This document outlines a federal solicitation for construction services. The General Services Administration is seeking proposals for the remaining tenant fit-out of the DHS Operations Center facility located at the St. Elizabeths West Campus in Washington, D.C. The project involves finishing spaces designated for DHS components to support the agency's mission. Construction is to be completed within 335 calendar days of the notice to proceed. The total estimated cost range is between $10-20 million. The solicitation is set aside only for small businesses and will use the lowest price technically acceptable selection method. A mandatory pre-proposal conference will take place on February 10, 2022, with proposals due by the date specified in the forthcoming RFP. Questions will be addressed through amendments to the solicitation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF
HOMELAND SECURITY
National Capital Region
SENSITIVE BUT UNCLASSIFIED
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF
THESE DRAWINGS, PLANS, OR SPECIFICATIONS
TO UNAUTHORIZED PERSONS IS PROHIBITED.
Do not remove this notice.
Properly destroy documents when no longer needed.
DHS Operations Center (DOC A) Phase 2D
IFB RESUBMISSION SPECIFICATIONS
April 6, 2021
Contract # GS11P08MK0080
Solicitation # OK47PM21F0004
GSA DOC A Phase 2D IFB - Resubmission April 6, 2021
ZGF Architects TOC - 1 Table of Contents
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
Do not remove this notice. Properly destroy documents when no longer needed.
TABLE OF CONTENTS
DIVISION 01 — GENERAL REQUIREMENTS
01 1000 - Summary
01 1400 - Work Restrictions
01 2300 - Alternates
01 2500 - Substitution Procedures
01 2900 - Payment Procedures
01 3000 - Electronic Project Management
01 3100 - Project Management & Coordination
01 3120 - Small Projects CPM Schedule Specs
01 3220 - Photographic Documentation
01 3300 - Submittal Procedures
01 3600 - COBie
01 4000 - Quality Assurance & Control
01 4050 - System Quality Control
01 4200 - References
01 4523 - Testing And Inspecting Services
01 5000 - Temporary Facilities
01 5930 - Security Regulations
01 5950 - Safety & Health
01 6000 - Product Requirements
01 7000 - Execution Requirements
01 7310 - Cutting & Patching
01 7320 - Selective Demolition
01 7350 - Fire Prevention Precautions for Hot Work
01 7419 - Construction Nonhazardous Waste Management & Disposal
01 7700 - Closeout Procedures
01 7822 - Operation & Maintenance Documentation
01 8100 - Sustainable Design Reporting
01 8100A - LEED Material Content Form
01 8113 - Sustainable Design Requirements
01 8200 - Demonstration & Training
01 8210 - Volatile Organic Compound (VOC) Restrictions
01 8300 - Construction and Demolition Waste Management
01 8400 - Indoor Air Quality Management
01 9113 - Commissioning
DIVISION 02 — EXISTING CONDITIONS
02 4119 - Selective Structure Demolition
DIVISION 03 — CONCRETE
03 5400 - Cast Underlayment
DIVISION 04 — MASONRY
04 2000 - Unit Masonry
ZGF Architects TOC - 2 Table of Contents
DIVISION 05 — METALS
05 4000 - Cold-Formed Metal Framing
05 5000 - Metal Fabrications
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
06 0573 - Wood Treatment
06 1000 - Rough Carpentry
06 2000 - Finish Carpentry
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 8400 - Firestopping
07 9200 - Joint Sealants
07 9513 - Expansion Joint Cover Assemblies
DIVISION 08 — OPENINGS
08 1113 - Hollow Metal Doors and Frames
08 1416 - Flush Wood Doors
08 3100 - Access Panels
08 3473 - Sound Control Security Door Assemblies
08 3475 - Sound Control Door and Sidelite Assemblies
08 5114 - Interior All Glass Storefront
08 7100 - Door Hardware
08 8010 - Interior Glazing
DIVISION 09 — FINISHES
09 1000 - Non-Structural Metal Framing
09 2900 - Gypsum Board
09 5100 - Acoustical Ceilings
09 5426 - Suspended Wood Ceilings
09 6500 - Resilient Flooring
09 6800 - Carpeting
09 6900 - Access Flooring
09 7200 - Wall Coverings
09 8129 - Sprayed Acoustical Finish
09 8415 - Acoustical Panels
09 8435 - Ceiling-Mounted Baffle Panels
09 9000 - Painting And Coating
DIVISION 10 — SPECIALTIES
10 1100 - Visual Display Surfaces
10 1400 - Signage
10 2123 - Cubicle Curtains and Track
10 2600 - Wall and Door Protections
10 4400 - Fire-Protection Specialties
10 5113 - Metal Lockers
DIVISION 11 — EQUIPMENT
NOT USED
DIVISION 12 — FURNISHINGS
NOT USED
ZGF Architects TOC - 3 Table of Contents
DIVISION 13 — SPECIAL CONSTRUCTION
NOT USED
DIVISION 14 — CONVEYING EQUIPMENT
NOT USED
DIVISION 22 — PLUMBING
22 1016 - Plumbing Piping
DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING
23 0500 - Special Mechanical Requirements
23 0523 - Manual Valves
23 0529 - Penetrations and Supports
23 0548 - Mechanical Seismic Restraint Systems
23 0550 - Mechanical Sound and Vibration Control
23 0553 - Mechanical Identification Systems
23 0700 - Pipe, Duct and Equipment Insulation
23 0800 - Testing and Balancing
23 1100 - Pipe and Fittings
23 2113 - Hydronic Piping Systems
23 3113 - Air Distribution System
23 3500 - Exhaust and Ventilating Fans
