STE VSW Industry Day Slides 9.22.26.pdf
PDF 1 MB Posted
- Solicitation number
- STE-VSW-26-0006
About this file
This document is an Industry Day presentation for the Synthetic Training Environment (STE) Virtual Software (VSW) procurement, held September 22-24, 2026, by the U.S. Army's Capability Program Executive for Simulation, Training, Test and Threat (CPE ST3).
The procurement is structured as a five-lot acquisition with an approximate ceiling of $250 million. Lot 1 (Common Core Software) comprises the foundational operating system, simulation engine, and data fabric with published SDK. Lot 2 (Simulation Applications) includes specialized plug-in modules for vehicle physics, weapon ballistics, and tactical systems. Lot 3 (HIL Integration) provides physical-to-digital translation for ground fighting equipment controls to HAPI packets and software-in-the-loop integration only. Lot 4 (AAR Data Layer) delivers training management and analytics capabilities. Lot 5 (Enterprise Integration Support) serves as an independent evaluator and testing authority, responsible for DevSecOps, Software Integration Lab management, conformance testing, and leasing/operating the brick-and-mortar SIL facility in the greater Orlando, Florida area. The government will not provide physical real estate. Multi-vendor teaming across Lots 1-4 is encouraged; however, Lot 5 operates under strict structural organizational conflict of interest rules prohibiting dual award or performance with Lots 1, 2, or 4, with no corporate firewall mitigation accepted.
Phase 1 submissions for Lots 1, 3, and 5 are due September 29, 2026, with anticipated awards November 13, 2026. Submissions must include Volume I (mandatory technical readiness and compliance, non-blind), Volume II (anonymous technical concept, maximum 5-8 pages), Volume III (product demonstration artifacts with 5-minute video and API/SDK documentation, non-blind), Volume IV (non-binding ROM and licensing model for planning only, not scored), and Volume V (recent and relevant experience, non-blind). Phase 2 consists of one-hour live or virtual demonstrations; Phase 3 requires revised solutions. Lots 2 and 4 solicitations are deferred until after the winning Lot 1 platform is selected and its SDK finalized, approximately four months after Lot 1 Phase 3 awards. Evaluation criteria in descending importance are Schedule, Technical Merit, and Viability, with assessment of Recent/Relevant Experience and Overall Project Risk (Low, Moderate, or High). The government reserves the right to limit vendors invited to Phase 2 and subsequent phases and may bypass Phase 2 to Phase 3 if funding is available. Vendors demonstrating acceptable technical merit but not selected for further consideration may be placed in an electronic basket of vendors for up to 24 months. Contact points of contact for questions and submissions are Ruth Torres, Kimberly Skinner, David Hagler, Sean Johnson, and Mark Muñiz at Army Contracting Command Army Proving Ground Orlando Division.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advancing Today’s Training Defeating Tomorrow’s Threats
UNCLASSIFIED
UNCLASSIFIED
Project Manager Simulation (PM SIM)
U.S. Army Capability Program Executive for Simulation, Training, Test and Threat
(CPE ST3)
Synthetic Training Environment (STE) Virtual Software (VSW) Industry
Day
22 September 2026
UNCLASSIFIED 2
Welcome and Opening Comments
COL Natashia Coleman
UNCLASSIFIED 3
STE VSW Industry Day Agenda
• Welcome and Introductions
• Strategic Context and Why We Are Here
• Core Operational Priority Deliverables
• Architecture and Demarcation of Responsibilities
• Acquisition Strategy and Phased Timeline
• Proposal Submission Guidelines and Evaluation
• Next Steps and Q&A
10-Minute Break
• Question and Answer Session
• Closing Comments
UNCLASSIFIED 4
Panel Members
• MAJ Rob Scrip – STE VSW Assistant Product Manager
• MAJ Tyler Valentine – STE VSW Assistant Product Manager
• Mr. Alpesh Patel – PdM CSE Chief Engineer
• Mr. Neal Eskin – STE VSW Lead Engineer
• Mr. Chad Thomas – UnITE Chief Architect
• Mr. Mark A. Muñiz – Army Contracting Command Army Proving Ground – Orlando Division
Contracting/Agreements Officer
• LTC Michael Cuddy – NSC Virtual Training Environment Division Chief
UNCLASSIFIED 5
Administrative Announcements
• Welcome!
