SS 2027 PW2 Estimates Form - Addenda 4.xlsx
XLSX spreadsheet 298 KB Posted
- Attached to
- SS 2027 PW2
- Solicitation number
- BD-27-1217-MAP03-MAP03-133291
- Issued by
- Norfolk County, Boston City, Massachusetts
About this file
Summary
This is an Estimates Form for the Metropolitan Area Planning Council (MAPC) on behalf of the South Shore Regional Services Consortium representing twelve Massachusetts municipalities: Braintree, Cohasset, Duxbury, Hanover, Hingham, Hull, Marshfield, Milton, Norwell, Pembroke, Rockland, and Scituate. The document provides detailed cost and quantity estimates for public works services and materials to be provided through December 31, 2027, under IFB SS 2027 PW2. The spreadsheet itemizes fourteen major work categories including roadway management, surface sealing treatments, crack sealing, pavement markings, guardrail work, street sweeping, catch basin cleaning, earth materials, debris disposal, trench patch repairs, street signs, sidewalk construction, tree services, mobile crushing services, pedestrian crosswalk solutions, and cold in-place recycling. Sealed bids were due October 8, 2026, at 4:30 p.m. via CommBUYS. The contract term extends through December 31, 2027, with possible extension if new contracts are not procured by that date, though no term including extensions shall exceed three years. The total estimated cost across all work items is approximately $11.9 million for District 6 and $10.9 million for District 5.
Contractors must submit unit pricing on a per-ton, per-square-yard, per-linear-foot, or other specified unit basis depending on the work item. MassDOT prequalification is required; non-prequalified contractors' bids will be rejected unless a waiver is requested at least two weeks before bid opening. A 5% bid deposit (bid bond or certified check) and performance and labor/materials payment bonds at 50% of estimated contract value are required. Contractors must provide comprehensive general liability insurance ($2 million aggregate/$1 million per occurrence), automobile liability ($1 million), workers compensation, and excess liability ($2 million aggregate/$1 million occurrence). Massachusetts prevailing wage laws apply. All employees must complete 10 hours of OSHA-approved construction safety and health training before beginning work. Individual contracts will be executed between each municipality and the low bidder; municipalities reserve the right to accept or reject award recommendations. A 1% MAPC contract administration fee applies based on total invoiced amounts. Work shall conform to the latest MassDOT Standard Specifications for Highways and Bridges.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2027 PW1 Data
| IFB#: SS 2027 PW2 | District 6 | District 5 | District 5 | District 5 | District 5 | District 5 | District 5 | District 6 | District 5 | District 5 | District 5 | District 5 | ||||||||||||||
| North | North | South | South | North | North | South | North | South | South | South | South | |||||||||||||||
| September 9, 2026 | Est. Cost | Est. Unit Cost | Est. Quant. | Units | Est. Cost | Est. Unit Cost | Est. Quant. | Units | Est. Cost | Est. Unit Cost | Est. Quant. | Units | Misc. | Braintree | Cohasset | Duxbury | Hanover | Hingham | Hull | Marshfield | Milton | Norwell | Pembroke | Rockland | Scituate | |
| ALL | NORTH | SOUTH | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 |
| Total Estimated Cost 1 = | $ 11,949,322 | $ - 0 | $ - 0 | ||
| 1 | Roadway Management |
| 120.1 | Unclassified Excavation | 129,600 | 12.000 | 10,800 | CY | - | 9,200 | CY | - | 1,400 | CY | 100 | 100 | 9,200 | 1,000 | 200 | 200 | ||||
| 121 | Class A Rock Excavation | 13,100 | 50.000 | 262 | CY | - | - | CY | - | 142 | CY | 2 | 20 | 120 | 120 | ||||||
| 129 | Bituminous Concrete Excavation by Cold Planer | 453,330 | 2.700 | 167,900 | SY | - | 85,900 | SY | - | 79,000 | SY | 80,000 | 5,000 | 20,000 | 4,900 | 1,000 | 50,000 | 1,000 | 3,000 | 3,000 | |
| 129.1 | Bituminous Concrete Excavation by Cold Planer [Keyways] | 40,720 | 20.000 | 2,036 | SY | - | 736 | SY | - | 1,100 | SY | 50 | 500 | 200 | 636 | 50 | 200 | 200 | 200 | ||
| 141.1 | Test Pit for Exploration | 200 | 10.000 | 20 | CY | - | - | CY | - | 20 | CY | 20 | |||||||||
| 142 | Class B Trench Excavation | 300 | 60.000 | 5 | CY | - | - | CY | - | 5 | CY | 5 | |||||||||
| 144 | Class B Rock Excavation | 250 | 50.000 | 5 | CY | - | - | CY | - | 5 | CY | 5 | |||||||||
| 151 | Gravel Borrow | 14,550 | 10.000 | 1,455 | CY | - | - | CY | - | 1,295 | CY | 5 | 30 | 1,000 | 100 | 160 | 160 | ||||
| 153 | Controlled Density Fill - Excavatable | 8,400 | 120.000 | 70 | CY | - | - | CY | - | 40 | CY | 10 | 30 | 30 | |||||||
| 170 | Fine Grading & Compacting | 88,805 | 1.000 | 88,805 | SY | - | 13,800 | SY | - | 75,005 | SY | 5 | 5,000 | 13,800 | 20,000 | 50,000 | |||||
| 187.3 | Removal & Disposal of Drainage Structure Sediments | 1,000 | 100.000 | 10 | CY | - | - | CY | - | 10 | CY | 10 | |||||||||
| 201 | Catch Basin | 55,000 | 2,500.000 | 22 | EA | - | - | EA | - | 19 | EA | 10 | 6 | 3 | 3 | ||||||
| 202 | Manhole | 55,000 | 2,500.000 | 22 | EA | - | - | EA | - | 19 | EA | 10 | 6 | 3 | 3 | ||||||
| 202.2 | Manhole [9 - 14 feet depth] | 9,600 | 3,200.000 | 3 | EA | - | - | EA | - | 2 | EA | 1 | 1 | 1 | |||||||
| 202.3 | Manhole [14 - 18 feet depth] | 12,000 | 4,000.000 | 3 | EA | - | - | EA | - | 2 | EA | 1 | 1 | 1 | |||||||
| 204 | Gutter Inlet | 10,800 | 1,200.000 | 9 | EA | - | - | EA | - | 9 | EA | 3 | 6 | ||||||||
| 205 | Leaching Basin | 30,800 | 2,800.000 | 11 | EA | - | - | EA | - | 9 | EA | 5 | 2 | 2 | 2 | ||||||
| 220.1.2 | Drainage Structure Adjusted [Less than 6" Vertical] | 191,600 | 400.000 | 479 | EA | - | 274 | EA | - | 195 | EA | 180 | 20 | 60 | 64 | 20 | 10 | 30 | 75 | 10 | 10 |
| 220.2 | Drainage Structure Rebuilt | 25,700 | 200.000 | 129 | VFt | - | 34 | VFt | - | 75 | VFt | 10 | 15 | 10 | 21 | 3 | 10 | 20 | 20 | 20 | |
| 220.3 | Drainage Structure Change in Type | 10,200 | 600.000 | 17 | EA | - | - | EA | - | 12 | EA | 2 | 5 | 5 | 5 | ||||||
| 220.5 | Drainage Structure Remodeled | 44,500 | 500.000 | 89 | EA | - | - | EA | - | 84 | EA | 2 | 2 | 75 | 5 | 5 | |||||
| 220.7.2 | Sanitary Structure Adjusted [Less than 6" Vertical] | 85,600 | 400.000 | 214 | EA | - | 209 | EA | - | 5 | EA | 180 | 5 | 20 | 9 | ||||||
| 220.8 | Sanitary Structure Remodeled | 400 | 400.000 | 1 | EA | - | - | EA | - | 1 | EA | 1 | |||||||||
| 221 | Frame & Cover | 32,500 | 500.000 | 65 | EA | - | - | EA | - | 55 | EA | 15 | 30 | 10 | 10 | ||||||
| 222 | Frame & Grate | 32,500 | 500.000 | 65 | EA | - | - | EA | - | 55 | EA | 15 | 30 | 10 | 10 | ||||||
| 222.1 | Frame & Grate MHD Cascade Type | 5,000 | 500.000 | 10 | EA | - | - | EA | - | 10 | EA | 5 | 5 | ||||||||
| 223 | Frame & Grate (or Cover) Removed and Reset | 40,000 | 400.000 | 100 | EA | - | - | EA | - | 95 | EA | 10 | 20 | 60 | 5 | 5 | |||||
| 238.12 | 12" Ductile Iron Pipe | 6,000 | 100.000 | 60 | LF | - | - | LF | - | 60 | LF | 20 | 40 | ||||||||
| 244.12 | 12" Reinforced Concrete Pipe Class V | 12,300 | 60.000 | 205 | LF | - | - | LF | - | 105 | LF | 5 | 100 | 100 | |||||||
| 252.12 | 12" Corrugated Plastic Pipe | 13,000 | 50.000 | 260 | LF | - | - | LF | - | 160 | LF | 20 | 40 | 100 | 100 | ||||||
| 252.112 | 12" Corrugated Plastic (Polyethylene) Pipe Flared End | 150 | 150.000 | 1 | EA | - | - | EA | - | 1 | EA | 1 | |||||||||
| 258 | Stone for Pipe Ends | 3,250 | 50.000 | 65 | SY | - | - | SY | - | 35 | SY | 5 | 30 | 30 | |||||||
| 269.06 | 6" Slot Perforated Corrugated Plastic Pipe (Subdrain) | 1,950 | 30.000 | 65 | LF | - | - | LF | - | 35 | LF | 5 | 30 | 30 | |||||||
| 269.08 | 8" Slot Perforated Corrugated Plastic Pipe (Subdrain) | 1,950 | 30.000 | 65 | LF | - | - | LF | - | 35 | LF | 5 | 30 | 30 | |||||||
| 357 | Gate Box | 38,000 | 200.000 | 190 | EA | - | - | EA | - | 175 | EA | 10 | 50 | 100 | 15 | 15 | |||||
| 358.1 | Gate Box Adjusted [Greater than 6" Vertical] | 31,400 | 200.000 | 157 | EA | - | 22 | EA | - | 130 | EA | 5 | 10 | 20 | 2 | 10 | 100 | 5 | 5 | ||
| 358.2 | Gate Box Adjusted [Less than 6" Vertical] | 75,600 | 200.000 | 378 | EA | - | 178 | EA | - | 195 | EA | 150 | 30 | 50 | 21 | 7 | 10 | 100 | 5 | 5 | |
| 381 | Service Box | 33,000 | 200.000 | 165 | EA | - | - | EA | - | 165 | EA | 5 | 60 | 100 | |||||||
| 381.3 | Service Box Adjusted | 41,000 | 200.000 | 205 | EA | - | - | EA | - | 205 | EA | 20 | 60 | 50 | 75 | ||||||
| 402 | Dense Graded Crushed Stone for Sub-Base | 26,500 | 20.000 | 1,325 | CY | - | - | CY | - | 1,125 | CY | 25 | 900 | 200 | 200 | ||||||
| 402.12 | Dense Graded Crushed Stone for Shoulders | 2,600 | 20.000 | 130 | CY | - | - | CY | - | 70 | CY | 10 | 60 | 60 | |||||||
| 403 | Reclaimed Base Course and/or Sub-Base | 332,900 | 4.000 | 83,225 | SY | - | 3,000 | SY | - | 80,125 | SY | 25 | 5,000 | 3,000 | 75,000 | 100 | 100 | ||||
| 403.1 | Crushed Stone for Blending | 60 | 20.000 | 3 | TN | - | - | TN | - | 3 | TN | 3 | |||||||||