23 3600 - Air Terminal Units and Chilled Beams
23 8239 - Hydronic Terminal Units
DIVISION 25 - INTEGRATED AUTOMATION
25 5000 - Building Management and Control System
DIVISION 26 — ELECTRICAL
26 0010 - Electrical General Requirements
26 0519 - Low Voltage Electrical Power Conductors and Cables
26 0526 - Grounding and Bonding for Electrical Systems
26 0533 - Conduits
26 0534 - Boxes
26 0535 - Wireways
26 0548 - Seismic Controls for Electrical Systems
26 0943 - Low Voltage Lighting Control System
26 2213 - Low Voltage Distribution Transformers
26 2413 - Switchboards
26 2416 - Panelboards
26 2726 - Wiring Devices
26 2816 - Enclosed Safety Switches
26 4313 - Surge Protective Devices for Low Voltage Equipment
26 5113 - Building Lighting
DIVISION 27 — COMMUNICATIONS
27 0530 - Communications Empty Conduit and Outlet Boxes
EXHIBIT 1 — INFRASTRUCTURE AND GENERAL COORDINATION NARRATIVE
EXHIBIT 2 — GDOS GENERAL SPECIFICATIONS FOR GENERAL CONTRACTOR
ZGF Architects TOC - 4 Table of Contents
EXHIBIT 3 — LEED SCORECARD
ZGF Architects 01 1000 - 1 Summary
SECTION 01 1000 – SUMMARY
PART 1 - GENERAL
1.1 PROJECT INFORMATION
A. Project Name and Location: GSA DOC A Phase 2D, St Elizabeth’s Campus, SE DC.
B. Project Summary Description:
1. The scope of Work for this project is the buildout of the Department of Homeland
Security (DHS) Operations Center being designed for the General Services
Administration. The project is part of the DHS headquarters operations consolidation into a secure, 4.5 million gross square feet (GSF) campus at the St. Elizabeth’s Campus in the
Southeast quadrant of Washington, DC.
2. The uncompleted areas are to be occupied by designated DHS Component entities supporting the overall DOC mission. The following tenants constitute the make-up of the remaining buildable spaces within the DOC building: 26,020 USF.
a. Lower Level 2 (LL2): Approximately 18,700 USF
1) Cybersecurity and Infrastructure Security Agency (CISA) Watch:
Approximately 9750 USF.
2) Cybersecurity and Infrastructure Security Agency (CISA) Communications and Intelligence: Approximately 7450 USF.
3) Bunkroom: Approximately 1500 USF.
b. Lower Level 3 (LL3): Approximately 7320 USF
1) United States Coast Guard Cyber Command: Approximately 5880 USF.
2) Bunkroom: Approximately 1440 USF.
C. Architect: The term Architect refers to the project designer. The Architect's status relative to the construction will be stated in writing by the Contracting Officer prior to the pre-construction conference. The project was designed by: ZGF Architects, LLP, 600 14th St, NW, Suite 800, Washington, DC 20005
D. Project Delivery Method: Design-bid-build.
E. The Contracting Officer for the project is: Bonnie Echoles 202-561-7821
1.2 WORK BY OTHER CONTRACTORS
A. The Contractor shall cooperate with other contractors performing related work, including providing labor, materials and other costs necessary to satisfactorily coordinate the Contract work with work performed under other contracts.
ZGF Architects 01 1000 - 2 Summary
1.3 SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY
A. The project includes the following Government furnished property to be installed by the
Contractor. The contractor shall advise GSA at least 30 days in advance of when the property should be delivered.
1. Coordinate with FAS any orders of furniture, carpet, telecom, etc. Coordinate with GSA customer agency, any relocation of equipment or the customer’s need.
1.4 MISCELLANEOUS PROVISIONS
A. Work in existing facilities shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish.
B. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of Work under the Contract. Work out of alignment where exposed by removal of existing work shall be called to the attention of GSA. Necessary corrective work shall be as directed.
1. Replacements of existing conditions that are removed shall match similar existing conditions.
2. Unless otherwise indicated, existing structural members shall not be cut or altered without authorization by the Contracting Officer.
3. Conditions remaining in place, which are damaged or defaced during the Work, shall be restored to the condition existing at time of award of Contract.
4. Discolored or unfinished surfaces exposed by removal of existing conditions, that are indicated to be final exposed surfaces, shall be refinished or replaced as necessary to produce uniform and harmonious contiguous surfaces.
C. Existing structures will remain in place.
D. Existing utility services with related meters and equipment will remain in place.
E. Removed items indicated to remain the property of the Government shall be stored on site where directed by the Contracting Officer.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 01 1000
ZGF Architects 01 1400 - 1 Work Restrictions
SECTION 01 1400 - WORK RESTRICTIONS
1.1 CONTRACTOR USE OF PREMISES
A. The Contractor will review and document the existing conditions surrounding the project premises. Provide documentation to the Government prior to the commencement of any construction activity.
