SIR 6973GH-20-R-00093 Question and Answers 2.docx
DOCX document 13 KB Posted
- Solicitation number
- 6973GH-20-R-00093
About this file
This document provides details regarding a solicitation by the Federal Aviation Administration for building envelope sealing, roof guardrail upgrading, and other miscellaneous upgrades at an air traffic control facility in Oakdale, Pennsylvania. The contractor will be responsible for furnishing all labor, materials, equipment, insurance, permits, and supervision to complete the work described in the technical specifications, construction drawings, and other attachments. Questions about the project, specifications, or plans must be submitted in writing by May 15, 2020, and proposals are due by May 22, 2020. The contractor must be registered in the System for Award Management, and the FAA reserves the right to review offerors' program eligibility and communicate with offerors during the solicitation process. The anticipated contract type is firm-fixed-price for construction services.
The document includes attachments providing additional project details and required proposal submission forms. The solicitation number is 6973GH-20-R-00093.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIR 6973GH-20-R-00093 Question & Answers 2
Drawing S002
1. Can each of the railings connect at a post via pipe to pipe bolted connection? I guess were not really understanding detail 4 and what the rails are and how they connect.
The guardrail specified is based on a prefabricated engineered system with manufacturer standard posts, rails and toe plate.
1. Does the toe kick need to be a formed piece or will simple flat strip suffice?
See above response.
Please clarify Note 7 on Dwg. D001
1. Any idea as to if we will know the identified materials are ACM, before the bid date so we can include or exclude the cost for this work correctly.
The contractor should be aware that ACM may be encounter at the concrete roof ledge. Any ACM encountered is to be managed in place. Any incidental ACM abatement required will be added on an as needed basis.