This appears to be a set of construction drawings file related to Phase V of a steam system upgrade project at the VA Medical Center in Perry Point, Maryland. The drawings are part of a larger solicitation (36C24525R0019) for construction services to upgrade the steam system specifically in patient areas of the medical center. Based on the filename and associated details, this is technical documentation that would provide contractors with the engineering and architectural specifications needed to bid on the steam system upgrade construction work. The project is being managed by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 5.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPGRADE STEAM SYSTEM PATIENT AREAS - DESIGN
VA MARYLAND HEALTHCARE SYSTEM - VISN 5, NRM PROJECT - 512A5-21-304
PERRY POINT, MD 21902
100% BID SUBMISSION - FEBUARY 2, 2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
PRIME A/E:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
100% SUBMISSION
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
UPGRADE STEAM SYSTEM
PATIENT AREAS
512A5-21-304
MC/NH02/02/2024
CIVIL ENGINEER /LANDSCAPE/ SURVEY
700 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
G001
COVER SHEET
MAP OF VICINITY SITE PLAN
DESIGN CERTIFICATION:OWNER'S / DEVELOPER'S CERTIFICATION
MDE GENERAL PERMIT:
DS
AutoCAD SHX Text I HEREBY CERTIFY THAT THIS PLAN HAS BEEN DESIGNED IN ACCORDANCE WITH THE 2011 MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL, THE 2000 MARYLAND STORMWATER DESIGN MANUAL, VOLUMES I & II INCLUDING SUPPLEMENTS, THE ENVIRONMENT ARTICLE SECTIONS 4-101 THROUGH 116 AND SECTIONS 4-201 AND 215, AND THE CODE OF MARYLAND REGULATIONS (COMAR) 26.17.01 AND COMAR 26.17.02 FOR EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT, RESPECTIVELY. DATE DESIGNER'S SIGNATURE DESIGNER'S SIGNATURE MD REGISTRATION NO. P.E., R.L.S., R.L.A. OR R.A. (CIRCLE ONE) PRINTED NAMEPRINTED NAME
AutoCAD SHX Text I/WE HEREBY CERTIFY THAT ALL CLEARING, GRADING, CONSTRUCTION, AND/OR DEVELOPMENT WILL BE DONE PURSUANT TO THIS PLAN AND THAT ANY RESPONSIBLE PERSONNEL INVOLVED IN THE CONSTRUCTION PROJECT WILL HAVE A CERTIFICATE OF ATTENDANCE AT A MARYLAND DEPARTMENT OF THE ENVIRONMENT APPROVED TRAINING PROGRAM FOR THE CONTROL OF EROSION AND SEDIMENT BEFORE BEGINNING THE PROJECT. I/WE HEREBY AUTHORIZE THE RIGHT OF ENTRY FOR PERIODIC ON-SITE EVALUATION BY APPROPRIATE INSPECTION AND ENFORCEMENT AUTHORITY OR THE STATE OF MARYLAND, DEPARTMENT OF THE ENVIRONMENT. I/WE HEREBY CERTIFY THAT STORMWATER MANAGEMENT FACILITIES WILL BE MAINTAINED IN ACCORDANCE WITH APPROVED PLANS. DATE OWNER/DEVELOPER SIGNATURE OWNER/DEVELOPER SIGNATURE RESPONSIBLE PERSONNEL CERTIFICATION NO. PRINTED NAME AND TITLEPRINTED NAME AND TITLE
AutoCAD SHX Text
MATTHEW ERNEST, P.E.
AutoCAD SHX Text 32151
AutoCAD SHX Text PROJECT WILL REQUIRE TO OBTAIN A GENERAL PERMIT FROM MARYLAND DEPARTMENT OF ENVIRONMENT. THE VA WILL OBTAIN THE INITIAL PERMIT. CONTRACTOR WILL BE REQUIRED TO PAY FOR THIS PERMIT DIRECTLY TO MDE. ESTIMATED EXPENSE IS $100. HOWEVER, CONTRACTOR SHALL CONFIRM THIS EXPENSE AND HAVE INCLUDED IN THE LUMP SUM PRICE. THE CONTRACTOR SHALL BE REQUIRED TO ACCEPT THE RESPONSIBILITY/ACCOUNTABILITY OF THIS PERMIT VIA GENERAL PERMIT TRANSFER # MDE/ WMA/ PER.079. THIS INCLUDES ALL INSPECTIONS, DOCUMENTATION ETC. AS REQUIRED BY THE MDE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
PRIME A/E:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
100% SUBMISSION
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
UPGRADE STEAM SYSTEM
PATIENT AREAS
512A5-21-304
MC/NH02/02/2024
CIVIL ENGINEER /LANDSCAPE/ SURVEY
700 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
G002
INDEX OF DRAWINGS
INDEX OF DRAWINGS
SHEET DISCIPLINE TITLE SHEET NO.
G001 GENERAL COVER SHEET 1
G002 GENERAL INDEX OF DRAWINGS 2
G003 GENERAL PHASED REPAIRS DISTRIBUTION PLAN 3
G004 ARCHITECTURAL ARCHITECTURAL LEGENDS, ABBREVIATIONS AND NOTES 4
G005 ARCHITECTURAL BUILDING 14H - LIFE SAFETY PLAN AND CODE SUMMARY CHARTS 5
AD101 ARCHITECTURAL BUILDING 14H - REMOVAL PLANS 6
AD102 ARCHITECTURAL BUILDING 15H - REMOVAL PLANS 7
AD103 ARCHITECTURAL BUILDING 17H - REMOVAL PLANS 8
AD104 ARCHITECTURAL BUILDING 18H - REMOVAL PLANS 9
AD105 ARCHITECTURAL BUILDING 19H - REMOVAL PLANS 10
AD106 ARCHITECTURAL BUILDING 20H - REMOVAL PLANS 11
AD107 ARCHITECTURAL BUILDING 80H - REMOVAL PLANS 12
AD108 ARCHITECTURAL BUILDING 101 - REMOVAL PLANS 13
A101 ARCHITECTURAL BUILDING 14H - RENOVATION PLANS 14
A102 ARCHITECTURAL BUILDING 15H - RENOVATION PLANS 15
A103 ARCHITECTURAL BUILDING 17H - RENOVATION PLANS 16
A104 ARCHITECTURAL BUILDING 18H - RENOVATION PLANS 17
A105 ARCHITECTURAL BUILDING 19H - RENOVATION PLANS 18
A106 ARCHITECTURAL BUILDING 20H - RENOVATION PLANS 19
A107 ARCHITECTURAL BUILDING 80H - RENOVATION PLANS 20
A108 ARCHITECTURAL BUILDING 101 - RENOVATION PLANS 21
A501 ARCHITECTURAL DETAILS 22
A601 ARCHITECTURAL SCHEDULES & DETAILS 23
C001 CIVIL MDE INFORMATION SHEET 24
C002 CIVIL OVERALL SITE PLAN 25
VF101 CIVIL EXISTING CONDITIONS PLAN - WEST 26
VF102 CIVIL EXISTING CONDITIONS PLAN - EAST 27
CG101 CIVIL EROSION AND SEDIMENT CONTROL PLAN - AREA 1 AND 2 28
CG102 CIVIL EROSION AND SEDIMENT CONTROL PLAN - AREA 3 AND 4 29
CG103 CIVIL EROSION AND SEDIMENT CONTROL PLAN - AREA 5 30
CG501 CIVIL EROSION AND SEDIMENT CONTROL NOTES 31
CG502 CIVIL EROSION AND SEDIMENT CONTROL NOTES 32
CU101 CIVIL UTILITY PLAN - AREA 1 (BUILDING 101 TO MH-1) 33
CU102 CIVIL UTILITY PLAN - AREA 2 (BUILDING 80H TO BUILDING 20H) 34
CU103 CIVIL UTILITY PLAN - AREA 3 (BUILDING 17H TO BUILDING 18H) 35
CU104 CIVIL UTILITY PLAN - AREA 4 (BUILDING 14H TO MH-22) 36
CU105 CIVIL UTILITY PLAN - AREA 5 (BUILDING 9H TO BUILDING MH-24) 37
CU301 CIVIL UTILITY PROFILES 38
CU501 CIVIL SITE DETAILS 39
LP101 CIVIL LANDSCAPE PLAN 40
SS100 STRUCTURAL NEW MANHOLE 9H - STRUCTURAL PLANS AND DETAILS 41