B. The Contractor shall limit use of the premises to the work in areas indicated, and to allow for
Government occupancy and public use.
1. Confine operations at the site to areas indicated. Do not disturb portions of the site beyond the areas in which Work is indicated.
2. Keep driveways and entrances serving the premises clear and available at all times to the
Government, Government employees and to visitors. Do not use these areas for parking or storage of materials.
3. Schedule deliveries to minimize space and time requirements for storage of material and equipment on site.
4. Maintain existing building in a safe and weather-tight condition throughout the construction period. Repair damage caused by construction operations to the satisfaction of the government. Take precautions to protect the building, its occupants and the public during the construction period. A representative of the Contractor shall be available to arrive on site within one (1) hour of notice should an emergency occur.
5. Keep public areas, such as hallways, stairs, lobbies and toilet rooms, free from accumulation of waste material, rubbish, construction debris and construction materials.
6. Space on the premises will be made available for the Contractor's storage and related activities, provided that its use will not interfere with operations of the Government.
Arrange and gain approval for use of this space through the Contracting Officer.
7. Use of the existing loading dock facilities will be shared with Government activities on a first-come-first-served, wait-your-turn basis. The loading dock is available for the delivery of materials, tools, and supplies between the hours of 6 am to 4 p.m.
8. Existing materials and equipment that are removed as part of the construction operations, and that are not reused or designated to be salvaged as Government property, shall become the property of the Contractor and shall be removed from the site. Storage or sale of excess salvageable materials and equipment is not permitted on site.
9. Pollution producing equipment shall not be located near air intakes where airborne smoke or fumes could be drawn into the building. When not required for powering unloading operations, turn off engines when docked.
10. Smoking is not permitted in or around the building, see Facilities Management
Regulation (FMR) Case 2008-102—3. Also see Code of Federal Regulations (CFR) 41
CFR Part 102-74. This includes electronic cigarettes.
11. No parking will be available on site during working hours for building occupants. The
Contractor and Contractor's employees shall make their own arrangements for vehicle parking off site.
ZGF Architects 01 1400 - 2 Work Restrictions
12. Cell Phones: Contractor is to provide company cell phone during this contract. All cell phones to be “on vibrate” at all times. If a telephone begins audibly ringing, the building guards will take the cell phone and hold until the end of the working day prior to the con-tractor leaving the property. Cell phones are only permitted in construction area and contractor’s office space.
13. No apparatus with an open flame is allowed to be used within the facility without the prior receipt of a burn permit. Contact the Field Office to obtain burn permits. Burn permits are required for each separate occurrence.
14. Permits: Refer to FAR 52.236-7
15. The work shall be sequenced to minimize disruption to building occupants, visitors, and maintenance activities. To the greatest extent feasible, demolition work should not take place until supplies are on hand to perform new work.
16. Coordinate with the GSA Building Manager and the COR for site access.
17. Coordinate with the GSA Building Manager and the COR on correct response procedures for any building system alarms occurring during or resulting from the construction process.
18. All building systems outside the immediate construction area shall be kept fully operational during normal working hours.
19. Protect building site from flying debris.
20. Coordinate with Building Manager and/or security office as to the use of cameras in the building.
1.2 GOVERNMENT OCCUPANCY
A. The Government will occupy the site and the existing building during the entire period of construction. Cooperate with the Government's representatives during construction operations to minimize conflicts, mitigate noise, and facilitate Government usage. Perform the Work in a manner that does not interfere with the Government's operations.
B. The Government reserves the right to occupy, place, and install equipment in completed areas of the building prior to Substantial Completion, provided such occupancy does not interfere with completion of the Work. The Government's installation of equipment and partial occupancy shall not constitute acceptance of the total Work.
1. Prior to partial Government occupancy, mechanical and electrical systems for the space shall be fully operational, and required inspections and tests shall be successfully completed. Upon occupancy, the Government will operate and maintain mechanical and electrical systems serving the occupied portions of the building.
2. Upon occupancy, the Government will assume responsibility for maintenance and custodial service for the occupied portions of the building.
1.3 WORKING HOURS
A. Government Occupied Hours: Government personnel are scheduled to occupy the building during the following hours on weekdays, Monday through Friday, except for established
Government Holidays : 6:00 a.m. to 4:00 p.m.
ZGF Architects 01 1400 - 3 Work Restrictions
B. Government Unoccupied Hours: Government personnel are not scheduled to occupy the building during times not indicated as Government Occupied Hours.
C. Contractor's General Working Hours: The Contractor working hours shall be generally established to occur during Government Occupied Hours.
D. Contractor's Required Working Hours: The following work shall be performed during
Government Unoccupied Hours:
1. Noisy and/or odor-producing work that may disrupt tenant operations in adjacent spaces.
2. While U.S. Courts are in session.
E. Work accomplished during Government Unoccupied Hours shall be performed at no additional cost to the Government. Contractor shall submit a proposed schedule and gain the Contracting
Officer's approval at least 48 hours before proceeding with any work during Government
Unoccupied Hours.
1. Coordinate with tenants and GSA field office manager during design to identify temporary security and escort requirements for bidding purposes. Coordinate with
Tenants to provide RWAs for security escorts. .
