AMENDMENT 0001 FINAL 20220131.pdf

PDF 985 KB Posted

Attached to
DOC A Phase 2D Tenant Build Out, St Elizabeths West Campus, SE Wash. , DC
Solicitation number
47PM0021R0009
Issued by

About this file

This solicitation requests proposals for construction services for tenant fit-out of the remaining spaces in the Department of Homeland Security Operations Center building at St. Elizabeths Hospital in Washington, D.C. The work includes electrical, HVAC, plumbing and interior construction. The total estimated value ranges from $10-20 million. Proposals are due by March 4, 2022. Award will be made based on lowest price among technically acceptable proposals.

The solicitation is set aside for small businesses. Offerors must demonstrate experience with at least two similar projects valued over $4.5 million each, including one involving a secured communications facility. Key personnel requirements include industry certification for proposed staff. The period of performance is 335 days from notice to proceed. A pre-proposal conference will be held on February 10, 2022 to discuss the project. The General Services Administration will manage the contract for this work to complete build-out of the DHS Operations Center building.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

ISSUED UNDER AMENDMENT 0001

GSA Solicitation No RFP 47PM0021R0009, DOC A Phase 2D Tenant Build Out, St Elizabeths West Campus SE Wash DC

DESCRIPTION OF AMENDMENT (CONTINUATION PAGE)

ITEM 1: Proposal receipt date and time IS EXTENDED as follows.

March 4, 2022, by 3:00PM EST BY EMAIL to the attention of the Contracting Officer, bonnie.echoles@gsa.gov

ITEM 2: RFP SBSA_LPTA_Sol_August_2021 (page 6 of 26).

The Receipt Date for Offers is hereby extended to read as follows:

I.H. Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 3:00 pm EST, local time on the following date and at the following address.

Date: March 4, 2022 EXTENDED

Address: By Email to the attention of the Contracting Officer at bonnie.echoles@gsa.gov

Make changes to all documents.

ITEM 3: MANDATORY Site Visit/Site Access/Pre-Proposal Conference.

THURSDAY, February 10, 2022, 1:00PM EST MANDATORY

St Elizabeths West Campus

2701 Martin Luther King JR Ave, SE

Washington, DC 20032

A. All requests for Site Access must be received by 3:00PM EST on Friday 02/04/2022, and addressed to the attention of the Project Manager as follows:

Thomas Wong, Civil Engineer

m. (202) 285-7293 email: Thomas.wong@gsa.gov

Mr. Wong is the designated Point of Contact for Offerors to gain access to the West Campus for the Pre-

Bid Conference/Site Walk.

B. Registered Site Visit participants are to enter the West Campus through GATE 2, park at the gravel lot at GATE 2.

C. Meet at the GSA Site Trailer (B37A), Conference Room.

ITEM 4: All Requests for Information (RFIs) must be received by 3:00PM EST on February 17, 2022, and addressed to bonnie.echoles@gsa.gov and thomas.wong@gsa.gov.

ITEM 5: 1 RFP SBSA_LPTA_Sol_August_2021, II.D. Technical Proposal mailto:Thomas.wong@gsa.gov mailto:bonnie.echoles@gsa.gov mailto:thomas.wong@gsa.gov

Make the changes are noted in RED to the Technical Factors as stated below. The revised sheet labeled

TECHNICAL EVALUATION FACTORS is hereby incorporated.

II.D. Technical Proposal

The Technical Proposal shall include the information requested below for the non-price factors described in Section VI. REFER TO THE ATTACHED SHEET: TECHNICAL EVALUATION FACTORS

A. Experience on Comparable Projects

This factor considers the extent of the Offeror’s past experience as a firm in providing similar construction services.

The Offeror must demonstrate successful experience as a General Contractor (GC) responsible for the construction of two “similar” projects substantially completed within the past eight (8) years from the date of the RFQ. Project shall be considered “similar” if it meets ALL of the following characteristics:

1. Project involved tenant fit-out, the reconfiguration or reorganization of office space.

2. Project was performed in an occupied and functioning office building.

3. Project included Electrical, HVAC, Plumbing, Sprinkler and Fire Alarm work, Interior, Construction

(i.e., Partitions, Floor/Wall/Ceiling, and Interior Doors/Finishes).

