 618822.7000

E 1227967.8141 bridge. See Bridge Plans

Place temporary

102+44.93

End bridge

Staking limits (typ.)

Proposed CL

EOP (typ.)

Proposed

L Existing C

EOP (typ.)

Existing

NOTES:

1. Adjust the limits and locations of all proposed work to meet field conditions as approved by the CO.

2. Perform 1770 square yards of clearing and grubbing within the limits of disturbance as directed by the CO.

3. Place 1770 square yards of topsoil, turf establishment, and rolled erosion control product, type 2.C, on all disturbed areas excluding pavement surface.

END WORK

104+20

N 618949.7001

E 1228362.9006

(including 8340 sqft of traveled way)

Area = 25855 sqft

Limits of disturbance (typ.)

See Detail E157-04

Place fiber roll, 800 lnft (typ.)

Centerline Road /

Route 70

U n n a m e d

G u t

U.S. DEPARTMENT OF TRANSPORTATION

CONTROL PLAN

EROSION AND SEDIMENT

ROUTE 70, STRUCTURE 2902-014P (SCHEDULE A)

1 03/15/23 FHC AMD #2 - Changed to Schedule A

AMENDMENT NO. 2 1

N72°31'06"E N71°56'30"E N72°40'54"E

.6

.2

.1

.9

.0

P

B

.3

P

E

:5

M a r c h

R o u te

P la n

S h e

P R

O J E

C T

S

S T

A T

E

D O

T \V

I\ S t_ C ro ix

\D P

W S

T X

H

W Y

D

E S

\C A

D D

\d g n \A m e n d m e n t

\A M

E N

D

M

-V

I D

P W

S T

X (0 e s c

R T

.d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) M04

LOCAL TRAFFIC ONLY

ROAD CLOSED

1200 FEET AHEAD

DETOUR

END

DETOUR

LOCAL TRAFFIC ONLY

ROAD CLOSED

1600 FEET AHEAD

4 5

ASTE ESTW

60" x 30"

R11-3a

48" x 18"

M4-10R

60" x 30"

R11-3a

48" x 18"

M4-10L

24" x 12"

M3-4

24" x 12"

M3-2 24" x 18"

M4-8a

24" x 12"

M4-8

24" x 24"

M1-5

21" x 15"

M6-1L

21" x 15"

M6-1R

21" x 15"

M6-3

11 12 13

Control Devices" (MUTCD), latest edition.

Install traffic control devices in accordance with the "Manual on Uniform Traffic 4.

directed by the CO.

Maintain all signs along the detour route for the duration of the closures as 3.

Cover or remove all conflicting signs as approved by the CO.2.

Obtain the CO's approval on the final locations of all the traffic control devices.1.

NOTES:

AHEAD

DETOUR CLOSED

ROAD

AHEAD

ROAD

CLOSED

36" x 36"

W20-2

36" x 36"

W20-3

48" x 30"

R11-2

1 2

(Mounted on barricade)

NO SCALE

Structure 2902-014P

DETOURDETOUR

N

U.S. DEPARTMENT OF TRANSPORTATION

PLAN

TEMPORARY TRAFFIC CONTROL

1 03/15/23 FHC AMD #2 - Changed to Schedule A

AMENDMENT NO. 2 1

:3

M a r c h

N

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t

\A

M E

N D

N

-N

-V

I D

P W

S T

X (0 tt c .d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) N03

MON W/CAP

MON W/CAP

NAIL

SPEED

LIMIT

SPEED

LIMIT

VEHICLES

COMMERCIAL

NO

NO

TRUCKS

OVER

EMPTY WT

10000 LBS

NO

TRUCKS

OVER

EMPTY WT

7000 LBS

N

BEGIN WORK

100+05

N 618822.7000

E 1227967.8141

Proposed CL

EOP (typ.)

Proposed

EOP (typ.)

Existing

NOTES:

1. Adjust the limits and locations of all proposed work to meet field conditions as approved by the CO.

2. Place R5-2 signs at the intersection with Route 64/65 west of the bridge and at the intersection with

Rout 707 east of the bridge.