SS101 STRUCTURAL NEW MANHOLES 26 AND 27 - STRUCTURAL PLANS AND DETAILS 42
SS102 STRUCTURAL MANHOLE 19B TO BUILDING 17H 43
SS103 STRUCTURAL TYPICAL STRUCTURAL DETAILS 44
SS104 STRUCTURAL POOL INFILL AT BUILDING 14H 45
H101 HAZARDOUS MATERIALS NOTES SHEET 46
H102 HAZARDOUS MATERIALS MANHOLE LOCATIONS 47
H103 HAZARDOUS MATERIALS BUILDING 14H - BASEMENT 48
H104 HAZARDOUS MATERIALS BUILDING 15H - BASEMENT 49
H105 HAZARDOUS MATERIALS BUILDING 17H - BASEMENT 50
H106 HAZARDOUS MATERIALS BUILDING 18H - FIRST FLOOR 51
H107 HAZARDOUS MATERIALS BUILDING 19H - BASEMENT 52
H108 HAZARDOUS MATERIALS BUILDING 20H - BASEMENT 53
H109 HAZARDOUS MATERIALS BUILDING 80H - BASEMENT 54
H110 HAZARDOUS MATERIALS BUILDING 101 - BASEMENT 55
M001 MECHANICAL MECHANICAL SYMBOLS AND ABBREVIATIONS 56
M002 MECHANICAL MECHANICAL GENERAL NOTES 57
MH101 MECHANICAL HVAC BASEMENT PART PLANS - BUILDING 14H - MECHANICAL HVAC - DEMO AND NEW WORK 58
MPD101 MECHANICAL PIPING BASEMENT PART PLANS - BUILDING 14H - MECHANICAL PIPING - DEMO 59
MPD102 MECHANICAL PIPING BASEMENT PLAN - BUILDING 15H - STEAM PIPING - DEMO 60
MPD103 MECHANICAL PIPING BASEMENT PLAN - BUILDING 17H - STEAM PIPING - DEMO 61
INDEX OF DRAWINGS
SHEET DISCIPLINE TITLE SHEET NO.
MPD104 MECHANICAL PIPING FIRST FLOOR PLAN - BUILDING 18H - STEAM PIPING - DEMO 62
MPD105 MECHANICAL PIPING BASEMENT PLAN - BUILDING 19H - STEAM PIPING - DEMO 63
MPD106 MECHANICAL PIPING FIRST FLOOR PLAN - BUILDING 20H - STEAM PIPING - DEMO 64
MPD107 MECHANICAL PIPING BASEMENT PLAN - BUILDING 80H - STEAM PIPING - DEMO 65
MPD108 MECHANICAL PIPING BASEMENT PLAN - BUILDING 101 - STEAM PIPING - DEMO 66
MPD201 MECHANICAL PIPING MANHOLE PART PLANS - MECHANICAL PIPING - DEMO 67
MPD202 MECHANICAL PIPING MANHOLE PART PLANS - MECHANICAL PIPING - DEMO 68
MP101 MECHANICAL PIPING BASEMENT PART PLANS - BUILDING 14H - MECHANICAL PIPING - NEW WORK 69
MP102 MECHANICAL PIPING BASEMENT PLAN - BUILDING 15H - STEAM PIPING - NEW WORK 70
MP103 MECHANICAL PIPING BASEMENT PLAN - BUILDING 17H - STEAM PIPING - NEW WORK 71
MP104 MECHANICAL PIPING FIRST FLOOR PLAN - BUILDING 18H - STEAM PIPING - NEW WORK 72
MP105 MECHANICAL PIPING BASEMENT PLAN - BUILDING 19H - STEAM PIPING - NEW WORK 73
MP106 MECHANICAL PIPING FIRST FLOOR PLAN - BUILDING 20H - STEAM PIPING - NEW WORK 74
MP107 MECHANICAL PIPING BASEMENT PLAN - BUILDING 80H - STEAM PIPING - NEW WORK 75
MP108 MECHANICAL PIPING BASEMENT PLAN - BUILDING 101 - STEAM PIPING - NEW WORK 76
MP201 MECHANICAL PIPING MANHOLE PART PLANS - MECHANICAL PIPING - NEW WORK 77
MP202 MECHANICAL PIPING MANHOLE PART PLANS - MECHANICAL PIPING - NEW WORK 78
M401 MECHANICAL BUILDING 14H PIPING SCHEMATICS - NEW WORK AND DEMO 79
M402 MECHANICAL BUILDING 14H WATER PIPING SCHEMATICS - NEW WORK AND DEMO 80
M501 MECHANICAL MECHANICAL DETAILS 81
M502 MECHANICAL MECHANICAL DETAILS 82
M503 MECHANICAL MECHANICAL DETAILS 83
M504 MECHANICAL MECHANICAL DETAILS 84
M601 MECHANICAL MECHANICAL SCHEDULES 85
M602 MECHANICAL MECHANICAL SCHEDULES 86
P001 PLUMBING PLUMBING SYMBOLS AND ABBREVIATIONS 87
PD101 PLUMBING BASEMENT PLAN - BUILDING 14H - PLUMBING - DEMO 88
P101 PLUMBING BASEMENT PLAN - BUILDING 14H - PLUMBING - NEW WORK 89
P501 PLUMBING PLUMBING SCHEMATICS, DETAILS AND SCHEDULES 90
FS001 FIRE PROTECTION FIRE SUPPRESSION PROJECT NOTES, SYMBOLS AND ABBREVIATIONS 91
FSD101 FIRE PROTECTION BASEMENT PLAN - BUILDING 14H - FIRE SUPPRESSION PLAN - DEMO 92
FS101 FIRE PROTECTION BASEMENT PLAN - BUILDING 14H - FIRE SUPPRESSION PLAN - NEW WORK 93
FS501 FIRE PROTECTION FIRE SUPPRESSION DETAILS 94
FA001 FIRE PROTECTION FIRE ALARM PROJECT NOTES, SYMBOLS AND ABBREVIATIONS 95
FA101 FIRE PROTECTION BASEMENT PLAN - BUILDING 14H - FIRE ALARM PLAN - DEMO 96
FA501 FIRE PROTECTION BASEMENT PLAN - BUILDING 14H - FIRE ALARM PLAN - NEW WORK 97
ES001 ELECTRICAL ELECTRICAL SYMBOLS AND ABBREVIATIONS 98
ES002 ELECTRICAL SITE PLAN - ELECTRICAL 99
ED101 ELECTRICAL BASEMENT PLAN - BUILDING 14H - ELECTRICAL - DEMO 100
ED102 ELECTRICAL BASEMENT PLAN - BUILDING 15H - ELECTRICAL - DEMO 101
ED103 ELECTRICAL BASEMENT PLAN - BUILDING 17H - ELECTRICAL - DEMO 102
ED104 ELECTRICAL FIRST FLOOR PLAN - BUILDING 18H - ELECTRICAL - DEMO 103
ED105 ELECTRICAL BASEMENT PLAN - BUILDING 19H - ELECTRICAL - DEMO 104
ED106 ELECTRICAL FIRST FLOOR PLAN - BUILDING 20H - ELECTRICAL - DEMO 105
ED108 ELECTRICAL BASEMENT PLAN - BUILDING 101 - ELECTRICAL - DEMO 106
ED201 ELECTRICAL MANHOLE PART PLANS - ELECTRICAL - DEMO 107
ED202 ELECTRICAL MANHOLE PART PLANS - ELECTRICAL - DEMO 108
ES101a ELECTRICAL BASEMENT PLAN - BUILDING 14H - ELECTRICAL - NEW WORK 109
ES101b ELECTRICAL BASEMENT PLAN - BUILDING 14H - ELECTRICAL - NEW WORK 110
ES102 ELECTRICAL BASEMENT PLAN - BUILDING 15H - ELECTRICAL - NEW WORK 111
ES103 ELECTRICAL BASEMENT PLAN - BUILDING 17H - ELECTRICAL - NEW WORK 112
ES104 ELECTRICAL FIRST FLOOR PLAN - BUILDING 18H - ELECTRICAL - NEW WORK 113
ES105 ELECTRICAL BASEMENT PLAN - BUILDING 19H - ELECTRICAL - NEW WORK 114
ES106 ELECTRICAL FIRST FLOOR PLAN - BUILDING 20H - ELECTRICAL - NEW WORK 115
ES108 ELECTRICAL BASEMENT PLAN - BUILDING 101 - ELECTRICAL - NEW WORK 116
ES201 ELECTRICAL MANHOLE PART PLANS - ELECTRICAL - NEW WORK 117
ES202 ELECTRICAL MANHOLE PART PLANS - ELECTRICAL - NEW WORK 118
ES203 ELECTRICAL SCHEDULE, RISER & FLOOR PLAN - BUILDING 11 - ELECTRICAL - NEW WORK 119
E601 ELECTRICAL ELECTRICAL SCHEDULES 120
E602 ELECTRICAL ELECTRICAL SCHEDULES 121
DS
PHASE 2
PHASE 3
PHASE 1
PHASE 1
PHASE 4
PHASE 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
PRIME A/E:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
100% SUBMISSION
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
UPGRADE STEAM SYSTEM
PATIENT AREAS
512A5-21-304
MC/NH02/02/2024
CIVIL ENGINEER /LANDSCAPE/ SURVEY
700 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
G003
PHASED REPAIRS DISTRIBUTION
PLAN --
SCALE: 1" = 100'-0"
