SRE_VolumeReport.pdf
PDF 48 KB Posted
- Solicitation number
- 69056722b000005
About this file
This document contains a volume report and related federal contract opportunity. The volume report provides calculations of cut, fill, area and balance totals for a special rock embankment project from Klamath County Boat Marina to Lakeshore Drive. It indicates total cut of 0.829 cubic yards and 7.786 cubic yards, total fill of 3969.736 cubic yards and 90552.685 cubic yards, and area of 3053.268 square yards and 50163.253 square yards for two separate calculations.
The associated federal contract opportunity is solicitation number 69056722b000005 from the Department of Transportation Federal Highway Administration for the OR DOT 140(1) Klamath County Boat Marina to Lakeshore Drive project. The bid documents are for a project to construct a special rock embankment from the boat marina to the lakeshore drive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabulation_OR DOT 140(1).pdf | ||
| BidSum_OR DOT 140(1).pdf | ||
| Amendment A003_R1.pdf | ||
| QA_09-28-2022.pdf | ||
| Amendment A003.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| or14001_XS_Final.pdf | ||
| or14001_Drainage Report.pdf | ||
| or14001_VT-Alignment.pdf | ||
| or-14001-Plans_05-02-22.pdf | ||
| 19788_Geary_Canal_Bridge_ACM.pdf | ||
| OR140_controlsheet.xlsx | XLSX spreadsheet | |
| 19788_Shoulder_Soil_Final.pdf | ||
| Compiled OR 140 digiESCPrevisedJune2021noSpecsUpdated10Jan2022sign.pdf | ||
| or14001_Culvert_XS.pdf | ||
| IFB_OR DOT 140(1)_2022.pdf | ||
| More Phsyical Data_OR DOT 140.zip | ZIP file | |
| or14001_Earthwork_Report.pdf | ||
| or14001_HZ-Alignment.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOT 140(1)
Klamath County Boat Marina to
Lakeshore Drive - Special Rock Embankment Volume
Report
File: c:\pw‐work\d0295329\SRE_VolumeReport.vol 1/4/2022
** TIN to TIN Volume Report ‐‐ Tue Jan 04 10:01:52 2022 ** From TIN <pw:\Oregon\DOT_Highway_140\OR_DOT_140(1)\Development\CADD\Design\Merged_3.13.20.2251.
tin> to TIN <pw:\Oregon\DOT_Highway_140\OR_DOT_140(1)\Development\CADD\Design\RipRap_Fill_A.tin> ** Prismoidal Volume ** Total Cut = 0.829 Cubic Yards ** Total Fill = 3969.736 Cubic Yards ** Area = 3053.268 Sq Yards ** Balance = ‐3968.907 Cubic Yards
** TIN to TIN Volume Report ‐‐ Tue Jan 04 10:02:10 2022 ** From TIN <pw:\Oregon\DOT_Highway_140\OR_DOT_140(1)\Development\CADD\Design\Merged_3.13.20.2251.
tin> to TIN <pw:\Oregon\DOT_Highway_140\OR_DOT_140(1)\Development\CADD\Design\RipRap_Fill_B.tin> ** Prismoidal Volume ** Total Cut = 7.786 Cubic Yards ** Total Fill = 90552.685 Cubic Yards ** Area = 50163.253 Sq Yards ** Balance = ‐90544.898 Cubic Yards
Page: 1
Blank Page
File details come from the government source that posted it. Updated .