3. Place type 3 object markers (OM3-L and OM3-R) at each corner of the temporary bridge.

END WORK

104+20

N 618949.7001

E 1228362.9006

Centerline Road /

Route 70

100+00

100+00

100+00

104+25

104+25

104+25yellow markings

4-inch double solid white markings

4-inch single solid white markings

4-inch single solid

100+03

M2-1 plaques

Install M1-5 signs with

64 65

JCTJCT

Remove and reset sign, 101+16

Remove and reset sign, 100+75

Remove and reset sign, 103+05

U.S. DEPARTMENT OF TRANSPORTATION

MARKINGS PLAN

PERMANENT SIGNING AND

1 03/15/23 FHC AMD #2 - Changed to Schedule A

AMENDMENT NO. 2 1

:5

M a r c h

R o u te

P la n

S h e

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

H W

Y D

E S

\C A

D D

\d g n \A m e n d m e n t

\A

M E

N D

P

-V

I D

P W

S T

X (0 s s p R

T

.d g n

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX(001) P03

R01

/1

/2

M

P

R O

J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \A m e n d m e n t

\0

P

R O

J E

C T

S .d g n

R

P R

O J

N A

M E

B

L A

N K

G

N .D

G N

A C

T U

A L

F

IL

E

GENERAL NOTES

INDEX OF BRIDGE PLAN SHEETS

Steel Girder Bridge Alternative Typical Section

Truss Bridge Alternative Typical Section

Plan and Elevation (Structure 2902-020P)

Site Plan (Structure 2902-020P)

Plan and Elevation (Structure 2902-014P)

Site Plan (Structure 2902-014P)

General Notes and Index

SHEET NO. SHEET TITLE

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

GENERAL NOTES:

N/A

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

Construction:

AASHTO LRFD Bridge Design Specifications, 9 Edition, 2020

Design:

SPECIFICATIONS:

th

2902-014P, 2902-020P

SCOPE OF WORK

Provide 2-inch cover for reinforcing steel unless otherwise noted.

Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.

Reinforcing Steel:

Concrete:

- inch unless otherwise noted.4 3Chamfer exposed edges of all concrete

Furnish Class A(AE) concrete with f'c = 4.5 ksi at 28 days.

MATERIALS:

Furnish all structural steel conforming to ASTM A572, grade 50 steel.

Structural Steel:

Dead Load:

Concrete: 150 pcf

DESIGN LOADS:

Vehicle live load: HL-93

Live Loads:

Verify subgrade bearing pressure prior to casting footing

Assume a subgrade bearing pressure of 4 ksf

Footings:

The Contractor is responsible for the stability of the structure during the construction phase.

and locate all utilities before proceeding work.

surrounding area, adjust dimensions of the work to fit existing conditions. Contact utility companies of the proposed work in this contract are dependent on the dimensions of configuration of the

Verify all controlling field dimensions before ordering or fabricating any material. Where dimensions

CONSTRUCTION:

over existing structure.

- Design and install a two-lane temporary bridge and foundation

- Partially demolish concrete parapet from existing structure.

Structure Number 2902-020P - Route 669 Culvert

Schedule B over existing structure.

- Design and install a two-lane temporary bridge and foundation

- Remove guardrail from existing structure.

Structure Number 2902-014P - Route 70 Bridge

Schedule A

1 3/3/2023 DJL Revised Schedule A and B

1 1

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

March 2023 BRP-13247

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P & 2902-014P

STRUCTURAL REPAIRS AT 2 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

R02

Bridge Length: 60'-2"

M

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \A m e n d m e n t

\0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-014P)

SITE PLAN

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

" = 1'-0"2

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

2902-014P

5 6

0 5

N

Sta. 102+44.93

End BridgeBegin Bridge

Sta. 101+84.77 C Structure

C Route 70L

L

G u t

Notes:

system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

The bridge and foundation system shown on this sheet are for 1.

101+00 102+00 103+00

SCHEDULE A

1 3/3/2023 DJL Revised Schedule A and B 1 1

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

March 2023 BRP-13247

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P & 2902-014P

STRUCTURAL REPAIRS AT 2 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

60'-2"

R03

Bridge Length: 60'-2"

M

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \A m e n d m e n t

\0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-014P)

PLAN AND ELEVATION

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

Notes:

necessary for the installation of the new temporary bridge.

5. Remove existing guardrail system from existing bridge as

D03.

4. For additional information on the proposed ramp, see sheet system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

3. The bridge and foundation system shown on this sheet are for

BRIDGE ALTERNATIVE TYPICAL SECTION" sheets.

BRIDGE ALTERNATIVE TYPICAL SECTION" and "STEEL GIRDER

For details on temporary bridge alternatives, see "TRUSS 2.

bridge deck.

Set low chord of new temporary bridge 6" above existing 1.

" = 1'-0"2

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

PLAN

ELEVATION

2902-014P existing structure

Remove guardrail from

N

C Roadway

13'-8" north of

Existing ground

C Roadway

13'-2" south of

Existing ground

C Structure

C Route 70L

LElev.XX.XX (See Note 1)

Sta. 102+44.93

Elev.XX.XX (See Note 1)

Sta. 101+84.77

End BridgeBegin Bridge exsiting structure (Typ.)