| 420 | Class I Bituminous Concrete Base Course Type I-1 | 1,056,000 | 80.000 | 13,200 | TN | - | - | TN | - | 13,200 | TN | 200 | 3,000 | 10,000 | |||||||
| 440 | Calcium Chloride for Roadway Dust Control | 5 | 1.000 | 5 | Lb. | - | - | Lb. | - | 5 | Lb. | 5 | |||||||||
| 442 | Liquid Calcium Chloride for Blending | 2 | 2.000 | 1 | Gal. | - | - | Gal. | - | 1 | Gal. | 1 | |||||||||
| 443 | Water for Roadway Dust Control [per M Gallons] | 500 | 100.000 | 5 | M Gal. | - | - | M Gal. | - | 5 | M Gal. | 5 | |||||||||
| 460 | Class I Bituminous Concrete Pavement Type I-1 | 2,412,492 | 72.000 | 33,507 | TN | - | 15,057 | TN | - | 17,450 | TN | 9,000 | 250 | 3,000 | 4,847 | 1,200 | 10 | 3,200 | 10,000 | 1,000 | 1,000 |
| 460.2 | Class I Bituminous Concrete Pavement Type I-1 Open Graded | 588,000 | 80.000 | 7,350 | TN | - | - | TN | - | 7,300 | TN | 250 | 7,000 | 50 | 50 | ||||||
| 460.5 | Class I Bituminous Concrete Pavement Type I-1 Binder | 1,757,070 | 68.000 | 25,839 | TN | - | 4,039 | TN | - | 20,800 | TN | 1,500 | 1,500 | 3,023 | 1,000 | 16 | 6,800 | 10,000 | 1,000 | 1,000 | |
| 461 | Class I Dense Bituminous Concrete Type ST | 936,000 | 72.000 | 13,000 | TN | - | 1,000 | TN | - | 12,000 | TN | 2,000 | 1,000 | 10,000 | |||||||
| 464 | Bitumen for Tack Coat | 48,800 | 5.000 | 9,760 | Gal. | - | 4,200 | Gal. | - | 5,530 | Gal. | 3,000 | 2,000 | 2,790 | 1,200 | 210 | 500 | 30 | 30 | ||
| 464.5 | Hot Poured Rubberized Asphalt Sealer | 9,600 | 1.500 | 6,400 | LF | - | 3,400 | LF | - | 3,000 | LF | 3,400 | 2,500 | 500 | |||||||
| 472.1 | Patching | 194,000 | 200.000 | 970 | SY | - | - | SY | - | 910 | SY | 750 | 100 | 60 | 60 | ||||||
| 472.2 | Patching without Gravel | 42,000 | 200.000 | 210 | SY | - | - | SY | - | 180 | SY | 50 | 100 | 30 | 30 | ||||||
| 472.3 | Patching with Gravel 3" | 48,000 | 200.000 | 240 | SY | - | - | SY | - | 195 | SY | 50 | 100 | 45 | 45 | ||||||
| 472.4 | Grind & Inlay | 50,000 | 50.000 | 1,000 | SY | - | - | SY | - | 800 | SY | 100 | 500 | 200 | 200 | ||||||
| 482.15 | Hot Applied Asphalt Crack Filler (Polyester Fibers) | 95,000 | 50.000 | 1,900 | Gal. | - | - | Gal. | - | 1,700 | Gal. | 500 | 1,000 | 200 | 200 | ||||||
| 483.5 | Sawing Pavement and Sidewalk Joints | 34,200 | 2.000 | 17,100 | LF | - | - | LF | - | 17,100 | LF | 100 | 12,000 | 5,000 | |||||||
| 504 | Granite Curb Type VA4 - Straight | 250,250 | 35.000 | 7,150 | LF | - | 100 | LF | - | 6,050 | LF | 50 | 5,000 | 100 | 1,000 | 1,000 | |||||
| 504.1 | Granite Curb Type VA4 - Curved | 75,390 | 42.000 | 1,795 | LF | - | 40 | LF | - | 1,255 | LF | 5 | 750 | 40 | 500 | 500 | |||||
| 506 | Granite Curb Type VB - Straight | 182,325 | 33.000 | 5,525 | LF | - | - | LF | - | 4,525 | LF | 25 | 500 | 3,000 | 1,000 | 1,000 | |||||
| 506.1 | Granite Curb Type VB - Curved | 84,210 | 42.000 | 2,005 | LF | - | - | LF | - | 1,505 | LF | 5 | 500 | 500 | 500 | 500 | |||||
| 509 | Granite Transition Curb for Wheelchair Ramps - Straight | 24,150 | 35.000 | 690 | LF | - | - | LF | - | 660 | LF | 30 | 500 | 100 | 30 | 30 | |||||
| 509.1 | Granite Transition Curb for Wheelchair Ramps - Curved | 25,200 | 42.000 | 600 | LF | - | - | LF | - | 570 | LF | 20 | 500 | 20 | 30 | 30 | |||||
| 511.1 | Granite Edging Type SB Straight | 18,920 | 22.000 | 860 | LF | - | - | LF | - | 810 | LF | 10 | 750 | 50 | 50 | ||||||
| 516 | Granite Curb Corner Type A | 25,500 | 150.000 | 170 | EA | - | - | EA | - | 120 | EA | 10 | 60 | 50 | 50 | ||||||
| 520 | Concrete Curb Type VA | 280 | 28.000 | 10 | LF | - | - | LF | - | 10 | LF | 10 | |||||||||
| 570.1 | Bituminous Concrete Curb Type 1 | 64,190 | 4.900 | 13,100 | LF | - | - | LF | - | 13,100 | LF | 100 | 12,000 | 1,000 | |||||||
| 570.2 | Bituminous Concrete Curb Type 2 | 63,945 | 4.900 | 13,050 | LF | - | - | LF | - | 13,050 | LF | 50 | 12,000 | 1,000 | |||||||
| 570.3 | Bituminous Concrete Curb Type 3 | 63,945 | 4.900 | 13,050 | LF | - | - | LF | - | 13,050 | LF | 50 | 12,000 | 1,000 | |||||||
| 580 | Curb Remove and Reset | 23,000 | 25.000 | 920 | LF | - | - | LF | - | 820 | LF | 20 | 700 | 100 | 100 | ||||||
| 582 | Curb Corner Remove and Reset | 5,400 | 40.000 | 135 | EA | - | - | EA | - | 85 | EA | 5 | 30 | 50 | 50 | ||||||
| 670 | Fence Removed and Reset | 500 | 20.000 | 25 | LF | - | - | LF | - | 25 | LF | 25 | |||||||||
| 697 | Sedimentation Fence | 60 | 3.000 | 20 | LF | - | - | LF | - | 20 | LF | 20 | |||||||||
| 701 | Concrete Sidewalk | 270,250 | 50.000 | 5,405 | SY | - | - | SY | - | 5,205 | SY | 5 | 5,000 | 200 | 200 | ||||||
| 701.1 | Concrete Sidewalk at Driveways | 63,800 | 55.000 | 1,160 | SY | - | - | SY | - | 960 | SY | 10 | 750 | 200 | 200 | ||||||
| 701.2 | Concrete Wheelchair Ramp | 121,000 | 100.000 | 1,210 | SY | - | - | SY | - | 1,110 | SY | 10 | 1,000 | 100 | 100 | ||||||
| 702 | Bituminous Concrete Walk Surface | 826,500 | 150.000 | 5,510 | TN | - | - | TN | - | 5,410 | TN | 10 | 5,000 | 300 | 100 | 100 | |||||
| 702.1 | Excavation & Disposal of Existing Sidewalk | 83,100 | 10.000 | 8,310 | SY | - | - | SY | - | 8,310 | SY | 10 | 8,000 | 300 | |||||||
| 703 | Bituminous Concrete Driveways [Handwork] | 117,450 | 150.000 | 783 | TN | - | 283 | TN | - | 500 | TN | 200 | 100 | 198 | 85 | 200 | |||||
| 704.1 | Remove & Reset Brick walkway per Arlington Specifications | 22,000 | 100.000 | 220 | SY | - | - | SY | - | 220 | SY | 20 | 200 | ||||||||
| 715 | Rural Mailbox Removed and Reset | 500 | 50.000 | 10 | EA | - | - | EA | - | 10 | EA | 10 | |||||||||
| 751 | Loam Borrow | 23,500 | 50.000 | 470 | CY | - | - | CY | - | 370 | CY | 20 | 250 | 100 | 100 | ||||||
| 765 | Seeding | 10,040 | 2.000 | 5,020 | SY | - | - | SY | - | 4,020 | SY | 20 | 3,000 | 1,000 | 1,000 | ||||||
| 676.4 | Wood Chip Mulch | 150 | 30.000 | 5 | CY | - | - | CY | - | 5 | CY | 5 | |||||||||
| 767 | Mulch Sock | 100 | 20.000 | 5 | LF | - | - | LF | - | 5 | LF | 5 | |||||||||
| 767.8 | Bales of Hay for Erosion Control | 20 | 2.000 | 10 | EA | - | - | EA | - | 10 | EA | 10 | |||||||||
| 811.36 | Private Utility (Electric/Communications) Manhole Adjusted [Less than 6" Vertical] | 7,500 | 500.000 | 15 | EA | - | 10 | EA | - | 5 | EA | 5 | 10 | ||||||||
| 819.831 | Wire Loop Installed in Roadway | 9,450 | 15.000 | 630 | LF | - | 150 | LF | - | 280 | LF | 5 | 150 | 75 | 200 | 200 | |||||
| 854.014 | Temporary Pavement Markings - 4" Painted | 3,901 | 0.150 | 26,005 | LF | - | - | LF | - | 26,005 | LF | 5 | 6,000 | 20,000 | |||||||
| 854.034 | Temporary Pavement Markings - 4" Removable Tape | 13,275 | 1.000 | 13,275 | LF | - | 5,200 | LF | - | 8,075 | LF | 200 | 2,000 | 6,000 | 5,000 | 75 | |||||
| 861.04 | 4" Reflectorized Yellow Line - Painted | 13,250 | 0.250 | 53,000 | LF | - | 10,000 | LF | - | 33,000 | LF | 3,000 | 10,000 | 20,000 | 10,000 | 10,000 | |||||
| 866.04 | 4" Reflectorized White Line - Thermoplastic | 25,485 | 0.520 | 49,010 | LF | - | 10,000 | LF | - | 27,010 | LF | 10 | 15,000 | 10,000 | 12,000 | 12,000 | |||||
| 866.12 | 12" Reflectorized White Line - Thermoplastic | 13,748 | 2.250 | 6,110 | LF | - | - | LF | - | 3,110 | LF | 10 | 100 | 3,000 | 3,000 | ||||||
| 867.04 | 4" Reflectorized Yellow Line - Thermoplastic | 23,405 | 0.520 | 45,010 | LF | - | 10,000 | LF | - | 25,010 | LF | 10 | 15,000 | 10,000 | 10,000 | 10,000 | |||||
| 874.1 | Sign Removed and Reset | 5,250 | 150.000 | 35 | EA | - | - | EA | - | 35 | EA | 5 | 30 | ||||||||
| Traffic Controls/Safety Signing | |||||||||||||||||||||
| Traffic Controls/Safety Signing | 840 | 8.000 | 105 | SF | - | 100 | SF | - | 5 | SF | 5 | 100 | |||||||||
| Reflectorized Drums with Flashers [Type A] - Drum Day | 10 | 0.250 | 40 | DY | - | - | DY | - | 40 | DY | 10 | 30 | |||||||||
| Reflectorized Drums without Flashers - Drum Day | 34 | 0.400 | 85 | DY | - | 40 | DY | - | 45 | DY | 15 | 30 | 40 | ||||||||
| Traffic Cones - Unit Day | 55 | 1.000 | 55 | DY | - | - | DY | - | 55 | DY | 25 | 30 | |||||||||
| Portable Changeable Message Boards - Unit Day | 2,700 | 20.000 | 135 | DY | - | 100 | DY | - | 35 | DY | 5 | 30 | 100 | ||||||||
| Night Differential [Lump Sum] per Night | 35,000 | 5,000.000 | 7 | Night | - | 6 | Night | - | 1 | Night | 1 | 6 | |||||||||
| Equipment Rental | - | ||||||||||||||||||||
| Gradall | 19,600 | 100.000 | 196 | HR | - | - | HR | - | 156 | HR | 16 | 100 | 40 | 40 | |||||||
| Grader | 34,960 | 190.000 | 184 | HR | - | - | HR | - | 144 | HR | 4 | 100 | 40 | 40 | |||||||
| Tandem 10-Ton Roller | 6,600 | 100.000 | 66 | HR | - | - | HR | - | 66 | HR | 16 | 50 | |||||||||
| 10-Ton Vibrator Roller | 5,800 | 100.000 | 58 | HR | - | - | HR | - | 58 | HR | 8 | 50 |
| Total Estimated Cost 4 = | $ 4,485,787 | ||||
| Total Estimated Cost 4A = | $ 3,094,286 | $ - 0 | $ 3,094,286 | ||
| 4 | Roadway Surface Sealing Treatments |
| 4A | Microsurfacing | ||||||||||||||||||
| 1) | Surface Course (1 Lift) [30,000sy and over] | 4,450 | 1.780 | 2,500 | SY | - | 1.780 | - | SY | 4,450 | 1.780 | 2,500 | SY | 0 | 2,500 | 0 | 0 | 0 | |
| 2) | Surface Course (1 Lift) [under 30,000sy] | 67,106 | 1.780 | 37,700 | SY | - | 1.780 | - | SY | 67,106 | 1.780 | 37,700 | SY | 0 | 2,500 | 35,200 | 0 | 0 | |