4. The total project construction cost at award of the construction contract was at least $4,500,000.

MANDATORY REQUIREMENT: At least one of these two “similar” projects must have included constructing/building-out SCIF (controlled access and secured work area) as prior experience.

Submission Required by Offeror:

Submit two construction projects that demonstrate past experience described above. For the projects offered under this evaluation factor, the Offeror must include the information below:

Project Title

Name of Reference Company/Agency

E-mail address Telephone Number

Contract Number Type of Contract

Award Amount and Final Construction Contract Amount

Initial Completion Date and Actual Completion Date

Evaluation Criteria: This factor will evaluate the past experience of the firm to determine whether the firm has experience on two “similar” projects that were substantially completed within the last eight (8) years and meet ALL of the above similar characteristics, including one of the two similar projects consisting of constructing/building-out SCIF (controlled access and secured work area).

Acceptability Standard: This factor will be evaluated based upon the Offeror’s written response to the

RFQ. However, the Government reserves the right to contact references under this evaluation factor to verify the scope of the project offered. If the Offeror materially misrepresents information relating to its experience, the Contracting Officer may reject the proposal. Any proposal which does not provide one

“similar” project substantially completed within the past eight (8) years from the date of the RFQ and meet ALL of the above similar characteristics and the MANDATORY REQUIREMENT, then the project, will not be considered technically acceptable.

B. Designated Key Personnel (Superintendent, Project Manager, Quality Assurance Manager, Scheduler)

This factor evaluates the Offerors’ demonstrated qualifications of proposed key personnel.

This factor for Key Personnel requires the submission of a separate resume for each of the positions. Dual positions are NOT ALLOWED. Four separate positions = Four separate resumes = Four separate individuals).

C. Past Performance of Offeror

This factor considers the past performance of the Offeror.

Submission Required by Offeror:

The Offeror shall submit one reference (a person or persons who may be contacted regarding the quality of the Offeror’s past performance) for the similar projects presented in Evaluation Factor A: Experience on Comparable Projects. The Offeror shall provide the name, title, company name, current address, current phone number, current email address, and current fax number for the reference. Offeror is responsible for the accuracy of this information.

Evaluation Criteria: This factor evaluates the past performance of the Offeror to determine responsibility.

Acceptability Standard: This factor will be evaluated based upon the Offeror’s past performance record that demonstrates satisfactory performance on the comparable projects submitted under Factor A:

Experience on Comparable Projects. The Government intends to contact individuals provided as references but may solicit other sources including, but not limited to, Federal, state, and local agencies, better business bureaus, published media, and electronic databases as references for information on the identified projects presented by the offeror if deemed necessary. Any proposal which does not demonstrate satisfactory performance on the similar projects submitted under Factor A: Experience on

Comparable Projects will not be considered technically acceptable.

A 12 PBS Past Performance Questionnaire has been included in this solicitation for your use in responding to this Factor for Past Performance of Offeror. If you elect to submit any other form, that form must contain and address ALL information required on the 12 PBS Past Performance Questionnaire.

ITEM 6: 3 RFP SOW DOC A 2D 2021 07 12 (Comments, Clarifications are hereby incorporated in the solicitation.)

1.5. PROJECT SCHEDULE

The overall Period of Performance shall be 335 days from Notice to Proceed to Substantial Completion, based on the following:

• On-Site Construction Services 335 calendar days after Notice to Proceed

• Ultimate Contract Completion shall be 60 calendar days after Substantial Completion

COMMENT CLARIFICATION

2.1. PROJECT REQUIREMENTS, Interior

Construction: No mention of raised access flooring. Are they able to use existing flooring materials that are available in the DOC?

GSA has no objection to using the existing raised flooring material available in the DOC on this project. (FOR INFORMATION ONLY: Compu-

Site Technologies, Inc. was the raised floor installer on previous DOC projects.)

2.1. PROJECT REQUIREMENTS, Interior

Construction: 3. Flooring/Walls/Ceilings/Paint –

Interior finishes. Need to ensure that the contractor is aware that the graphic wall procurement and installation is part of their scope. NOTED.