Remove guardrail from

(Typ.) (See Note 4)

Proposed ramp to remain

Existing structure

L L joint (Typ.)

±1" Expansion

102+00101+80101+60 102+20 102+40 102+60

Abutment 1 Abutment 2

SCHEDULE A

1 3/3/2023 DJL Revised Schedule A and B

1 1

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

March 2023 BRP-13247

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P & 2902-014P

STRUCTURAL REPAIRS AT 2 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

R04

Bridge Length: 70'-2"

M

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \A m e n d m e n t

\0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-020P)

SITE PLAN

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

" = 1'-0"2

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

2902-020P

Begin Bridge

Sta. 201+58.82

Sta. 202+28.99

End Bridge

Notes:

system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

The bridge and foundation system shown on this sheet are for 1.

N

201+00 202+00

203+00

SCHEDULE B

C Structure

C Route 669L

L

C a s tle B u r k G u t

1 3/3/2023 DJL Revised Schedule A and B 1 1

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

March 2023 BRP-13247

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P & 2902-014P

STRUCTURAL REPAIRS AT 2 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

70'-2"

R05

Bridge Length: 70'-2"

M

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \A m e n d m e n t

\0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-020P)

PLAN AND ELEVATION

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

Notes:

D02.

5. For additional information on the proposed ramp, see sheet limits of parapet demolition for approval.

temporary bridge according to Section 203. Submit to CO

4. Partially demolish existing concrete parapet to fit new system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

The bridge and foundation system shown on this sheet are for 3.

BRIDGE ALTERNATIVE TYPICAL SECTION" sheets.

BRIDGE ALTERNATIVE TYPICAL SECTION" and "STEEL GIRDER

For details on temporary bridge alternatives, see "TRUSS 2.

bridge deck.

Set low chord of new temporary bridge 6" above existing 1.

" = 1'-0"2

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

PLAN

ELEVATION

2902-020P

(See Note 4) concrete parapet

Partially demolish cave

Existing erosion to remain

Existing structure

Elev. XX.XX (See Note 1)

Sta. 202+28.99

End BridgeBegin Bridge

Elev. XX.XX (See Note 1)

Sta. 201+58.82

N joint (Typ.)

±1" Expansion

C Structure

C Route 669L

(See Note 4) concrete parapet

Partially demolish

C Roadway

15'-10" west of

Existing ground

C Roadway

14'-9" east of

Existing ground

(Typ.) (See Note 5)

Proposed ramp

L

L

L

Existing profile

202+00 202+20 202+40 202+60

201+40201+20 201+80201+60

Abutment 1 Abutment 2

SCHEDULE B

1 3/3/2023 DJL Revised Schedule A and B 1 1

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

March 2023 BRP-13247

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P & 2902-014P

STRUCTURAL REPAIRS AT 2 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

70'-2"

R06

M

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \A m e n d m e n t

\0

P

R O

J E

C T

S .d g n

TYPICAL SECTION

TRUSS BRIDGE ALTERNATIVE

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

R

X P

R O

J N

A M

E B

L A

N K

S

H T

.D G

N A

C T

U A

L F

IL

E

Not to Scale

FOR INFORMATION ONLY

2902-014P, 2902-020P

Notes:

purposes only.

2. The bridge cross section shown on this sheet is for illustration

Submit a TL-2 railing to CO for approval.1.

SCHEDULES A&B

Revised Schedule A and BDJL3/3/20231

1 1

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

March 2023 BRP-13247

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P & 2902-014P

STRUCTURAL REPAIRS AT 2 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

24'-0" Curb to curb (2902-014P & 2902-020P)

R07

M

P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \A m e n d m e n t

\0

P

R O

J E

C T

S .d g n

TYPICAL SECTION

STEEL GIRDER BRIDGE ALTERNATIVE

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

R

X P

R O

J N

A M

E B

L A

N K

S

H T

.D G

N A

C T

U A

L F

IL

E

Not to Scale

TYPICAL SECTION

2902-014P, 2902-020P

FOR INFORMATION ONLY

Notes:

purposes only.

2. The bridge cross section shown on this sheet is for illustration

Submit a TL-2 railing to CO for approval.1.

C Roadway

C StructureL

L

(Typ.)

Steel beam

SCHEDULES A&B

Revised Schedule A and BDJL3/3/20231

1 1

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

March 2023 BRP-13247

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P & 2902-014P

STRUCTURAL REPAIRS AT 2 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

24'-0" Curb to curb (2902-014P & 2902-020P)

Contract No.