| 3) | Leveling & Surface Course (2 Lifts) [30,000sy and over] | 38,200 | 3.820 | 10,000 | SY | - | 3.820 | - | SY | 38,200 | 3.820 | 10,000 | SY | 0 | 10,000 | 0 | 0 | 0 | |
| 4) | Leveling & Surface Course (2 Lifts) [under 30,000sy] | 174,020 | 3.850 | 45,200 | SY | - | 3.850 | - | SY | 174,020 | 3.850 | 45,200 | SY | 0 | 10,000 | 35,200 | 0 | 0 | |
| 5) | Crack Sealing [per Square Yard] | 4,000 | 0.400 | 10,000 | SY | - | 0.400 | - | SY | 4,000 | 0.400 | 10,000 | SY | 0 | 10,000 | 0 | 0 | 0 | |
| 6) | Crack Sealing [per Day] | 4 | 0.400 | 10 | DY | - | 0.400 | - | DY | 4 | 0.400 | 10 | DY | 0 | 8 | 2 | 0 | 0 | |
| 7) | Rut Filling | 22,500 | 90.000 | 250 | TN | - | 90.000 | - | TN | 22,500 | 90.000 | 250 | SY | 0 | 250 | 0 | 0 | 0 | |
| 8) | Shimming [per Square Yard] | 2,700,000 | 90.000 | 30,000 | SY | - | 90.000 | - | SY | 2,700,000 | 90.000 | 30,000 | SY | 0 | 30,000 | 0 | 0 | 0 | |
| 9) | Shimming [per Ton] | 69,300 | 90.000 | 770 | TN | - | 90.000 | - | TN | 69,300 | 90.000 | 770 | TN | 0 | 500 | 270 | 0 | 0 | |
| 10) | Drainage or Sanitary Structures - Adjusted | 7,290 | 90.000 | 81 | TN | - | 90.000 | - | EA | 7,290 | 90.000 | 81 | EA | 0 | 50 | 31 | 0 | 0 | |
| 11) | Drainage or Sanitary Structures - Rebuilt | 5,940 | 90.000 | 66 | TN | - | 90.000 | - | FT | 5,940 | 90.000 | 66 | EA | 0 | 50 | 16 | 0 | 0 | |
| 12) | Traffic Controls/Safety Signing | - | - | - | |||||||||||||||
| Traffic Controls/Safety Signing | 100 | 1.000 | 100 | SF | - | 1.000 | - | SF | 100 | 1.000 | 100 | SF | 0 | 100 | 0 | 0 | 0 | ||
| Reflectorized Drums with Flashers [Type A] - Drum Day | 0 | 0.010 | 25 | DY | - | 0.010 | - | DY | 0 | 0.010 | 25 | DY | 0 | 25 | 0 | 0 | 0 | ||
| Reflectorized Drums without Flashers - Drum Day | 0 | 0.010 | 25 | DY | - | 0.010 | - | DY | 0 | 0.010 | 25 | DY | 0 | 25 | 0 | 0 | 0 | ||
| Traffic Cones - Unit Day | 0 | 0.010 | 25 | DY | - | 0.010 | - | DY | 0 | 0.010 | 25 | DY | 0 | 25 | 0 | 0 | 0 | ||
| Portable Changeable Message Boards - Unit Day | 1,375 | 55.000 | 25 | DY | - | 55.000 | - | DY | 1,375 | 55.000 | 25 | DY | 0 | 25 | 0 | 0 | 0 | ||
| - | |||||||||||||||||||
| Total Estimated Cost 4B = | $ 961,026 | $ - 0 | $ 961,026 | ||||||||||||||||
| 4 | Roadway Surface Sealing Treatments |
| 4B | Emulsion with Latex [Chip Seal] | |||||||||||||||||||||||||
| 1) | Patch Work | 114,125 | 55.000 | 2,075 | SY | - | 55.000 | - | SY | 114,125 | 55.000 | 2,075 | SY | 0 | 0 | 2,000 | 0 | 0 | 0 | 0 | 0 | 0 | 75 | 0 | 0 | |
| 2) | Double Stone Seal (1/2" & 3/8" Stone) | 380,000 | 8.000 | 47,500 | SY | - | 8.000 | - | SY | 380,000 | 8.000 | 47,500 | SY | 0 | 0 | 7,500 | 0 | 0 | 0 | 0 | 0 | 0 | 40,000 | 0 | 0 | |
| 3) | Double Stone Seal (3/8" Stone & 1/4" Grit) | 380,000 | 8.000 | 47,500 | SY | - | 8.000 | - | SY | 380,000 | 8.000 | 47,500 | SY | 0 | 0 | 7,500 | 0 | 0 | 0 | 0 | 0 | 0 | 40,000 | 0 | 0 | |
| 4) | Single Stone Seal (1/2" & 3/8" Stone) | 85,425 | 2.010 | 42,500 | SY | - | 2.010 | - | SY | 85,425 | 2.010 | 42,500 | SY | 0 | 0 | 2,500 | 0 | 0 | 0 | 0 | 0 | 0 | 40,000 | 0 | 0 | |
| 5) | Traffic Controls/Safety Signing | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Traffic Controls/Safety Signing | 100 | 1.000 | 100 | SF | - | 1.000 | - | SF | 100 | 1.000 | 100 | SF | 0 | 0 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Reflectorized Drums with Flashers [Type A] - Drum Day | 0 | 0.010 | 25 | DY | - | 0.010 | - | DY | 0 | 0.010 | 25 | DY | 0 | 0 | 25 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Reflectorized Drums without Flashers - Drum Day | 0 | 0.010 | 25 | DY | - | 0.010 | - | DY | 0 | 0.010 | 25 | DY | 0 | 0 | 25 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Traffic Cones - Unit Day | 0 | 0.010 | 25 | DY | - | 0.010 | - | DY | 0 | 0.010 | 25 | DY | 0 | 0 | 25 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Portable Changeable Message Boards - Unit Day | 1,375 | 55.000 | 25 | DY | - | 55.000 | - | DY | 1,375 | 55.000 | 25 | DY | 0 | 0 | 25 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Total Estimated Cost 4C = | $ 430,476 | $ - 0 | $ 430,476 | ||
| 4 | Roadway Surface Sealing Treatments |
| 4C | Asphalt Rubber Surface Treatment | ||||||||||||||||||
| 1) | 10% Asphalt Surface Treatment | 214,500 | 3.30 | 65,000 | SY | - | 3.30 | - | SY | 214,500 | 3.30 | 65,000 | SY | 0 | 15,000 | 0 | 50,000 | 0 | |
| 2) | 20% Asphalt Surface Treatment | 214,500 | 3.30 | 65,000 | SY | - | 3.30 | - | SY | 214,500 | 3.30 | 65,000 | SY | 0 | 15,000 | 0 | 50,000 | 0 | |
| 3) | Traffic Controls/Safety Signing | - 0 | - 0 | - 0 | |||||||||||||||
| Traffic Controls/Safety Signing | 100 | 1.000 | 100 | SF | - | 1.000 | - | SF | 100 | 1.000 | 100 | SF | 0 | 100 | 0 | 0 | 0 | ||
| Reflectorized Drums with Flashers [Type A] - Drum Day | 0 | 0.010 | 25 | DY | - | 0.010 | - | DY | 0 | 0.010 | 25 | DY | 0 | 25 | 0 | 0 | 0 | ||
| Reflectorized Drums without Flashers - Drum Day | 0 | 0.010 | 25 | DY | - | 0.010 | - | DY | 0 | 0.010 | 25 | DY | 0 | 25 | 0 | 0 | 0 | ||
| Traffic Cones - Unit Day | 0 | 0.010 | 25 | DY | - | 0.010 | - | DY | 0 | 0.010 | 25 | DY | 0 | 25 | 0 | 0 | 0 | ||
| Portable Changeable Message Boards - Unit Day | 1,375 | 55.000 | 25 | DY | - | 55.000 | - | DY | 1,375 | 55.000 | 25 | DY | 0 | 25 | 0 | 0 | 0 |
| Total Estimated Cost 5 = | $ 356,750 | ||||
| Total Estimated Cost 5A = | $ 50,500 | $ - 0 | $ 43,550 | ||
| 5 | CRACK SEALING |
| A. Asphalt-Fiber Reinforced Compound | ||||||||||||||
| 1) | Asphalt-Fiber Reinforced Compound - Day | 50,500 | 5,050.000 | 10 | DY | - | 4,355.000 | - | DY | 43,550 | 4,355.000 | 10 | DY | 10 |
| 2) | Asphalt-Fiber Reinforced Compound - Half Day | - | 2,860.500 | - | Half Day | - | 2,860.500 | - | Half Day | - | 2,860.500 | - | Half Day |
| Total Estimated Cost 5B = | $ 216,750 | $ 24,165 | $ 88,605 | ||
| 5 | CRACK SEALING |
| B. Asphalt-Fiber Reinforced Compound | |||||||||||||||||||
| 1) | Asphalt-Fiber Reinforced Compound - Gallon | 216,750 | 8.500 | 25,500 | Gallon | 24,165 | 5.370 | 4,500 | Gallon | 88,605 | 5.370 | 16,500 | DY | 4,500 | 4,500 | 4,500 | 3,000 | 4,500 | 4,500 |
| Total Estimated Cost 5C = | $ 55,000 | $ - 0 | $ 51,830 | ||
| 5 | CRACK SEALING |
| C. Modified Asphalt-Fiber Reinforced Compound | ||||||||||||||
| 1) | Modified Asphalt-Fiber Reinforced Compound - Day | 55,000 | 5,500.000 | 10 | DY | - | 5,183.000 | - | DY | 51,830 | 5,183.000 | 10 | DY | 10 |
| 2) | Modified Asphalt-Fiber Reinforced Compound - Half Day | - | 2,550.000 | - | Half Day | - | 2,550.000 | - | Half Day | - | 2,550.000 | - | Half Day |
| Total Estimated Cost 5D = | $ 34,500 | $ - 0 | $ 16,110 | ||
| 5 | CRACK SEALING |
| D. Modified Asphalt-Fiber Reinforced Compound | ||||||||||||||
| 1) | Modified Asphalt-Fiber Reinforced Compound - Gallon | 34,500 | 11.500 | 3,000 | Gallon | - | 5.370 | - | Gallon | 16,110 | 5.370 | 3,000 | DY | 3,000 |
| Total Estimated Cost 6 = | $ 591,081 | $ - 0 | $ - 0 | ||
| 6 | PAVEMENT MARKINGS | ||||
| [Contractor Provides both LABOR & MATERIALS] |
| 6A | Thermoplastic | $ 451,530 | $ - | $ - | |||||||||||||
| 1) | 4" Yellow Double | 19,375 | 0.760 | 25,493 | LF | - | 21,493 | LF | - | 4,000 | LF | 21,493 | 0 | 0 | 0 | 4,000 | |
| 2) | 4" Yellow Single | 236,285 | 0.350 | 675,100 | LF | - | 81,600 | LF | - | 593,500 | LF | 81,600 | 0 | 590,000 | 0 | 3,500 | |
| 3) | 4" Yellow - Dashed | 18 | 0.360 | 50 | LF | - | - | LF | - | 50 | LF | 0 | 0 | 0 | 0 | 50 | |
| 4) | 4" White Double | - | 0.720 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 5) | 4" White Single | 167,086 | 0.380 | 439,700 | LF | - | 81,700 | LF | - | 358,000 | LF | 81,700 | 0 | 350,000 | 0 | 8,000 | |
| 6) | 4" White - Dashed | 1,919 | 0.380 | 5,050 | LF | - | 5,000 | LF | - | 50 | LF | 5,000 | 0 | 0 | 0 | 50 | |
| 7) | 6" Yellow Double | - | 0.450 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 8) | 6" White - Single | - | 0.450 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 9) | 12" White Stop & Crosswalk | 7,033 | 1.450 | 4,850 | LF | - | 4,800 | LF | - | 50 | LF | 4,800 | 0 | 0 | 0 | 50 | |
| 10) | 6' White Police Circles | 100 | 50.000 | 2 | EA | - | - | EA | - | 2 | EA | 0 | 0 | 0 | 0 | 2 | |
| 11) | 8' White "SCHOOL" Legend | 1,400 | 100.000 | 14 | EA | - | 4 | EA | - | 10 | EA | 4 | 0 | 0 | 0 | 10 | |
| 12) | 8' White "ONLY" Legend | 1,000 | 100.000 | 10 | EA | - | - | EA | - | 10 | EA | 0 | 0 | 0 | 0 | 10 | |
| 13) | Arrows [federal size] | 5,625 | 75.000 | 75 | EA | - | 50 | EA | - | 25 | EA | 50 | 0 | 0 | 0 | 25 | |
| 14) | 4" White Parking T's and L's | 1,850 | 5.000 | 370 | EA | - | 70 | EA | - | 300 | EA | 70 | 0 | 0 | 0 | 300 | |
| 15) | 4" White or Yellow Channelization/Median Islands | 40 | 0.400 | 100 | LF | - | - | LF | - | 100 | LF | 0 | 0 | 0 | 0 | 100 | |
| 16) | 10' White "SCHOOL" | 200 | 100.000 | 2 | SF | - | - | SF | - | 2 | SF | 0 | 0 | 0 | 0 | 2 | |
| 17) | White "RXR" [federal size] | 2,400 | 100.000 | 24 | EA | - | 14 | EA | - | 10 | EA | 14 | 0 | 0 | 0 | 10 | |
| 18) | 8' White "STOP" | 2,750 | 25.000 | 110 | EA | - | 80 | EA | - | 30 | EA | 80 | 0 | 0 | 0 | 30 | |