F. Temporary Suspension of Work: The Contractor shall suspend work during a period as required by GSA/DGS. GSA will provide adequate advance notice of pending work suspension to coordinate with team members. Contractor shall not be entitled to an adjustment of the
Contract price or time of performance as a result of this suspension of work.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 01 1400
ZGF Architects 01 2300 - 1 Alternates
SECTION 01 2300 - ALTERNATES
1.1 SUMMARY
A. An alternate provides an amount proposed by the Contractor and stated on the pricing form for certain work that will adjust the Base Contract Amount if the Government decides to accept the corresponding scope of work products, materials, equipment, systems or installation methods described in the Contract Documents.
B. The amount for an alternate is the total net adjustment to the Base Bid to incorporate the alternate work into the project.
C. Alternate work shall include miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation, whether or not mentioned as part of the alternate description.
1.2 PROCEDURES
A. Selection: Acceptance or rejection of each alternate will be made by the Government prior to award of the Contract, and the Base Bid amount will be adjusted accordingly for accepted alternates to establish the contract price.
B. Coordination: The Contractor shall modify or adjust affected work as necessary to completely and fully integrate the accepted alternate work into the project Work.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. ALTERNATE 1: Bunk Room Floor Slab Infill
1. Base Condition: Refer to Section 096900 ACCESS FLOORING.
2. (ADD) ALTERNATE = In lieu of access flooring, fill floor slab opening with clean crushed gravel, compacted to avoid settling, topped by new concrete slab to level with adjacent floor. (4” thick normal weight concrete reinforced with 2” welded wire mesh).
Use cold joint at edge of fill. Finish treatment of new infill concrete should match and be flush with the adjacent existing floor.
B. ALTERNATE 2: CISA WATCH ROOM / CONFERENCE ROOMS (LL2-210 & LL2-220)
INTERIOR GLAZING
1. Base Condition: Refer to Section 10 2219 DEMOUNTABLE PARTITIONS.
ZGF Architects 01 2300 - 2 Alternates
2. (DEDUCT) ALTERNATE: Install drywall partition, matching adjacent wall type, with
STC 50 acoustic rating. Within wall, install one Interior acoustic glazed sidelight, matching typical office sidelights, at each conference room, adjacent to doors LL2-210A and LL2-
220A.
C. ALTERNATE 3: CISA WATCH ROOM / CONFERENCE ROOMS (LL2-210 & LL2-220)
INTERIOR GLAZING
1. Base Condition: Integral privacy blinds.
2. (ADD) ALTERNATE: Provide switch glass in lieu of privacy blinds.
END OF SECTION
ZGF Architects 01 2500 - 1 Substitution Procedures
SECTION 01 2500 - SUBSTITUTION PROCEDURES
1.1 RELATED DOCUMENTS
A. The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents. Drawings and general provisions of the
Contract and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
B. Related Sections:
1. Division016000 Section "Product Requirements" for requirements for submitting compa-rable product submittals for products by listed manufacturers.
2. Divisions02 through 49 Sections for specific requirements and limitations for substitu-tions.
1.3 DEFINITIONS
A. Substitutions: Proposed changes to the Contract Documents by the Contractor for products, materials, equipment, and methods of construction.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or una-vailability of required warranty terms
2. Substitutions for Convenience: Changes proposed by Contractor or Government that are not required in order to meet other Project requirements but may offer advantage to Con-tractor or Government
1.4 SUBMITTALS FOR CAUSE OR CONVENIENCE:
A. Substitution Requests: Per Submittal Procedures Section 01 3300 submit electronic copies through ePM of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.
1. Substitution Request Form: See attached substitution request form.
2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
a. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by the Government and sep-arate contractors that will be necessary to accommodate proposed substitution.
b. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Include annotated copy of applicable specification section.
ZGF Architects 01 2500 - 2 Substitution Procedures
Significant qualities may include attributes such as performance, weight, size, du-rability, visual effect, sustainable design characteristics, energy and resource per-formance goals, warranties, and specific features and requirements indicated. In-dicate deviations, if any, from the Work specified.
c. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
d. Samples, where applicable or requested.
e. Certificates and qualification data, where applicable or requested.
f. List of similar installations for completed projects with project name, location and contact information of owner and architect/engineer of record.
g. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
h. Research reports evidencing compliance with building code in effect for project, when applicable for the proposed substitution.
i. Detailed comparison of Contractor's construction schedule using proposed substi-tution with products specified for the Work. If specified product or method of con-struction cannot be provided within the Contract Time, include letter from manu-facturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery. Provide a schedule fragnet with a time impact analysis to allow the Government to consider the proposed substitution.
j. Cost information, including a proposal of change, if any, in the Contract Sum.
k. Proposed substitution complies with requirements in the Contract Documents ex-cept as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.
l. The Contracting Officer may require the Contractor to provide a contractor's waiv-er of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
3. The Contracting Officer or Contracting Officer’s Representative (CO) or (COR) Action:
If necessary, the Contracting Officer or COR will request additional information or doc-umentation for evaluation. The Contractor shall be entitled to receive notice of action on submittals within a reasonable time, given the volume or complexity of the submittals and the criticality of the affected activities to Substantial Completion as may be indicated in the Project Schedule. The Contractor shall not be entitled to receive notice of action on submittals containing variations from Contract requirements in less than twenty work-ing days.