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

VI DPW STX(00l)

UNITED STATES VIRGIN ISLANDS - DEPARTMENT OF PUBLIC WORKS

TEMPORARY BRIDGE AND STRUCTURAL REPAIRS AT 3 BRIDGES, 2902-020P,

2902-004P,2902-014P

CONTRACTOR:

ADDRESS:

AGREEMENT# 693C73-21-K-500025

SOLICITATION

693C73- 23-B-000007

This Contract Cites

STATE Virgin Islands

COUNTY St. Croix

AGENCY Virgin Islands Department of Public Works

TYPE OF IMPROVEMENT

Work consists of the installation of 2 temporary bridges, approach work, guardrail installation, and other miscellaneous work.

Project Length Totals

0.15 0.30

For Parking Areas, Lane Miles is calculated as SQFT/1 lft (nominal) lane

Parking Roadway / Parking Area / Other Stations / SQFT Linear Route Lane

Schedule Area Feet Miles Miles

B □ 2902-020P (Route 669 - Golden Grove 20015 To 20389 374 O.Q7 0.14 Road)

A □ 2902-014P (Route 70 - Centerline Road) 10005 To 10420 415 0.08 0.16

Amendment 0002

Questions / Clarifications

The following questions and issues were submitted via email. The Government response or clarification is provided.

1. Are the Plans of the existing bridges available?

Response: Existing bridge plans are not available.

2. Is this project a design/build project? If yes, what specifications will project design be under? PDDM and LRFD specifications?

Response: This is not a design/build project.

3. If the project is a design/build does the 280 day include time for design and permitting?

Response: N/A due to above response.

4. What structural repairs are required? The Title Sheet of the plan set states the project is "Temporary bridge and STRUCTURAL REPAIRS at 3 bridges?

Response: No structural repairs are required on the existing bridges. Partial demolition or removal of the bridge railing may be required on 2902-014P and 2902-020P to install the proposed temporary bridges over the existing bridges.

5. The scope indicates for the 2902-020P bridge to remove the parapet? What are the limits for the repair? What about the interface with the remaining bridge? Are any repairs required for that surface?

Response: Partial demolition of the existing concrete parapet on 2902-020P may be required to install the proposed temporary bridge over the existing bridge, removal is limited to what is required to install the proposed temporary bridge.

6. What is the desired cross slope on the temporary bridge?

Response: A cross slope on these bridges is unnecessary because they will have open curbs/rail and would be free draining. This also adds complexity to the install and foundation work.

7. Is the intent to solely have over-the side drainage?

Response: Yes, as existing approaches do not have curbs or ditches.

8. Are either the existing or proposed roadway profiles available for the portion of the roads at the location of the bridges?

Response: Roadway profiles were not provided since the proposed profile would vary based on the type of temporary bridge chosen and its top of deck elevation. According to Note 2 of the Plan sheets, a vertical profile slope of 9% or flatter should be provided from the existing profile to the top of deck elevation at both approaches of the bridge.

9. The proposed roadway profiles at the bridges appear to be relatively flat except for the ramps leading onto and off of the bridges. Is the intent to utilize vertical curves or simply apply grade breaks?

Response: Apply grade break or vertical curve.

10. The plans show neither turn back wingwalls nor wingwalls parallel with the abutment backwall. With the raising of the grade to form a ramp to support the raised roadway, what was anticipated to retain the earth?

Response: This is going to depend on the amount of grade change and the amount of space adjacent to the bridge to grade out the roadway.

11. The plans indicate that for the 2902-014P structure there is a riprap wall. What are the details for this wall?

Response: See sheet B06 for the detail for the riprap buttress.

12. What duration are the temporary bridges expected to be used?

Response: The temporary bridges are to remain in place until such time, subject to the availability of funds and the completion of the designs for the replacement bridges for the respective sites.

13. Has any hydraulic analysis been done for the proposed sites? If not will the contractor be required to provide a hydraulic analysis for each site?

Response: Based on the previous discussions, for the temporary bridges if there is documentation provided showing the time schedule the temporary structure will be in place, this requirement might be waived, and no H&H will be required per DPNR &

DPW.

14. Has any Geotech analysis been completed for the proposed sites? If not will the contractor be required to provide a Geotech analysis for each site?

Response: No, geotech analysis was not performed. Yes, as clearly stated under Footing Notes of Sheet R01, the contractor is responsible to confirm the assumed 4,000 psf allowable bearing capacity is achieved at the final foundation bottom elevation.

15. Will the proposed temporary bridges and abutments/footings be required to meet the 10 year flood without overtopping per AASHTO?

