3 RFP SOW DOC A 2D 2021 07 12.pdf

PDF 337 KB Posted

Attached to
DOC A Phase 2D Tenant Build Out, St Elizabeths West Campus, SE Wash. , DC
Solicitation number
47PM0021R0009
Issued by

About this file

This is a solicitation for construction services for the DHS Operations Center (DOC A) Phase 2D tenant build out project at the St. Elizabeths West Campus site in Washington, DC. The project involves completing the fit-out of spaces designated for DHS components to support the agency's mission. Construction will finish areas on lower levels two and three of the operations center building. The General Services Administration seeks a general contractor to provide management, labor, materials and equipment for final construction. The estimated cost range is $10-20 million. The performance period shall not exceed 335 days from notice to proceed to substantial completion. This competitive solicitation is a total small business set-aside issued under FAR 19.5. There will be a mandatory pre-proposal conference on February 10, 2022. Licensed contractors shall submit technical and price proposals to the contracting officer by the proposal due date. Selection will be made based on lowest price among technically acceptable offers.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Development Services - RFP

DOC PHASE 2D – July 2021

U.S. General Services

Administration

National Capital

Region Public

Buildings Service www.gsa.gov

RFP for

Construction Development Services

PROJECT IDENTIFICATION

Project Title: DHS OPERATIONS CENTER (DOC A) PHASE 2D

Building: OPERATIONS CENTER BUILDING

Building ID #:

Building Location: 2701 MARTIN LUTHER KING JR.

AVENUE SE WASHINGTON DC 20032

Project Control

Number: GSA Work

Items:

RWA #:

ePM Number:

Author: Matt Kelly – GSA Rep Project Manager http://www.gsa.gov/

2 PROJECT INFORMATION 4

1.1. PROJECT BACKGROUND 4

1.2. PROJECT SUMMARY DESCRIPTION 5

1.3. PROJECT DELIVERY TYPE 5

1.4. PROJECT GOALS 5

1.5. PROJECT OBJECTIVES 5

1.6. PROJECT BUDGET 6

1.7. PROJECT SCHEDULE 6

1.8. CONTRACT TYPE 6

2. SCOPE OF WORK 7

2.1. PROJECT REQUIREMENTS 7

2.2. PROJECT SITE REQUIREMENTS 10

1.1. STANDARDS AND CRITERIA DOCUMENTS 12

1.2. CUTTING & PATCHING REQUIREMENTS 13

1.3. NATIONAL HISTORIC PRESERVATION ACT (NHPA) REQUIREMENTS 14

1.4. NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REQUIREMENTS 14

1.5. NATIONAL CAPITAL PLANNING COMMISSION REQUIREMENTS 14

1.6. U.S. COMMISSION OF FINE ARTS REQUIREMENTS 14

1.7. FINE ARTS REQUIREMENTS 14

1.8. ACCESSIBILITY REQUIREMENTS 14

1.9. SAFETY REQUIREMENTS 15

1.10. FIRE PROTECTION AND LIFE SAFETY REQUIREMENTS 15

1.11. ENVIRONMENTAL REQUIREMENTS 17

1.12. HAZARDOUS MATERIAL REQUIREMENTS 17

1.13. SUSTAINABILITY REQUIREMENTS 19

1.14. ENERGY AND WATER EFFICIENCY REQUIREMENTS 21

1.15. BUILDING AUTOMATION SYSTEM & CONTROLS 23

1.16. COMMISSIONING 23

1.17. SITEWORK AND STORMWATER REQUIREMENTS 23

1.18. BUILDING TECHNOLOGY SERVICES 24

1.19. MANUFACTURER REQUIREMENTS 24

1.20. BUILDING INFORMATION MODELING (BIM) 25

1.21. ENERGY MODELING AND PERFORMANCE 26

1.22. COBie 26

2. DESIGN STAGE 27

3. CONSTRUCTION STAGE 27

3.1. GENERAL 27

3.2. PERMITTING 27

3.3. CONSTRUCTION SCHEDULE 27

3.4. CONSTRUCTION PROGRESS REPORTS 27

3.5. SHOP DRAWINGS / PRODUCT DATA SUBMISSIONS 27

3.6. SCHEDULE OF INSPECTIONS AND TESTS 27

3.7. CONSTRUCTION INSPECTIONS 27

3.8. SPECIAL INSPECTIONS 27

3.9. COMMISSIONING 27

3.10. QUALITY CONTROL PLAN 27

3.11. CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT 27

3.12. SAFETY PLAN 27

3.13. COORDINATION OF WORK 27

3.14. REQUESTS FOR INFORMATION 27

3.15. MODIFICATIONS / CHANGE ORDERS 27

4. CONTRACT ADMINISTRATION 28

4.1. CONTRACTOR’S STAFF 28

4.2. MEETINGS 28

4.3. COMMUNICATION 28

4.4. PROJECT CLOSEOUT 28

4.5. SCHEDULE OF VALUES 28

4.6. FEE & PAYMENT 28

4.7. GOVERNMENT FURNISHED PROPERTY 28

5. ATTACHMENTS 28

PROJECT INFORMATION

This section provides an overview of the project and it’s contract.

1.1. PROJECT BACKGROUND

The Project will be located on the former site of the St. Elizabeth’s Hospital, a National

Historic Landmark, and former mental health hospital that was previously operated by the

District of Columbia Health and Human Services. The St. Elizabeth’s Campus is located on Martin Luther King, Jr. Avenue in the Anacostia neighborhood of Southeast

Washington, D.C. The West Campus and a portion of the East Campus have been selected to meet the operational housing needs for the DHS. The West Campus, a 176-acre site, is situated on the “topographic bowl” of the District of Columbia and offers panoramic views of the city. The campus contains 62 historic buildings, 134 character defining landscape features and a historic cemetery, in which soldiers from the Civil War era, as well as former patients, are interred. The project is part of the DHS headquarters operations consolidation into a secure, 4.5 million gross square feet (GSF) campus at the

St. Elizabeth’s Campus in the Southeast quadrant of Washington, DC. The resultant campus will be the central core for leadership, operations coordination, policy, and program management functions in support of DHS’s strategic goals.

