This is an Asbestos Containing Material (ACM) Data Table documenting asbestos materials found in steam pits at the Perry Point VA Medical Center. The table details inspections of 25 steam pits, cataloging the location, type, quantity, and condition of asbestos-containing materials found in each pit.
The inspection found multiple types of asbestos materials including Calmag pipe insulation (containing 10% Chrysotile/10% Amosite), flange gaskets (presumed ACM), and black tar pipe insulation. Several steam pits (#3, #4, and #9) contain damaged or significantly damaged materials, with the most extensive contamination in Steam Pit #11 containing 110 linear feet of Calmag pipe insulation. The data indicates varying quantities of materials ranging from 1-20 gaskets per pit and 2-110 linear feet of pipe insulation. Some pits were noted to have "No suspect materials" or "No Asbestos" present. This document appears to be supporting documentation for a steam system upgrade project at the Perry Point VA Medical Center.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs Perry Point ‐ Building Steam Pits
Asbestos Containing Material Data Table
Campus/Site Area Designation
Building Number Floor Room
Number Category
(AHERA Class) Material Type Location Quantity Unit of Measure Condition Comments Asbestos Content Access Drawing
Number Photo
Number VA Comments
Perry Point Steam Pit #1 N/A N/A N/A No suspect materials N/A N/A Perry Point Steam Pit #1A N/A N/A N/A No suspect materials N/A N/A Perry Point Steam Pit #2 N/A N/A N/A No suspect materials N/A N/A Perry Point Steam Pit #2A N/A N/A N/A Flange gaskets Throughout 4 Gaskets Fair Presumed ACM N/A 2
Perry Point Steam Pit #3 N/A N/A N/A TSI Calmag pipe insulation Throughout 15 Linear feet Damaged Cal-mag pipe debris contaminating the floor
225 SF
10% Chrysotile / 10% Amosite N/A 1
Perry Point Steam Pit #3 N/A N/A N/A Miscellaneous Flange gaskets Throughout 1 Gaskets Fair Presumed ACM N/A 2
Perry Point Steam Pit #4 N/A N/A N/A TSI Calmag pipe insulation Throughout 8 Linear feet Damaged Cal-mag pipe debris contaminating the floor 6
SF
10% Chrysotile / 10% Amosite N/A 1
Perry Point Steam Pit #6 N/A N/A N/A TSI Calmag pipe insulation Throughout 15 Linear feet Fair Cal-mag pipe debris contaminating the floor 6
SF
10% Chrysotile / 10% Amosite N/A 1
Perry Point Steam Pit #6 N/A N/A N/A Miscellaneous Flange gaskets Throughout 6 Gaskets Fair Presumed ACM N/A 2
Perry Point Steam Pit #8 N/A N/A N/A TSI Calmag pipe insulation At walls 5 Linear feet Fair 10% Chrysotile / 10% Amosite N/A 1
Perry Point Steam Pit #8 N/A N/A N/A Miscellaneous Flange gaskets Throughout 4 Gaskets Fair Presumed ACM N/A 2
Perry Point Steam Pit #9 N/A N/A N/A TSI Calmag pipe insulation Throughout 10 Linear feet Significantly Damanged
10% Chrysotile / 10% Amosite N/A 1
Perry Point Steam Pit #9 N/A N/A N/A Miscellaneous Flange gaskets Throughout 9 Gaskets Fair Presumed Asbestos N/A 2
Perry Point Steam Pit #11 N/A N/A N/A TSI Calmag pipe insulation Throughout 110 Linear feet Fair Cal-mag pipe debris contaminating the floor 20
SF
10% Chrysotile / 10% Amosite N/A 1
Perry Point Steam Pit #11 N/A N/A N/A TSI Flange gaskets Throughout 20 Linear feet Fair Cal-mag pipe debris contaminating the floor 20
SF
10% Chrysotile / 10% Amosite N/A 2
Perry Point Steam Pit #14 N/A N/A N/A Miscellaneous Flange gaskets Throughout 8 Gaskets Fair Presumed ACM N/A 2 Perry Point Steam Pit #19 N/A N/A N/A Miscellaneous Flange gaskets Throughout 6 Gaskets Fair Presumed ACM N/A 2
Perry Point Steam Pit #19A N/A N/A N/A Miscellaneous Flange gaskets Throughout 4 Gaskets Fair Presumed ACM N/A 2
Perry Point Steam Pit #19A N/A N/A N/A Miscellaneous Black tar pipe insulation Throughout 30 Linear feet Fair No Asbestos N/A N/A
Perry Point Steam Pit #20 N/A N/A N/A Miscellaneous Flange gaskets Throughout 4 Gaskets Fair Presumed Asbestos N/A N/A
Perry Point Steam Pit #20 N/A N/A N/A Miscellaneous White powder debris Throughout 100 Square feet Poor No Asbestos N/A N/A Perry Point Steam Pit #21 N/A N/A N/A Miscellaneous Black tar pipe insulation Throughout 8 Linear feet Fair No Asbestos N/A N/A Perry Point Steam Pit #21 N/A N/A N/A Miscellaneous Flange gaskets Throughout 2 Gaskets Fair Presumed ACM N/A 2 Perry Point Steam Pit #22 N/A N/A N/A Miscellaneous Black tar pipe insulation Throughout 30 Linear feet Fair No Asbestos N/A N/A Perry Point Steam Pit #22 N/A N/A N/A Miscellaneous Flange gaskets Throughout 2 Gaskets Fair Presumed ACM N/A 2 Perry Point Steam Pit #23 N/A N/A N/A Miscellaneous Black tar pipe insulation Throughout 20 Linear feet Fair No Asbestos N/A N/A Perry Point Steam Pit #23 N/A N/A N/A Miscellaneous Flange gaskets Throughout 2 Gaskets Fair Presumed ACM N/A 2
Perry Point Steam Pit #24 N/A N/A N/A TSI Calmag pipe insulation Throughout 2 Linear feet Fair 10% Chrysotile / 10% Amosite N/A 1
Perry Point Steam Pit #24 N/A N/A N/A Miscellaneous Flange gaskets Throughout 8 Gaskets Fair Presumed ACM N/A 2 Perry Point Steam Pit #24 N/A N/A N/A Miscellaneous Black tar pipe insulation Throughout 14 Linear feet Fair No Asbestos N/A N/A Perry Point Steam Pit #25 N/A N/A N/A Miscellaneous Black tar pipe insulation Throughout 80 Linear feet Fair No Asbestos N/A N/A