Standard_Specifications_for_DTM.pdf
PDF 79 KB Posted
- Attached to
- West Side Bicycle Boulevards
- Solicitation number
- 260141
- Issued by
- Pima County, Tucson City, Arizona
About this file
This is a Standard Specifications and Details document issued by the Pima Association of Governments (PAG) that establishes the technical and construction standards applicable to the West Side Bicycle Boulevards project in Tucson, Arizona. The document incorporates the 2015 PAG Standard Specifications and Details for Public Improvements, along with updates from 2019-1, 2019-2, and 2020-1, by reference. The project involves roadway improvements designed to create a bicycle boulevard facility, including traffic calming measures such as speed humps and speed cushions, traffic circles, concrete curb and sidewalk construction, curb access ramps, concrete driveway aprons, traffic signal installation and modifications, pavement markings, signing, and landscaping improvements as detailed in City of Tucson Plan No. I-2024-018.
The specifications establish that any conflicts between the Special Provisions contained within the project documents and the referenced PAG Standard Specifications and Details shall be resolved with the Special Provisions prevailing. The complete 2015 PAG Standard Specifications and Details for Public Improvements are available for order in both printed and electronic formats through the Pima Association of Governments online portal at http://apps.pagregion.com/standardspecifications/. These specifications serve as the binding technical standards for all construction work performed under this contract.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD SPECIFICATIONS AND DETAILS
The 2015 Pima Association of Governments (PAG) Standard Specifications and Details for Public
Improvements, together with updates 2019-1, 2019-2 and 2020-1 are incorporated herein by this reference and are as much a part of this document as if they were attached hereto or as they may be modified herein.
In the event of any conflict, seeming or real, between the Special Provisions contained herein and the above-referenced Standard Specifications and Details, these Special Provisions shall prevail.
Copies of the 2015 Pima Association of Governments (PAG) Standard Specifications and Details for Public Improvements are available (printed or electronic download) for order online at:
http://apps.pagregion.com/standardspecifications/ http://apps.pagregion.com/standardspecifications/
File details come from the government source that posted it. Updated .