The original consolidation effort included the collocation of operation centers, decision support, and collaborative/support areas into a single facility at this location, currently referred to as the DHS Operation Center (DOC) building). The Design A/E team of Goody

Clancy I HDR, LLC was retained by GSA in July 2009 to perform the initial programming and to develop the facility design. Phase 1, 2A and 2B buildouts included spaces for Campus

Security Operations, US Coast Guard Headquarters Command Center, Intel and Cyber

Command watches, an Information Technology Operations Center, Campus Network

Operation Center, USSS Decision Support Cell, ICE Joint Information Operations Center, DHS OCIO Enterprise Security Operations Center and the DHS National Operations Center.

1.2. PROJECT SUMMARY DESCRIPTION

The DHS Operations Center (DOC A) Phase 2D includes several major construction elements relating to the remaining tenant fit-out of the DHS consolidated Operations Center facility (DHS Operations Center (DOC A) Phase 2D is currently finished with construction, but has some additional services needed, so it will be included in this proposal as a modification. The operations center building consists of two (2) stories below grade.

Located adjacent to the United State Coast Guard Headquarters (USCG HQ - Munro Bldg.), the remaining tenant fit-out work will finish spaces designated for the DHS components and required to support the DHS mission at the St. Elizabeth’s campus.

This acquisition plan is for the procurement of a Stand Alone Contract, General Contractor whom must provide all management, supervision, labor, materials, supplies, and equipment

(except as otherwise provided), and must plan, schedule, coordinate and assure effective performance of all final construction to meet General Services Administration (GSA) and client agency requirements. The GC will perform the construction in accordance with the design specifications, drawings, and the provisions of the contract.

1.1. PROJECT DELIVERY TYPE

The project is a Design-Bid-Build delivery type. This project will also be a change of use of space, as the current space is not being used (vacant) at this time.

1.2. PROJECT GOALS

● Complete project within 10% of overall project duration

● Complete project within 10% of overall project budget

● Quality Assurance

● Schedule Performance

● Cost Performance

1.3. PROJECT OBJECTIVES

The project will include, but not be limited to, the following:

● Review the Final Design Drawings provided in the RFP package.

● Propose design alternates where drawings could improve or be altered to be more efficient, cost-effective and/or energy efficient

• Reference the Schedule of Alternates on project specifications

012300-1

● Review site data and submit applicable data on logistics to/from site.

● Life Cycle cost analysis

● Provide a schedule of construction work.

● Secure work area and provide for continued access to the facility

● Construct project

● Create and provide operations and maintenance manual

● Provide as-constructed (as-built) drawings

● To be considered successful, the Work must achieve the following objectives:

● Provide Project Management, Pre-Construction Services, General Contractor Services, Quality Management, and Construction Administration Services.

● Complete all construction installation scope tasks based on P100 requirements.

1.4. PROJECT BUDGET

The Estimated Construction Cost at Award (ECCA) is

BonnieEEcholes Typewriter between $10,000,000 and $20,000,000.

1.5. PROJECT SCHEDULE

The overall Period of Performance shall be 335 days from Notice To Proceed to Substantial

Completion, based on the following:

● On-Site Construction Services 335 calendar days after Notice to

Proceed Ultimate Contract Completion shall be 355 calendar days after Substantial

Completion

1.6. CONTRACT TYPE

The Government contemplates the award of a firm fixed-price contract to the successful offeror. The prices shall include, but shall not be limited to the following:

● Project Management

● Construction Management

● Contract Management

● Pre-Construction Services

● Construction Services

● Quality Management

● Professional Inspection Services

2. SCOPE OF WORK

This section details the technical requirements and constraints which the Contractor must account for during design. The Scope of Work indicated is not intended to limit the design of the Architect-

Engineer. Variation from the Scope of Work will be considered by GSA, if the proposed change is within the construction budget limitations, meets the objectives for the project, and results in an improved design. GSA must approve all proposed changes in the Scope of Work.

2.1. PROJECT REQUIREMENTS

2.1.1. Base Bid

The project will consist of the construction of the following scope tasks:

The uncompleted areas are to be occupied by designated DHS Component entities supporting the overall DOC mission. The following tenants constitute the makeup of the remaining buildable areas within the DOC building:

1. Lower Level 2 (LL2): Approximately 18,700 USF

a. Cybersecurity and Infrastructure Security Agency (CISA) Watch: Approximately

9750 USF

b. Cybersecurity and Infrastructure Security Agency (CISA) Communications and

Intelligence: Approximately 7450 USF

c. Bunkroom: Approximately 1500 USF

2. Lower Level 3 (LL3): Approximately 7320 USF

a. United States Coast Guard Cyber Command: Approximately 5880 USF

b. Bunkroom: Approximately 1440 USF

Contractor shall provide all labor and materials necessary for installation of the following:

Selective Demolition:

1. Reference all selective demolition specifications and items to be salvaged for re-installation

2. Remove all flooring to structural slab

3. Remove all ceiling tile finishes and existing doors

Interior Construction:

1. Self-leveling cement based flooring – to be installed per Spec Section 03-5400

2. Partitions – Contractor shall provide all labor and materials necessary for installation of the interior construction inclusive of the following:

Partitions are included as labeled on the drawings for LL3 and LL2 and the access control drawings for LL3 and LL2. A full renovation of this project was included for the interior fit-out, inclusive but not limited to of brick, CMU block, mortar, metal framing and interior drywall.

3. Flooring/Walls/Ceilings/Paint – Interior finishes have been included as identified on the IID. Additional finishes are included in the IID set. A full renovation of this project was included, as applicable, in the IID set.