• Rules of Engagement
• Please keep sidebars/chatter to a minimum
• Hold questions until end of meeting
• 3x5 Cards
• Microphone Stands
• Fire Protocol / Emergency Exits
• 1x 10-Minute Breaks
• Bathroom Locations
• 1200 (Noon) Cutoff
UNCLASSIFIED 6
Strategic Context and Why We Are Here
MAJ Rob Scrip
UNCLASSIFIED 7
STE Virtual Software – Strategic Context
• A Rapidly Evolving Multi-Domain Battlespace Near-peer threats, dynamic electronic warfare, and modernized combat networks demand more adaptable, rigorous virtual collective training.
• Maintaining Concurrency with the Warfighter Training systems must match the pace of tactical platform modernizations (OFPs, fire control, mission command) in weeks and months, not years.
• Agility Through a Government-as-Integrator Model Adopting a Modular Open Systems Approach (MOSA) with published SDKs to rapidly onboard cutting-edge commercial technology.
UNCLASSIFIED 8
Core Operational Priority Deliverables
1. A Doctrinal TC 3-20.0 Table II Gate to Live
Fire for Ground
2. TC 3-04.3 Table VII & Table X Collective
Gunnery Gate for Air
3. A True Combined Arms Environment
4. Full Mission Command Concurrency
5. Rapid Capability Onboarding and Integration
UNCLASSIFIED 9
STE VSW Architecture and Demarcation of Responsibilities
UNCLASSIFIED 10
STE VSW “Platform and Application” Architecture
5 Capability Lots: "Platform + Apps"
Lot 1: Common Core Software The foundational OS, simulation engine, and data fabric.
Lot 2: Simulation Applications Specialized plug-in modules (CGF, vehicles, sUAS).
Lot 5: Enterprise Integration Support DevSecOps, Software Integration Lab management, and Conformance Testing.
Lot 3: HIL Integration
Physical hardware translation.
Lot 4: AAR Data Layer
Training mgmt & analytics.
• Lot 1 (Core Engine): The "virtual world operating system" (simulation, rendering, data fabric, published SDK).
• Lot 2 (Simulation Apps): The "App Store" modules (vehicle physics, weapon ballistics, tactical plug-ins).
• Lot 3 (HIL Integrator): Physical-to-digital translation (GFE controls to HAPI packets; SIL integration only—no site fielding).
• Lot 4 (AAR & Analytics): Subscribes to message bus for automated TC 3-20.0 scorecards and spatial replays.
• Lot 5 (Enterprise Integrator): The independent "digital motherboard" custodian (SIL operations, DevSecOps pipeline, CTS testing, SBOM analysis).
UNCLASSIFIED 11
Teaming and Lot 5 Structural OCI Rule
• Lots 1–4 Teaming: Multi-vendor teaming and cross-lot subcontractor participation are greatly encouraged.
• Lot 5 Independence: Lot 5 is an independent evaluator/testing authority.
• The Rule: A company/affiliate may bid on Lot 5 and Lot’s 1/2/4 but cannot be awarded or perform on 5 and either Lot 1/2/4. If selected for both, the vendor must elect a single award. Internal corporate firewalls will not be accepted for dual-lot performance.
UNCLASSIFIED 12
Operational Requirements and Trade Space
MAJ Tyler Valentine
UNCLASSIFIED 13
Virtual Training Requirements (Ground)
Delivering the TC 3-20 (IWTS) Table II Virtual Gate to Live Fire
Ground fleet initial focus: M1A2 Abrams, M2A3/A4 Bradley & BFIST, Stryker.
• SHOOT (Lethality & Fire Control)
• Full weapon &FCS switchology
• High-fidelity ballistics, time of flight, dispersion, and pH/pK
• Platform battle damage, ammunition loadouts, and doctrinal reload times
• MOVE (Maneuver & Vehicle Dynamics)
• Physics-based tracked/wheeled vehicle dynamics over OWT
• Section- and platoon-level battle drills, combat formations, and actions on contact
• COMMUNICATE (Mission Command Concurrency)
• Integration with operational Mounted Mission Command
• Tactical intercom and multi-echelon radio simulation
• Training under contested conditions: GPS-denied, EW jamming, degraded
C2
UNCLASSIFIED 14
Virtual Training Requirements (Air)
Delivering Aviation collective gunnery: TC 3-04.3 Tables VII and X for AH-64E, UH-60M/V, and CH-47F
Air initial focus: AH-64E, CH-47F, UH-60M/V
• Shoot
• High-fidelity ballistics, time of flight, dispersion & pH/pK
• Full weapon (30mm, Hellfire, Rockets, M240) & sensor (PNVS, TADS, FCR, Link 16) functionality for current platform version
• Move
• Accurate flight modeling of rotary wing physics that depend on the environment, weight and operational systems (fuel, engine, etc.)
