23-SF-0108 - MDE Signed Approval - Perry Point VA Medical Center - Upgrade Steam System Patient Areas.pdf
PDF 333 KB Posted
- Solicitation number
- 36C24525R0019
About this file
This document is a Stormwater Management and Sediment & Erosion Control Approval issued by the Maryland Department of Environment (MDE) for the Perry Point VA Medical Center's Steam System Patient Areas upgrade project. The approval, numbered 23-SF-0108 and effective April 5, 2024, grants permission for the Department of Veterans Affairs to proceed with construction at the Perry Point, MD facility, with specific conditions related to environmental compliance. Key conditions include a three-year construction completion timeline, compliance with all current laws and regulations, notification requirements to MDE before and after construction, submission of a National Pollutant Discharge Elimination System (NPDES) permit, and adherence to Chesapeake Bay Critical Area requirements. The project involves earth disturbance of 1.0 acre or greater and was prepared by A. Morton Thomas & Associates, Inc. from Rockville, with a stormwater management waiver granted under Maryland's guidelines for State and Federal Projects.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORMWATER MANAGEMENT AND SEDIMENT & EROSION CONTROL APPROVAL
STATE/FEDERAL PROJECTS
SEDIMENT & STORMWATER PLAN REVIEW DIVISION
MDE NUMBER: 23-SF-0108 APPROVED BY: ____________________________________
Program Manager, Sediment, Stormwater, and Dam Safety EFFECTIVE DATE: April 5, 2024 (Pursuant to Criteria Noted Below)
IN COMPLIANCE WITH: Environment Article, Sections 4-106 and 4-205 Annotated Code of Maryland
APPROVAL IS HEREBY GRANTED: Department of Veterans Affairs ADDRESS: Perry Point VA Medical Center
Building82H, Room 218 Perry Point, MD 21902 Attn: Oladapu Lajubutu
HEREINAFTER KNOWN AS OWNER,
FOR THE PLANS AND SPECIFICATIONS PRESENTED FOR: Contract No. N/A AI No.177833 Perry Point VA Medical Center - Upgrade Steam Patient Areas - Cecil County
PREPARED BY: A. Morton Thomas & Associates, Inc. - Rockville This APPROVAL is granted subject to the following conditions:
1. This Approval shall become null and void if the construction authorized herein has not been completed within three (3) years from the granting of this Approval, except that these limits may be extended at the discretion of the Department when requested by the owner or authorized agent.
2. This Approval is subject to all laws and regulations now in effect and may be revoked if it is subsequently determined that this authorization violates other laws of the State. Construction shall comply with approved terms.
3. The location and dimensions of all sediment control structures and stormwater management facilities, as well as grading, excavation, and filling shall be in accordance with plans approved by the Department of the Environment/ Water and Science Administration (MDE/WSA). The owner or authorized agent shall obtain written approval from the MDE/WSA for any plan modifications or changes. A copy of the approved plan with any approved modifications and this Approval shall be available at the construction site for reference during the construction period.
4. Off-site borrow or waste sites require local county and Soil Conservation District approvals if they are located on private property or MDE/WSA approval if on State or federal property. Local approval numbers shall be furnished to the MDE/WSA Inspector.
5. The Owner or his authorized agent shall notify the MDE/WSA Compliance Program at (410) 537-3510, at least seven (7) days prior to initiation of the project and five (5) days after work ends.
6. This project has an earth disturbance of 1.0 acre or greater. Prior to any earth disturbance, notice of intent (NOI) application for the National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Associated with Construction Activity shall be submitted to and approved by MDE.
7. This project is located in the Chesapeake Bay Critical Area and subject to consistency with Critical Area requirements.
8. A stormwater management waiver has been granted for this project in accordance with Section 3.3.A of the Maryland Stormwater Management and Erosion & Sediment Control Guidelines for State and Federal Projects.
DTL/JAE
for
| 2024-04-05T15:48:30-0400 | |
| Daniel Laird |