| 19) | 2' Letters | - | 2.000 | - | EA | - | - | EA | - | - | EA | 0 | 0 | 0 | 0 | 0 | |
| 20) | 3' Letters | - | 2.000 | - | EA | - | - | EA | - | - | EA | 0 | 0 | 0 | 0 | 0 | |
| 21) | 4" Parking Lot stalls (est. 50 lf each) | 2,600 | 2.000 | 1,300 | EA | - | 1,300 | EA | - | - | EA | 1,300 | 0 | 0 | 0 | 0 | |
| 22) | Bike Lane Symbols - White Directional Arrow | 200 | 10.000 | 20 | LF | - | - | LF | - | 20 | LF | 0 | 0 | 0 | 0 | 20 | |
| 23) | Bike Lane Symbols - White Bicycle | 200 | 10.000 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 0 | 0 | 0 | 20 | |
| 24) | Bike Lane Symbols - White Bicyclist | 200 | 10.000 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 0 | 0 | 0 | 20 | |
| 25) | Bike Lane Letters - White "BIKE", "LANE" | 100 | 10.000 | 10 | EA | - | - | EA | - | 10 | EA | 0 | 0 | 0 | 0 | 10 | |
| 26) | Bike Lane Symbols - White Sharrow/Shared Lane | - | - | EA | - | - | EA | - | - | EA | 0 | 0 | 0 | 0 | 0 | ||
| 27) | Bicycle Detector Symbol - White | 750 | 75.000 | 10 | EA | - | - | EA | - | 10 | EA | 0 | 0 | 0 | 0 | 10 | |
| 28) | Grind Existing Lines (95% - 100%) | 400 | 1.000 | 400 | LF | - | - | LF | - | 400 | LF | 0 | 0 | 0 | 0 | 400 |
| 6B | Water-Based Paint | $ 49,041 | $ - | $ - | |||||||||||||
| 1) | 4" Yellow Double | 1,227 | 0.074 | 16,582 | LF | - | - | LF | - | 16,582 | LF | 0 | 500 | 0 | 6,082 | 10,000 | |
| 2) | 4" Yellow Single | 1,261 | 0.037 | 34,082 | LF | - | - | LF | - | 34,082 | LF | 0 | 25,000 | 0 | 6,082 | 3,000 | |
| 3) | 4" Yellow - Dashed | 150 | 0.037 | 4,050 | LF | - | - | LF | - | 4,050 | LF | 0 | 0 | 0 | 4,000 | 50 | |
| 4) | 4" White Double | 666 | 0.074 | 9,000 | LF | - | - | LF | - | 9,000 | LF | 0 | 5,000 | 0 | 4,000 | 0 | |
| 5) | 4" White Single | 965 | 0.037 | 26,082 | LF | - | - | LF | - | 26,082 | LF | 0 | 0 | 0 | 6,082 | 20,000 | |
| 6) | 4" White - Dashed | 2 | 0.037 | 50 | LF | - | - | LF | - | 50 | LF | 0 | 0 | 0 | 0 | 50 | |
| 7) | 6" Yellow Double | - | 0.450 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 8) | 6" White - Single | - | 0.450 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 9) | 12" White Stop & Crosswalk | 1,278 | 0.360 | 3,550 | LF | - | - | LF | - | 3,550 | LF | 0 | 1,500 | 0 | 2,000 | 50 | |
| 10) | 6' White Police Circles | 200 | 40.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 3 | 0 | 0 | 2 | |
| 11) | 8' White "SCHOOL" Legend | 3,390 | 30.000 | 113 | EA | - | - | EA | - | 113 | EA | 0 | 3 | 0 | 100 | 10 | |
| 12) | 8' White "ONLY" Legend | 3,120 | 26.000 | 120 | EA | - | - | EA | - | 120 | EA | 0 | 10 | 0 | 100 | 10 | |
| 13) | Arrows [federal size] | 2,430 | 18.000 | 135 | EA | - | - | EA | - | 135 | EA | 0 | 10 | 0 | 100 | 25 | |
| 14) | 4" White Parking T's and L's | 20 | 1.000 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 20 | 0 | 0 | 0 | |
| 15) | 4" White or Yellow Channelization/Median Islands | 98 | 0.160 | 610 | LF | - | - | LF | - | 610 | LF | 0 | 10 | 0 | 500 | 100 | |
| 16) | 10' White "SCHOOL" | 19,418 | 38.000 | 511 | SF | - | - | SF | - | 511 | SF | 0 | 3 | 0 | 500 | 8 | |
| 17) | White "RXR" [federal size] | 550 | 50.000 | 11 | EA | - | - | EA | - | 11 | EA | 0 | 3 | 0 | 0 | 8 | |
| 18) | 8' White "STOP" | 150 | 1.000 | 150 | EA | - | - | EA | - | 150 | EA | 0 | 40 | 0 | 100 | 10 | |
| 19) | 2' Letters | 120 | 3.000 | 40 | EA | - | - | EA | - | 40 | EA | 0 | 20 | 0 | 0 | 20 | |
| 20) | 3' Letters | 360 | 4.000 | 90 | EA | - | - | EA | - | 90 | EA | 0 | 20 | 0 | 50 | 20 | |
| 21) | 4" Parking Lot stalls (est. 50 lf each) | 21 | 0.250 | 85 | EA | - | - | EA | - | 85 | EA | 0 | 25 | 0 | 60 | 0 | |
| 22) | Bike Lane Symbols - White Directional Arrow | 650 | 10.000 | 65 | LF | - | - | LF | - | 65 | LF | 0 | 5 | 0 | 50 | 10 | |
| 23) | Bike Lane Symbols - White Bicycle | 75 | 5.000 | 15 | EA | - | - | EA | - | 15 | EA | 0 | 5 | 0 | 0 | 10 | |
| 24) | Bike Lane Symbols - White Bicyclist | 150 | 10.000 | 15 | EA | - | - | EA | - | 15 | EA | 0 | 5 | 0 | 0 | 10 | |
| 25) | Bike Lane Letters - White "BIKE", "LANE" | 2,625 | 25.000 | 105 | EA | - | - | EA | - | 105 | EA | 0 | 5 | 0 | 0 | 100 | |
| 26) | Bike Lane Symbols - White Sharrow/Shared Lane | - | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | ||
| 27) | Bicycle Detector Symbol - White | 115 | 23.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | |
| 28) | Grind Existing Lines (95% - 100%) | 10,000 | 1.000 | 10,000 | LF | - | - | LF | - | 10,000 | LF | 0 | 10,000 | 0 | 0 | 0 |
| 6C | Epoxy | $ 66,038 | $ - | $ - | |||||||||||||
| 1) | 4" Yellow Double | 3,949 | 0.600 | 6,582 | LF | - | - | LF | - | 6,582 | LF | 0 | 500 | 0 | 6,082 | 0 | |
| 2) | 4" Yellow Single | 9,325 | 0.300 | 31,082 | LF | - | - | LF | - | 31,082 | LF | 0 | 25,000 | 0 | 6,082 | 0 | |
| 3) | 4" Yellow - Dashed | 1,200 | 0.300 | 4,000 | LF | - | - | LF | - | 4,000 | LF | 0 | 0 | 0 | 4,000 | 0 | |
| 4) | 4" White Double | 5,400 | 0.600 | 9,000 | LF | - | - | LF | - | 9,000 | LF | 0 | 5,000 | 0 | 4,000 | 0 | |
| 5) | 4" White Single | 1,825 | 0.300 | 6,082 | LF | - | - | LF | - | 6,082 | LF | 0 | 0 | 0 | 6,082 | 0 | |
| 6) | 4" White - Dashed | - | 0.300 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 7) | 6" Yellow Double | - | 0.450 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 8) | 6" White - Single | - | 0.450 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 9) | 12" White Stop & Crosswalk | 2,465 | 1.450 | 1,700 | LF | - | - | LF | - | 1,700 | LF | 0 | 1,500 | 0 | 200 | 0 | |
| 10) | 6' White Police Circles | 225 | 75.000 | 3 | EA | - | - | EA | - | 3 | EA | 0 | 3 | 0 | 0 | 0 | |
| 11) | 8' White "SCHOOL" Legend | 9,270 | 90.000 | 103 | EA | - | - | EA | - | 103 | EA | 0 | 3 | 0 | 100 | 0 | |
| 12) | 8' White "ONLY" Legend | 9,350 | 85.000 | 110 | EA | - | - | EA | - | 110 | EA | 0 | 10 | 0 | 100 | 0 | |
| 13) | Arrows [federal size] | 6,710 | 61.000 | 110 | EA | - | - | EA | - | 110 | EA | 0 | 10 | 0 | 100 | 0 | |
| 14) | 4" White Parking T's and L's | 400 | 20.000 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 20 | 0 | 0 | 0 | |
| 15) | 4" White or Yellow Channelization/Median Islands | 60 | 1.000 | 60 | LF | - | - | LF | - | 60 | LF | 0 | 10 | 0 | 50 | 0 | |
| 16) | 10' White "SCHOOL" | 7,560 | 120.000 | 63 | SF | - | - | SF | - | 63 | SF | 0 | 3 | 0 | 60 | 0 | |
| 17) | White "RXR" [federal size] | 3,180 | 60.000 | 53 | EA | - | - | EA | - | 53 | EA | 0 | 3 | 0 | 50 | 0 | |
| 18) | 8' White "STOP" | 2,600 | 65.000 | 40 | EA | - | - | EA | - | 40 | EA | 0 | 40 | 0 | 0 | 0 | |
| 19) | 2' Letters | 100 | 5.000 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 20 | 0 | 0 | 0 | |
| 20) | 3' Letters | 120 | 6.000 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 20 | 0 | 0 | 0 | |
| 21) | 4" Parking Lot stalls (est. 50 lf each) | 50 | 2.000 | 25 | EA | - | - | EA | - | 25 | EA | 0 | 25 | 0 | 0 | 0 | |
| 22) | Bike Lane Symbols - White Directional Arrow | 375 | 75.000 | 5 | LF | - | - | LF | - | 5 | LF | 0 | 5 | 0 | 0 | 0 | |
| 23) | Bike Lane Symbols - White Bicycle | 375 | 75.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | |
| 24) | Bike Lane Symbols - White Bicyclist | 500 | 100.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | |
| 25) | Bike Lane Letters - White "BIKE", "LANE" | 500 | 100.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | |
| 26) | Bike Lane Symbols - White Sharrow/Shared Lane | - | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | ||
| 27) | Bicycle Detector Symbol - White | 500 | 100.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | |
| 28) | Grind Existing Lines (95% - 100%) | 20,000 | 2.000 | 10,000 | LF | - | - | LF | - | 10,000 | LF | 0 | 10,000 | 0 | 0 | 0 |
| 6D | Low V.O.C. | $ 24,471 | $ - | $ - | |||||||||||||
| 1) | 4" Yellow Double | 40 | 0.080 | 500 | LF | - | - | LF | - | 500 | LF | 0 | 500 | 0 | 0 | 0 | |
| 2) | 4" Yellow Single | 1,025 | 0.041 | 25,000 | LF | - | - | LF | - | 25,000 | LF | 0 | 25,000 | 0 | 0 | 0 | |
| 3) | 4" Yellow - Dashed | - | 0.041 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 4) | 4" White Double | 410 | 0.082 | 5,000 | LF | - | - | LF | - | 5,000 | LF | 0 | 5,000 | 0 | 0 | 0 | |
| 5) | 4" White Single | - | 0.040 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 6) | 4" White - Dashed | - | 0.041 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 7) | 6" Yellow Double | - | 0.450 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 8) | 6" White - Single | - | 0.450 | - | LF | - | - | LF | - | - | LF | 0 | 0 | 0 | 0 | 0 | |
| 9) | 12" White Stop & Crosswalk | 645 | 0.430 | 1,500 | LF | - | - | LF | - | 1,500 | LF | 0 | 1,500 | 0 | 0 | 0 | |
| 10) | 6' White Police Circles | 75 | 25.000 | 3 | EA | - | - | EA | - | 3 | EA | 0 | 3 | 0 | 0 | 0 | |
| 11) | 8' White "SCHOOL" Legend | 105 | 35.000 | 3 | EA | - | - | EA | - | 3 | EA | 0 | 3 | 0 | 0 | 0 | |
| 12) | 8' White "ONLY" Legend | 250 | 25.000 | 10 | EA | - | - | EA | - | 10 | EA | 0 | 10 | 0 | 0 | 0 | |
| 13) | Arrows [federal size] | 250 | 25.000 | 10 | EA | - | - | EA | - | 10 | EA | 0 | 10 | 0 | 0 | 0 | |
| 14) | 4" White Parking T's and L's | 60 | 3.000 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 20 | 0 | 0 | 0 | |