• Concurrent & operational aircraft OFP
• Communicate
• Simulation of tactical radios & communication devices by platform (ICS, VHF, UHF, Longbow Net, BFT, Link 16, SATCOM)
• Manned – Unmanned Teaming (MUM-T) capability from other aircraft & UAS (AAG, UR)
• Other
• Mission Planning: AMPS mission planning data ingestion
UNCLASSIFIED 15
RVCT-A Architectural Trade Space
• Call to Industry on Air: Lot 1 and Lot 2 offerors are asked to propose their preferred architectural approach:
• (A) Unified multi-domain simulation engine
• (B) Modular Lot 2 flight physics plugins
• (C) Federated domain-specific engines over standard protocols (DIS/HLA/gRPC)
• (D) Other
UNCLASSIFIED 16
Acquisition Strategy and Phased Timeline
Mr. Mark A. Muñiz
UNCLASSIFIED 17
Phased Solicitation and Award Sequencing
Where are we today, in our anticipated schedule?
Acquisition Events Anticipate Date(s) DRAFT STE VSW CFS posting 27 August 2026
DRAFT STE VSW CFS Q&A 27 August 2026 - 13 September 2026 FINAL STE VSW CFS posting 15 September 2026
STE VSW Industry Day and One on One sessions, Orlando, FL.
22 - 24 September 2026
UNCLASSIFIED 18
Phased Solicitation and Award Sequencing
Phase 1: Solution Brief
• Offerors will submit a high-level summary of their solution, addressing the government’s objectives and requirements. Offerors shall submit a solution structured into the Volumes as noted in Section 6 of the STE VSW CFS. Solutions that fail to adhere to the page limitations or submission requirements will be considered non-compliant and may not be reviewed.
• Detailed solution brief submission requirements for Phase 1 are provided in Section 6 of the STE VSW CFS. Evaluation criteria for Phase 1 are outlined in Section 7 of the STW VSW CFS.
Phase 2: Demonstration Pitch
Selected offerors may be invited to present and discuss their solution in a live or virtual setting.
Phase 3: Revised Solution
The Government shall use the same criteria to evaluate prototype solutions as described for Solution Briefs.
UNCLASSIFIED 19
Phased Solicitation and Award Sequencing
• Immediate Focus (Phase 1): Solicitations open for Lot 1, Lot 3, and Lot 5 (due Tuesday, 29 September 2026). Anticipated award Monday, 13 November 2026.
• Deferred Solicitations (Lots 2 & 4): Formal calls for Lot 2 and Lot 4 will be issued after the initial 90-day sandbox when the Lot 1 SDK is finalized. Approximately 4-months after Lot 1 Phase 3 awards. Lot 2 will have on-ramping opportunities throughout the development phase.
• Approximate Total Project Value: ~$250M ceiling across all Lots.
• Electronic Basket of Vendors: Those selected to have Schedule Narrative, Technical Merit, and Solution Viability Recency, Relevancy, with Low or Moderate overall project risk, but not selected for further consideration, may be selected for basket consideration for up to twenty-four
(24) months.
UNCLASSIFIED 20
Proposal Submission Guidelines and Evaluation
Mr. Mark A. Muñiz
UNCLASSIFIED 21
GFI Baseline Access Procedures
• How to access the TSS GFI baseline (Attachment 06/06a):
1. Sign the STE-IS Software Distribution Agreement (Att 06)
2. Provide all documentation along with a formal request to the Solicitation POCs listed on the sam.gov posting
3. Supply an 8TB external storage drive (schedule appointment to drop off at P IV)
GFI Data Transfer takes approximately 8 hrs. Proposal/Solution submission deadline remains 29 September.
UNCLASSIFIED 22
Phase 1 Submission Requirements
• All solution/proposal submissions shall be submitted using no less than 11 size Arial font, one-inch margins on an 8.5 x 11 standard size page. File size shall be broken up to no larger than 5MB size per email submission. There is no restrictions on file naming. The email solution/proposal submission shall identify specific Lot number.
