This solicitation package describes a federal construction contract opportunity for building envelope sealing and roof guardrail upgrades at the PIT ARSR facility in Oakdale, Pennsylvania. The Federal Aviation Administration requires sealing of unused exterior wall openings on multiple floors, replacement of an existing non-compliant roof guardrail, and miscellaneous work including removal of abandoned equipment and repair of concrete defects. Site visits must be scheduled by May 15th and proposals are due by May 22nd, with award anticipated as a firm-fixed-price construction contract. Contractors must register in SAM and submit required forms with their response. The statement of work provides specifications for sealing wall openings, replacing exhaust fans, repairing concrete, upgrading the roof guardrail to current OSHA standards while avoiding roof penetrations, and coordinating removal and reinstallation of communications equipment.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Aviation Administration

INFRASTRUCTURE

ENG. CTR., N.Y.

STATEMENT OF WORK:

(SOW)

1/16/2020

SITE: PIT - ARSR

LOCATION: Oakdale, PA PROJECT: ARSR Building Envelope Sealing and Roof Guard Railing Upgrades

DATE OF SITE VISIT: 3/23/2017

DESCRIPTION OF WORK:

1. GENERAL:

a. The existing unused exterior wall openings on floors 1, 2, 3, 4 and 5 will be infilled and sealed, as they are a source of water intrusion and infiltration.

b. The existing roof guardrail will be replaced and updated to meet the current OSHA standards for fall protection.

c. FAA-TSOG will remove and reinstall the Grounding and Lightning protection system at the roof level per FAA-Std 019f and in coordination with the guardrail replacement.

d. FAA-SSC will coordinate with the Contractor regarding BUEC antenna relocation and the removal of abandoned/unused communication and electrical items as described below.

e. Some of the inoperable wall exhaust fans will be replaced to provide the minimum required ventilation for the building.

f. Remove four abandoned tripod dish support stanchions from roof and seal roof membrane.

g. Remove steel platform, canopy and caged ladder from the NW exterior wall.

h. Repair concrete surface defects and remediate asbestos caulking/backer rod at the exterior of the ARSR tower.

2. DEFICIENCIES: Existing architectural deficiencies relative to the project description are as follows:

a. Unused exterior wall openings on floors 1, 2, 3, 4 and 5 with defective weather hoods are a source of infiltration and water intrusion.

b. The building does not have the required minimum ventilation to prevent possible build-up of toxic gases; inoperable exhaust fans.

c. The existing roof guardrail is in poor condition, corroded and is not compliant with the current

OSHA standards for fall protection.

d. Exterior repairs needed due to spalling concrete and deteriorated caulking at expansion joints.

e. Abandoned miscellaneous items need to be removed from roof and exterior walls.

3. SEAL BUILDING ENVELOPE & REPAIR EXTERIOR DEFECTS

a. The existing unused exterior wall openings will be infilled with CMU block secured to the existing steel channels that frame the openings using Nelson studs. Associated asbestos containing drywall joint compound will be removed. Associated exterior louvers and vent hoods/canopies and anchors will be removed and repair resulting concrete damage.

Associated unused air handlers will have their intake duct section removed. Remaining ductwork will be blanked off using sheet metal. A stainless steel exterior drip edge will be installed above each sealed opening to protect the existing steel channels from corrosion. The exterior of all infilled openings will be parged to match the color and texture of the existing concrete wall.

1) For openings where GWB exists, the infill will be covered with rigid board insulation, furred, and then covered with GWB. Finishes will match the existing interior.

2) For openings where exposed CMU/concrete interior finish exists, the infill will consist of 10” CMU with the interior parged and finished to match the existing interior.

3) If a grounding wire passes through the existing opening, it will need to be routed through 1” PVC conduit and sealed.

b. The existing exterior openings to be sealed include:

1) Southeast Elevation:

• First Floor: 26”x26”, 40”x24” and 48”x24”

• Second Floor: 24”x24” and 118”x 48”

• Third Floor: 42”x36”

• Fourth Floor: 23”x22”and 23”x22”

• Fifth Floor: 23”x22”

2) Southwest Elevation:

• Second Floor: 77”x35”

3) Northeast Elevation:

• Third Floor: 42”x36” (partial closure)

• Fifth Floor: 82”x32”

4) Northwest Elevation:

• Third Floor: 42”x36”

• Fourth Floor: 29”x24” and 18”x12” and 12”x24” (existing CMU infilled - exterior parge coat only)

• Fifth Floor: 23”x22”, 23”x22”.

c. Three existing inoperable 24”x24” wall exhaust fans will be replaced in kind on the 1st, 2nd and 3rd floors to provide the code required minimum ventilation for the building. During warm weather conditions, thermostat in automatic mode, will cycle exhaust fan operation. Fans may be operated manually as needed for continuous ventilation when necessary. Fan existing electrical sources will be reused.

d. From visual inspection the FAA has established a baseline of 960 sq.ft. of concrete surface defects at the exterior of the ARSR tower. Repair visible exterior concrete defects including spalling and rebar pop-outs. Provide sounding practices as necessary to identify additional concrete defects that are to be repaired on a unit cost basis.

e. Existing vertical expansion joint caulking w/backer rod at the exterior contains asbestos to be abated and replaced with new caulking w/backer rod. Vertical joints at the sides of each of twelve pilasters measuring approximately 90 lineal feet in height for a total of 2,160 lineal ft. of joint remediation.