4. Interior Doors/Finishes – Interior doors, frames, and hardware have been included as identified on the IID drawings. Additional doors, frames, and hardware are included.

5. Wood treatment – per 06 0573, please follow IID documents for all fire protection requirements

6. Interior all-glass storefronts and signage are included – reference IID drawings for specifications on manufacturers and glazing requirements

7. Acoustical panels and finishes – all acoustical finishes and requirements are included in the IID set

Plumbing

1. General – The new plumbing pricing is generally based on the layout drawings dated

April 4, 2021 – adding new mechanical equipment and layouts based on the new architectural layout.

2. Sleeves, controls, and Seals for Fire-Suppression Piping and Equipment is Included

3. General plumbing, such as drainage, cleanouts, valves, piping, fittings are included

4. Plumbing – Sanitation lines and new plumbing for bathrooms in level LL2 included.

Mechanical:

1. General – The new mechanical pricing is generally based on the layout drawings dated

April 4, 2021 – adding new mechanical equipment and layouts based on the new architectural layout.

2. HVAC – The estimates include required new systems for the following:

a. HVAC Distribution ductwork, chilled beams, outlets, hydronic piping, VAV, FCU, insulation, etc.

b. Installation of new HVAC Equipment in accordance to spec section 23 0548

c. Modifications to the HVAC controls.

d. Testing & balancing.

3. Fire Protection – The fire protection estimate includes relocating and adjusting the sprinkler heads as required.

Electrical:

1. General – The electrical pricing is generally based on the preliminary layout drawings by ZGF Architects, dated April 4, 2021 along with historical pricing from similar projects.

2. Security Requirements –

• The Contractor shall comply with DHS policies, standards, and procedures as they relate to this Task Order

• When technologies do not comply with current standards the Contractor shall comply with all policies and procedures for the introduction of new technologies per the authorization to operate (ATO), Technical Refresh Model (TRM), Infrastructure Change Control Board (ICCB), and Certification and

Authorization (C&A) processes

• All construction, physical security and IT installation must comply with the following:

• All design and construction for Sensitive Compartmented Information

Facilities (SCIF) in the DOC shall be in accordance with the contract documents

• Intelligence Community Directive (ICD) 705 – Sensitive Compartmented

Intelligence Facilities and subsets thereof, includes Intelligence

Community Standard 705-1 – Physical and Technical Security Standards for Sensitive Compartmented Intelligence Facilities.

• All design and construction for spaces which store Collateral Classified materials

(including: Top Secret & Secret) in the DOC shall be in accordance the following documents:

• DHS Instruction 121-01-011: DHS Administrative Security Program;

dated April 25, 2011.

• All unclassified office space and specialty spaces: shall be in accordance with the following document:

• DHS Instruction 121-01-017-01: DHS HQ Physical Security Construction and Equipment Specifications Handbook; dated March 21, 2015.

3. Electrical and Grounding Distribution –includes electrical distribution modifications.

4. Receptacles & Branch Wiring – Allowances are included for receptacles and misc.

branch power in all of the reprogramming areas.

5. Lighting & Lighting Controls – The estimate includes allowances for lighting and lighting controls in all of the reprogramming areas.

6. Communications – The estimation includes allowances for the telecom outlets rough-in, any equipment, racks, patch panels or switches.

7. Security Systems – Includes allowances for security system modifications of the existing systems in the reprogramming areas. Separate allowances are included for the new access door controls.

8. Fire Alarm System - Includes modifications to the existing fire alarm system in all of the reprogramming areas.

9. Audio-Visual Rough-In - The estimate includes allowances for the audio-visual rough-in, but does NOT include any equipment or cabling.

2.1.2. Option 01: N/A

2.1.3. Unit Price 01 N/A

2.2. PROJECT SITE REQUIREMENTS

2.2.1. Work Restrictions

The Contractor shall survey the entire worksite and review existing documentation to be familiar with the existing conditions. This includes all areas of the building, structure, and site affected by the removal and demolition work, alterations and new construction work prior to initiation of design work.

The Contractor shall have full use of the designated premises for survey, including full use of the indicated work site, limited only by the Government's right to perform work on portions of the project. The Contractor shall limit the use of the premises to the work areas indicated, and to allow for Government occupancy and public use.

The work shall be sequenced to minimize disruption to building occupants, visitors, and maintenance activities. To the greatest extent feasible, demolition work should not take place until supplies are on hand to perform new work.

The building is to remain fully operational throughout the entirety of the project, with no disruption to tenant operations. All work areas must be cleaned at the end of every work day.

2.2.2. Working Hours

2.2.2.1. Government Occupied Hours

Government personnel are scheduled to occupy the building during the following hours on weekdays, Monday through Friday, except for established Government

Holidays, 6:00 AM to 6:00 PM.

2.2.2.2. Contractor's Working Hours

The following work shall be performed outside of Government Occupied Hours:

● Noisy and/or odor-producing work that may disrupt tenant operations in adjacent spaces.

● Any work while U.S.C.G mission implementations are in session.

Work accomplished outside of Government Occupied Hours shall be performed at no additional cost to the Government. The Contractor shall submit a proposed schedule and gain the COR’s approval at least 72 hours before proceeding with any work during Government Unoccupied Hours.

2.2.3. Loading Dock : Materials delivered to the site must enter gate 1. The drive and truck must be submitted to the security office no later than 72 hours prior to the delivery. Deliveries must be coordinated with the GSA Project Manager a minimum of 72 hours in advance.

2.2.4. Parking: Limited parking is available on site. 5 parking spots will be made available for the Contractors use.

2.2.5. Staging and Storage: The Contractor may be provided a staging area within the building, contingent upon GSA approval and provided that its use will not interfere with operations of the Government. No GSA employees will assist with unloading/loading of vehicles(s). The contractor shall provide all personnel and equipment needed for unloading, moving, and assembling the materials.