UNCLASSIFIED 23
Phase 1 Solution Brief Basis of Evaluation
• Volume I (Mandatory Technical Readiness and Compliance): Non-blind. Att 01 Interested Vendor and/or Interested Vendor Form; Attachments: 02 Warranties and Representation; 03 Telecom Reps; Attachment 04 ACA LOI; DD Form 2345; One World Terrain (OWT)/OGC Ingestion & Rendering link or screen capture; OCI dual-submission Acknowledgement Statement; and comprehensive Risk & Mitigation Plan. Master Compliance Matrix (optional).
Ratings will be Acceptable/Not Acceptable
• Volume II (Anonymous Technical Concept Submission): Strictly Anonymous. 5 pages max per Lot (expanded to 8 pages for Lot 1: 5 pages core + 3 pages Air Annex). Up to 2 uncounted diagram pages allowed. Concise technical risk callouts included. Ratings in descending order of importance: (a) Schedule, (b) Technical Merit, and (c) Viability.
• Volume III (Product Demonstration Artifacts): Non-blind. 5-minute video and live API/SDK documentation links.
Evaluated as being Compliant/Non-Compliant based on the verification and validation of the “show, don’t tell” artifacts.
• Volume IV (Rough Order of Magnitude (ROM) and Licensing Model): Non-binding planning ROM for the 9-month prototype effort (including 90-day SIL sprint). ROM is collected for Government planning and market research only;
this volume will NOT be evaluated or scored.
• Volume V (Recent and Relevant Experience): Non-blind. Up to 3 recent contracts within the last 3 years of CFS submission date and relevant experience. Ratings will be Recent/Not Recent and Relevant/Not Relevant.
UNCLASSIFIED 24
Phase 1 Down-Select Evaluation Methodology
• Step 1: Mandatory Technical Readiness and Compliance:
- Mandatory Acceptable/Not Acceptable Readiness application to Volume I.
- If step 1 receives an acceptable rating, then the evaluation moved to Step 2.
• Step 2: Solution Brief Volume II (Anonymous Technical Concept):
- Weighted Evaluation Criteria: Evaluated in descending order of importance:
(a) Schedule, (b) Technical Merit, and (c) Viability.
- Recent and Relevant Experience applicable to Volume V: This volume is going to be assessed as being Recent within will within 3 years of CFS submission date; Recency ratings will be Recent/Not Recent. Relevant to the specific Lot scope, objectives, and requirements.
Ratings will be Relevancy/Not Relevant.
- Overall Project Risk: This subjective overall project risk rating is synthesized from the evaluation findings across Volumes II, and V, reflecting the Government’s confidence in the offeror’s ability to successfully deliver and integrate the proposed STE Virtual Software capabilities without mission failure or critical delay. The Government will utilize the following risk tiers: Low Risk; Moderate Risk; High Risk.
UNCLASSIFIED 25
Phase 1 Down-Select Evaluation Methodology
• Based on the evaluated sections, the Solution submission will be categorized as Selected for Further Consideration or Not Selected for Further Consideration. Those selected to have Schedule Narrative, Technical Merit, Solution Viability, Recency, Relevancy, with Low or Moderate overall project risk, but not selected for further consideration, may be selected for basket consideration for up to twenty-four (24) months.
• The selection of one (1) or more submissions into the next Phase will be based on the criteria listed above and funding availability.
• The Government reserves the right to limit the number of Vendors invited to Phase 2 and/or subsequent Phases. As such, a Vendor’s solution may be evaluated for Schedule Narrative, Technical Merit, Solution Viability, Relevancy, Recency, with Low or Moderate overall project risk but not invited to Phase 2 and/or Subsequent Phases. Solution submissions that are chosen for Phase 2 and/or subsequent Phases will be notified in writing as soon as practicable. The Government reserves the right to bypass Phase 2 into Phase 3 to request a formal proposal should funding be available.
UNCLASSIFIED 26
Phase 2 Demonstration Pitch
• Live Demonstrations: Down-selected offerors will be invited to conduct a one-hour, live or virtual technical demonstration of their submitted software solution to the Government evaluation team.
• Evaluation: criteria will remain the same as in Phase 1 for Lots 1,2, and 4. Lots 3 & 5 evaluations will be identified upon selection.
UNCLASSIFIED 27
Phase 3 Revised Solution Submission
• Phase 3 Revised Solution Submission: submission requirements and evaluation criteria will be outlined in the invitation to this phase.