Response: This depends on the duration the bridges plan to be in service. If the bridge is to be in place for less than 5 years, then the bridge is considered temporary, and the requirements change. Also see response for 24/25.

16. Permits provided expire 5/4/23. Will the contract or the government be required to re-submit permits with final bridge and foundation design?

Response: The Government will apply for a permit extension at least 30 days prior to the 5/4/23 expiration date of the DPNR permits. If there are any modifications to the Government provided plans, the Contractor is responsible for preparing the permit modification for Government submittal. Note that a permit modification may take longer to obtain from DPNR than a permit extension.

17. Please confirm if a demolition permit will be required for the project? If yes, will the contractor be responsible for applying for these permits?

Response: Yes, the responsibility for demolition permits is on the contractor.

18. Will the contractor be able to use the existing utility agreements between VI Government and Utility companies for any utility relocation?

Response: Utility lines underground will not be affected since the temporary bridges will be constructed above the existing bridges. Utility coordination may be required at the supports.

19. For Route 7025 (Structure 2902-004P) bridge currently has a steel beam temporary bridge installed over the existing concrete bridge. Will this temporary bridge be removed or left in place?

Response: The existing temporary bridge will be left in place. Plans and estimates have been amended to remove this structure from the proposed work.

20. The allowable bearing pressure for the temporary abutments has been assumed at 4 KSF.

Did EFL do any subsurface investigations as a basis for this number? Should the D/B team perform borings or other testing to verify this value?

Response: No, EFL did not perform any borings at any of the sites. It is responsibility of the contractor to confirm the assumed allowable bearing pressure of 4,000 psf capacity is achieved at the final foundation bottom elevation for all bridges. The timeline and means and methods to confirm this value is of the responsibility of the contractor. As stated in sheets R02, R03, R04, R05, R06, and R07, Note No. 2 “The bridge and foundation system shown on this sheet are for illustration purposes only.

Submit a bridge and foundation system to the CO for approval.” The submittal must include the foundation capacity calculations to justify the foundation system proposed is adequate. The soil bearing capacity verification should be done immediately prior to pouring the foundation concrete and a copy of the data should be given to the CO.

21. Project plans show spread footing for each proposed temporary bridge. At least one of the sites the footing appears be under water based on the mean water level provided in the plans.

If the 4 KSP bearing capacity cannot be met what is the contractor to do? i.e if deep foundation are required after the starting of the project will the contractor be compensated for the change in the scope?

Response: As noted on sheets R02, R03, R04, R05, R06, and R07 “The bridge and foundation system shown on this sheet are for illustration purposes only. Submit a bridge and foundation system to the CO for approval.” The final foundation may or may not match what is shown on the plans.

22. For Route 7025 (Structure 2902-004P) no utilities shown or noted on the structure (physically attached), in both the plan documents and the inspection report. The plan documents (and inspection photos) for the proposed project show numerous overhead power lines around the project limits. Please confirm that no utilities are to be relocated for this structure?

Response: Per the answer to question #19, this structure is no longer part of this project.

23. For Route 669 (Structure 2902-020P) the summary of Quantities Schedule B, Line Item B0280, states "Project Lump Sum (Utility Relocations at 2902-014P)" but the inspection report for Route 669 (Structure 2902-020P) notes a 5" diameter utility along the west side (Inspection Report sheets 6 and 11 of 25). The plan documents for the proposed project do not clearly show this utility on any of the Route 669 (Structure 2902-020P) plan sheets. Is this utility not effected by the proposed project?

Response: There is a 5” diameter utility located along this structure as indicated, however, type and use was not determined at the time of survey and was captured as a miscellaneous line string. VI DPW has determined that this line is inactive, and there are no active underground water lines at this site.

24. For Structure 2902-004P (Route 70205 King Street) - the base flood elevation on the flood hazard permit is 10.0'. This will overtop the existing bridge and hit the temporary bridge. Should scour protection and lateral restraint be included in the design of the temporary bridge?

Response: Per the answer to question #19, this structure is no longer part of this project.

25. For Structure 2902-020P (Route 669 - Golden Grove Road) - the base flood elevation on the flood hazard permit is 89.5'. This will overtop the existing bridge and hit the temporary bridge. Should scour protection and lateral restraint be included in the design of the temporary bridge?

Response: Include if abutments are installed within the floodplain. We are currently requiring the Contractor to install the temporary bridges with the low chord 6-inches about the top of existing roadway. But this also goes back into duration these bridges will be left in place.

26. For Route 70 (Structure 2902-014P) the…

This is the start of the file's text. The full file is on GovTribe.