| 15) | 4" White or Yellow Channelization/Median Islands | 2 | 0.200 | 10 | LF | - | - | LF | - | 10 | LF | 0 | 10 | 0 | 0 | 0 | |
| 16) | 10' White "SCHOOL" | 126 | 42.000 | 3 | SF | - | - | SF | - | 3 | SF | 0 | 3 | 0 | 0 | 0 | |
| 17) | White "RXR" [federal size] | 297 | 99.000 | 3 | EA | - | - | EA | - | 3 | EA | 0 | 3 | 0 | 0 | 0 | |
| 18) | 8' White "STOP" | 40 | 1.000 | 40 | EA | - | - | EA | - | 40 | EA | 0 | 40 | 0 | 0 | 0 | |
| 19) | 2' Letters | 55 | 2.750 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 20 | 0 | 0 | 0 | |
| 20) | 3' Letters | 160 | 8.000 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 20 | 0 | 0 | 0 | |
| 21) | 4" Parking Lot stalls (est. 50 lf each) | 6 | 0.250 | 25 | EA | - | - | EA | - | 25 | EA | 0 | 25 | 0 | 0 | 0 | |
| 22) | Bike Lane Symbols - White Directional Arrow | 125 | 25.000 | 5 | LF | - | - | LF | - | 5 | LF | 0 | 5 | 0 | 0 | 0 | |
| 23) | Bike Lane Symbols - White Bicycle | 225 | 45.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | |
| 24) | Bike Lane Symbols - White Bicyclist | 225 | 45.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | |
| 25) | Bike Lane Letters - White "BIKE", "LANE" | 175 | 35.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | |
| 26) | Bike Lane Symbols - White Sharrow/Shared Lane | - | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | ||
| 27) | Bicycle Detector Symbol - White | 175 | 35.000 | 5 | EA | - | - | EA | - | 5 | EA | 0 | 5 | 0 | 0 | 0 | |
| 28) | Grind Existing Lines (95% - 100%) | 20,000 | 2.000 | 10,000 | LF | - | - | LF | - | 10,000 | LF | 0 | 10,000 | 0 | 0 | 0 |
| Total Estimated Cost 7 = | $ 191,786 | $ 15,470 | $ 162,916 | ||
| 7 | Guardrail |
| 7A | Steel Beam [New Type SS Galvanized Rail/Posts/Hardware] | $ 99,820 | $ 10,870 | $ 79,550 | ||||||||||||||||||||||
| 1) | Straight (single-faced) | 46,830 | 21.000 | 2,230 | LF | 2,730 | 21.000 | 130 | LF | 42,000 | 21.000 | 2,000 | LF | 100 | 0 | 100 | 100 | 30 | 0 | 0 | 0 | 200 | 1,500 | 100 | 100 | |
| 2) | Curved (single-faced) | 24,150 | 23.000 | 1,050 | LF | 2,300 | 23.000 | 100 | LF | 19,550 | 23.000 | 850 | LF | 100 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | 50 | 500 | 100 | 100 | |
| 3) | Straight (double-faced) | - | 50.000 | - | LF | - | 50.000 | - | LF | - | 50.000 | - | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 4) | Terminal Section (single-faced) | 25,000 | 50.000 | 500 | EA | 5,000 | 50.000 | 100 | EA | 15,000 | 50.000 | 300 | EA | 100 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 100 | 100 | |
| 5) | Terminal Section (double-faced) | - | 85.000 | - | EA | - | 85.000 | - | EA | - | 85.000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 6) | Green/Red Terminal End Delineator | - | 25.000 | - | EA | - | 25.000 | - | EA | - | 25.000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 7) | White Mountable Delineator | - | 6.000 | - | EA | - | 6.000 | - | EA | - | 6.000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 8) | Highway Guard Buried Ends (single-faced) | - | 490.000 | - | EA | - | 490.000 | - | EA | - | 490.000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 9) | Remove & Dispose of Existing | 3,000 | 6.000 | 500 | LF | - | 6.000 | - | LF | 3,000 | 6.000 | 500 | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500 | 0 | 0 | |
| 10) | Class B Rock Excavation | 840 | 42.0000 | 20 | CY | 840 | 42.0000 | 20 | CY | - | 42.0000 | - | CY | 0 | 0 | 0 | 0 | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 7B | Steel Beam [New Corten Rail/Posts/Hardware] | $ 49,566 | $ - | $ 49,566 | ||||||||||||||||||||||
| 1) | Straight (single-faced) | 33,694 | 19.8200 | 1,700 | LF | - | 19.8200 | - | LF | 33,694 | 19.8200 | 1,700 | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 200 | 1,500 | 0 | 0 | |
| 2) | Curved (single-faced) | 15,092 | 27.4400 | 550 | LF | - | 27.4400 | - | LF | 15,092 | 27.4400 | 550 | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 50 | 500 | 0 | 0 | |
| 3) | Straight (double-faced) | - | 44.0000 | - | LF | - | 44.0000 | - | LF | - | 44.0000 | - | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 4) | Terminal Section (single-faced) | - | 58.0000 | - | EA | - | 58.0000 | - | EA | - | 58.0000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 5) | Terminal Section (double-faced) | - | 58.0000 | - | EA | - | 58.0000 | - | EA | - | 58.0000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 6) | Green/Red Terminal End Delineator | - | 24.0000 | - | EA | - | 24.0000 | - | EA | - | 24.0000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 7) | White Mountable Delineator | - | 6.0000 | - | EA | - | 6.0000 | - | EA | - | 6.0000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 8) | Highway Guard Buried Ends (single-faced) | - | 444.0000 | - | EA | - | 444.0000 | - | EA | - | 444.0000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 9) | Remove & Dispose of Existing | 780 | 1.5600 | 500 | LF | - | 1.5600 | - | LF | 780 | 1.5600 | 500 | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500 | 0 | 0 | |
| 10) | Class B Rock Excavation | - | 42.0000 | - | CY | - | 42.0000 | - | CY | - | 42.0000 | - | CY | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 7C | Steel Beam [New Corten Rail/Hardware/Wood Posts] | $ 17,800 | $ - | $ 17,800 | ||||||||||||||||||||||
| 1) | Straight (single-faced) | 15,400 | 22.000 | 700 | LF | - | 22.000 | - | LF | 15,400 | 22.000 | 700 | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 200 | 500 | 0 | 0 | |
| 2) | Curved (single-faced) | 1,200 | 24.000 | 50 | LF | - | 24.000 | - | LF | 1,200 | 24.000 | 50 | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 50 | 0 | 0 | 0 | |
| 3) | Straight (double-faced) | - | 44.0000 | - | LF | - | 44.0000 | - | LF | - | 44.0000 | - | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 4) | Terminal Section (single-faced) | - | 50.000 | - | EA | - | 50.000 | - | EA | - | 50.000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 5) | Terminal Section (double-faced) | - | 58.0000 | - | EA | - | 58.0000 | - | EA | - | 58.0000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 6) | Green/Red Terminal End Delineator | - | 24.0000 | - | EA | - | 24.0000 | - | EA | - | 24.0000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 7) | White Mountable Delineator | 1,200 | 6.0000 | 200 | EA | - | 6.0000 | - | EA | 1,200 | 6.0000 | 200 | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 200 | 0 | 0 | |
| 8) | Highway Guard Buried Ends (single-faced) | - | 444.0000 | - | EA | - | 444.0000 | - | EA | - | 444.0000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 9) | Remove & Dispose of Existing | - | 6.000 | - | LF | - | 6.000 | - | LF | - | 6.000 | - | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 10) | Class B Rock Excavation | - | 42.0000 | - | CY | - | 42.0000 | - | CY | - | 42.0000 | - | CY | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 11) | Concrete Posts Remove & Dispose | - | 12.0000 | - | EA | - | 12.0000 | - | EA | - | 12.0000 | - | EA | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 7D | New Wood | $ 24,600 | $ 4,600 | $ 16,000 | ||||||||||||||||||||||
| 1) | Type 1 (including posts 8' o.c.) | 24,600 | 20.000 | 1,230 | LF | 4,600 | 20.000 | 230 | LF | 16,000 | 20.000 | 800 | LF | 200 | 0 | 200 | 200 | 30 | 0 | 0 | 0 | 200 | 0 | 200 | 200 | |
| 2) | Remove & Dispose of Existing Type 1 | - | 6.000 | - | LF | - | 6.000 | - | LF | - | 6.000 | - | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 3) | Type 2 (including posts 8' o.c.) | - | 25.000 | - | LF | - | 25.000 | - | LF | - | 25.000 | - | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 4) | Remove & Dispose of Existing Type 2 | - | 6.000 | - | LF | - | 6.000 | - | LF | - | 6.000 | - | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Total Estimated Cost 8 = | $ 84,000 | $ - 0 | $ 84,000 | |||||||||||||||
| Total Estimated Cost 8A = | $ 59,600 | $ - 0 | $ 59,600 | |||||||||||||||
| 8 | Street Sweeping | |||||||||||||||||
| A) | Spring Clean-Up [Streets] | - | - | - | ||||||||||||||
| 1) Disposal by Town | 54,000 | 360.000 | 150 | CiM | - | 360.000 | - | CiM | 54,000 | 360.000 | 150 | CiM | 0 | 150 | 0 | 0 | ||
| 2) Disposal by Contractor | 5,600 | 28.000 | 200 | TN | - | 28.000 | - | TN | 5,600 | 28.000 | 200 | TN | 0 | 200 | 0 | 0 |
| Total Estimated Cost 8B = | $ 24,400 | - | $ 24,400 | ||||||||||||||
| B) | On-Call [Regular & Emergency] | - | - | - | |||||||||||||
| 1) Disposal by Town | 15,000 | 100.000 | 150 | HR | - | 100.000 | - | HR | 15,000 | 100.000 | 150 | HR | 0 | 150 | 0 | 0 | |
| 2) Disposal by Contractor | 9,400 | 47.000 | 200 | TN | - | 47.000 | - | TN | 9,400 | 47.000 | 200 | TN | 0 | 200 | 0 | 0 |
| Total Estimated Cost 9 = | $ 244,707 | $ 35,673 | ERROR:#REF! | |||||||||||||||||||||||
| 9 | Catch Basin Cleaning | |||||||||||||||||||||||||
| $ 29,614 | $ 2,600 | ERROR:#REF! | ||||||||||||||||||||||||
| 9A. | Catch Basin Cleaning [Disposal by Town] | - | - | - | ||||||||||||||||||||||