100 0 100 20050
1. INSTALL NEW PIPING TO THE GREATEST EXTENT POSSIBLE PRIOR TO ANY PERFORMING ANY DEMOLITION.
2. ALL STEAM OUTAGES OR BUILDING SHUTDOWNS SHALL BE MINIMIZED.
3. CONTRACTOR TO COORDINATE FINAL PHASING PLAN WITH THE VAMC PERRY POINT ENGINEERING AND FACILITIES.
4. EXISTING UNDERGROUND STEAM AND CONDENSATE PIPING, DIRECT-BURIED OR IN TRENCHES, SHALL BE ABANDONED IN PLACE AT THE
CONCLUSION OF THE PROJECT. CAP OPEN ENDED PIPES AND SEAL CONCRETE TRENCHES.
PHASE I:
· STEAM TIE-INS FOR ALL AREAS SHALL BE COMPLETED WITHIN A 40 HOUR TIMEFRAME.
· 17H STEAM SERVICE IS CRITICAL AND CANNOT BE SHUTDOWN FOR MORE THAN 16 HOURS.
· HPS, LPC AND HPC FROM MANHOLE 19B WILL BE ROUTED ABOVE GROUND TO 17H, THROUGH 17H, AND UNDERGROUND TO 15H. STEAM PIPING
WITHIN MANHOLES 19A AND 20 WILL BE REMOVED AND ENDS WILL BE CAPPED. MANHOLES SHALL BE ABANDONED IN PLACE.
· ALL NEW STEAM PIPING AND EQUIPMENT IN 14H MECHANICAL ROOM SHALL HAVE BEEN INSTALLED AND PREPPED FOR TIE-IN DURING THE
SCHEDULED SHUTDOWN.
· 14H CHILLED WATER TIE-IN TO BE AFTER 10/15 AND BEFORE 4/15.
· NEW MANHOLE 9H WILL BE BUILT AND TIED INTO THE 6" HPS FEEDING BLDG 9H. BLDG 9H (VACANT) WILL BE REMOVED FROM THE STEAM SYSTEM.
PHASE 2:
· 101 STEAM SERVICE SHUTDOWN APPROXIMATELY 10 HOURS.
· SHUTDOWN WILL BE AT MANHOLE 1 FOR BLDG 4R SIDE OF CAMPUS ONLY.
· SHUTDOWN SHALL BE ON A WEEKEND.
PHASE 3:
· STEAM TIE-INS FOR ALL AREAS SHALL BE COMPLETED WITHIN A 24 HOUR TIMEFRAME.
· 19H MECH ROOM STEAM STATIONS WILL BE DONE AT SEPERATE TIME AFTER MAIN STEAM TIE-IN. STEAM STATION WORK COULD BE SEVERAL DAYS
WITHIN CONGESTED AREA. CONTRACTOR SHALL PROVIDE SEPARATE WORK SCHEDULE FOR THIS AREA.
· MANHOLE 6 HAS SHUTOFF VALVES FOR 19H AND 20H. THESE VALVES SHALL BE REPLACED DURING THE SHUTDOWN.
PHASE 4:
· STEAM TIE-INS FOR ALL AREAS SHALL BE COMPLETED WITHIN A 40 HOUR TIMEFRAME.
· MANHOLE 9H (NEW) WILL BE CONNECTED TO MANHOLE 26 AND MANHOLE 27. EACH NEW MANHOLE WILL HAVE VALVED FUTURE CONNECTION.
· MANHOLE 25 WILL BE COMPLETELY UNCOVERED AND EXPOSED TO ACCOMPLISH WORK.
PROJECT PHASING NOTES
DS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 19a
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02a
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 9H
AutoCAD SHX Text 19b
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING 361
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING 364
AutoCAD SHX Text
BUILDING 80
AutoCAD SHX Text
BUILDING 19H
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING 11H
AutoCAD SHX Text
BUILDING 9H
AutoCAD SHX Text
BUILDING 23H
AutoCAD SHX Text 314C
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text 314B
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text 314A
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING 15H
AutoCAD SHX Text
BUILDING 14H
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING 18H
AutoCAD SHX Text
BUILDING 13H
AutoCAD SHX Text
BUILDING 24H
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING 14
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BUILDING 101
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BLDG 321
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
101ABC
AutoCAD SHX Text
BUILDING 20H
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
AutoCAD SHX Text 27H
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text 6H
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BUILDING 4H
AutoCAD SHX Text
BUILDING 5H
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING 3H
AutoCAD SHX Text
BUILDING 1H
AutoCAD SHX Text
BUILDING 17H
AutoCAD SHX Text
BUILDING 2H
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BUILDING 5
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 8A
AutoCAD SHX Text
BUILDING 15
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING 25H
AutoCAD SHX Text
CONTINUES TO BUILDING 82H, SEE DETAIL AT LEFT
AutoCAD SHX Text
BUILDING 82H
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
BUILDING 11
DOOR TAG
REMOVAL KEY NOTE
ANNOTATION SYMBOLS LEGEND:
WALL / PARTITION TYPE TAG
DETAIL ELEVATION
EXTERIOR ELEVATION
CALLOUT LASSO
XXX
DIMENSION STRING
X'-X"
X-XXXX
X-XXX
X
X
X-XXX
X
X-XXX
X
X-XXX
X
X-XXX
X
DETAIL SECTIONBUILDING
SECTION
WALL SECTION
NORTH
NORTH ARROW
1ST FLOOR
100' - 0"
ELEVATION MARKER
DETAIL
NUMBER
SHEET
DETAIL NUMBER
(TYP.)
SHEET (TYP.)
ROOM TAG
ROOM
REVISION IDENTIFICATION
REVISION
REVISION NUMBER
A WINDOW TAG
DOOR (EXISTING)
DOOR
(NEW CONSTRUCTION)
R#
RENOVATION KEY NOTE
EXISTING CONSTRUCTION
(TO BE REMOVED)
XXX
A
WINDOW TAG
WINDOW UNIT
DOOR
DOOR TAG
EXAMPLE:
ø 5
0"
30" MIN.
M
IN
TURNING RADIUS WHEELCHAIR APPROACH
ADA CLEARANCES:
M
IN
MAX.