B. Failure by the government to respond does not constitute acceptance of the proposed substitution.
1.5 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage qualified testing agency to perform compatibility tests recommended by manufacturers.
B. Substituted products must comply with the Buy American Act.
ZGF Architects 01 2500 - 3 Substitution Procedures
1.6 PROCEDURES
A. Coordination: Modify or adjust affected work as necessary to integrate work of the approved substitutions.
PART 2 - PRODUCTS
2.1 SUBSTITUTIONS
A. Substitutions for Cause: Submit requests for substitution immediately upon discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.
1. Conditions: The Contracting Officer (CO) will consider Contractor's request for substitu-tion when the following conditions are satisfied. If the following conditions are not satis-fied, the Contracting Officer (CO) will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution is consistent with the Contract Documents and will produce indicated results.
b. Substitution request is fully documented and properly submitted.
c. If requested substitution involves schedule impact Contractor has identified time impact and a mitigation plan. .
d. Requested substitution has received necessary approvals of authorities having ju-risdiction.
e. Requested substitution is compatible with other portions of the Work.
f. Requested substitution has been coordinated with other portions of the Work.
g. Requested substitution provides specified warranty.
h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
B. Substitutions for Convenience: The Contracting Officer (CO) will consider requests for substitution if received within 30 days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of the Contracting Officer (CO) or the
Contracting Officer Representative (COR).
1. Conditions: The Contracting Officer will consider Contractor's request for substitution when the following conditions are satisfied.
a. Requested substitution offers the Government a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional obligations the Government incurs..
b. Requested substitution does not require extensive revisions to the Contract Docu-ments.
c. Requested substitution is consistent with the Contract Documents and will produce indicated results.
d. Substitution request is fully documented and properly submitted.
e. If requested substitution involves schedule impact Contractor has identified time impact and a mitigation plan.
ZGF Architects 01 2500 - 4 Substitution Procedures
f. Requested substitution has received necessary approvals of authorities having ju-risdiction.
g. Requested substitution is compatible with other portions of the Work.
h. Requested substitution has been coordinated with other portions of the Work.
i. Requested substitution provides specified warranty.
j. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
PART 3 - EXECUTION (NOT USED)
END OF SECTION 01 2500
ZGF Architects 01 2500 - 5 Substitution Procedures
SUBSTITUTION REQUEST
To:
Project:
Specified Item:
Section Page Paragraph Description
PROPOSED SUBSTITUTION:
Undersigned certifies following items, unless modified by attachments, are correct:
A. Proposed substitution does not affect dimensions shown on drawings.
B. Undersigned will pay for changes to building design, including engineering design, detail-ing, and construction costs caused by proposed substitution.
C. Proposed substitution has no adverse effect on other trades, construction sched-ule, or specified warranty requirements.
D. Maintenance and service parts are available locally or are readily obtainable for pro-posed substitution.
Undersigned further certifies the function, appearance, and quality of the proposed substitution are equivalent or superior to the specified item.
Undersigned agrees, if this page is reproduced, the terms and conditions for substitutions found in Bidding Documents apply to this proposed substitution.
Submitted by:
Name (printed or type) General Contractor (if after award of Contract)
Signature For Use by A/E
Firm Name Approved Approved as Noted
Not Approved Received Too Late Address
By
City, State, Zip Date
_ Remarks _
Date
Telephone Fax
ZGF Architects 01 2500 - 6 Substitution Procedures
List of Attachments:
ZGF Architects 01 2900 - 1 Payment Procedures
SECTION 01 2900 - PAYMENT PROCEDURES
1.1 SUMMARY
A. This Section specifies administrative and procedural requirements necessary to prepare and to process Requests for Payment.
1.2 DEFINITIONS
A. Schedule of Values: A detailed written statement (masterformat/uniformat) furnished by the
Contractor outlining the portions of the contract sum, which allocates values (price & percentage) for the various parts of the work and used as the basis for payment application and reviewing progress payments. The Agreement provides further details.
B. Request for Payment: A contractor’s invoice and request for progress payment with substantiating information consistent with approved schedule of values.
1.3 SCHEDULE OF VALUES
A. Coordination: Submit completed Schedule of Values no later than 14 calendar days prior to scheduled date of initial Requests for Payment.
1. Format and Content: Contractor shall be responsible to complete the GSA Schedule of
Values Workbook and compile the values into electronic Project Management (ePM)
System. Contractor will enter values into workbook prior to ePM input and provide associated electronic baseline copy to contracting officer for record. Contractor will follow guidelines in the Schedule of Values workbook to support ePM upload.
2. Identification: Complete the following Project Identification fields in the Schedule of
Values:
a. Project Name
b. Project Number
c. Project Location, City, State
d. Task Order Number
e. Modification Number
f. GSA Project Manager
g. Contractor's Name and contact information
h. Date of submittal
3. [Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Requests for Payment and progress reports.
a. Work activity – (by division or specific work activity)
b. Dollar value of each specific work activity – both with an amount in dollars and whole cents, and as a percentage of the Contract Sum to nearest one-hundredth percent. Adjust the amounts to total to the Contract Sum and the percentages to total 100 percent.