| 1) | Routine Maintenance | 25,792 | 12.400 | 2,080 | EA | 248 | 12.400 | 20 | EA | 25,544 | 12.400 | 2,060 | EA | 0 | 0 | 0 | 0 | 20 | 0 | 60 | 0 | 0 | 2,000 | 0 | 0 | |
| 2) | Emergency & Unscheduled Service | 3,822 | 98.000 | 39 | HR | 2,352 | 98.000 | 24 | HR | ERROR:#REF! | 98.000 | ERROR:#REF! | HR | 0 | 0 | 0 | 0 | 24 | 0 | 15 | 0 | 0 | 0 | 0 | 0 |
| $ 47,378 | $ 6,528 | $ 40,850 | |||||||||||||||||||||||
| 9B | Catch Basin Cleaning [Disposal by Contractor] | - | - | - | |||||||||||||||||||||
| 1) | Routine Maintenance | 40,128 | 26.400 | 1,520 | EA | 528 | 26.400 | 20 | EA | 39,600 | 26.400 | 1,500 | EA | 0 | 0 | 0 | 0 | 20 | 0 | 1,500 | 0 | 0 | 0 | 0 | 0 |
| 2) | Emergency & Unscheduled Service | 7,250 | 250.000 | 29 | HR | 6,000 | 250.000 | 24 | HR | 1,250 | 250.000 | 5 | HR | 0 | 0 | 0 | 0 | 24 | 0 | 5 | 0 | 0 | 0 | 0 | 0 |
| $ 94,260 | $ 3,860 | $ 90,400 | |||||||||||||||||||||||
| 9C | Jet-Rodding [Disposal by Contractor] | - | - | - | |||||||||||||||||||||
| 1) | Routine Maintenance | 86,700 | 85.000 | 1,020 | Cubic Yd. | 1,700 | 85.000 | 20 | Cubic Yd. | 85,000 | 85.000 | 1,000 | Cubic Yd. | 0 | 0 | 0 | 0 | 20 | 0 | 0 | 0 | 0 | 1,000 | 0 | 0 |
| 2) | Emergency & Unscheduled Service | 7,560 | 135.000 | 56 | HR | 2,160 | 135.000 | 16 | HR | 5,400 | 135.000 | 40 | HR | 0 | 0 | 0 | 0 | 16 | 0 | 0 | 0 | 0 | 40 | 0 | 0 |
| $ 22,810 | $ 17,940 | $ 4,870 | |||||||||||||||||||||||
| 9D | Drain Line Video Inspection & Reporting | - | - | - | |||||||||||||||||||||
| 1) | Inspection & Reporting | 18,000 | 900.000 | 20 | DY | 13,500 | 900.000 | 15 | DY | 4,500 | 900.000 | 5 | DY | 0 | 0 | 0 | 0 | 15 | 0 | 5 | 0 | 0 | 0 | 0 | 0 |
| 2) | Emergency & Unscheduled Service | 4,810 | 185.000 | 26 | HR | 4,440 | 185.000 | 24 | HR | 370 | 185.000 | 2 | HR | 0 | 0 | 0 | 0 | 24 | 0 | 2 | 0 | 0 | 0 | 0 | 0 |
| $ 46,795 | $ 3,295 | $ 43,500 | |||||||||||||||||||||||
| 9E | Water Quality Structure Maintenance [Disposal by Town] | - | - | - | |||||||||||||||||||||
| 1) | Routine Maintenance | 29,120 | 130.000 | 224 | EA | 3,120 | 130.000 | 24 | EA | 26,000 | 130.000 | 200 | EA | 0 | 20 | 0 | 0 | 4 | 0 | 200 | 0 | 0 | 0 | 0 | 0 |
| 2) | Emergency & Unscheduled Service | 17,675 | 175.000 | 101 | HR | 175 | 175.000 | 1 | HR | 17,500 | 175.000 | 100 | HR | 0 | 0 | 0 | 0 | 1 | 0 | 100 | 0 | 0 | 0 | 0 | 0 |
| $ 3,850 | $ 1,450 | $ 1,800 | |||||||||||||||||||||||
| 9F | Water Quality Structure Maintenance [Disposal by Contractor] | - | - | - | |||||||||||||||||||||
| 1) | Routine Maintenance | 3,600 | 150.000 | 24 | EA | 1,200 | 150.000 | 8 | EA | 1,800 | 150.000 | 12 | EA | 4 | 0 | 4 | 4 | 4 | 0 | 0 | 0 | 0 | 0 | 4 | 4 |
| 2) | Emergency & Unscheduled Service | 250 | 250.000 | 1 | HR | 250 | 250.000 | 1 | HR | - | 250.000 | - | HR | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Total Estimated Cost 10 Delivered = | $ 83,525 | $ - 0 | $ 51,105 | ||
| 10 | Earth Materials [Delivered] |
| 10A | Gravels [Delivered] | $ 40,700 | $ - | $ 22,540 | |||||||||||
| 1) | Gravel Borrow | 13,200 | 22.000 | 600 | TN | - | 11.900 | - | TN | 7,140 | 11.900 | 600 | TN | 600 | |
| 2) | Gravel for Sub-Base | 15,000 | 25.000 | 600 | TN | - | 14.000 | - | TN | 8,400 | 14.000 | 600 | TN | 600 | |
| 3) | Gravel [Packed Type] | 12,500 | 25.000 | 500 | TN | - | 14.000 | - | TN | 7,000 | 14.000 | 500 | TN | 500 | |
| 4) | Processed Gravel for Sub-Base (3/4" Dense Pack) | 15,000 | 25.000 | 600 | TN | - | 14.000 | - | TN | 8,400 | 14.000 | 600 | TN | 600 |
| 10B | Loam Borrow [Delivered] | $ - | $ - | $ - | ||||||||||
| 1) | Loam Borrow | - | 25.000 | - | CY | - | 13.700 | - | CY | - | 13.700 | - | CY |
| 10C | Ordinary Borrow [Delivered] | $ - | $ - | $ - | ||||||||||
| 1) | Ordinary Borrow | - | 20.000 | - | TN | - | 9.000 | - | TN | - | 9.000 | - | TN |
| 10D | Recycled Material [Delivered] | $ - | $ - | $ - | ||||||||||
| 1) | By Weight | - | 18.000 | - | TN | - | 11.000 | - | TN | - | 11.000 | - | TN |
| 10E | Sand [Delivered] | $ 8,575 | $ - | $ 8,575 | |||||||||||
| 1) | Washed | 6,575 | 13.150 | 500 | TN | - | 13.150 | - | TN | 6,575 | 13.150 | 500 | TN | 500 | |
| 2) | Borrow | 2,000 | 10.000 | 200 | TN | - | 10.000 | - | TN | 2,000 | 10.000 | 200 | TN | 200 |
| 10F | Stone [Delivered] | $ 28,250 | $ - | $ 13,990 | |||||||||||
| 1) | 3/8' Washed | - | 30.500 | - | TN | - | 16.000 | - | TN | - | 16.000 | - | TN | ||
| 2) | 1/2' Washed | - | 30.500 | - | TN | - | 16.000 | - | TN | - | 16.000 | - | TN | ||
| 3) | 3/4' Washed | - | 31.500 | - | TN | - | 15.900 | - | TN | - | 15.900 | - | TN | ||
| 4) | 1-1/2" Washed | - | 31.500 | - | TN | - | 15.900 | - | TN | - | 15.900 | - | TN | ||
| 5) | 2" Washed | 22,050 | 31.500 | 700 | TN | - | 16.000 | - | TN | 11,200 | 16.000 | 700 | TN | 700 | |
| 6) | Stone Dust | 3,050 | 30.500 | 100 | TN | - | 11.900 | - | TN | 1,190 | 11.900 | 100 | TN | 100 | |
| 7) | 6" - 10" Rip Rap | 3,150 | 31.500 | 100 | TN | - | 16.000 | - | TN | 1,600 | 16.000 | 100 | TN | 100 |
| 10G | Bituminous Materials [Delivered] | $ - | $ - | $ - | ||||||||||
| 1) | Hot Mix Asphalt [Type I] | - | 80.000 | - | TN | - | 62.890 | - | TN | - | 62.890 | - | TN | |
| 2) | Hot Mix Asphalt [Winter Mix Type I] | - | 101.000 | - | TN | - | 89.850 | - | TN | - | 89.850 | - | TN | |
| 3) | Winter Cold Patch | - | 105.000 | - | TN | - | 82.000 | - | TN | - | 82.000 | - | TN |
| 10H | Fiber Mulch [Delivered] | $ - | $ - | $ - | ||||||||||
| 1) | Fiber Mulch | - | 33.000 | - | CY | - | 33.000 | - | CY | - | 33.000 | - | CY |
| 10I | Winter Maintenance Sand [Delivered] | $ 6,000 | $ - | $ 6,000 | |||||||||||
| 1) | Winter Maintenance Sand | 6,000 | 12.000 | 500 | TN | - | 12.000 | - | TN | 6,000 | 12.000 | 500 | TN | 500 |
| Total Estimated Cost 10 F.O.B. = | $ 27,850 | $ - 0 | ERROR:#REF! | ||
| 10 | Earth Materials [F.O.B.] |
| 10A | Gravels [F.O.B.] | $ - | $ - | $ - | ||||||||||
| 1) | Gravel Borrow | - | 12.000 | - | TN | - | 7.000 | - | TN | - | 7.000 | - | TN | |
| 2) | Gravel for Sub-Base | - | 12.500 | - | TN | - | 9.000 | - | TN | - | 9.000 | - | TN | |
| 3) | Gravel [Packed Type] | - | 12.500 | - | TN | - | 9.000 | - | TN | - | 9.000 | - | TN | |
| 4) | Processed Gravel for Sub-Base (3/4" Dense Pack) | - | 12.500 | - | TN | - | 9.000 | - | TN | - | 9.000 | - | TN |
| 10B | Loam Borrow [F.O.B.] | $ - | $ - | ERROR:#REF! | ||||||||||
| 1) | Loam Borrow | - | 18.000 | - | CY | - | 6.000 | - | CY | ERROR:#REF! | 6.000 | ERROR:#REF! | CY |
| 10C | Ordinary Borrow [F.O.B.] | $ - | $ - | $ - | ||||||||||
| 1) | Ordinary Borrow | - | 9.000 | - | TN | - | 6.000 | - | TN | - | 6.000 | - | TN |
| 10D | Recycled Material [F.O.B.] | $ 750 | $ - | $ 550 | |||||||||||
| 1) | By Weight | 750 | 7.500 | 100 | TN | - | 5.500 | - | TN | 550 | 5.500 | 100 | TN | 100 |
| 10E | Sand [F.O.B.] | $ 1,750 | $ - | $ 1,450 | |||||||||||
| 1) | Washed | 1,000 | 10.000 | 100 | TN | - | 8.500 | - | TN | 850 | 8.500 | 100 | TN | 100 | |
| 2) | Borrow | 750 | 7.500 | 100 | TN | - | 6.000 | - | TN | 600 | 6.000 | 100 | TN | 100 |
| 10F | Stone [F.O.B.] | $ 850 | $ - | $ 550 | |||||||||||
| 1) | 3/8' Washed | - | 18.000 | - | TN | - | 11.000 | - | TN | - | 11.000 | - | TN | ||
| 2) | 1/2' Washed | - | 18.000 | - | TN | - | 11.000 | - | TN | - | 11.000 | - | TN | ||
| 3) | 3/4' Washed | - | 17.000 | - | TN | - | 11.000 | - | TN | - | 11.000 | - | TN | ||
| 4) | 1-1/2" Washed | - | 17.000 | - | TN | - | 11.000 | - | TN | - | 11.000 | - | TN | ||
| 5) | 2" Washed | - | 17.000 | - | TN | - | 11.000 | - | TN | - | 11.000 | - | TN | ||
| 6) | Stone Dust | 850 | 17.000 | 50 | TN | - | 11.000 | - | TN | 550 | 11.000 | 50 | TN | 50 | |
| 7) | 6" - 10" Rip Rap | - | 18.000 | - | TN | - | 11.000 | - | TN | - | 11.000 | - | TN |
| 10G | Bituminous Materials [F.O.B.] | $ 24,500 | $ - | $ 19,374 | |||||||||||
| 1) | Hot Mix Asphalt [Type I F.O.B.] | 8,000 | 80.000 | 100 | TN | - | 62.890 | - | TN | 6,289 | 62.890 | 100 | TN | 100 | |
| 2) | Hot Mix Asphalt [Winter Mix Type I F.O.B.] | 11,500 | 115.000 | 100 | TN | - | 89.850 | - | TN | 8,985 | 89.850 | 100 | TN | 100 | |
| 3) | Winter Cold Patch [F.O.B.] | 5,000 | 100.000 | 50 | TN | - | 82.000 | - | TN | 4,100 | 82.000 | 50 | TN | 50 |
| 10H | Fiber Mulch [F.O.B.] | $ - | $ - | $ - | ||||||||||
| 1) | Fiber Mulch | - | 33.000 | - | CY | - | 33.000 | - | CY | - | 33.000 | - | CY |
| 10I | Winter Maintenance Sand [F.O.B.] | $ - | $ - | $ - | ||||||||||
| 1) | Winter Maintenance Sand | - | 12.000 | - | TN | - | 12.000 | - | TN | - | 12.000 | - | TN |
| Total Estimated Cost 11 = | $ 72,988 | $ - 0 | $ - 0 | ||
| 11 | Debris Disposal |
| 1) | Catch Basin Cleanings | 36,735 | 48.980 | 750 | TN | - | - | TN | - | 750 | TN | 0 | 150 | 300 | 200 | 100 |
| 2) | Street Sweepings | 36,253 | 42.650 | 850 | TN | - | - | TN | - | 850 | TN | 0 | 200 | 300 | 150 | 200 |
| Total Estimated Cost 12 = | $ 412,900 | $ - 0 | ERROR:#REF! | ||
| 12 | Permanent Trench Patch Repairs |
| 1) | 4 Inch Grind and Inlay | 63,150 | 68.270 | 925 | SY | - | 100 | SY | ERROR:#REF! | ERROR:#REF! | SY | 0 | 0 | 300 | 200 | 100 | 0 | 125 | 0 | 100 | 0 | 50 | 50 |