2.1. PROJECT REQUIREMENTS, Electrical:

Need to make it clear to the contractor they will be responsible for all pathways/conduits to support AV/IT/PS systems. NOTED.

2.1. PROJECT REQUIREMENTS, Electrical: 2.

Security Requirements –

The Contractor shall comply with DHS policies, standards, and procedures as they relate to this

Contract.

2.1. PROJECT REQUIREMENTS, Electrical: 7.

Security Systems. If General Dynamics (GD) programs the electronic security devices, what existing systems would the Contractor be reprogramming?

GD takes care of the AV and IT requirements for the campus (on their own timeline). The contractor would, for those cases, usually provide the conduit infrastructure to facilitate their work.

This is planned to be hashed out in a page turn once GSA has made the award to the successful offeror.

2.2. PROJECT SITE REQUIREMENTS, 2.2.3.

Loading Dock. Need to determine the path the contractor will use to get materials into the DOC and how they are going to remove the large steel framing.

Center Building docks closest route for delivery of materials. Means and methods how contractor will remove large steel framing. Gov't will request that a plan to remove the steel framing be included in the RFP response.

2.2. PROJECT SITE REQUIREMENTS, 2.2.3.

Loading Dock. Materials enter thru Gate 1 or Gate

6?

Materials delivered to the site must enter GATE 6.

GATE 6 has the screening facility.

8 2.18. COMMISSIONING, 2.18.2. Building

Enclosure Commissioning. Will the entire DOC be tested and balanced?

There is an option to TAB the entire building in

Section 23 0800 TESTING AND BALANCING /

PART 1 GENERAL / 1.2 DESCRIPTION B.

OPTION No. 1 in the IFB. Option added by amendment.

2.21. PRE-CONSTRUCTION PHASE, 2.21.1.2.

Estimates. Which design submission is the GC responsible for? This is a Design/Bid/Build with 3 alternates.

3. CONSTRUCTION STAGE, 3.3.

CONSTRUCTION SCHEDULE.

General: The Contractor shall provide one electronic copy of the project schedule after award and before the pre-construction conference.

Baseline schedule due within 10 working days of

Notice to Proceed.

11 IID drawing set is referenced several times.

Unclear what IID stands for.

This should read “IFB” ISSUED FOR BID. Make all changes and clarifications to the documents.

What is the Intelligence Community Directive

(ICD 705)?

The Intelligence Community Directive (ICD 705) is a three (3) page capstone that implements the

Intelligence Community Standard (ICS). The latest version is 705-1.5 released in March 2020.

SPEC SECTION 09 6900 ACCESS

FLOORING, 1.2 SUMMARY. B. Pre-bid Survey of OFCI Materials

During the site walk Contractors will need to verify the Owner's stock for bid purposes.

ITEM 7: SCOPE OF WORK - 2.2. PROJECT SITE REQUIREMENTS, 2.2.2. Loading Dock

As an attachment to the Technical Submission, provide a plan to remove the large steel framing from the building.

ITEM 8: DELETE the Pricing Sheet (Attachment to the SF1442) as issued in the RFP and INSERT the attached revised, Pricing Sheet in lieu thereof. This REVISED SHEET is to be used for proposal submission.

ITEM 9: The Agreement RFQ SBSA_GC_Agreement_Jan_2022 Para. II.B. Contract Price Form

DELETE Para. II.B. Contract Price Form in its entirety and INSERT the attached, revised Para. II.B.

Contract Price Form in lieu thereof.

ITEM 10: Offerors must acknowledge receipt of this amendment on offer form, giving number and date.