2.2.6. Dumpster

Dumpster: If dumpsters are needed, they shall be designated in an approved location by GSA and in the designated stand-down location for the project. All trash pickup and delivery of new dumpsters to be coordinated with the GSA project manager and security office no later than 72 hours in advance.

2.2.7. Restrooms

Restrooms: If a restroom is available onsite, contractor will need GSA approval to use the facilities for the duration of the project. If a restroom is not available, the contractor shall provide restroom services for all employees and contractors. Company shall be proposed, and later approved prior to placement of the restroom facilities. All pickup of waste shall be coordinated with GSA security with minimum 72 hour notice.

2.2.8. Freight Elevator

Not applicable.

2.2.9. Existing Conditions

Not applicable.

2.3. STANDARDS AND CRITERIA DOCUMENTS

All design work and related submissions must comply with the latest edition of the documents listed below. Any conflicts or ambiguities within or among the referenced

Standards and Criteria Documents, or any deviations from requirements contained in the

Standards and Criteria Documents, must be reported to the GSA in writing, for determination as to applicability.

2.3.1. GSA Requirements

● PBS P100, Facilities Standards for the Public Buildings Service, including all applicable Standards, Criteria and Guides listed therein, 2018

● PBS P100 Addendum, 2019

● PBS P120, Public Buildings Service Cost and Schedule Management Policy Requirements

● Architectural Barriers Act Accessibility Standard (ABAAS)

● PBS Order 3490.2, “Document Security for Sensitive but Unclassified Building

Information.”

● PBS CAD Standards

● PBS Building Commissioning Guide

● Guidance for Electric Metering in Federal Buildings

● IAQ Guidelines for Occupied Buildings under Construction

● Occupational Safety and Health regulations for construction and general industry; 29

CFR Parts 1926 and 1910

● Section 01546 – Safety and Health Specification

● International Building Code (IBC)

● International Fire Code (IFC)

● National Fire Protection Association (NFPA) National Fire Codes and Standards

● Egress issues shall meet NFPA 101 (Life Safety Code)

● OFM COBie Playbook

● GSA Spec 013600 - COBie performance

● ANSI NETA Standards

● GSA Strategic Sustainability Performance Plan

● The Guiding Principles for Sustainable Federal Buildings New Construction and

Major Renovations -OR- Existing Buildings (whichever applies)

● Section 02089 - Small PCB Items and Lamps

● Section 02090 - Control of LBP

2.3.2. Customer Requirements

● U.S. Courts Design Guide

● U.S. Courts Design Guide, Renovation and Alteration Appendix

● USMS Publication 64, Requirements and Specifications for Special Purpose and Support

Space

● U.S. Attorneys’ Facilities Standards

● FBI Field Office Design Guide.

● ICD 705, v 1.4 - Technical Specifications for Construction and Management of

Sensitive Compartmented Information Facilities

2.3.3. Stakeholder Requirements N/A

2.4. CUTTING & PATCHING REQUIREMENTS

Replace, patch, and repair material and surfaces cut or damaged by methods and with materials in such a manner as not to void any existing warranties.

All substrates must be inspected and defects repaired prior to installing new material or finish. All replacement and new materials should match the existing in material, dimensions, color and finish. All material selections / mock-ups need to be reviewed and approved by the GSA Project Manager and/or Customer prior to ordering.

2.4.1.1. Structural Systems

Do not cut structural beams or major structural elements without the written review and approval of a Licensed Structural Engineer and the General Services Administration. Prior to cutting and/or drilling through any structural member, the Contractor shall conduct ground penetrating radar or similar type of investigative measure to prevent cutting concealed material. Submit structural calculations sealed by a licensed Structural Engineer to the Contracting Officer and COR concurrently for approval.

Do not cut and patch structural elements in a manner that would change their load-carrying capacity or load-deflection ratio.

2.4.2. Operational Systems

Do not cut and patch operating elements, safety related systems, or related components in a manner that would result in reducing their capacity to perform as intended, or that would result in increased maintenance or decreased operational life or safety.

2.4.3. Visual / Finishes

Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in GSA's opinion, reduce the building's aesthetic qualities. Do not cut and patch construction in a manner that would result in visual evidence of cutting and patching.

Remove and replace construction that is cut and patched in a visually unsatisfactorily manner.

Patched areas shall be neatly trimmed prior to patching. Feather all patches to provide a complete and finished surface. Paint all exposed work provided under the contract including all patched areas, exposed areas uncovered during demolition, to provide a complete and finished project. Paint patched areas plus surrounding areas to the nearest break in wall surface, or other building line to provide a neat and finished appearance. All paint shall match adjacent painted surfaces. Protect all surrounding areas including fixtures, furniture, floors and accessories from paint splatter and droppings. Clean-up and restore all areas splashed with paint.

Any design related to removing equipment, brackets, supports, etc. that leaves holes or damaged surfaces on the floor, walls, and ceilings, the design shall include requirements to patch the damaged surfaces with the same adjacent material and finish.

2.5. NATIONAL HISTORIC PRESERVATION ACT (NHPA) REQUIREMENTS: N/A

2.6. NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REQUIREMENTS: N/A

2.7. NATIONAL CAPITAL PLANNING COMMISSION REQUIREMENTS: N/A

2.8. U.S. COMMISSION OF FINE ARTS REVIEW REQUIREMENTS: N/A

2.9. FINE ARTS REQUIREMENTS

It is not anticipated that Fine Arts will be disturbed during work activities.

2.10. ACCESSIBILITY REQUIREMENTS

Architectural Barriers Act Accessibility Standard (ABAAS) is mandatory for all GSA projects. If local accessibility standards exist, the Contractor must follow the most stringent requirements between the local standards and ABAAS.

The building ABAAS accessibility shall be maintained at all times.