| 2) | 1 1/2 Inch Grind and Inlay | 151,860 | 25.310 | 6,000 | SY | - | 600 | SY | - | 5,350 | SY | 300 | 0 | 2,000 | 800 | 300 | 0 | 500 | 0 | 2,000 | 0 | 50 | 50 |
| 3) | Infrared Pavement Patch Repair | 197,890 | 77.000 | 2,570 | SY | - | 50 | SY | - | 2,510 | SY | 0 | 0 | 1,000 | 500 | 50 | 0 | 500 | 0 | 500 | 0 | 10 | 10 |
| Total Estimated Cost 13 = | $ - 0 | $ - 0 | $ - 0 | ||
| 13 | FURNISH AND INSTALL STREET SIGNS AND POSTS |
| 1) | Street Name Sign, Double Sided with Hardware | - | 72.000 | - | EA | - | 72.000 | - | EA | - | 72.000 | - | EA |
| Street Name Sign, Double Sided with Hardware - Furnish Only | - | 30.000 | - | EA | - | 30.000 | - | EA | - | 30.000 | - | EA | |
| 2) | Street Sign, Double Sided with Hardware | - | 72.000 | - | EA | - | 72.000 | - | EA | - | 72.000 | - | EA |
| Street Sign, Double Sided with Hardware - Furnish Only | - | 30.000 | - | EA | - | 30.000 | - | EA | - | 30.000 | - | EA | |
| 3) | Street Name Sign, Single Sided with Hardware | - | 36.000 | - | EA | - | 36.000 | - | EA | - | 36.000 | - | EA |
| Street Name Sign, Single Sided with Hardware - Furnish Only | - | 20.000 | - | EA | - | 20.000 | - | EA | - | 20.000 | - | EA | |
| 4) | Street Sign, Single sided with Hardware | - | 36.000 | - | EA | - | 36.000 | - | EA | - | 36.000 | - | EA |
| Street Sign, Single sided with Hardware - Furnish Only | - | 20.000 | - | EA | - | 20.000 | - | EA | - | 20.000 | - | EA | |
| 5) | Sign Support – 1 Breakaway Post Assembly - Steel | - | 88.000 | - | EA | - | 88.000 | - | EA | - | 88.000 | - | EA |
| Sign Support – 1 Breakaway Post Assembly - Steel - Furnish Only | - | 50.000 | - | EA | - | 50.000 | - | EA | - | 50.000 | - | EA | |
| 6) | Signs Removed and Reset | - | 50.000 | - | EA | - | 50.000 | - | EA | - | 50.000 | - | EA |
| 7) | Signs Removed and Disposed | - | 5.000 | - | EA | - | 5.000 | - | EA | - | 5.000 | - | EA |
| 8) | Warning – Regulatory & Route Marker – Aluminum Panels (Type A) | - | 9.000 | - | SF | - | 9.000 | - | SF | - | 9.000 | - | SF |
| Warning – Regulatory & Route Marker – Aluminum Panels (Type A) - Furnish Only | - | 5.000 | - | SF | - | 5.000 | - | SF | - | 5.000 | - | SF |
| Total Estimated Cost 14 = | $ 796,585 | $ - 0 | $ - 0 | ||
| 14 | Sidewalk Construction, Reconstruction & Resurfacing |
| 1) | Cape Cod Berm [Machine Laid] | 4,000 | 10.00 | 400 | LF | - | - | LF | - | 400 | LF | 0 | 200 | 0 | 200 |
| 2) | Granite Curb - Straight [Supply and Set] | 207,195 | 36.35 | 5,700 | LF | - | - | LF | - | 5,700 | LF | 0 | 2,500 | 0 | 3,200 |
| Granite Curb - Straight [Set Only] | 360 | 18.00 | 20 | LF | - | - | LF | - | 20 | LF | 0 | 20 | 0 | 0 | |
| Granite Curb - Radius [Supply and Set] | 6,525 | 43.50 | 150 | LF | - | - | LF | - | 150 | LF | 0 | 100 | 0 | 50 | |
| Granite Curb - Radius [Set Only] | 360 | 18.00 | 20 | LF | - | - | LF | - | 20 | LF | 0 | 20 | 0 | 0 | |
| 3) | Pre-Cast Concrete Curb - Straight [Set Only] | 3,600 | 18.00 | 200 | LF | - | - | LF | - | 200 | LF | 0 | 100 | 0 | 100 |
| Pre-Cast Concrete Curb - Radius [Set Only] | 90 | 18.00 | 5 | LF | - | - | LF | - | 5 | LF | 0 | 5 | 0 | 0 | |
| 4) | Adjust/Reset Curbing | 2,963 | 19.75 | 150 | LF | - | - | LF | - | 150 | LF | 0 | 100 | 0 | 50 |
| 5) | Bituminous Concrete Sidewalk - New Construction | 21,328 | 44.90 | 475 | SY | - | - | SY | - | 475 | SY | 0 | 275 | 0 | 200 |
| [Site Prep by Town] | 250 | 25.00 | 10 | SY | - | - | SY | - | 10 | SY | 0 | 10 | 0 | 0 | |
| 6) | Bituminous Concrete Sidewalk - Reconstruction | 87,360 | 38.40 | 2,275 | SY | - | - | SY | - | 2,275 | SY | 0 | 275 | 0 | 2,000 |
| [Site Prep by Town] | 250 | 25.00 | 10 | SY | - | - | SY | - | 10 | SY | 0 | 10 | 0 | 0 | |
| Gravel | 18,200 | 28.00 | 650 | CY | - | - | CY | - | 650 | CY | 0 | 450 | 0 | 200 | |
| 7) | Bituminous Concrete Sidewalk and Driveway Apron - Resurfacing | 1,781 | 14.25 | 125 | SY | - | - | SY | - | 125 | SY | 0 | 125 | 0 | 0 |
| [Site Prep by Town] | 184 | 12.25 | 15 | SY | - | - | SY | - | 15 | SY | 0 | 15 | 0 | 0 | |
| 8) | Cement Concrete Sidewalk - New Construction | 4,500 | 90.00 | 50 | SY | - | - | SY | - | 50 | SY | 0 | 50 | 0 | 0 |
| Cement Concrete Sidewalk - Reconstruction | 4,750 | 95.00 | 50 | SY | - | - | SY | - | 50 | SY | 0 | 50 | 0 | 0 | |
| 9) | Cement Concrete Wheelchair Ramps - New Construction | 9,000 | 90.00 | 100 | SY | - | - | SY | - | 100 | SY | 0 | 100 | 0 | 0 |
| Cement Concrete Wheelchair Ramps - Reconstruction | 9,500 | 95.00 | 100 | SY | - | - | SY | - | 100 | SY | 0 | 100 | 0 | 0 | |
| 10) | Sawcutting | 11,000 | 2.00 | 5,500 | LF | - | - | LF | - | 5,500 | LF | 0 | 2,500 | 0 | 3,000 |
| 11) | Handicap Ramp Tactile Strips | 13,750 | 250.00 | 55 | EA | - | - | EA | - | 55 | EA | 0 | 25 | 0 | 30 |
| 12) | Loam & Hydro-Seed [4" Depth] | 4,800 | 12.00 | 400 | SY | - | - | SY | - | 400 | SY | 0 | 100 | 0 | 300 |
| 13) | Adjust Service Box | 23,750 | 125.00 | 190 | EA | - | - | EA | - | 190 | EA | 0 | 40 | 0 | 150 |
| 14) | Replace Service Box | 3,000 | 150.00 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 10 | 0 | 10 |
| 15) | Adjust Manhole Catch Basin Frames | 39,375 | 175.00 | 225 | EA | - | - | EA | - | 225 | EA | 0 | 25 | 0 | 200 |
| 16) | Rebuild Manhole and Catch Basin Frames | 14,000 | 200.00 | 70 | EA | - | - | EA | - | 70 | EA | 0 | 20 | 0 | 50 |
| 17) | Reset or Replace Brick or Stone Walkway | 20,625 | 275.00 | 75 | SY | - | - | SY | - | 75 | SY | 0 | 25 | 0 | 50 |
| 18) | Catch Basin Installed | 87,500 | 3,500.00 | 25 | EA | - | - | EA | - | 25 | EA | 0 | 15 | 0 | 10 |
| 19) | Gutter Inlet Installed | 24,000 | 1,200.00 | 20 | EA | - | - | EA | - | 20 | EA | 0 | 10 | 0 | 10 |
| 20) | Ductile Iron Drainpipe | 22,500 | 50.00 | 450 | LF | - | - | LF | - | 450 | LF | 0 | 250 | 0 | 200 |
| 21) | 4 inch PVC Pipe for Drainage | 10,500 | 30.00 | 350 | LF | - | - | LF | - | 350 | LF | 0 | 300 | 0 | 50 |
| 22) | Unclassified Excavation | 13,200 | 20.00 | 660 | CY | - | - | CY | - | 660 | CY | 0 | 600 | 0 | 60 |
| 23) | Hot Mix Asphalt for Patching | 74,250 | 165.00 | 450 | TN | - | - | TN | - | 450 | TN | 0 | 250 | 0 | 200 |
| 24) | Traffic Controls/Safety Signing | - | - | - | 0 | 0 | 0 | ||||||||
| Traffic Controls/Safety Signing | 1,000 | 4.00 | 250 | SF | - | - | SF | - | 250 | SF | 0 | 250 | 0 | 0 | |
| Reflectorized Drums with Flashers [Type A] - Drum Day | 30 | 1.00 | 30 | DY | - | - | DY | - | 30 | DY | 0 | 30 | 0 | 0 | |
| Reflectorized Drums without Flashers - Drum Day | 80 | 1.00 | 80 | DY | - | - | DY | - | 80 | DY | 0 | 30 | 0 | 50 | |
| Traffic Cones | 80 | 1.00 | 80 | DY | - | - | DY | - | 80 | DY | 0 | 30 | 0 | 50 | |
| 25) | Pre-Paving Sweeping | 40 | - | 40 | 40 | ||||||||||
| Disposal by Town | 11,250 | 150.00 | 75 | HR | - | - | HR | - | 75 | HR | 0 | 5 | 0 | 70 | |
| Disposal by Contractor | 1,250 | 25.00 | 50 | TN | - | - | TN | - | 50 | TN | 0 | 50 | 0 | 0 | |
| 26) | Equipment Rental | - | - | - | 0 | ||||||||||
| Gradall | 21,000 | 175.00 | 120 | HR | - | - | HR | - | 120 | HR | 0 | 40 | 0 | 80 | |
| Grader | 350 | 175.00 | 2 | HR | - | - | HR | - | 2 | HR | 0 | 2 | 0 | 0 | |
| Tandem 10-Ton Roller | 3,750 | 125.00 | 30 | HR | - | - | HR | - | 30 | HR | 0 | 30 | 0 | 0 | |
| 10-Ton Vibrator Roller | 3,750 | 125.00 | 30 | HR | - | - | HR | - | 30 | HR | 0 | 30 | 0 | 0 | |
| 10-Wheel Dump Truck | 7,920 | 99.00 | 80 | HR | - | - | HR | - | 80 | HR | 0 | 80 | 0 | 0 | |
| Trailer | 1,680 | 105.00 | 16 | HR | - | - | HR | - | 16 | HR | 0 | 16 | 0 | 0 |
| Total Estimated Cost 15 = | $ - 0 | $ - 0 | $ - 0 | ||
| 15 | Crosswalk Surface Treatment |
| 1) | Surface Treatment | - | 67.670 | - | SY | - | - | SY | - | - | SY |
| 2) | Night Differential [ADD] | - | 2.510 | - | SY | - | - | SY | - | - | SY |
| Total Estimated Cost of 16 = | $ 623,590 | |||||||||||||||||||||||||
| Total Estimated Cost 16A = | $ 351,415 | $ 85,620 | $ 211,215 | |||||||||||||||||||||||
| 16 | Tree Services | |||||||||||||||||||||||||
| 16A | Tree Services - On-Site Arborist | |||||||||||||||||||||||||
| 1) | Trimming, Removal, Dead-Wooding, Crown Reduction & Cleanup - Day | 109,800 | 1,800.000 | 61 | DY | 18,000 | 1,800.000 | 10 | DY | 73,800 | 1,800.000 | 41 | DY | 0 | 0 | 1 | 20 | 10 | 0 | 10 | 0 | 0 | 0 | 10 | 10 | |
| 2) | Trimming, Removal, Dead-Wooding, Crown Reduction & Cleanup - Half-Day | 31,500 | 900.000 | 35 | Half-Day | 9,000 | 900.000 | 10 | Half-Day | 18,000 | 900.000 | 20 | Half-Day | 0 | 0 | 1 | 4 | 10 | 0 | 10 | 0 | 0 | 0 | 5 | 5 | |
| 3) | Stump Grinding - Day | 41,000 | 1,000.000 | 41 | DY | - | 1,000.000 | - | DY | 31,000 | 1,000.000 | 31 | DY | 0 | 0 | 1 | 0 | 0 | 0 | 10 | 0 | 0 | 10 | 10 | 10 | |
| 4) | Stump Grinding - Half-Day | 15,600 | 600.000 | 26 | Half-Day | - | 600.000 | - | Half-Day | 12,600 | 600.000 | 21 | Half-Day | 0 | 0 | 1 | 0 | 0 | 0 | 10 | 0 | 0 | 5 | 5 | 5 | |
| 5) | Non-Scheduled/Emergency Work (for Item 1 work) | 96,000 | 2,400.000 | 40 | DY | 36,000 | 2,400.000 | 15 | DY | 48,000 | 2,400.000 | 20 | DY | 0 | 0 | 1 | 4 | 15 | 0 | 10 | 0 | 0 | 0 | 5 | 5 | |