6"
M
IN
MIN.
11"
MIN.
8"
MAX.
17" - 25"
KNEE & TOE CLEARANCES
3' -2
4" 2'
-5
2' -1
0"
1' -6
2' -5
2' -1
0"
1'-0" 3'-6"
2' -0
1' -5
3' -1
0"
1' -6
*2 '-1
0"
4' -0
1'-6"
6" 3'-0"
1' -7
39"-41"
1' -6
1'-6" 7"-9"
SD TD
CHILD
ADA
UR
LAV
PROVIDE CLEARANCE
OF 1 1/2" MIN. BELOW
GB, 12" MIN ABOVE GB
PROVIDE CLEARANCE FOR
FLUSH VALVE AT GRAB
BARS, TYP.
PROTECTIVE PIPE WRAP OR
ENCLOSURE AT HANDICAPPED
LAVATORY, TYP.
PROTECTIVE PIPE
WRAP OR ENCLOSURE
AT HANDICAPPED
LAVATORY, TYP.
GBX = GRAB BAR; 'X' REPRESENTS LENGTH (E.G. GB36 IS A 36" LONG GRAB BAR.
GBL3052 IS AN L-SHAPED GRAB BAR 30"x52".)
FOR OTHER ACCESSORY ITEMS, SEE MANUFACTURER'S REQUIREMENTS FOR
HANDICAPPED MOUNTING HEIGHTS.
NOTE:
NOTE:
REFER TO PLUMBING DRAWINGS FOR ACTUAL FIXTURE TYPES. FIXTURES DEPICTED ARE
FOR INFORMATIONAL PURPOSES WITH REGARD TO MOUNTING HEIGHTS AND LOCATIONS.
NOTE:
REFER TO WASHROOM INTERIOR ELEVATIONS FOR ACCESSORY MOUNTING LOCATIONS
IN ROOMS.
NOTE:
UR
TYPICAL MOUNTING HEIGHTS AND LOCATIONS:
T O
E N
S U
R E
GB36
WC
TPHLAV
TD MAX.
MAX.
GB42
F O
R W
A R
D R
E A
C H
DF/WBF
MIRR
GB18
WC TPH
LAV
1'
5"
(C H
IL
D
R E
N
WR
M A
X
M A
X 18
(C H
IL
D
R E
N
(C H
IL
D
R E
N
34"-36"
(CHILDREN)
(C H
IL
D
R E
N
2' -7
(C H
IL
D
R E
N
A G
E
-1 2)
(C H
IL
D
2' -7
(C H
IL
D
R
N
E S
-1
2)
CHILDREN'S REACH RANGES (SUGGESTED)
FORWARD OR
SIDE REACH
AGES
3 AND 4
AGES
5 - 8
AGES
9 - 12
HIGH (MAX)
LOW (MIN)
36"
20"
40"
18"
44"
16"
COORDINATE MOUNTING HEIGHTS OF FIXTURES AND EQUIPMENT WITH SUGGESTED
CHILDREN'S REACH RANGES CHART PER ADVISORY 308.1 REACH RANGES FROM THE U.S.
ACCESS BOARD FOR ANSI 117.1-2009.
NOTE:
S T
A N
D
IN
P
R S
O N
S
M A
X
W H
E E
LC
H
IR
C C
E S
S
IB
LE
M A
X
C H
IL
D
R E
N
M
IN
K N
E E
C
LE
A R
5'
0' M
A X
FE
F E
LB
S
3'
6" M
A X
F E
LB
S
FEC
MOUNT CABINET SUCH
THAT FIRE EXTINGUISHER
HEIGHT IS MAINTAINED.
DOOR FRAME
18"
MIN.
SN
M
IN
M
A X
B T
M
O F
B R
A
IL
LE
SD -
TD -
WR -
UR -
LAV -
MIRR -
WC -
GB -
TPH -
DF/WBF -
FE -
FEC -
SN -
SOAP DISPENSER
TOWEL DISPENSER
WASTE RECEPTACLE
URINAL
LAVATORY
MIRROR
WATER CLOSET
GRAB BAR
TOILET PAPER HOLDER
DRINKING FOUNTAIN / WATER BOTTLE FILLER
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
SIGN
HATCH LEGEND
CONCRETE
(CAST IN PLACE OR PRECAST)
GYPSUM WALL BOARD
CONCRETE MASONRY
EARTH
RIGID INSULATION
BATT INSULATION
WOOD / LUMBER
PLYWOOD
STEEL
UNDERBED MATERIAL
BRICK
A
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
ALUM ALUMINUM
ANOD ANODIZED
@ AT
B
BLKG BLOCKING
C
CAB CABINET
CCT CUBICLE CURTAIN TRACK
CG CORNER WALL GUARD
CLG CEILING
CLO CLOSET
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CSS CLINICAL SERVICE SINK
CPT CARPET
CT CERAMIC TILE
D
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DR DOOR
DWG DRAWING
DWR DRAWER
E
EA EACH
EG END WALL GUARD
ELEC ELECTRIC(AL)
ELEV ELEVATOR/ ELEVATION
EMER EMERGENCY
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXT EXTERIOR
F
FA FIRE ALARM
FT FEET/ FOOT
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHS FIRE HOSE STATION (CABINET)
FHV FIRE HOSE VALVE CABINET
FLR FLOOR(ING)
FLUOR FLUORESCENT
FR FRAME
FVC FIRE VALVE CABINET
G
GALV GALVANIZE(D)
GB GRAB BAR
GC GENERAL CONTRACTOR
GOVT GOVERNMENT
GWB GYPSUM WALL BOARD
H
HC HOLLOWCORE
HDW HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
I
IB INTEGRAL BASE
ID INSIDE DIAMETER
IN INCH(ES)
INT INTERIOR
INTEG INTEGRAL
INTLK INTERLOCK
L
LAM LAMINATE(D)
LAV LAVATORY
LB POUND
LT LENGTH
LH LEFT HAND
LHRB LEFT HAND REVERSE BEVEL
LOCK LOCKERS
LVR LOUVER
M
MA MEDICAL AIR
MAX MAXIMUM
MED MEDICAL/MEDICATIONS
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N
N NORTH/ NITROGEN
NC NURSE CALL
NEG NEGATIVE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
O/OX OXYGEN
OPG OPENING
P
PL PLATE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
PR PAIR
PNT PAINT(ED)
PRT PARTITION
R
RB RESILIENT BASE
REQ REQUIRED
RESIL RESILIENT
REV REVISED
RH RIGHT HAND
RHRB RIGHT HAND REVERSE BEVEL
RO ROUGH OPENING
S
S SOUTH
SCW SOLID CORE WOOD
SEAL SEALANT
SECT SECTION
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION(S)
SQ SQUARE
SSM SOLID SURFACE MATERIAL
SS STAINLESS STEEL
SSV SEAMLESS SHEET VINYL
STL STEEL
STN STAIN
STOR STORAGE
STRUCT STRUCTURAL
SV SHEET VINYL
T
TC TERRA COTTA
TEL TELEPHONE
TEMP TEMPORARY
THK THICK(NESS)
TOC TOP OF CURB
TOIL TOILET
TOS TOP OF SLAB/ TOP OF STEEL
TPTN TOILET PARTITION
TV TELEVISION
TW TOP OF WALL
TYP TYPICAL
TZ TERRAZZO
U
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
V
VAC VACUUM
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W
W WEST
W/ WITH
WC WATER CLOSET/
WATER COOLER/
WALL COVERING
WD WOOD
WG WIRE GLASS
WH WALL HUNG
W/O WITHOUT
WP WATERPROOF(ING)
WR WATER RESISTANT
WS WEATHERSTRIPPING
WSCT WAINSCOT
WT WEIGHT
ABBREVIATIONS
EXISTING ITEM(S) / EQUIPMENT TO BE PROVIDED
EXISTING ITEM(S) / EQUIPMENT TO REMAIN
RENOVATION LINE TYPE LEGEND
EXISTING ITEM(S) / EQUIPMENT TO BE REMOVED
EXISTING ITEM(S) / EQUIPMENT TO REMAIN
REMOVAL LINE TYPE LEGEND
EXISTING TO REMAIN
LINE TYPE LEGEND - ROOF
ROOF SYSTEM, FLASHING, EQUIPMENT, ITEMS
TO BE PROVIDED
CHANGE IN ELEVATION MARKER
(HIGH/LOW)
ROOF SYSTEM, FLASHING, EQUIPMENT, ITEMS
TO BE REMOVED
CEILING HEIGHT A.F.F.X' - X"
REFLECTED CEILING PLAN LEGEND
1X4 PENDANT LIGHT FIXTURE
(SHADING DENOTES EMERGENCY LIGHT)
4' x 4' INSULATION BOARD
NOTE: REFER TO 'FP', 'M', AND 'E' DRAWINGS FOR EXACT FIXTURE /
EQUIPMENT TYPE(S), SIZES AND ADDITIONAL INFORMATION.