1. PERIMETER ROOF GUARDRAIL UPGRADE & MISCELLANEOUS ITEMS

a. The existing 250 ft. length of non-compliant roof guardrail will be replaced with a new compliant guardrail system that does not penetrate the roof membrane.

b. The new guardrail will provide fall protection to meet OSHA 1926.502(b) Standards.

c. The guardrail system will be anchored to the concrete structure of the building.

d. The new guardrail components will be hot dipped galvanized steel.

e. The guardrail will be fitted with a continuous 4” high toe board attached to the guardrail posts.

f. The design and construction of the guardrail system will be permanent, i.e., no removable sections.

g. Dedicated posts for mounting four BUEC antennas shall be furnished and installed by the guardrail contractor to accommodate BUEC antenna base heights of 44.5 inches above the roof per the FAA-SSC. FAA-SSC will remove and furnish & install all hardware to remove and remount the BUEC antennas and related cables in coordination with guardrail replacement.

h. Contractor shall replace two BUEC cable enclosures (splice boxes) with new s/s enclosures.

FAA-SSC will coordinate with the contractor to remove and reroute the BUEC cables through the enclosures.

i. Contractor shall remove abandoned and unused comm. switches, receptacle, cables, J-boxes and conduits per the FAA-SSC. Two existing conduits penetrating the roof shall be cut and capped above the roof line.

j. Contractor shall remove four abandoned tripod dish support stanchions as follows: (1) Cut/grind all tripod legs just below the top of the existing pitch pockets; (2) Top off pitch pockets with new pitch; (3) Cap pitch pockets with material to match the existing roof membrane; (4) Paint potential trip hazards yellow.

k. Contractor shall remove steel platform, canopy and caged ladder from the NW exterior wall.

Remove all associated anchors and repair resulting concrete damage.

l. Grounding & Lightning Protection (By FAA-TSOG)

1) FAA-TSOG will remove and reinstall the Grounding and Lightning protection system at the roof level per FAA-Std 019f and in coordination with the guardrail replacement.

2) The new roof guardrail system will be bonded (every 16 ft.) to a new 250 ft. perimeter ground cable and connected to the existing lightning down conductors.

3) Existing metal components within 6 ft. of the perimeter cable will be bonded to the cable.

4) New lightning air terminals (24” length) will be mounted/bonded to the guardrail spaced approximately 25 ft. apart.

5) All work will be coordinated with ARSR operations and will not impact the existing rooftop equipment / antennas.

6) Four new post supports for BUEC antennas will be bonded to the perimeter cable.

2. PUBLICATIONS: The applicable requirements of the latest edition of the following codes and standards shall apply:

a. American Society of Heating. Refrigeration and Air Conditioning Engineering (ASHRAE)

b. NFPA 70 - National Electric Code (NEC)

c. IMC – International Mechanical Code

d. FAA Std-032

e. FAA Std-019e

f. FAA Std-1217f - Electrical Work - Interior

3. ENVIRONMENTAL:

a. Environmental assessment to be performed in areas where construction may disturb existing assemblies.

4. SECURITY AND ACCESS TO THE ARSR-4 SITE:

a. The contractor and all sub-contractors shall be escorted at all times by the FAA on-site representative. Escort will be provided by the RE and/or the ESU site tech.

5. MANUFACTURER'S SPECIFICATIONS AND DRAWINGS:

a. All equipment shall be installed in accordance with manufacturer's specifications and drawings.

All discrepancies are to be reported to the RE for resolution.

6. WORK PERFORMANCE:

a. The contractor shall assure all work is performed and supervised by a trained and qualified person for the trade being performed. The contractor shall insure the certification of all CFC (refrigerant) handlers.

7. ACCEPTABLE WORK:

a. All work performed by the contractor and sub-contractor shall be in accordance with all industry and FAA standards and must be approved by the RE. Contractor shall notify RE, five

(5) days prior to completion of all work for final inspection, and testing for acceptance.

8. DISPOSAL AND SITE CLEAN- UP:

a. The contractor shall remove all debris resulting from construction and secure the site at the end of each day. Refrigerant will be recovered per EPA regulations. Final clean up shall be performed by the contractor upon completion of the job.

9. CONTACTS AND TELEPHONE NUMBERS:

b. Kevin Weinheimer SSC Manager 412-269-9241

c. Francis Wichryk ATS Specialist 724-693-8964

d. Craig Gray ATS Specialist 412-589-0150

e. Dennis Hays SEC Manager 317-247-2696

f. Rob Andrews AJW-2E15K – Architect 718-553-4941

g. Jean Sanon AJW-2E15K – Elec. Engineer 718-553-4844

h. Russ Classi AJW-2E15K – Mech. Engineer 718-553-3376

i. George Beasley PIM 404-305-7127

j. Ed Brand Spvr Engineering Svces 718-553-4961