2.11. SAFETY REQUIREMENTS

All contractor(s) shall comply with the safety guidelines and requirements contained in

NCR’s Section 01546 – Safety and Health specification.

2.12. FIRE PROTECTION AND LIFE SAFETY REQUIREMENTS

GSA’s Fire Protection Engineers are the authority having jurisdiction (AHJ) for all GSA owned facilities.

2.12.1. Egress/Life Safety

● The means of egress shall be maintained at all times.

● Egress issues shall meet NFPA 101 (Life Safety Code).

● Provide code analysis using the latest requirements of GSA PBS P-100, International

Building Code, NFPA codes and standards, and any other applicable requirements. Code analysis shall include at a minimum applicable construction codes and standards, use and occupancy identification, construction type, height and area requirements, fire resistant rated construction requirements, vertical opening separation requirements, interior finishes, and egress requirements. The technical egress requirements of NFPA 101 must be used in lieu of the International Building Code.

● Provide occupant load and egress capacity calculations

● Provide illuminated exit marking signage and emergency lighting

● Demonstrate compliance with IBC requirements for fire resistant rated partitions, walls, and interior finishes

● Demonstrate compliance with NFPA locking and exit door hardware requirements.

2.12.2. Fire Protection Systems

● Design fire protection engineers shall perform the design of the building fire pump and water-based fire protection systems. Design shall include but not be limited to water supply analysis, sizing of building fire pump, sizing of building standpipes/risers and mains, sizing and location of drains, location of zone control valve assemblies and inspectors test connections, and identification of occupancy hazards and design densities.

● Design fire protection engineers shall perform the design of special hazard fire protection systems including but not limited to clean agent fire protection systems and wet-chemical suppression systems.

● Design fire protection engineer shall modify the applicable GSA guide specifications for the associated water-based and special hazard fire protection system design.

2.12.3. Fire Alarm Systems

● Design fire protection engineers shall perform the design of the building fire alarm system. Design shall include but not be limited to location of fire alarm control equipment and power supplies, location of fire alarm notification appliances, location of addressable initiating devices, identification of circuit and pathway types, and system network riser diagram. Fire alarm design shall incorporate equipment and devices necessary for interfacing with other building systems including HVAC, smoke control, electrical, elevators, and security.

● Design fire protection engineer shall modify the applicable GSA guide specifications for the associated digital addressable voice evacuation fire alarm system design.

2.12.4. Fire and Life Safety System Testing and Acceptance

● It is anticipated that fire protection engineering services are required for system acceptance testing and inspections.

2.13. ENVIRONMENTAL REQUIREMENTS

Contractor shall not allow the venting of coolants to the atmosphere in compliance with section 608 of the Clean Air Act (40 CFR Part 82)

2.14. HAZARDOUS MATERIAL REQUIREMENTS

All work, including contact with and handling of hazardous materials, the disturbance or dismantling of structures containing hazardous materials, and/or the transport and disposal of hazardous materials shall comply with the applicable requirements of 29 CFR 1910/1926, and

40 CFR 761/260-271

2.14.1. General

All work areas should be inspected and tested as part of the Existing Conditions Survey. If material suspected to be ACMs or LBPs are encountered, the material shall be sampled for bulk asbestos and/or lead paint chips. Include asbestos and lead paint removal or abatement as required by GSA on drawings and in specifications.

Indicate the following statement on drawing, Cover Sheet:

“NO HAZMAT: IT IS NOT ANTICIPATED THAT ASBESTOS-CONTAINING

MATERIALS (ACM) OR LEAD-BASED PAINT (LBP) WILL BE ENCOUNTERED

DURING WORK ACTIVITIES. HOWEVER, WORK AREA SHOULD BE INSPECTED

PRIOR TO STARTING WORK AND IF MATERIALS SUSPECTED TO BE ACMS OR

LBPS ARE PRESENT, BULK ASBESTOS AND/OR LEAD PAINT CHIP SAMPLING

SHALL BE COLLECTED AND TESTED. IF WORKERS ENCOUNTER SUSPECT

MATERIALS DURING WORK, ALL WORK ACTIVITIES IN THAT AREA SHALL

CEASE IMMEDIATELY AND BULK ASBESTOS AND/OR LEAD PAINT CHIP

SAMPLING SHALL BE CONDUCTED. IF THE MATERIALS SAMPLED ARE

DETERMINED NECESSARY FOR REMOVAL, THEN THE CONTRACTOR SHALL

ADHERE TO THE REQUIREMENTS OF SPECIFICATION SECTIONS 02085 FOR

ASBESTOS REMOVAL AND 02090 FOR REMOVAL AND DISPOSAL OF LEAD-

BASED PAINT.”

2.14.2. Asbestos Containing Material

It is not anticipated that Asbestos Containing Material will be encountered during work activities.

2.14.3. Lead Based Paint

It is not anticipated that Lead-Based Paint (LBP) will be encountered during work activities.

2.14.4. Polychlorinated Biphenyl

It is not anticipated that Polychlorinated Biphenyl (PCB) will be encountered during work activities.

2.14.5. Radon

It is not anticipated that Radon gases will be encountered during work activities. .

2.14.6. Mercury

It is not anticipated that mercury will be encountered during work activities.

2.14.7. Universal / Hazardous Waste

It is not anticipated that universal / hazardous waste will be encountered during work activities.

2.14.8. Exit Signs Requiring Special Disposal

It is not anticipated that exit signs requiring special disposal will be encountered during work activities.

2.14.9. Presence of Hazardous Materials N/A.

2.14.10. Hazardous Materials Cost Tracking N/A

2.15. SUSTAINABILITY REQUIREMENTS

The Contractor is required to meet GSA Sustainability requirements as described in the P100 and to meet Green Purchasing mandated requirements. The Contractor will confirm the requirements with the GSA project manager and incorporate them into their Design Build deliverables including, but not limited to: Drawings, Specifications, and General Contractor

Scope of Work.