2' x 4' INSULATION BOARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
ENGINEERS:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
CIVIL ENGINEER /LANDSCAPE/ SURVEY
800 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
F R e v it L o c a ls
\2
.3
.0
V
A M
C P e rr y P t U p g ra d e S te a m
S y s P a ti e n t_ v
L
A rr ia z a
.r v t
/2
/2
:5
:5
P
M
G004
ARCHITECTURAL LEGENDS,
ABBREVIATIONS AND NOTES
100% SUBMISSION UPGRADE STEAM SYSTEMS
PATIENT AREAS
512A5-21-304
LAEJL02/02/2024Revisions: Date:
PRIME A/E :
UP
UP
UP
LIFE SAFETY LEGEND
1 HOUR FIRE RESISTANCE RATING
2 HOUR FIRE RESISTANCE RATING
PRIMARY EGRESS PATH
SECONDARY EGRESS PATH
MRP
MOST REMOTE POINT OF EGRESS
ACCESS
EXIT DISCHARGEEXIT
TD = XX' - XX" TRAVEL DISTANCE TO EXIT
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
SMOKE BARRIER (1HR RATED,
UNLESS OTHERWISE SHOWN)
15161718
PROJECT
AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
ENGINEERS:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
CIVIL ENGINEER /LANDSCAPE/ SURVEY
800 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
F R e v it L o c a ls
\2
.3
.0
V
A M
C P e rr y P t U p g ra d e S te a m
S y s P a ti e n t_ v
L
A rr ia z a
.r v t
/2
/2
:5
:0
P
M
G005
BUILDING 14H-LIFE SAFETY PLAN
AND CODE SUMMARY CHARTS
100% SUBMISSION UPGRADE STEAM SYSTEMS
PATIENT AREAS
512A5-21-304
LAEJL02/02/2024
SCALE: 1/8" = 1'-0"G005
1 RENOVATION BASEMENT PLAN
SCALE: N.T.S.
BUILDING 14H-KEY PLAN
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
NORTH
Revisions: Date:
UP
15161718
R2
R3
R
R4
EXISTING TO REMAIN
1279 SF
MECHANICAL ROOM
619 SF
MECHANICAL ROOM
270 SF
MECHANICAL ROOM
SHOWER ROOM
LOCKER ROOM
R7
R1 R1
R1
R1
R5
K E
Y N
O T
E
R
K E
Y N
O T
E
R9 R10
DN
R3
DN
DN
R11R12
CONSTRUCTION
ACCESS DOOR
15161718
R8
EXISTING TO REMAIN
MECHANICAL ROOM
SHOWER ROOM
1 LOCKER ROOM
MECHANICAL ROOM
MECHANICAL ROOM
R1R1
R1 R1
R9
PROJECT
AREA
PROJECT ACTIVITY:
PATIENT RISK GROUP:
PATIENT RISK GROUP:
TYPE C
LOW RISK (MECHANICAL SPACES)
CLASS III / IV
ICRA NOTES
DESCRIPTION OF REQUIRED INFECTION PREVENTION PRECAUTIONS BY CLASS
DURING CONSTRUCTION UPON COMPLETION OF CONSTRUCTION
1. OBTAIN INFECTION CONTROL PERMIT BEFORE
CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK
IS BEING DONE TO PREVENT CONTAMINATION OF
THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR
IMPLEMENT CONTROL CUBE METHOD BEFORE
CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
5. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA
WHERE WORK IS BEING PERFORMED.
6. DO NOT REMOVE BARRIERS FROM WORK SITE
UNTIL COMPLETE AND PROJECT IS THOROUGHLY
CLEANED BY EMS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP WITH DISINFECTANT.
9. REMOVE BARRIER MATERIAL CAREFULLY TO
MINIMIZE SPREADING OF DUST AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
10. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
11. COVER TRANSPORT RECEPTACLES OR CART
AND TAPE COVERING IN PLACE.
1. DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT IS INSPECTED BY
THE OWNER’S SAFETY DEPARTMENT AND
INFECTION PREVENTION COORDINATOR AND
THOROUGHLY CLEANED BY (EMS)
ENVIRONMENTAL MANAGEMENT SERVICES.
2. REMOVE BARRIER MATERIALS CAREFULLY TO
MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
4. WET MOP AREA WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED
CLASS: CLASS III
SCALE: 1/8" = 1'-0"AD101
1 BASEMENT REMOVAL PLAN
REMOVAL KEY NOTES
R1 EXISTING TO REMAIN
R2 PREP EXISTING POOL AREA TO BE INFILLED AND REPURPOSED FOR NEW MECHANICAL ROOM SPACE.
R3 REMOVE ALL POOL RELATED EQUIPMENT INCLUDING FIXED BENCHES AND LADDERS. PATCH AND REPAIR AS NEEDED.
R4 REMOVE CERAMIC FLOOR TILE IN THIS ROOM. REPAIR & CLEAN CONCRETE SLAB FOR NEW MECHANICAL ROOM.
R5 REMOVE CERAMIC TILE AND POOL BASIN PERIMETER TILE TRIM. PATCH,REPAIR & CLEAN CONCRETE SLAB FOR NEW MECHANICAL ROOM.
R6 REMOVE EXISTING PARTITION COMPLETELY SHOWN DASHED. REMOVE DEBRIS FROM BEHIND PARTITION.
R7 REMOVE EXISTING PARTITION, DOOR, & FRAME SHOWN DASHED IN THIS AREA.
R8 REMOVE EXISTING PLASTER ON METAL LATH CEILING. REMOVE CEILING SUSPENSION ASSEMBLY REMOVE LIGHT FIXTURES & CEILING DEVICES.
R9 PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIER, 1 HOUR RATED. PROVIDE CONSTRUCTION ACCESS AS NECESSARY.
R10 REMOVE CEILING AS NECESSARY TO INSTALL NEW WORK. RETAIN FOR RE-INSTALLATION.
R11 REMOVE EXISTING WALL TILE FINISH FROM CMU SUBSTRATE. PREPARE SURFACE TO RECEIVE LAMINATED GYPSUM BOARD
R12 REMOVE EXISTING DOOR & FRAME CMU WALL.
SCALE: 1/8" = 1'-0"AD101
2 BASEMENT REMOVAL RCP
NORTH
GENERAL REMOVAL NOTES
A. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING ELEMENTS TO BE REMOVED. REFER TO OTHER TRADE DRAWINGS
FOR OTHER REMOVALS, INCLUDING MODIFICATIONS THAT MAY EXTEND BEYOND AREAS SHOWN.
B. FOR DURATION OF PROJECT, EXISTING CONSTRUCTION AND/OR EQUIPMENT TO REMAIN FROM DAMAGE OR CONSTRUCTION ACTIVITIES. WHERE CONSTRUCTION ACTIVITIES RESULT IN DAMAGE TO EXISTING CONSTRUCTION TO BE RETAINED, REPLACE/REPAIR EXISTING CONSTRUCTION TO RETURN IT TO ITS ORIGINAL CONDITION. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK, AND OTHER ITEMS CREATES OPENINGS IN WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH SAME MATERIALS AS ADJACENT CONSTRUCTION AND/OR TO MAINTAIN REQUIRED FIRE RATING.
C. PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIERS WHERE REQUIRED TO PREVENT DUST POLLUTION OF SURROUNDING OCCUPIED AREAS. SEAL AIR-TIGHT. PARTITIONS MUST BE INSTALLED IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS ACCESS TO EXITS DURING CONSTRUCTION.
D. TAKE PROPER MEASURES TO PREVENT DUST MIGRATION TO AREAS OUTSIDE THE CONSTRUCTION AREA BY CLOSING ALL OPENINGS IN DUCTS, WALLS, FLOORS AND CEILINGS. PROVIDE CONTINUOUS EXHAUST TO EXTERIOR TO MAINTAIN NEGATIVE
PRESSURE IN CONSTRUCTION AREA.
E. COORDINATE WITH OWNER FOR EQUIPMENT TO BE SALVAGED AND RETURNED TO OWNER. THE OWNER WILL RETAIN ALL SALVAGE THAT IS OF VALUE AS DESIGNATED BY THE USER OR BUILDING ENGINEER. REMOVE FROM THE BUILDING AND DISPOSE
OF IN A LAWFUL MANNER ALL DEBRIS AND/OR ITEMS NOT RETAINED BY OWNER.
F. INSTALL ADHESIVE MATS INSIDE AND OUTSIDE EACH ACCESS DOOR TO CONSTRUCTION AREA.
G. COORDINATE WITH OTHER TRADE DRAWINGS FOR REMOVAL WORK, AS REQUIRED.
H. REFER TO HAZARDOUS MATERIALS REPORT.
I ESTIMATED QUANTITY OF LEAD BASED PAINT REMOVAL IS 3500 SF(325 SM)
SCALE: N.T.S.
BUILDING 14H-KEY PLAN
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
ENGINEERS:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
CIVIL ENGINEER /LANDSCAPE/ SURVEY
800 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
F R e v it L o c a ls
\2
.3
.0
V
A M
C P e rr y P t U p g ra d e S te a m
S y s P a ti e n t_ v
L
A rr ia z a
.r v t
/2
/2
:5
:0
P
M
AD101
BUILDING 14H-REMOVAL PLANS 100% SUBMISSION UPGRADE STEAM SYSTEMS
PATIENT AREAS
512A5-21-304
LAEJL02/02/2024
14H
STEAM PIT
CRAWL SPACE
R13
R13
EXISTING TO REMAIN
PROJECT ACTIVITY:
PATIENT RISK GROUP:
PATIENT RISK GROUP:
TYPE C
LOW RISK (MECHANICAL SPACES)
CLASS II
ICRA NOTES
DESCRIPTION OF REQUIRED INFECTION PREVENTION PRECAUTIONS BY CLASS
DURING CONSTRUCTION UPON COMPLETION OF CONSTRUCTION
1. PROVIDES ACTIVE MEANS TO PREVENT AIR-BORNE
DUST FROM DISPERSING INTO ATMOSPHERE
(SURROUNDING ENVIRONMENT.)
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE
CUTTING
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL DUCT VENTS.
5. WIPE SURFACES WITH DISINFECTANT.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK
AREA.
9. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE
WORK IS BEING PERFORMED.
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
CLASS: CLASS II
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
ENGINEERS:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
CIVIL ENGINEER /LANDSCAPE/ SURVEY
800 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
F R e v it L o c a ls
\2
.3
.0
V
A M
C P e rr y P t U p g ra d e S te a m
S y s P a ti e n t_ v
L
A rr ia z a
.r v t
/2
/2
:5
:0
P
M
AD102
BUILDING 15H REMOVAL PLAN 100% SUBMISSION UPGRADE STEAM SYSTEMS
PATIENT AREAS
512A5-21-304
EJLEJL02/02/2024
0'
SCALE: 3/32" = 1'-0"
5'-4" 21'-4"10'-8"
SCALE: 3/32" = 1'-0"AD102
1 BASEMENT PLAN - BLDG. 15H - REMOVAL PLAN
AD-102 REMOVAL KEY NOTES
R13 REFER TO MECHANICAL PLUMBING REMOVAL AND RENOVATION PLANS FOR WORK
15H
GENERAL REMOVAL NOTES
A. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING ELEMENTS TO BE REMOVED. REFER TO OTHER TRADE DRAWINGS
FOR OTHER REMOVALS, INCLUDING MODIFICATIONS THAT MAY EXTEND BEYOND AREAS SHOWN.
B. FOR DURATION OF PROJECT, EXISTING CONSTRUCTION AND/OR EQUIPMENT TO REMAIN FROM DAMAGE OR CONSTRUCTION ACTIVITIES. WHERE CONSTRUCTION ACTIVITIES RESULT IN DAMAGE TO EXISTING CONSTRUCTION TO BE RETAINED, REPLACE/REPAIR EXISTING CONSTRUCTION TO RETURN IT TO ITS ORIGINAL CONDITION. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK, AND OTHER ITEMS CREATES OPENINGS IN WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH SAME MATERIALS AS ADJACENT CONSTRUCTION AND/OR TO MAINTAIN REQUIRED FIRE RATING.
C. PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIERS WHERE REQUIRED TO PREVENT DUST POLLUTION OF SURROUNDING OCCUPIED AREAS. SEAL AIR-TIGHT. PARTITIONS MUST BE INSTALLED IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS ACCESS TO EXITS DURING CONSTRUCTION.
D. TAKE PROPER MEASURES TO PREVENT DUST MIGRATION TO AREAS OUTSIDE THE CONSTRUCTION AREA BY CLOSING ALL OPENINGS IN DUCTS, WALLS, FLOORS AND CEILINGS. PROVIDE CONTINUOUS EXHAUST TO EXTERIOR TO MAINTAIN NEGATIVE
PRESSURE IN CONSTRUCTION AREA.
E. COORDINATE WITH OWNER FOR EQUIPMENT TO BE SALVAGED AND RETURNED TO OWNER. THE OWNER WILL RETAIN ALL SALVAGE THAT IS OF VALUE AS DESIGNATED BY THE USER OR BUILDING ENGINEER. REMOVE FROM THE BUILDING AND DISPOSE
OF IN A LAWFUL MANNER ALL DEBRIS AND/OR ITEMS NOT RETAINED BY OWNER.
F. INSTALL ADHESIVE MATS INSIDE AND OUTSIDE EACH ACCESS DOOR TO CONSTRUCTION AREA.
G. COORDINATE WITH OTHER TRADE DRAWINGS FOR REMOVAL WORK, AS REQUIRED.
H. REFER TO HAZARDOUS MATERIALS REPORT.
I ESTIMATED QUANTITY OF LEAD BASED PAINT REMOVAL IS 3500 SF(325 SM)
CDGH F K E
13A
STORAGE
WAREHOUSE STORAGE
SVC AREA
SVC AREA
CANTEEN STORAGE
COOLER
VEGETABLE
PREPARATION UNIT
MECH RM
MECH SHOP
TRANSFORMER
LOADING
DOCK
A/C
R13
R13
R13
EXISTING TO REMAIN
ICRA NOTES
PROJECT ACTIVITY:
PATIENT RISK GROUP:
PATIENT RISK GROUP:
TYPE C
LOW RISK (MECHANICAL SPACES)
CLASS II
DESCRIPTION OF REQUIRED INFECTION PREVENTION PRECAUTIONS BY CLASS
DURING CONSTRUCTION UPON COMPLETION OF CONSTRUCTION
1. PROVIDES ACTIVE MEANS TO PREVENT AIR-BORNE
DUST FROM DISPERSING INTO ATMOSPHERE
(SURROUNDING ENVIRONMENT.)
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE
CUTTING
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL DUCT VENTS.
5. WIPE SURFACES WITH DISINFECTANT.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK
AREA.
9. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE
WORK IS BEING PERFORMED.