END OF AMENDMENT 0001

ATTACHMENTS

Revised Pricing Sheet (Attachment to SF 1442)

Revised Para. II.B. Contract Price Form

Revised Sheet labeled TECHNICAL EVALUATION FACTORS

ISSUED UNDER AMENDMENT 0001 Page 1 of 2 GSA Solicitation No RFP 47PM0021R0009, DOC A Phase 2D Tenant Build Out, St Elizabeths West Campus SE Wash DC

Company Name:

PRICING SHEET

Attachment to SF 1442, Solicitation, Offer and Award (This form must be submitted as an attachment to the SF1442

CLIN ITEM PRICE

1 Base Contract $

2.A. A. ALTERNATE 1: Bunk Room Floor Slab Infill

2.A.1. 1. Base Condition: Refer to Section 096900 ACCESS FLOORING. $

2.A.2. 2. (ADD) ALTERNATE = In lieu of access flooring, fill floor slab opening with clean crushed gravel, compacted to avoid settling, topped by new concrete slab to level with adjacent floor. (4” thick normal weight concrete reinforced with 2” welded wire mesh). Use cold joint at edge of fill. Finish treatment of new infill concrete should match and be flush with the adjacent existing floor.

2.B. B. ALTERNATE 2: CISA WATCH ROOM / CONFERENCE ROOMS (LL2-

210 & LL2-220) INTERIOR GLAZING

2.B.1. 1. Base Condition: Refer to Section 10 2219 DEMOUNTABLE

PARTITIONS

2.B.2. 2. (DEDUCT) ALTERNATE: Install drywall partition, matching adjacent wall type, with STC 50 acoustic rating. Within wall, install one Interior acoustic glazed sidelight, matching typical office sidelights, at each conference room, adjacent to doors LL2-210A and LL2-220A.

2.C. C. ALTERNATE 3: CISA WATCH ROOM / CONFERENCE ROOMS (LL2-

210 & LL2-220) INTERIOR GLAZING

2.C.1 1. Base Condition: Integral privacy blinds. $

2.C.2 2. (ADD) ALTERNATE: Provide switch glass in lieu of privacy blinds. $

3 Option No. 1 – Entire Building Testing and Balancing (TAB):

1. Independent of the work described above, provide a bid line item to test, balance and adjust the mechanical systems serving ALL AREAS of the building not covered in paragraph 1.2.A above.

2. Refer to the As-Built TAB Reports for existing AHU 1, 2, 3, 4, 5, 21, 25, and 26, dated 4/30/13; and the Base Building engineering record design drawing set, dated 2/28/14.

3. Balance the systems to the values indicated in the referenced As-Built TAB Report.

ISSUED UNDER AMENDMENT 0001 Page 2 of 2 GSA Solicitation No RFP 47PM0021R0009, DOC A Phase 2D Tenant Build Out, St Elizabeths West Campus SE Wash DC

Company Name:

4. Where there have been renovations subsequent to the initial construction resulting in quantities of devices which vary from the referenced documents, notify the COTR and request the subsequent construction record documents for the affected areas. To account for these variances in quantities, provide supplemental bid unit pricing for:

a. “cost per each additional diffuser/register/grille” $

b. “cost per each fan” $

c. “cost per each terminal unit” $

5. These documents cover the extent, scope and quantities of air system terminal devices, fans, diffusers, registers and grilles.

a. Air distribution systems.

b. Air handling units and air moving equipment

c. The overall size of the building is considered to be:

1) 3 Levels Below Grade (Gross - 34,066.9 Sm, or 366,692 Sf)

2) 1 Levels Above Grade (Gross - 5,157.1 Sm, or 55,510 Sf)

OPTIONAL BID RATES

10 Contractor’s Overhead Rate for Adjustments %

11 Contractor’s Profit Rate for Adjustments %

12 Contractor’s Daily Rate for Compensable Project Delay (Work Day) $

Acceptance or rejection of each alternate will be made by the Government prior to award of the Contract, and the Base Bid amount will be adjusted accordingly for accepted alternates to establish the contract price.

Name:

Signature:

Company:

Date:

II.B. Contract Price Form

1 Base Contract $

2.A. A. ALTERNATE 1: Bunk Room Floor Slab Infill

2.A.1. 1. Base Condition: Refer to Section 096900 ACCESS FLOORING. $

2.A.2. 2. (ADD) ALTERNATE = In lieu of access flooring, fill floor slab opening with clean crushed gravel, compacted to avoid settling, topped by new concrete slab to level with adjacent floor. (4” thick normal weight concrete reinforced with 2” welded wire mesh). Use cold joint at edge of fill. Finish treatment of new infill concrete should match and be flush with the adjacent existing floor.

