QA_09-28-2022.pdf
PDF 94 KB Posted
- Solicitation number
- 69056722b000005
About this file
This document contains questions and answers related to bid documents for solicitation number 69056722b000005 from the Oregon Department of Transportation for work on OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive. The opportunity is being issued by the Department of Transportation Federal Highway Administration. Question A1320 asks for clarification around the quantity of temporary concrete barrier specified, as the interpretation is that standard concrete barrier will be relocated rather than narrow base barrier used. The answer indicates this will be addressed in Amendment A003. No other details are provided around required products or services, response dates, or award timing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabulation_OR DOT 140(1).pdf | ||
| BidSum_OR DOT 140(1).pdf | ||
| Amendment A003_R1.pdf | ||
| Amendment A003.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| or14001_XS_Final.pdf | ||
| or14001_Drainage Report.pdf | ||
| or14001_VT-Alignment.pdf | ||
| or-14001-Plans_05-02-22.pdf | ||
| 19788_Geary_Canal_Bridge_ACM.pdf | ||
| OR140_controlsheet.xlsx | XLSX spreadsheet | |
| 19788_Shoulder_Soil_Final.pdf | ||
| Compiled OR 140 digiESCPrevisedJune2021noSpecsUpdated10Jan2022sign.pdf | ||
| or14001_Culvert_XS.pdf | ||
| IFB_OR DOT 140(1)_2022.pdf | ||
| More Phsyical Data_OR DOT 140.zip | ZIP file | |
| or14001_Earthwork_Report.pdf | ||
| or14001_HZ-Alignment.pdf | ||
| SRE_VolumeReport.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOT 140(1)
OR 140 ‐ Klamath County Boat Marina to Lakeshore Drive
# General Technical Question Answer Date
1 X
Item A1320, Temporary Traffic Control, Concrete Barrier (Narrow Base) with a quantity of 9,300 LF. Our interpretation of the traffic control documents is that a quantity of 1,125 LF of standard concrete barrier is supplied and relocated as the work areas move in accordance with the temporary traffic control plans provided. We do not believe any narrow base concrete barrier is required, are we missing something?
This will be addressed under Amendment
A003.
9/28/2022