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
CLASS: CLASS II
SCALE: 3/32" = 1'-0"AD103
1 BASEMENT PLAN - BLDG. 17H - REMOVAL PLAN
0'
SCALE: 3/32" = 1'-0"
5'-4" 21'-4"10'-8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
ENGINEERS:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
CIVIL ENGINEER /LANDSCAPE/ SURVEY
800 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
F R e v it L o c a ls
\2
.3
.0
V
A M
C P e rr y P t U p g ra d e S te a m
S y s P a ti e n t_ v
L
A rr ia z a
.r v t
/2
/2
:5
:1
P
M
AD103
BUILDING 17H REMOVAL PLAN 100% SUBMISSION UPGRADE STEAM SYSTEMS
PATIENT AREAS
512A5-21-304
EJLEJL02/02/2024
AD-103 REMOVAL KEY NOTES
R13 REFER TO MECHANICAL PLUMBING REMOVAL AND RENOVATION PLANS FOR WORK
17H
GENERAL REMOVAL NOTES
A. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING ELEMENTS TO BE REMOVED. REFER TO OTHER TRADE DRAWINGS
FOR OTHER REMOVALS, INCLUDING MODIFICATIONS THAT MAY EXTEND BEYOND AREAS SHOWN.
B. FOR DURATION OF PROJECT, EXISTING CONSTRUCTION AND/OR EQUIPMENT TO REMAIN FROM DAMAGE OR CONSTRUCTION ACTIVITIES. WHERE CONSTRUCTION ACTIVITIES RESULT IN DAMAGE TO EXISTING CONSTRUCTION TO BE RETAINED, REPLACE/REPAIR EXISTING CONSTRUCTION TO RETURN IT TO ITS ORIGINAL CONDITION. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK, AND OTHER ITEMS CREATES OPENINGS IN WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH SAME MATERIALS AS ADJACENT CONSTRUCTION AND/OR TO MAINTAIN REQUIRED FIRE RATING.
C. PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIERS WHERE REQUIRED TO PREVENT DUST POLLUTION OF SURROUNDING OCCUPIED AREAS. SEAL AIR-TIGHT. PARTITIONS MUST BE INSTALLED IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS ACCESS TO EXITS DURING CONSTRUCTION.
D. TAKE PROPER MEASURES TO PREVENT DUST MIGRATION TO AREAS OUTSIDE THE CONSTRUCTION AREA BY CLOSING ALL OPENINGS IN DUCTS, WALLS, FLOORS AND CEILINGS. PROVIDE CONTINUOUS EXHAUST TO EXTERIOR TO MAINTAIN NEGATIVE
PRESSURE IN CONSTRUCTION AREA.
E. COORDINATE WITH OWNER FOR EQUIPMENT TO BE SALVAGED AND RETURNED TO OWNER. THE OWNER WILL RETAIN ALL SALVAGE THAT IS OF VALUE AS DESIGNATED BY THE USER OR BUILDING ENGINEER. REMOVE FROM THE BUILDING AND DISPOSE
OF IN A LAWFUL MANNER ALL DEBRIS AND/OR ITEMS NOT RETAINED BY OWNER.
F. INSTALL ADHESIVE MATS INSIDE AND OUTSIDE EACH ACCESS DOOR TO CONSTRUCTION AREA.
G. COORDINATE WITH OTHER TRADE DRAWINGS FOR REMOVAL WORK, AS REQUIRED.
H. REFER TO HAZARDOUS MATERIALS REPORT.
I ESTIMATED QUANTITY OF LEAD BASED PAINT REMOVAL IS 3500 SF(325 SM)
TOILET
PIPE CHASE
01A
LOCKER RM
01B
BREAK RM
OFFICE
OFFICE
ARCHITECTURE
SHOP
CARPENTER SHOP
SUPV OFFICE
04A
CARPENTER SHOP
OFFICE
06A
MECH RM
BREAK RM
STORAGE
07A
PAINT SPRAY BOOTH
WAREHOUSE D
WAREHOUSE C
ENGG SUPPLY
WAREHOUSE B
OFFICE
11A
ELECTRIC SHOP
OFFICE
10A
PIPE SHOP
R13
EXISTING TO REMAIN EXISTING TO REMAIN
ICRA NOTES
PROJECT ACTIVITY:
PATIENT RISK GROUP:
PATIENT RISK GROUP:
TYPE C
LOW RISK (MECHANICAL SPACES)
CLASS II
DESCRIPTION OF REQUIRED INFECTION PREVENTION PRECAUTIONS BY CLASS
DURING CONSTRUCTION UPON COMPLETION OF CONSTRUCTION
1. PROVIDES ACTIVE MEANS TO PREVENT AIR-BORNE
DUST FROM DISPERSING INTO ATMOSPHERE
(SURROUNDING ENVIRONMENT.)
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE
CUTTING
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL DUCT VENTS.
5. WIPE SURFACES WITH DISINFECTANT.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK
AREA.
9. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE
WORK IS BEING PERFORMED.
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
CLASS: CLASS II
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
ENGINEERS:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
CIVIL ENGINEER /LANDSCAPE/ SURVEY
800 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
F R e v it L o c a ls
\2
.3
.0
V
A M
C P e rr y P t U p g ra d e S te a m
S y s P a ti e n t_ v
L
A rr ia z a
.r v t
/2
/2
:5
:1
P
M
AD104
BUILDING 18H REMOVAL PLAN 100% SUBMISSION UPGRADE STEAM SYSTEMS
PATIENT AREAS
512A5-21-304
EJLEJL02/02/2024
18H
SCALE: 3/32" = 1'-0"AD104
1 FIRST FLOOR PLAN - BLDG. 18H - REMOVAL PLAN
AD-104 REMOVAL KEY NOTES
R13 REFER TO MECHANICAL PLUMBING REMOVAL AND RENOVATION PLANS FOR WORK
0'
SCALE: 3/32" = 1'-0"
5'-4" 21'-4"10'-8"
GENERAL REMOVAL NOTES
A. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING ELEMENTS TO BE REMOVED. REFER TO OTHER TRADE DRAWINGS
FOR OTHER REMOVALS, INCLUDING MODIFICATIONS THAT MAY EXTEND BEYOND AREAS SHOWN.
B. FOR DURATION OF PROJECT, EXISTING CONSTRUCTION AND/OR EQUIPMENT TO REMAIN FROM DAMAGE OR CONSTRUCTION ACTIVITIES. WHERE CONSTRUCTION ACTIVITIES RESULT IN DAMAGE TO EXISTING CONSTRUCTION TO BE RETAINED, REPLACE/REPAIR EXISTING CONSTRUCTION TO RETURN IT TO ITS ORIGINAL CONDITION. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK, AND OTHER ITEMS CREATES OPENINGS IN WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH SAME MATERIALS AS ADJACENT CONSTRUCTION AND/OR TO MAINTAIN REQUIRED FIRE RATING.
C. PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIERS WHERE REQUIRED TO PREVENT DUST POLLUTION OF SURROUNDING OCCUPIED AREAS. SEAL AIR-TIGHT. PARTITIONS MUST BE INSTALLED IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS ACCESS TO EXITS DURING CONSTRUCTION.
D. TAKE PROPER MEASURES TO PREVENT DUST MIGRATION TO AREAS OUTSIDE THE CONSTRUCTION AREA BY CLOSING ALL OPENINGS IN DUCTS, WALLS, FLOORS AND CEILINGS. PROVIDE CONTINUOUS EXHAUST TO EXTERIOR TO MAINTAIN NEGATIVE
PRESSURE IN CONSTRUCTION AREA.
E. COORDINATE WITH OWNER FOR EQUIPMENT TO BE SALVAGED AND RETURNED TO OWNER. THE OWNER WILL RETAIN ALL SALVAGE THAT IS OF VALUE AS DESIGNATED BY THE USER OR BUILDING ENGINEER. REMOVE FROM THE BUILDING AND DISPOSE
OF IN A LAWFUL MANNER ALL DEBRIS AND/OR ITEMS NOT RETAINED BY OWNER.
