Past Performance Questionnaire for 512A5-21-304 Upgrade Steam System Phase V Construction.pdf
PDF 414 KB Posted
- Solicitation number
- 36C24525R0019
About this file
This is a Past Performance Questionnaire (PPQ) form issued by the Department of Veterans Affairs Network Contracting Office 5 at Perry Point VAMC for solicitation 512A5-21-304 Upgrade Steam System Phase V - Patient Areas (Construction).
The PPQ consists of a 6-page form with two main sections: one to be completed by the contractor providing their information (in blue shaded boxes), and another to be completed by the reference contact (in yellow shaded boxes). The evaluation criteria use a 0-5 rating scale (Neutral to Outstanding) across multiple performance categories including Quality Management and Workmanship (7 factors), Business Practices/Customer Relationship (6 factors), Compliance and Safety (3 factors), and Overall Customer Satisfaction (3 factors). Key areas assessed include management capabilities, quality control, schedule adherence, problem resolution, subcontractor management, safety compliance, and federal regulation compliance. The form requires detailed remarks explaining the overall rating and concludes with a certification of accuracy from the reference.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs Network Contracting Office 5
Perry Point VAMC 361 Boiler House Road, Perry Point, MD 21902
Past Performance Questionnaire for: 512A5-21-304 Upgrade Steam System Phase V - Patient Areas (Construction)
Instruction to Interested Party:
Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes).
Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and return to you in a timely manner.
Company Name Street Address
Point of Contact (POC) City
POC Phone Number State
Reference Project Title Zip Code
Contract Period of Performance
Contract Number Contract Dollar Value
Description of Work
Role of Contractor on referenced contract (check box)
Prime Contractor Sub-Contractor Key Personnel
Perry Point VAMC
Instructions to Reference Contract:
The contractor named above is an interested party for a United States Department of Veterans Affairs solicitation, and has sent this form to you as a past performance reference contact. Please complete the following pages in full (all areas shaded in light yellow, below). Once completed, please return this form to
[insert name / email address] ______________________________ by no later than [insert date and time]
RESPONDENT INFORMATION [completed by Reference Contact]
Company Name Street Address
Point of Contact (POC) City
POC Phone Number State
POC Email Zip Code
Perry Point VAMC
Performance Information:
Choose the number on the scale of 0 (Neutral) to 5 (Exceptional) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE AN EXPLANATION FOR THE OVERALL RATING in the Remarks section, below.
0 1 2 3 4 5 Neutral Unacceptable Marginal Acceptable Very Good Outstanding
No record of past performance, or not applicable or the record is inconclusive.
Performance did not meet most contractual requirements.
There were serious problems and the contractor’s corrective actions were ineffective.
Performance did not meet some contractual requirements.
There were problems, some of a serious nature, for which corrective action was only marginally effective.
Performance met most contractual requirements.
There were some minor problems and corrective actions taken by the contractor were satisfactory.
Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.
Performance exceeded all contract requirements. There were no problems.
Quality – Management and Workmanship The Contractor… 0 1 2 3 4 5 1 Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
2 Demonstrated ability to hire, maintain, and replace, if necessary, qualified construction personnel during the contract period.
3 Provided and followed approved quality control plan and/or inspection procedures to meet contract requirements.
4 Corrected deficiencies in timely manner and pursuant to their quality control procedures.
5 Submittals clearly identified the proposed item IAW the specifications and drawings.
6 Suggested alternative approaches to problems.
7 Contractor provided timely notices of possible delays / schedule revisions.
REMARKS:
Perry Point VAMC
8 Timeliness in submitting submittals and reports and responding to agency inquiries, RFP's, etc.
9 Developed realistic and met approved progress schedules.
Business Practices / Customer Relationship and Ability to Perform
The Contractor… 0 1 2 3 4 5 10 Displayed initiative to solve problems.
11 How well did the contractor work independent of Government guidance, oversight, and assistance?
12 Subcontractors / tradesmen were adequately managed and coordinated. Explain any subcontracting issues (positive or negative) that impacted the performance of your contract(s).
Perry Point VAMC
13 For contract changes, contractor provided timely and realistic change order proposals.
Compliance and Safety The Contractor… 0 1 2 3 4 5 14 Reports (i.e., daily, test, logs) / records were submitted completely and accurately satisfy the requirement.
15 Applicable to Federal Contracts –Contractor complied with applicable Federal Laws and Regulations such as Construction Wage Rate Requirements – timely payrolls and compliance;
Drug-Free Workplace; Environmental Regulations and Use of Recovered Materials; Executive Order 13101 Greening the Government.
16 Contractor’s safety program was in compliance with federal regulations. Contractor implemented and followed their safety plan and ran a “safe jobsite”.
Overall Customer Satisfaction The Contractor… 0 1 2 3 4 5 17 Demonstrated reasonableness in modifications cost proposal.
18 Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
Yes No
19 Would you award another contract to this contractor? If not, please explain in “remarks.”
Yes No
Overall Customer Satisfaction The Contractors… 0 1 2 3 4 5
OVERALL PERFORMANCE RATING
Perry Point VAMC
Remarks:
I hereby certify that the information that I have reported above is accurate to the best of my knowledge.
Printed Name Signature Date
Business Title / Company Name E-mail address
| Company Name: |
| Street Address: |
| Point of Contact POC: |
| City: |
| POC Phone Number: |
| State: |
| Reference Project Title: |
| Zip Code: |
| Contract Period of Performance: |
| Email: |
| Contract Number: |
| Contract Dollar Value: |
| Description of Work: |
| by no later than insert date and time: |
| undefined: |
| Company Name_2: |
| Street Address_2: |
| Point of Contact POC_2: |
| City_2: |
| POC Phone Number_2: |
| State_2: |
| POC Email: |
| Zip Code_2: |
| Remarks: |
| Printed Name: |
| Date: |
| Business Title Company Name: |
| Email address: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Group6: Off |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
File details come from the government source that posted it. Updated .