2.B. B. ALTERNATE 2: CISA WATCH ROOM / CONFERENCE ROOMS (LL2-210

& LL2-220) INTERIOR GLAZING

2.B.1. 1. Base Condition: Refer to Section 10 2219 DEMOUNTABLE PARTITIONS $

2.B.2. 2. (DEDUCT) ALTERNATE: Install drywall partition, matching adjacent wall type, with STC 50 acoustic rating. Within wall, install one Interior acoustic glazed sidelight, matching typical office sidelights, at each conference room, adjacent to doors LL2-210A and LL2-220A.

2.C. C. ALTERNATE 3: CISA WATCH ROOM / CONFERENCE ROOMS (LL2-210

& LL2-220) INTERIOR GLAZING

2.C.1 1. Base Condition: Integral privacy blinds. $

2.C.2 2. (ADD) ALTERNATE: Provide switch glass in lieu of privacy blinds. $

3 Option No. 1 – Entire Building Testing and Balancing (TAB):

1. Independent of the work described above, provide a bid line item to test, balance and adjust the mechanical systems serving ALL AREAS of the building not covered in paragraph 1.2.A above.

2. Refer to the As-Built TAB Reports for existing AHU 1, 2, 3, 4, 5, 21, 25, and 26, dated 4/30/13; and the Base Building engineering record design drawing set, dated 2/28/14.

3. Balance the systems to the values indicated in the referenced As-Built TAB Report.

4. Where there have been renovations subsequent to the initial construction resulting in quantities of devices which vary from the referenced documents, notify the COTR and request the subsequent construction record documents for the affected areas. To account for these variances in quantities, provide supplemental bid unit pricing for:

a. “cost per each additional diffuser/register/grille” $

b. “cost per each fan” $

c. “cost per each terminal unit” $

5. These documents cover the extent, scope and quantities of air system terminal devices, fans, diffusers, registers and grilles.

a. Air distribution systems.

b. Air handling units and air moving equipment

c. The overall size of the building is considered to be:

1) 3 Levels Below Grade (Gross - 34,066.9 Sm, or 366,692 Sf)

2) 1 Levels Above Grade (Gross - 5,157.1 Sm, or 55,510 Sf)

OPTIONAL BID RATES

10 Contractor’s Overhead Rate for Adjustments %

11 Contractor’s Profit Rate for Adjustments %

12 Contractor’s Daily Rate for Compensable Project Delay (Work Day) $

Acceptance or rejection of each alternate will be made by the Government prior to award of the Contract, and the Base Bid amount will be adjusted accordingly for accepted alternates to establish the contract price.

TECHNICAL EVALUATION FACTORS

The following are the non-price evaluation factors:

Factor A - Experience on Comparable Projects Factor B – Designated Key Personnel Factor C - Past Performance of Offeror.

1. The Government will evaluate all technical proposals on a pass/fail basis to determine all offers that meet the minimum technically acceptable requirements. Failure to meet a requirement may result in an offer being determined technically unacceptable.

An unacceptable rating for any one factor makes the entire proposal unacceptable. Any costs incurred by offerors in preparing or submitting offers are the offerors' sole responsibility; the United States will not reimburse any offeror for any proposal preparation costs.

2. Award will be made based on the lowest evaluated price of proposals meeting the acceptability standards for non-price factors.

3. The following non-price factors will be evaluated for acceptability:

A. Experience on Comparable Projects

This factor considers the extent of the Offeror’s past experience as a firm in providing similar construction services.

The Offeror must demonstrate successful experience as a General Contractor (GC) responsible for the construction of two “similar” projects substantially completed within the past eight (8) years from the date of the RFQ. Project shall be considered “similar” if it meets ALL of the following characteristics:

1. Project involved tenant fit-out, the reconfiguration or reorganization of office space.

2. Project was performed in an occupied and functioning office building.

3. Project included Electrical, HVAC, Plumbing, Sprinkler and Fire Alarm work, Interior, Construction (i.e., Partitions, Floor/Wall/Ceiling, and Interior Doors/Finishes).