ZGF Architects 01 2900 - 2 Payment Procedures
c. Each item in the schedule of values and Requests for Payment shall be complete.
Include total cost and proportionate share of general overhead and profit for each item. (i.e. no stand alone item for Overhead, and Profit)
d. Modifications that affect value.
e. Update affected work branches and subordinate line items and
f. resubmit the schedule of values before the next Request for Payment when
Modifications result in a change in the Contract Sum
g. Line item for mobilization and de-mobilization
h. Line item for close out (% to be negotiated with GSA COR)
4. Each item in the Schedule of Values and Requests for Payment shall be complete.
Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at the government's option.
5. Revise and update workbook in ePM with all items affecting scope, schedule or cost and resubmit within 14 calendar days as coordinated with project manager or contracting officer. Contractor shall provide a final as-built schedule at project completion. Update affected work branches and subordinate line items and resubmit the schedule of values before the next Request for Payment when Modifications result in a change in the
Contract Sum
1.4 REQUESTS FOR PAYMENT
A. Requirements for Requests for Payment are in Section III, Terms and Conditions of the
Agreement.
B. Each Request for Payment following the initial Request for Payment shall be consistent with previous Requests.
1. Initial Request for Payment, Request for Payment at time of Substantial Completion, and final Request for Payment involve additional requirements.
C. Payment Request Times: Submit Request for Payment to GSA by the last day of the month.
The period covered by each Request for Payment is one month, ending on the last day of the month.
1. Submit one paper draft copy (aka pencil copy) of Request for Payment to the CO or enter in ePM along with construction progress report seven days prior to due date for review by
GSA. Provide documentation evidencing the cost of work performed to be included in the Request for Payment. Resolve questions resulting from GSA review of draft Request for Payment and construction progress report prior to submitting Request for Payment.
D. Request Preparation: All payments must be executed by a person authorized to legally bind the
Contractor.
1. Entries shall match data on the schedule of values and Contractor's construction schedule.
Use updated schedules if revisions were made.
2. Include amounts for work completed following effective date of previous Request for
Payment, whether or not payment has been received. Include only amounts for work completed as of effective date of current Request for Payment.
ZGF Architects 01 2900 - 3 Payment Procedures
3. Include amounts of Modifications issued before last day of construction period covered by Request.
4. After 75% completion, if requested by COTR, present in -progress as-built drawings for review by GSA QAM as part of payment application process. Contractor to include cover sheet with signature lines on as-built drawings, indicating the set has been certified by
Contractor’s QCM per each payment application.
E. Stored Materials: Differentiate between items stored on-site and items stored off-site.
1. Provide certificate of insurance, and consent of surety to payment, for stored materials.
2. Provide supporting documentation that verifies amount requested, such as paid invoices.
Match amount requested with amounts indicated on documentation.
3. Provide summary documentation for stored materials indicating the following:
a. Value of materials previously stored and remaining stored as of effective date of previous Request for Payment.
b. Value of previously stored materials put in place after effective date of previous
Request for Payment and on or before effective date of current Request for
Payment.
c. Value of materials stored since effective date of previous Request for Payment and remaining stored as of effective date of current Request for Payment.
F. Initial Request for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Request for Payment include the following:
1. List of subcontractors.
2. Schedule of values.
3. Contractor's construction schedule per Agreement (startup if not final).
4. Products list (preliminary if not final).
5. Sustainable design submittal for project materials cost data.
6. Sustainable design action plans.
7. Schedule of unit prices.
8. Submittal schedule (preliminary if not final).
9. List of Contractor's staff assignments.
10. List of Contractor's principal consultants.
11. Copies of building permits.
12. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.
13. Initial progress report.
14. Schedule of completed tests and inspections.
15. Report of preconstruction conference.
G. Request for Payment at Substantial Completion: After GSA issues the Notice of Substantial
Completion, submit a Request for Payment less previous payments made for portion of the
Work claimed as substantially complete.
1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.
2. Include COTR acceptance of as-built Drawings.
3. This Request shall reflect Notices of Substantial Completion issued previously for GSA occupancy of designated portions of the Work.
ZGF Architects 01 2900 - 4 Payment Procedures
4. If requested by COTR, , present in -progress as-built drawings for review by GSA QAM as part of payment application process. Contractor to include cover sheet with signature lines on as-built drawings, indicating the set has been certified by Contractor’s QCM per each payment application.
H. Final Payment Request: The Agreement provides further details.
PART 2 - PRODUCTS (NOT USED)
END OF SECTION 01 2900
ZGF Architects 01 3000 - 1 Electronic Project Management
SECTION 01 3000 - ELECTRONIC PROJECT MANAGEMENT (EPM) SYSTEM
1.1 PURPOSE
A. The Contractor shall use GSA’s web-based electronic Project Management (ePM) system, which is a fully configured version of Meridian Systems’ Proliance Construction Management
Software. Click on this link for the ePM minimum requirements: http://www.gsa.gov/epm.
1.2 DEFINITION
A. ePM is a web-based project management tool which provides GSA’s Public Buildings Service with an automated workflow, collaboration, document management and project management solution to help manage GSA design and construction projects. ePM is integrated with GSA’s gBUILD (Green Building Upgrade Information Lifecycle Database ) to share project creation and data storage information.