2.15.1. Green Purchasing

All products and services purchased by GSA must meet strict sustainability requirements including, but not limited to, non-toxic, low VOC, recycled content, energy efficient, and water conserving.

Where products that are labelled FEMP-approved, DesignLights Consortium® (DLC)

Premium Certification (or Standard DLC rating if Premium is not available), Energy Star, EPA Safer Choice, or WaterSense exist and are applicable for this project, they must be used.

2.15.2. Key Sustainable Products

The use of GSA’s Key Sustainable Product (KSP) standards is mandatory for all contracts and task orders. If any of the five materials listed below are purchased as part of this project, they must comply with their respective sustainability standards. The Contractor shall specify the brand name and product that shall be used to meet each applicable KSP standard below.

The Contractor shall provide the required data submittals to the Contracting Officer (CO) or their designee prior to the start of construction. The COR shall verify that the products submitted are compliant with these KSPs.

● Interior Latex Paint Standard: ≤ 50 grams per liter (g/L) VOCs post-tint (i.e.

SCAQMD Rule 1113 standard).

● Acoustical Ceiling Tile Standard: Meets the California Section 01350 standard for low-

VOC materials; AND total recycled content ≥ 20%; AND recyclable in a closed loop process; AND USDA Certified BioPreferred; AND Environmental Product Declaration

(EPD) available.

● Nylon Carpet Standard: NSF 140 Platinum certification or Cradle-to-Cradle Bronze

● Gypsum Board Standard: Greenguard Gold certification OR 0 g/L VOCs

In addition to the above listed key sustainable products, all other interior finishes must meet, at a minimum, the baseline environmental requirements specified in the GSA P100 facilities standards, Chapter 3, Architecture and Interior Design. Contractor shall submit product data for each finish material used, demonstrating compliance with the appropriate environmental requirements.

Sustainability requirements for specific interior finishes and construction materials may also be found at https://sftool.gov/.

2.15.3. Proof of Compliance

The Contractor must, at all times during the performance of this contract, maintain a cut sheet or other documentation of compliance with product purchasing activities as stated within this specification.

The Contractor shall provide copies of such documentation to the Contracting Officer or their designee as required in a designated submittal package for the project.

2.15.4. Construction and Demolition Debris

GSA's minimum requirement is to divert 50% of C&D waste from landfills/incinerators, with a higher reach goal of 70% diversion. The design specifications completed by the Contractor must be consistent with these goals. The Contractor must include the Construction Waste

Management and Disposal template specification in the design. The Contractor must also include the C&D Waste Management Report form as an attachment to the specification.

Templates for both of these documents are attached to this document.

Waste reports and associated documentation must be submitted with each invoice.

2.15.5. Refrigerants - N/A

2.16. ENERGY AND WATER EFFICIENCY REQUIREMENTS

The Contractor will install energy/water efficient, GSA Proving Ground proven technologies, Energy Star rated, FEMP rated, WaterSense certified equipment.

https://sftool.gov/ https://www.gsa.gov/governmentwide-initiatives/sustainability/emerging-building-technologies/gpgproven-technologies-with-gsa-deployment-potential

2.16.1. Life Cycle Cost Analysis: N/A

2.16.2. Plumbing Fixtures

Faucets, commodes, urinals, and showerheads must comply with EPA WaterSense standards.

The Contractor must provide cut sheets to document compliance and must meet the gpm or gpf minimum standard below:

● Kitchen (breakroom) faucets: 1.8 gpm

● Lavatory faucets: Metered - 0.25 gallons per metering cycle

● Toilets - flushometer: 1.28 gpf (WaterSense)

● Toilets - tank-type: 1.28 gpf (WaterSense)

● Urinals: 0.125 gpf

2.16.3. Lighting Fixtures

Lighting fixtures should be approved by the DesignLights Consortium® (DLC) with a DLC

Premium Certification, followed by a Standard DLC rating if Premium is not available—as the first priority—and Energy Star certified if DLC is not available. Lighting-inclusive projects should use efficient light-emitting diode (LED) fixtures and automatic lighting controls (i.e. either occupancy or vacancy sensors—the preference is for vacancy sensors) that are linked to the Building Automation System, if present. When retrofitting an existing lighting fixture with new LED bulbs or tubular LEDs, Section 6.3.2.2 of the P100 must be followed.

Interior lighting color temperature is recommended to be 3500 K and not to exceed 4000 K.

Indoor lighting should be on motion detection controls and daylight controls if within 10 feet of a window or skylight.

2.16.4. Energy Rebates: N/A

2.16.5. Cooling Tower Replacement: N/A

2.16.6. Transformer Replacement: N/A

2.16.7. Roof Replacement: N/A

2.16.8. Pump and Motor Replacement/Upgrade : NA

2.16.9. Insulation

The maximum feasible insulation needs to be installed on new tanks, pipes, fittings, valves and other associated equipment related to the domestic hot water system in the building.

2.17. BUILDING AUTOMATION SYSTEM & CONTROLS

The property does have a Building Automation System.

All new equipment is required to tie in with the existing Building Automation System and controllers. This includes interface compatibility, required programming, and commissioning to ensure performance meets required performance objectives. The Contractor is responsible for integration of new with existing systems.

2.18. COMMISSIONING

2.18.1. Commissioning Agent

The GSA shall retain the services of a Commissioning Agent (CxA) through the Construction

Quality Manager.

2.18.2. Building Enclosure Commissioning

Per P100, 3.2.7 Building Enclosure Commissioning (BECx), BECx is required to ensure designed performance. Develop a BECx plan as part of the overall Commissioning Plan.

Building Enclosure must comply with ASTM E2813.