| Work | 46,400 | 1,600.000 | 29 | 4 Hrs | 19,200 | 1,600.000 | 12 | 4 Hrs | 22,400 | 1,600.000 | 14 | 4 Hrs | 0 | 0 | 1 | 0 | 12 | 0 | 10 | 0 | 0 | 0 | 3 | 3 | ||
| Work | 11,115 | 285.000 | 39 | Addtl Hrs | 3,420 | 285.000 | 12 | Addtl Hrs | 5,415 | 285.000 | 19 | Addtl Hrs | 0 | 0 | 1 | 0 | 12 | 0 | 10 | 0 | 0 | 0 | 8 | 8 | ||
| 6) | Crane Rate | 30,550 | 325.000 | 94 | /hr | 0 | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | 40 | 40 |
| Total Estimated Cost 16B = | $ 272,175 | $ 105,520 | $ 112,635 | |||||||||||||||||||||||
| 16B | Tree Services - On-Call Arborist | |||||||||||||||||||||||||
| 1) | B. Trimming, Removal, Dead-Wooding, Crown Reduction & Cleanup - Day | 80,000 | 1,600.000 | 50 | DY | 24,000 | 1,600.000 | 15 | DY | 40,000 | 1,600.000 | 25 | DY | 0 | 0 | 3 | 0 | 15 | 0 | 2 | 0 | 10 | 0 | 10 | 10 | |
| 2) | B. Trimming, Removal, Dead-Wooding, Crown Reduction & Cleanup - Half-Day | 26,400 | 800.000 | 33 | Half-Day | 12,000 | 800.000 | 15 | Half-Day | 10,400 | 800.000 | 13 | Half-Day | 0 | 0 | 1 | 0 | 15 | 0 | 2 | 0 | 5 | 0 | 5 | 5 | |
| 3) | Stump Grinding - Day | 39,200 | 800.000 | 49 | DY | 12,000 | 800.000 | 15 | DY | 19,200 | 800.000 | 24 | DY | 0 | 0 | 2 | 0 | 15 | 0 | 2 | 0 | 10 | 0 | 10 | 10 | |
| 4) | Stump Grinding - Half-Day | 14,000 | 500.000 | 28 | Half-Day | 7,500 | 500.000 | 15 | Half-Day | 4,000 | 500.000 | 8 | Half-Day | 0 | 0 | 1 | 0 | 15 | 0 | 2 | 0 | 0 | 0 | 5 | 5 | |
| 5) | Non-Scheduled/Emergency Work (for Item 1 work) | 94,600 | 2,200.000 | 43 | DY | 55,000 | 2,200.000 | 25 | DY | 28,600 | 2,200.000 | 13 | DY | 0 | 0 | 1 | 0 | 25 | 0 | 2 | 0 | 5 | 0 | 5 | 5 | |
| Work | 29,400 | 1,400.000 | 21 | 4 Hrs | 16,800 | 1,400.000 | 12 | 5 Hrs | 8,400 | 1,400.000 | 6 | 5 Hrs | 0 | 0 | 1 | 0 | 12 | 0 | 2 | 0 | 0 | 0 | 3 | 3 | ||
| Work | 5,735 | 185.000 | 31 | Addtl Hrs | 2,220 | 185.000 | 12 | Addtl Hrs | 2,035 | 185.000 | 11 | Addtl Hrs | 0 | 0 | 1 | 0 | 12 | 0 | 2 | 0 | 0 | 0 | 8 | 8 | ||
| 6) | Crane Rate | 59,150 | 325.000 | 182 | /hr | 0 | 0 | 4 | 0 | 120 | 0 | 0 | 0 | 0 | 10 | 24 | 24 | |||||||||
| Total Estimated Cost 17 = | $ 1,845 | $ - 0 | $ - 0 | |||||||||||||||||||||||
| 17 | Mobile Crushing Services |
1) Labor and Equipment to Process Material as Specified 1,845 3.00 615 TN - - TN - 615 TN 0 0 15 0 0 0 500 0 0 100 0 0
| Total Estimated Cost 18 = | $ - 0 | $ - 0 | $ - 0 | ||
| 18 | Pedestrian Crosswalk Solutions |
1) Pedestrian Crosswalk Solutions - Supplied Only - - EA - - SY - - SY
| Total Estimated Cost 19 = | $ - 0 | $ - 0 | ERROR:#REF! | ||
| 19 | Cold In-Place Recycling |
| 1) | Cold In-Place Recycling Including Fog Seal (4" depth and greater) | - | - | SY | - | - | SY | ERROR:#REF! | ERROR:#REF! | SY |
| 2) | Liquid Asphalt Stabilizing Agent | - | - | Gal | - | - | SY | - | - | SY |
| 3) | Portland Cement Stabilizing Agent | - | - | Lb | - | - | SY | - | - | SY |
| 4) | Manholes/Catch Basins | - | - | EA | - | - | SY | - | - | SY |
| 5) | Water Gates/Small Structures | - | - | EA | - | - | SY | - | - | SY |
| 6) | Structure Rebuild | - | - | VF | - | - | SY | - | - | SY |
| 7) | Base Repaid for CIR Pavement | - | - | SY | - | - | SY | - | - | SY |
| 8) | Shaping Shoulders | - | - | LF | - | - | SY | - | - | SY |
| 9) | Hot Mix Asphalt MassDOT Specs Type I | - | - | Ton | - | - | SY | - | - | SY |
Dist
District 5
| IFB#: SS 2027 PW2 | District 5 | District 5 | District 5 | District 5 | District 5 | District 5 | District 5 | District 5 | District 5 | District 5 | ||||||||||||||
| North | South | South | North | North | South | South | South | South | South | |||||||||||||||
| September 9, 2026 | Est. Cost | Est. Unit Cost | Est. Quant. | Units | Est. Cost | Est. Unit Cost | Est. Quant. | Units | Est. Cost | Est. Unit Cost | Est. Quant. | Units | Misc. | Cohasset | Duxbury | Hanover | Hingham | Hull | Marshfield | Norwell | Pembroke | Rockland | Scituate | |
| ALL | NORTH | SOUTH | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 | CY2027 |
| Total Estimated Cost 1 = | $ 10,878,164 | ERROR:#REF! | $ - 0 | ||
| 1 | Roadway Management |
| 120.1 | Unclassified Excavation | 129,600 | 12.000 | 10,800 | CY | ERROR:#REF! | ERROR:#REF! | CY | - | 1,400 | CY | 100 | 100 | 9,200 | 1,000 | 200 | 200 | ||
| 121 | Class A Rock Excavation | 13,100 | 50.000 | 262 | CY | ERROR:#REF! | ERROR:#REF! | CY | - | 142 | CY | 2 | 20 | 120 | 120 | ||||
| 129 | Bituminous Concrete Excavation by Cold Planer | 237,330 | 2.700 | 87,900 | SY | ERROR:#REF! | ERROR:#REF! | SY | - | 79,000 | SY | 5,000 | 20,000 | 4,900 | 1,000 | 50,000 | 1,000 | 3,000 | 3,000 |
| 129.1 | Bituminous Concrete Excavation by Cold Planer [Keyways] | 39,720 | 20.000 | 1,986 | SY | ERROR:#REF! | ERROR:#REF! | SY | - | 1,100 | SY | 500 | 200 | 636 | 50 | 200 | 200 | 200 | |
| 141.1 | Test Pit for Exploration | 200 | 10.000 | 20 | CY | ERROR:#REF! | ERROR:#REF! | CY | - | 20 | CY | 20 | |||||||
| 142 | Class B Trench Excavation | 300 | 60.000 | 5 | CY | ERROR:#REF! | ERROR:#REF! | CY | - | 5 | CY | 5 | |||||||
| 144 | Class B Rock Excavation | 250 | 50.000 | 5 | CY | ERROR:#REF! | ERROR:#REF! | CY | - | 5 | CY | 5 | |||||||
| 151 | Gravel Borrow | 14,550 | 10.000 | 1,455 | CY | ERROR:#REF! | ERROR:#REF! | CY | - | 1,295 | CY | 5 | 30 | 1,000 | 100 | 160 | 160 | ||
| 153 | Controlled Density Fill - Excavatable | 8,400 | 120.000 | 70 | CY | ERROR:#REF! | ERROR:#REF! | CY | - | 40 | CY | 10 | 30 | 30 | |||||
| 170 | Fine Grading & Compacting | 88,805 | 1.000 | 88,805 | SY | ERROR:#REF! | ERROR:#REF! | SY | - | 75,005 | SY | 5 | 5,000 | 13,800 | 20,000 | 50,000 | |||
| 187.3 | Removal & Disposal of Drainage Structure Sediments | 1,000 | 100.000 | 10 | CY | ERROR:#REF! | ERROR:#REF! | CY | - | 10 | CY | 10 | |||||||
| 201 | Catch Basin | 55,000 | 2,500.000 | 22 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 19 | EA | 10 | 6 | 3 | 3 | ||||
| 202 | Manhole | 55,000 | 2,500.000 | 22 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 19 | EA | 10 | 6 | 3 | 3 | ||||
| 202.2 | Manhole [9 - 14 feet depth] | 9,600 | 3,200.000 | 3 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 2 | EA | 1 | 1 | 1 | |||||
| 202.3 | Manhole [14 - 18 feet depth] | 12,000 | 4,000.000 | 3 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 2 | EA | 1 | 1 | 1 | |||||
| 204 | Gutter Inlet | 10,800 | 1,200.000 | 9 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 9 | EA | 3 | 6 | ||||||
| 205 | Leaching Basin | 30,800 | 2,800.000 | 11 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 9 | EA | 5 | 2 | 2 | 2 | ||||
| 220.1.2 | Drainage Structure Adjusted [Less than 6" Vertical] | 115,600 | 400.000 | 289 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 195 | EA | 20 | 60 | 64 | 20 | 30 | 75 | 10 | 10 |
| 220.2 | Drainage Structure Rebuilt | 23,100 | 200.000 | 116 | VFt | ERROR:#REF! | ERROR:#REF! | VFt | - | 75 | VFt | 15 | 10 | 21 | 10 | 20 | 20 | 20 | |
| 220.3 | Drainage Structure Change in Type | 10,200 | 600.000 | 17 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 12 | EA | 2 | 5 | 5 | 5 | ||||
| 220.5 | Drainage Structure Remodeled | 44,500 | 500.000 | 89 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 84 | EA | 2 | 2 | 75 | 5 | 5 | |||
| 220.7.2 | Sanitary Structure Adjusted [Less than 6" Vertical] | 10,000 | 400.000 | 25 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 5 | EA | 5 | 20 | ||||||
| 220.8 | Sanitary Structure Remodeled | 400 | 400.000 | 1 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 1 | EA | 1 | |||||||
| 221 | Frame & Cover | 32,500 | 500.000 | 65 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 55 | EA | 15 | 30 | 10 | 10 | ||||
| 222 | Frame & Grate | 32,500 | 500.000 | 65 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 55 | EA | 15 | 30 | 10 | 10 | ||||
| 222.1 | Frame & Grate MHD Cascade Type | 5,000 | 500.000 | 10 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 10 | EA | 5 | 5 | ||||||
| 223 | Frame & Grate (or Cover) Removed and Reset | 40,000 | 400.000 | 100 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 95 | EA | 10 | 20 | 60 | 5 | 5 | |||
| 238.12 | 12" Ductile Iron Pipe | 6,000 | 100.000 | 60 | LF | ERROR:#REF! | ERROR:#REF! | LF | - | 60 | LF | 20 | 40 | ||||||
| 244.12 | 12" Reinforced Concrete Pipe Class V | 12,300 | 60.000 | 205 | LF | ERROR:#REF! | ERROR:#REF! | LF | - | 105 | LF | 5 | 100 | 100 | |||||
| 252.12 | 12" Corrugated Plastic Pipe | 13,000 | 50.000 | 260 | LF | ERROR:#REF! | ERROR:#REF! | LF | - | 160 | LF | 20 | 40 | 100 | 100 | ||||
| 252.112 | 12" Corrugated Plastic (Polyethylene) Pipe Flared End | 150 | 150.000 | 1 | EA | ERROR:#REF! | ERROR:#REF! | EA | - | 1 | EA | 1 | |||||||
| 258 | Stone for Pipe Ends | 3,250 | 50.000 | 65 | SY | ERROR:#REF! | ERROR:#REF! | SY | - | 35 | SY | 5 | 30 | 30 | |||||
| 269.06 | 6" Slot Perforated Corrugated Plastic Pipe (Subdrain) | 1,950 | 30.000 | 65 | LF | ERROR:#REF! | ERROR:#REF! | LF | - | 35 | LF | 5 | 30 | 30 | |||||
| 269.08 | 8" Slot Perforated Corrugated Plastic Pipe (Subdrain) | 1,950 | 30.000 | 65 | LF | ERROR:#REF! | ERROR:#REF! | LF | - | 35 | LF | 5 | 30 | 30 |
This is the start of the file's text. The full file is on GovTribe.