1.3 PROJECT COLLABORATION AND DOCUMENTATION
A. General
1. The Contractor shall effectively manage the ePM database including maintaining adequate staffing levels and ensuring that personnel attend the mandatory GSA-provided training sessions.
2. The Contractor shall use ePM to upload, store, capture, preserve, record, maintain, update, and route all project-related documentation to comply with GSA's Document
Security Requirements. Classified material is not permitted to be stored in this system.
3. The Contractor shall use the workflow processes contained within ePM to submit and receive approval for all project deliverables.
4. The Contractor shall continuously monitor and review ePM to ensure the Contractor data is current through completion of the Close-out Phase of Construction.
5. The Contractor is required to store documents from their subcontractors and vendors in ePM. If a subcontractor or vendor does not obtain an ePM license, the contractor will be responsible for uploading and processing documents in ePM on their behalf.
B. Contents of ePM
1. The Contractor shall use ePM as the electronic filing cabinet for all project-related correspondence and submittals. The Contract Documents specify certain documentation that the Contractor shall provide during performance of the Contract. For the avoidance of doubt, and unless specifically stated otherwise in the Contract Documents, in addition to any documentation that the Contractor submits to GSA as set forth in the Contract
Documents. The current ePM Minimum Requirements can be found at:
http://epm.pbs.gsa.gov/Portal.
http://epm.pbs.gsa.gov/Portal
ZGF Architects 01 3000 - 2 Electronic Project Management
1.4 SCHEDULING REQUIREMENTS
A. The Project Schedule shall be produced using widely used, commercially available computer software that is capable of generating and monitoring a CPM schedule and is compatible with
Meridian Proliance.®
1.5 EQUIPMENT AND TRAINING
A. Equipment
1. GSA will not furnish any equipment related to accessing ePM. ePM is web-accessible, and can therefore be accessed via any computer with an Internet connection. For up to date ePM desktop requirements: http://epm.pbs.gsa.gov/Portal. .
B. ePM Training
1. GSA will provide no cost training to familiarize team members with the ePM system.
The GSA Project Manager will ensure that appropriate personnel should attend training and what roles they will be set up within the system based on their project responsibilities. GSA will determine if training is virtual or in-person.
C. ePM Support
1. GSA will provide ePM system administration and end user support, for the duration of the project.
1.6 PERSONNEL REQUIREMENTS
A. An HSPD-12 security clearance is required to access ePM. Project Team members without an
HSPD-12 clearance will need to work with the GSA Project Manager to initiate the clearance process, and request a temporary waiver for ePM access until clearance can be confirmed. A waiver means that once the individual’s HSPD-12 clearance is confirmed, an ePM username and password will be provided. For up to date GSA HSPD-12 information:
www.gsa.gov/hspd12. Obtaining clearances vary in length and may take time to receive them.
1.7 DATA OWNERSHIP
A. GSA shall retain ownership of all data entered into the system and shall administer all information contained therein. And distribution of any system data shall be made upon request.
1.8 DOCUMENT SECURITY
A. ePM security access levels ensure that sensitive documents can only be accessed by the appropriate personnel. It is the contractor’s responsibility to ensure their employees, subcontractors and vendors have the appropriate level of security to ensure document security.
http://epm.pbs..gsa.gov/epm http://www.gsa.gov/hspd12
ZGF Architects 01 3000 - 3 Electronic Project Management
PART 2 - PRODUCTS (NOT USED)
END OF SECTION 01 3000
ZGF Architects 01 3100 - 1 Project Management & Coordination
SECTION 01 3100 - PROJECT MANAGEMENT AND COORDINATION
1.1 SUMMARY
A. This section includes certain administrative provisions for managing and coordinating construction operations, including but not limited to the following:
1. General project coordination.
2. Coordination drawings.
3. Conservation.
4. Administrative and supervisory personnel.
5. Conferences and meetings.
6. Utility service interruptions.
7. Cleaning and protection.
1.2 GENERAL PROJECT COORDINATION
A. Coordination of Trades: Coordinate construction operations included in the various sections of the Specifications to provide an efficient and orderly installation of each part of the Work.
Coordinate construction operations included under different sections of the Specifications that depend on each other for proper installation, connection or operation. Keep pipes, ducts, conduit, and the like as close as possible to ceiling slab, walls, and columns to take up a minimum amount of space. Locate pipes, ducts, and equipment so that they do not interfere with the intended use of eyebolts and other lifting devices. Assure all controls can be reached and operated.
1. Schedule construction operations in the sequence required to obtain the best results where the installation of one part of the Work depends on installation of other components before or after that part.
2. Coordinate installation of different components to provide maximum accessibility for required maintenance, service, testing and repair.
3. Minimize roof penetrations.
B. Notification: Prepare and distribute memoranda to each party involved, outlining special procedures required for coordination. Include notices, reports and meeting minutes as part of the memoranda.
C. Administrative Procedures: Coordinate scheduling and timing of administrative procedures with other construction activities to avoid conflicts and promote orderly progress of the Work.
Administrative procedures include but are not limited to the following:
1. Preparation of schedules.
2. Installation and removal of temporary facilities.
3. Security packages and systems by others (i.e. U.S. Marshals Service (USMS), Federal
Protective Service (FPS), tenants, etc.)