Additional equipment and other items required for testing the building's airtightness are to be installed by the Contractor as specified by the testing agency in accordance with the

Commissioning Plan. This may include: indoor-to-outdoor pressure taps at various locations across the air barrier system, air flow and pressure measuring stations in air conveyance and handling systems, and tight-sealing dampers on all ducts carrying air across the air barrier.

2.18.3. HVAC / Energy Metering

Per P100, 6.5.3.4 Advanced Building Metering and Control, this project must install advanced meters for gas and steam in accordance with EISA 2007, Section 434 (b), and EPAct 2005, “Guidance for Electric Metering in Federal Buildings.”

2.18.4. Electrical Metering / Monitoring

Per P100, 6.5.3.4 Advanced Building Metering and Control, this project must install advanced meters for electricity in accordance with EPAct 2005. Provide electric meters capable of bidirectional monitoring of phase voltages, phase currents, power consumption

(demand), power factor, kVAR, and availability. These meters must be capable of communicating via MOContractorUS/TCP/IP.

Electric sub-meters shall be design-selected and installed for overall premises, and special-use internal facilities (data centers, computer rooms, laboratory), having a designed electricity intensity exceeding 7 watts per usable square foot (7 w/USF) - reference GSA

Public Buildings Service Pricing Guide, 4th Edition. Tenant-Agency supplemental HVAC and other equipment including, but not limited to, roof-top HVAC units (RTUs), computer room air conditioning (CRAC) units, and business support equipment larger than 5 KVA, shall also be provided with metering in compliance with ASHRAE 90.1.

Electrical contract design shall include detailed drawings and panel schedules indicating capacity and connected load calculations (KVA) for all premises, special-use facilities, and electrically operated equipment. Electrical contract design shall result in electric panel configuration that facilitates a cost-effective method (‘single-meter’) of high intensity facilities and individual equipment.

Electric meters shall be installed and tested for operation prior to electrical sub-contract substantial completion and subsequent project commissioning.

2.18.5. Lighting

Measure light levels at 3' A.F.F. using a footcandle meter after installation/commissioning to verify compliance with IES.

2.18.6. Acoustics

Acoustical performance will be verified during the commissioning of the building.

2.18.7. Documentation Transfer N/A

2.19. BUILDING TECHNOLOGY SERVICES

The Contractor shall comply with the following requirements for cyber security, Information

Technology and Smart Buildings.

● GSA IT Building Technology Technical Reference Guide (BTTRG)

● 140416 Telecommunications Distribution Design Guide

● Smart Building Implementation Guide requirements

● Security and Privacy Controls for Federal Information Systems and Organizations, NIST

800-53 Rev 4

● Guide to Industrial Control Systems (ICS) Security, NIST 800-82 rev 2

● Building Monitoring & Control (BMC) Device Security Assessment Process

● GSA order 2100.1J GSA Information Technology (IT) Security Policy

● IT Security Procedural Guide: Key Management CIO-IT Security-09- 43 rev3

● 2100.2B CIO P GSA Wireless Local Area Network (LAN) Security guide.

● GSA IT Security Procedural Guide: SSL TLS Implementation Guide - CIO-IT Security 14-

The Contractor shall coordinate the design and construction drawings to ensure all digital control systems and software meet the GSA-specific requirements. This will require the

Contractor to schedule multiple reviews with GSA’s Building Technology Services

Division.

2.20. COBie

The Contractor shall submit a COBie-compliant facility management data set for all equipment within this SOW.

The Contractor shall not submit separate COBie files without coordinating such files with the overall COBie deliverables.

The Contractor shall verify that the room numbering list complies with the COBie requirements set forth in the contract documents and matches the data structure of the computerized maintenance management system (CMMS).

2.21. PRE-CONSTRUCTION PHASE

2.21.1.1. Construction Submittal List

As part of the Construction Document Submission, the Contractor shall submit a list of all submittals required for construction. This list shall be sent at a minimum 10 business days prior to the construction start date. The list shall include specification sections, paragraph numbers and type of submittal.

As part of the construction document submission, the Contractor shall also create a complete submittal register that includes all of the submittals required in the specifications. All submittal shall use the following naming convention:

● Specification number – Specification section name - Submittal type.

2.21.1.2. Estimates

The Contractor must provide an estimate at each formal design submission.

Complete form “Estimated Construction Cost at Award (ECCA) Summary,”

Attachment # 10.2 with the first milestone submission including scope narrative summary and cost. Subsequent milestone submissions that have higher costs than the preceding submission will provide a narrative summary of the scope changes leading to the increased cost.

The estimate must comply with the PBS P-120 Public Buildings Service Cost and

Schedule Management Policy Requirements.

The final estimate must be a detailed estimate covering all labor and materials necessary to complete this project in accordance with the specifications and drawings.

Submit a disc version complying with the CAD Deliverables Policy with the final submission.

The Contractor shall use the following information in developing their cost estimate.

However, this info is just for estimating purposes and may change.

● Estimated date of construction award: 09/01/2021

● Planned procurement method: Stand Alone Contract, General Contractor whom must provide all management, supervision, labor, materials, supplies, and equipment (except as otherwise provided), and must plan, schedule, coordinate and assure effective performance of all final construction to meet General

Services Administration (GSA) and client agency requirements. The Contractor will perform the construction in accordance with the design specifications, drawings, and the provisions of the contract.

2.21.1.3. Schedules

Provide a detailed, time-scaled computer generated Project Schedule at each formal design submission with activities representing each portion of the Work for the entire

Contract Performance Period. Submit both as MS Project and PDF. This shall be submitted at least 10 business days prior to the construction start date.

At a minimum, the schedule must include GSA’s 15 Schedule Milestones. All owner furnished equipment and materials shall be identified with dates needed to be received by the Contractor.

All durations shall be shown in calendar days. A revised schedule must be submitted every month for the duration of the project.

The Project Schedule shall use the Critical Path Method (CPM) for the planning, scheduling and reporting of the work to be performed under the contract.