F. INSTALL ADHESIVE MATS INSIDE AND OUTSIDE EACH ACCESS DOOR TO CONSTRUCTION AREA.
G. COORDINATE WITH OTHER TRADE DRAWINGS FOR REMOVAL WORK, AS REQUIRED.
H. REFER TO HAZARDOUS MATERIALS REPORT.
I ESTIMATED QUANTITY OF LEAD BASED PAINT REMOVAL IS 3500 SF(325 SM)
PIT
CRAWL SPACE
21-A
RAMP
RAMP
RAMP
FIRE EQUIP
8-C
ELECTRICAL RM
01-D
TELE
CLOSET
12-G
PHYSICIANS OFFICE
12-D
COPY RM
12-B
FILE ROOM
BIOMED
STORAGE
ELECTRICAL RM
17-A
BIOMED
OFFICE
17-D
BIOMED
STORAGE
17-C
FEMALE TOILET
STORAGE
01-B
MALE
TOILET
05-A
MECH
05-B
CORRIDOR
CARDIOLOGY OFFICE
FILE RM
OFFICE
MECH RM
9-A
SOILED
LINEN
9 BOILER RM
MECH/TELEPHONE RM
STAIR HALL
ASST CHIEF
RESP
12-H
VACANT
12-C
MECH RM
12-I
VACANT
12-A
VACANT
12-E
CORRIDOR
CHIEF MED
CARE
CLINICAL
CENTER
OFFICE
12-F
ELECTRICAL/FA RM
17-B
STORAGE
BIOMED
HOUSE
KEEPING
STORAGE
MECH
CHAPLAINS
OFFICE
STAIR HALL
OFFICE
7-B
NURSE
CASE MGR
OFFICE
7-C
HAC
STORAGE
01-C1
ELEVATOR
MACH RM
01-A1
ELEVATOR
PM AND R
OFFICE
01-A
HAC
STORAGE
01-C
HAC
ELEVATOR
CARDIOLOGY OFFICE
SOCIAL
WORKER
OFFICE
INFECTION
CONTROL
OFFICE
MECH RM
18-A
CORRIDOR
CRAWL
SPACE
CORRIDOR
CORRIDOR
CLOSET
8-B-A
SUPPLY
R15
R16 R13
R13 R14R13 R14R13 R14R13 R14
R13 R14
R13
R14
R15
R13 R14
EXISTING TO
REMAIN
EXISTING
TO REMAIN
PROJECT ACTIVITY:
PATIENT RISK GROUP:
PATIENT RISK GROUP:
TYPE C
MEDIUM (MECHANICAL SPACES, OFFICE)
CLASS III
ICRA NOTES
DESCRIPTION OF REQUIRED INFECTION PREVENTION PRECAUTIONS BY CLASS
DURING CONSTRUCTION UPON COMPLETION OF CONSTRUCTION
1. OBTAIN INFECTION CONTROL PERMIT BEFORE
CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK
IS BEING DONE TO PREVENT CONTAMINATION OF
THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR
IMPLEMENT CONTROL CUBE METHOD BEFORE
CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
5. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA
WHERE WORK IS BEING PERFORMED.
6. DO NOT REMOVE BARRIERS FROM WORK SITE
UNTIL COMPLETE AND PROJECT IS THOROUGHLY
CLEANED BY EMS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP WITH DISINFECTANT.
9. REMOVE BARRIER MATERIAL CAREFULLY TO
MINIMIZE SPREADING OF DUST AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
10. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
11. COVER TRANSPORT RECEPTACLES OR CART
AND TAPE COVERING IN PLACE.
1. DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT IS INSPECTED BY
THE OWNER’S SAFETY DEPARTMENT AND
INFECTION PREVENTION COORDINATOR AND
THOROUGHLY CLEANED BY (EMS)
ENVIRONMENTAL MANAGEMENT SERVICES.
2. REMOVE BARRIER MATERIALS CAREFULLY TO
MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
4. WET MOP AREA WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED
CLASS: CLASS III
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCH./ENGINEER OF RECORD
ENGINEERS:
STAMPSUBCONSULTANTS
321 4 5 6 7 8 9 10
VETERAN DESIGN & CONSTRUCTION INC. VAMC PERRY POINT
DELTA ENGINEERS, ARCHITECTS & SURVEYORS
CIVIL ENGINEER /LANDSCAPE/ SURVEY
800 KING FARM BOULEVARD, 3RD FLOOR
ROCKVILLE, MARYLAND 20850
301.881.2545
STRUCTURAL ENGINEERING
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, MARYLAND 21152
410.467.2377
MORABITO CONSULTANTS, INC.
5523 RESEARCH PARK DRIVE SUITE 110
BALTIMORE, MARYLAND 21228
443.543.5081
A. MORTON THOMAS AND ASSOCIATES, INC.
8401 CONNECTICUT AVE SUITE 350
CHEVY CHASE, MARYLAND 20815
301.718.0080
INDUSTRIAL HYGIENIST
15850 CRABBS BRANCH WAY, STE 200
ROCKVILLE, MARYLAND 20855
240.499.7325
APEX COMPANIES, LLC
ARCHITECTURAL SERVICES
F R e v it L o c a ls
\2
.3
.0
V
A M
C P e rr y P t U p g ra d e S te a m
S y s P a ti e n t_ v
L
A rr ia z a
.r v t
/2
/2
:5
:1
P
M
AD105
BUILDING 19H REMOVAL PLAN 100% SUBMISSION UPGRADE STEAM SYSTEMS
PATIENT AREAS
512A5-21-304
EJLEJL02/02/2024
19H
SCALE: 3/32" = 1'-0"AD105
1 BASEMENT PLAN - BLDG. 19H - REMOVAL PLAN
0'
SCALE: 3/32" = 1'-0"
5'-4" 21'-4"10'-8"
AD-105 REMOVAL KEY NOTES
R13 REFER TO MECHANICAL PLUMBING REMOVAL AND RENOVATION PLANS FOR WORK
R14 REMOVE EXISTING CEILING PANELS, LIGHT FIXTURES AND OTHER CEILING ELEMENTS. RETAIN FOR REINSTALLATION.
R15 PROVIDE TEMPORARY CONSTRUCTION ACCESS. REMOVE AFTER COMPLETION OF WORK. MAINTAIN USER ACCESS & USER
AT ADJACENT SPACE
R16 PROVIDE TEMPORARY CONSTRUCTION ACCESS. REMOVE AFTER COMPLETION OF WORK. MAINTAIN USER ACCESS & USER
AT ADJACENT SPACE
GENERAL REMOVAL NOTES
A. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING ELEMENTS TO BE REMOVED. REFER TO OTHER TRADE DRAWINGS
FOR OTHER REMOVALS, INCLUDING MODIFICATIONS THAT MAY EXTEND BEYOND AREAS SHOWN.
B. FOR DURATION OF PROJECT, EXISTING CONSTRUCTION AND/OR EQUIPMENT TO REMAIN FROM DAMAGE OR CONSTRUCTION ACTIVITIES. WHERE CONSTRUCTION ACTIVITIES RESULT IN DAMAGE TO EXISTING CONSTRUCTION TO BE RETAINED, REPLACE/REPAIR EXISTING CONSTRUCTION TO RETURN IT TO ITS ORIGINAL CONDITION. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK, AND OTHER ITEMS CREATES OPENINGS IN WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH SAME MATERIALS AS ADJACENT CONSTRUCTION AND/OR TO MAINTAIN REQUIRED FIRE RATING.
C. PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIERS WHERE REQUIRED TO PREVENT DUST POLLUTION OF SURROUNDING OCCUPIED AREAS. SEAL AIR-TIGHT. PARTITIONS MUST BE INSTALLED IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS ACCESS TO EXITS DURING CONSTRUCTION.
D. TAKE PROPER MEASURES TO PREVENT DUST MIGRATION TO AREAS OUTSIDE THE CONSTRUCTION AREA BY CLOSING ALL OPENINGS IN DUCTS, WALLS, FLOORS AND CEILINGS.