4. The total project construction cost at award of the construction contract was at least $4,500,000.

MANDATORY REQUIREMENT: At least one of these two “similar” projects must have included constructing/building-out SCIF (controlled access and secured work area) as prior experience.

Submission Required by Offeror:

Submit two construction projects that demonstrate past experience described above.

For the projects offered under this evaluation factor, the Offeror must include the information below:

Project Title Name of Reference Company/Agency E-mail address Telephone Number Contract Number Type of Contract Award Amount and Final Construction Contract Amount Initial Completion Date and Actual Completion Date

Evaluation Criteria: This factor will evaluate the past experience of the firm to determine whether the firm has experience on two “similar” projects that were substantially completed within the last eight (8) years and meet ALL of the above similar characteristics, including one of the two similar projects consisting of constructing/building-out SCIF (controlled access and secured work area).

Acceptability Standard: This factor will be evaluated based upon the Offeror’s written response to the RFQ. However, the Government reserves the right to contact references under this evaluation factor to verify the scope of the project offered. If the Offeror materially misrepresents information relating to its experience, the Contracting Officer may reject the proposal. Any proposal which does not provide one “similar” project substantially completed within the past eight (8) years from the date of the RFQ and meet ALL of the above similar characteristics and the MANDATORY REQUIREMENT, then the project, will not be considered technically acceptable.

B. Designated Key Personnel (Superintendent, Project Manager, Quality Assurance Manager, Scheduler)

This factor evaluates the Offerors’ demonstrated qualifications of proposed key personnel.

This factor for Key Personnel requires the submission of a separate resume for each of the positions. Dual positions are NOT ALLOWED. Four separate positions = Four separate resumes = Four separate individuals).

a. General Superintendent –

1) Education: Graduation from an accredited undergraduate program with Bachelor of Science Degree in Engineering, Construction Management, a similar field of expertise, or a higher-level trade specific technical certification.

Note: Appropriate experience may be substituted for education and credentials.

2) Project Experience: Minimum 5 years field construction experience in General Construction projects with at least two projects at least $250,000 each of which included Electrical, HVAC, Sprinkler and Fire Alarm work, Lighting, Door and wall installations/reconfigurations. (10 years with no degree)

3) Training: Certification of completion, OSHA 30 HR Construction Safety & Health Course, or equivalent training.

4) Additional Qualifications: The Offeror may provide any additional qualifications regarding this individual.

b. Project Manager –

1) Education: Graduation from an accredited undergraduate program with a Bachelor of Science Degree in Engineering, Construction Management, or a similar field of expertise.

Note: Appropriate experience may be substituted for education and credentials.

2) Project Experience: At least 5 years project management experience on general construction with at least two projects at least $250,000. (10 years with no degree).

3) Training: Certification of completion, OSHA 30 HR Construction Safety & Health Course, or equivalent training.

4) Additional Qualifications: The Offeror may provide any additional qualifications regarding this individual.

c. Quality Control Manager/Quality Assurance Manager –

1) Education: Graduation from an accredited undergraduate program with a Bachelor of Architecture, Bachelor of Science Degree in Engineering, Construction Management, or a similar field of expertise.

2) Credentials: Registered Professional Architect (R.A.) and/or Professional Engineer (P.E.) and C.Q.M. for Contractors Course Certification; Note: Appropriate experience may be substituted for education and credentials.

3) Project Experience: At least 5 years CQC experience on at least two (2) projects at least $250,000 each of which included Electrical, HVAC, Sprinkler and Fire Alarm work, Lighting, Door and wall installations/reconfigurations (10 years with no degree)

4) Training: Certification of completion, OSHA 30 HR Construction Safety & Health Course, or equivalent training.

5) Additional Qualifications: The Offeror may provide any additional qualifications regarding this individual.

d. Project Scheduler –

1) Certifications: must indicate Scheduling Software experience (e.g., Primavera, Microsoft Project)

2) Project Experience: must possess a minimum of 5 years of experience as a project scheduler on at least two (2) projects

Submission Required by Offeror:

The Offeror must provide a Resume that includes the following bulleted information below for each of the above stated Key Personnel and shall provide information that shows the proposed Key Personnel’s experience meets the minimum qualifications stated above.