No unspecified constraints, float suppression techniques, or use of activity durations, logic ties and/or sequences deemed unreasonable by GSA shall be used in the Project Schedule.

As defined by the Contract, the entire project performance period shall establish the

Project Substantial Completion Date which shall be used in the planning and presentation of the Contractor’s Project Schedule. GSA reserves the right not to approve any schedule deemed to have an unrealistic forecasted Substantial

Completion Date.

2.21.2. Submission Format

Each Submission requires:

● 3 USB Flash Drive (or electronic copy) which includes the following:

○ One consolidated, searchable PDF containing all drawing “AS Built” files

○ Construction Submittal List as PDF

○ Project schedule as MS Project

○ Project schedule as PDF

2.21.3. Stakeholder Review

GSA has allocated time for all stakeholder reviews in the above table. Any delays beyond the original review time-frame due to rejection or revision to the submission package is the responsibility of the GC to recover from. In the event that the stakeholder does not provide a response within the time frame included above, the period of performance will be extended by an equitable amount of calendar days.

2.21.4. Rejection of Submittals

Government rejection of submittals does not relieve the Contractor from responsibility of meeting the period of performance.

3. CONSTRUCTION STAGE

This section details the professional services required from the Contractor during the construction stage of the project.

3.1. GENERAL

Construction and Close Out Phase

● Conduct pre-construction meetings with successful sub-contractors at the project site.

● Prepare and maintain a Master Project Schedule incorporating the activities of the

Contractors Construction Teams.

● Provide full-time On-site Construction Administration and Construction Representative Services.

● Provide part-time on-site construction representative services to observe progress of construction.

● Conduct weekly on-site construction meetings, inclusive of a meeting agenda and issue meeting minutes.

● Coordinate 3rd Party Materials Testing and Special Inspections work with the Contractors.

● Monitor and facilitate the RFI, submittal, shop drawing process.

● Negotiate all change orders and provide all backup associated with Sub – Contractors prior to submission to the government.

● Prepare daily construction logs and submit to the GSA PM weekly.

● Facilitate construction close-out procedures including assembling of punch lists, operations and maintenance manuals, record drawings, warranties/guarantees, 3rd party commissioning, start-up and testing, training, etc.

3.2. PERMITTING

Not applicable.

3.3. CONSTRUCTION SCHEDULE

General: The Contractor shall provide one electronic copy of the project schedule after award and before the design meeting. The schedule shall include a detailed design phase with design deliverable submission dates, review periods as well as a summary construction schedule with important milestones included for both phases.

Fully develop the construction portion of the schedule and submit to the GSA/DHS before the Preconstruction meeting or any construction begins. The project schedule shall be updated on a milestone basis throughout the entire contract period and until project substantial completion. The status date of each schedule update shall be 10 business days before the progress payment request date.

Purpose: The purpose of the project schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of design and construction activities of the

Contractor. The project schedule will assist the Contractor and the GSA/DHS in monitoring the progress of the work, evaluating proposed changes, and processing the contractors monthly progress payment requests.

3.4. CONSTRUCTION PROGRESS REPORTS

Schedule and conduct weekly progress meetings.

3.5. SCHEDULE OF INSPECTIONS AND TESTS

The quality of all work shall be the responsibility of the Contractor. Testing shall be the responsibility of an independent testing laboratory. Inspect and test all work as needed to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.

3.6. CONSTRUCTION INSPECTIONS

Construction inspections shall be scheduled, coordinated and performed to ensure that all specified materials, means and methods are installed per code compliance and contract. At a minimum, inspections must be performed at the following intervals:

● Site inspection (before first ground disturbance - erosion control requirement)

● Foundation inspection (before placing of concrete)

● Sub floor inspection (before covering the floor framing)

● Structural inspection (before covering the outside sheathing)

● Framing and rough-in inspection (before insulating or covering framing)

● Insulation inspection (after insulation is installed)

● SCIF/Security inspection (after drywall and doors are installed)

● Final inspection (after all construction is complete)

3.7. SPECIAL INSPECTIONS

The Contractor shall observe special inspections as indicated in the Schedule of Inspections and Testing.

3.8. COMMISSIONING

The Contractor is required to be an active participant in the commissioning process.

The Contractor is required to make the recommended corrections to commissioned systems for any system which fails to meet the required test parameters.

3.9. QUALITY CONTROL PLAN

The shall Contractor shall provide a Quality Control Plan for completeness and conformance to the 100% Construction Documents.

3.10. CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT

It is the responsibility of Subcontractor(s) to execute their work in strict accordance with all

OSHA requirements.

3.11. SAFETY PLAN

The Contractor shall submit a Safety Plan which meets all necessary and prudent safety standards and requirements to protect the health and safety of all personnel providing services on this project.

3.12. COORDINATION OF WORK

The Contracting Officer (CO) will provide all necessary written notification and/or direction to the Contractor. An on-site independent Construction Management Representative (CMR) will coordinate the Contractor’s construction efforts daily operations and will transmit and receive correspondence between the GSA and the DHS.

3.13. REQUESTS FOR INFORMATION

The Contractor shall send all RFI’s to the Contracting Officer for formal processing.

3.14. MODIFICATIONS / CHANGE ORDERS

A Change Order will only be approved if GSA agrees that additional work to be performed by the Contractor as a result of resolution of an RFI is beyond the original scope of work.

4. CONTRACT ADMINISTRATION

4.1. CONTRACTOR’S STAFF

4.1.1. Personnel Qualifications

The Contractor shall exclusively utilize the Key Personnel named and/or otherwise identified in the Contractor bid submission materials to perform services required under this contract.

In the event that any personnel named in the Contractors Technical Qualifications Statement are unable to perform their duties due to death, illness, resignation from the Contractors employment, the Contracting Officer's request for removal, or similar reasons, the

Contractors shall, within five working days, submit to the Contracting Officer, in writing, the name and…