UNCLASSIFIED 28
POCs for Questions and Solution/Proposal Submission
Contract POCs:
Ruth Torres, Contract/Agreements Specialist: ruth.e.torres10.civ@army.mil
Kimberly Skinner, Contract/Agreements Specialist: kimberly.c.skinner.civ@army.mil
Dave Hagler, Contracting/Agreements Officer: david.a.hagler.civ@army.mil
Sean J. Johnson, Contracting/Agreements Officer: sean.j.johnson2.civ@army.mil
Mark A. Muñiz, Contracting/Agreements Officer: mark.a.muniz6.civ@army.mil mailto:ruth.e.torres10.civ@army.mil mailto:kimberly.c.skinner.civ@army.mil mailto:david.a.hagler.civ@army.mil mailto:sean.j.johnson2.civ@army.mil mailto:mark.a.muniz6.civ@army.mil
UNCLASSIFIED 29
Next Steps
• 25 September 2026: Q&A Cutoff
• 29 September 2026: Submission Deadline
• 02 October 2026: Anticipated Down-Select Notifications
• 09 October 2026: RVCT Platforms available in the TIF for experimentation
• 20-22 October 2026: Lots 1, 3, & 5 Demonstration Pitch
UNCLASSIFIED 30
10 Minute Break Before Questions and Open Discussion
UNCLASSIFIED 31
Most Frequently Asked Questions
UNCLASSIFIED 32
Most Frequently Asked Questions
1. Volume IV Pricing Scope, Enterprise Licensing Models & ROM Metrics
• Government Position: Volume IV is non-binding and collected for planning/market research only – it is not evaluated or scored in Phase 1. The baseline preference is a flat STE-program-wide enterprise license across the 22 planned fielded RVCT sites.
2. Volume III Demonstration Artifacts, Live Portals, and TRL 8/9 Maturity Gates
• Government Position: Volume III is an objective Compliant/Not Compliant technical readiness gate and is exempt from anonymity. Password-protected or credentialed portals are acceptable provided immediate, self-service access credentials are included in Volume I. Lot 5 vendors may demonstrate operational pipelines from other defense or commercial enterprise programs as proof of TRL 8/9 capability.
3. SIL Physical Facility, Real Estate, Networks & Infrastructure Responsibility
• Government Position: As formalized in Amendment 001, the Government will not provide physical real estate. Lot 5 is solely responsible for leasing, securing, accrediting, and operating the brick-and-mortar SIL facility in the greater Orlando, FL area, along with internal simulation and development LANs. Lot 5 acts as physical custodian (receiving, rigging, placing GFE cabs), while Lot 3 acts strictly as the technical integration tenant.
UNCLASSIFIED 33
Most Frequently Asked Questions
4. Lot 2 and Lot 4 Submission Deferrals, Milestones, and Deadlines
• Government Position: The 29 September 2026 deadline is unchanged and applies to Lots 1, 3, and 5.
Formal Phase 1 submissions and Phase 2 demonstrations for Lots 2 and 4 are fully deferred until after the winning Lot 1 Common Core platform is selected and its SDK is published.
5. Organizational Conflict of Interest (OCI) and Lot 5 Firewall Restrictions
• Government Position: Under FAR Subpart 9.5 and OT principles, the Lot 5 firewall is a strict structural exclusion applying across the entire corporate family—corporate firewall mitigation plans will not be accepted between Lot 5 and Lots 1, 2, or 4. Companies may submit bids on multiple Lots, but in the event of dual selection, they must elect a single award. Cross-lot teaming is permitted across Lots 1–4, and Lot 3/Lot 5 dual-proposals are evaluated for impaired objectivity on a case-by-case basis.
6. Cybersecurity Compliance, Risk Management Framework (RMF) & Authority to Operate (ATO) Responsibilities
• Government Position: Shared Responsibility Model – Lots 1 through 4 are responsible for delivering component-level security artifacts. Lot 5 acts as the centralized pipeline aggregator and lab custodian, automating security testing and maintaining the integrated security package under direct Government Program Office oversight.
UNCLASSIFIED 34
Q&A and Open Discussion
UNCLASSIFIED 35
Closing Comments
COL Natashia Coleman
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Virtual Training Requirements (Ground) |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Next Steps |
| Slide Number 30 |
| Slide Number 31 |
| Most Frequently Asked Questions |
| Most Frequently Asked Questions |
| Slide Number 34 |
| Slide Number 35 |
File details come from the government source that posted it. Updated .