• Name and title

• Project assignment

• Name of firm with which associated

• Years of experience with this firm (in the key personnel’s field of expertise/discipline) and years of experience with other firms (in the key personnel’s field of expertise/discipline)

• Education degree(s), year, and institution

• Active professional registration, year first registered, if applicable

• Other experience and qualifications relevant to same/similar work required under this contract

• List of projects in which the individual has worked to include Name of project(s) and project location(s).

• Include in the resume 1 to 2 sentences why this person is qualified and a “good fit” for the proposed position.

• Include the names, phone numbers, and project names of two references for each of the staff occupying the positions noted above.

Resumes for each position are limited to two (2) pages, and references are limited to one (1) page.

The Government reserves the right to obtain and consider information from references other than those given by the Offeror.

Evaluation Criteria: This factor evaluates the Offerors’ demonstrated qualifications of proposed key personnel.

Acceptability Standard: This factor will be evaluated based upon the Offeror’s written response to the RFQ. Any proposal which does not demonstrate a resume containing all information requested and shows minimum qualifications of each Key personnel are met will not be considered technically acceptable.

C. Past Performance of Offeror

This factor considers the past performance of the Offeror.

Submission Required by Offeror:

The Offeror shall submit one reference (a person or persons who may be contacted regarding the quality of the Offeror’s past performance) for the similar projects presented in Evaluation Factor A: Experience on Comparable Projects. The Offeror shall provide the name, title, company name, current address, current phone number, current email address, and current fax number for the reference. Offeror is responsible for the accuracy of this information.

Evaluation Criteria: This factor evaluates the past performance of the Offeror to determine responsibility.

Acceptability Standard: This factor will be evaluated based upon the Offeror’s past performance record that demonstrates satisfactory performance on the comparable projects submitted under Factor A: Experience on Comparable Projects. The Government intends to contact individuals provided as references but may solicit other sources including, but not limited to, Federal, state, and local agencies, better business bureaus, published media, and electronic databases as references for information on the identified projects presented by the offeror if deemed necessary. Any proposal which does not demonstrate satisfactory performance on the similar projects submitted under Factor A: Experience on Comparable Projects will not be considered technically acceptable.

A 12 PBS Past Performance Questionnaire has been included in this solicitation for your use in responding to this Factor for Past Performance of Offeror. If you elect to submit any other form, that form must contain and address ALL information required on the 12 PBS Past Performance Questionnaire.

topmostSubform[0]:
Page2[0]:
TextField1[5]:
TextField1[2]:
TextField1[1]:
TextField1[4]:
TextField1[3]:
TextField1[0]:
Page1[0]:
Code[0]: WPH1A
Copies[0]:
CheckBox9[0]: 1
Code[2]: WPIAA
NameandTitleOfficer[0]: Bonnie Echoles, Contracting Officer
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:

TO ALL INTERESTED, PROSPECTIVE SMALL BUSINESS OFFERORS

DateSigned[1]: 01/31/2022
Pages[0]: 16
AmendmentNo[0]: 0001
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: Capital Projects Division, Office of Design and Construction, GSA, PBS, NCR

301 7th St SW

WASHINGTON, DC 20407-0001 USA

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQWPIC-21-0006
Dated9B[0]: 1/24/2022
2022-01-31T23:21:15-0500
Bonnie E Echoles
I am the author of this document
C13[0]:
Description[0]: RFP 47PM0021R0009, DOC A Phase 2D Tenant Build Out, St Elizabeths West Campus SE Wash DC

Under this Amendment 0001, make all changes, corrections, clarifications, and additions as noted herein.

Continued on the next page.

NotExtended[0]: Off
Code[1]:
AmendmentNo[1]: 47PM0021R0009
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 1/31/2022
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: 1
D13[0]:
IssuedBy[0]: GSA, PBS R11 Office of Acquisition

Construction Services Division (CSD) 1800 F St. NW, 4th Floor Washington, DC 20405 USA NameandTitleSigner[0]:

File details come from the government source that posted it. Updated .