ZGF Architects 01 3100 - 2 Project Management & Coordination
4. Audio Visual (AV) and technology requirements and packages for tenants and/or end users.
5. Telecommunication, data, internet and other tele-work systems for GSA, tenants and/or end users.
6. Delivery and processing of submittals.
7. Progress meetings.
8. Project closeout activities.
9. Startup and adjustment of systems.
1.3 COORDINATION DRAWINGS
A. Prepare coordination drawings and/or BIM model and data where coordination is needed for installation of products and materials fabricated by separate entities, and prepare coordination drawings where limited space availability necessitates maximum use of the space for efficient installation of different components.
1. Show the relationship of components from the separate shop drawings. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems
2. Indicate required installation sequences.
3. Indicate minimum access space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.
4. Show locations and sizes of all access doors on vertical and horizontal surfaces throughout the facility.
5. Provide vertical and horizontal dimensions necessary to locate each component and avoid conflicts within the space.
6. Comply with shop drawing requirements for sheet size and submittal methods specified in Division 1 Section "Submittal Procedures."
B. Refer to Divisions 23, and 26 Plumbing, Heating Ventilating and Air Conditioning, and
Electrical for specific coordination drawing requirements for mechanical and electrical installations.
C. Provide coordination drawings for equipment and system installations in mechanical and electrical rooms and spaces where two or more entities will provide the work and separate shop drawings are insufficient to show coordination.
D. Provide coordination drawings for raised access floor showing grid of raised access floor, quantity, size and locations for field-cut grommet holes, furniture layout, and power and data infrastructure beneath the raised access floor. Coordination drawings must be prepared prior to
Furniture System Pre-Installation conference.
E. Work installed prior to approval of coordination drawings shall be at the Contractor’s risk.
Subsequent relocations required to avoid interferences shall be made without additional expense to the Government. In case interference develops, the Government will decide which work shall be relocated, regardless of which was installed first.
ZGF Architects 01 3100 - 3 Project Management & Coordination
F. Coordinate BIM requirements in section 01 7810 and COBie (Construction Operations Building information exchange. Digital Data Files of Coordination Drawings: Prepare coordination digital data files in accordance with the following requirements:
1. File Preparation Format: Same digital data software program, version, and operating system as the original Drawings.
2. File Submittal Format: Same digital data software program, version, and operating system as the original Drawings and Portable Document Format (PDF).
3. GSA will furnish Contractor one set of digital data files of the Drawings for use in preparing coordination digital data files.
a. GSA makes no representations as to the accuracy or completeness of digital data files as they relate to the Drawings.
b. Digital Data Software Program: [BIM, Revit, latest edition, as approved by GSA.
c. Execute a data licensing agreement in a form acceptable to the GSA, if required for
Project.
1.4 CONSERVATION
A. Coordinate conservation of energy, water and materials in the conduct of construction operation. Salvage materials and equipment involved in the performance of, but not incorporated into, the Work.
B. Comply with Green Purchasing Plan requirements.
C. Waste Management Plan: Establish a program to maximize recycling of waste materials.
Program shall include the following:
1. Designation of a waste management coordinator.
2. Identification of recyclable materials.
3. Identification of available local recycling firms and agencies to receive recyclable materials.
4. Establishment of quantity goals for collection of each recyclable material.
5. Designation of one or more locations on the project site for collection, sorting and temporary storage of recyclable materials.
6. Means and schedule for transporting and delivery of recyclable materials to recycling firms and agencies.
7. Implementation of the Waste Management Plan: Contractor's waste management coordinator shall provide on-site instruction of workers in the identification, separation and handling of recyclable materials, and shall manage the process for the duration of the
Contract.
a. Contractor shall lay out and define specific areas to facilitate separation of materials for recycling, and shall maintain collection bins clearly marked to avoid contamination of the recyclable materials.
b. The waste management coordinator shall report monthly, in writing, the quantity of each recyclable material collected during the previous month and cumulatively to date, compared to the quantity goal, and other points of interest. Copies of each report shall be distributed to each significant stakeholder of the project, including the Government.
ZGF Architects 01 3100 - 4 Project Management & Coordination
1.5 ADMINISTRATIVE AND SUPERVISORY PERSONNEL
A. The Contractor shall provide administrative and supervisory personnel for proper performance of the Work.
B. Project Coordinator: Provide a full-time project coordinator, experienced in the administration and supervision of building construction, including all systems required in the project. The project coordinator shall be authorized to act as the coordinator of construction activities, including but not limited to the following:
1. Scheduling and sequencing of Work.
2. Sharing access to work spaces.
3. Installations.
4. Protection of work.
5. Cutting and patching.
6. Selections for compatibility.
7. Preparation of coordination of drawings.
8. Inspection and tests.
9. Temporary services and facilities.
C. Safety and Health Officer: Provide a safety and health officer whose duties shall consist of developing and implementing safety and health programs specified in Division 1 Section
"Safety and Health."
D. Provide a waste management coordinator whose duties shall consist of developing and implementing a program for maximizing recycling of waste.
E. Add additional staff and respective duties as necessary
1. Mechanical Electrical Plumbing (MEP) Coordinator).
2. Commissioning…