This specifications document outlines roof repair requirements for the Honokaa State Office Building issued by the Department of Accounting and General Services (DAGS), Central Services Division. The project addresses an active roof failure requiring temporary repairs while a complete roof replacement is planned. Bidders must provide pricing proposals for two distinct overlay systems: a Sure-Weld TPO membrane cap overlay system and a Snap-Clad metal roofing overlay system, with the State selecting one system for award. Both line items require complete installation including labor, materials, tools, equipment, and supervision. The skylight opening must be covered with wood framing and plywood under both systems, with specific fastening, sealing, and finishing requirements detailed for each option. Work must be completed within 90 calendar days from the Notice to Proceed, and contractors must coordinate schedules with the Contract Administrator prior to work initiation.

Bid prices must be all-inclusive of labor, equipment, supplies, applicable taxes including Hawaii General Excise Tax, and all other expenses necessary to complete the roof repairs. Contractors must possess a valid Hawaii Specialty Contractor's C-42 License and demonstrate a minimum of two consecutive years of experience managing contracts of similar size and scope, substantiated by a list of three comparable roof repair projects with company contact information and project costs. The State reserves the right to request contractor qualifications documentation at any time. All work is subject to inspection and correction of substandard work at the contractor's expense. Contractors must provide a one-year written labor warranty on repairs, close off work areas with safety signage, manage all site protection including temporary weather barriers to prevent water infiltration, and properly dispose of construction debris daily. The Contract Administrator is Jesse Drake, Engineer at the West Hawaii District Office, who may be contacted at (808) 980-3030 or jesse.c.drake@hawaii.gov.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS Page 1 of 4 CSD-26-100-O

SPECIFICATIONS

HONOKAA STATE OFFICE BUILDING – ROOF REPAIRS

SCOPE OF WORK:

At the date of the bidding, the roof on this building has failed. DAGS is requesting bids to provide a temporary solution while a complete roof replacement is planned. The Contractor shall provide all labor, materials, tools, vehicles, and equipment necessary to repair the roof of this building. The itemized scope of work is as follows:

• Furnish (provide and install) roof repairs on the entire building as noted areas on the attached Plan, complete and in-place.

• Provide pricing proposals for both a Sure-Weld TPO Membrane Cap overlay system and a Snap-Clad metal roofing overlay system on the respective line-item tab in the HiEPRO. DAGS will select one of the items for award. Note brands listed are for bid product guidance. Approved substitutes will be considered.

o Item 1 - Sure-Weld TPO membrane cap overlay - the skylight shall be covered Install 2x wood framing and min. $1/2'' CDX plywood to cover the opening.

Mechanically fasten Sure-Weld TPO 60mil membrane with Carlisle

HP-XTRA Fasteners and PIRANHA XTRA Plates. Fasteners must achieve a minimum 1-inch penetration into the structural wood deck.

Fastener spacing shall be 6" o.c. along the perimeter.

Install drip edge metal and 6" P-S cover strip over plates and drip edge primed with TPO primer.

Apply Carlisle or Henry silicone butter grade along the perimeter transition as needed.

Apply a 1/8'' bead of Carlisle Cut-Edge Sealant on all cut edges of the reinforced TPO membrane o Item 2 - Snap-Clad metal roofing overlay - the skylight shall be covered Install 2x wood framing and min. 1/2'' CDX plywood covering opening and extending minimum 4" past transition.

Adhere PAC-CLAD HT high-temp self-adhering underlayment.

Install Snap-Clad 12" or 16" wide metal roofing peak detail and slope change at transition detail, with panel clips and screws through to the wood deck.

Install matching PAC-CLAD factory-formed metal drip edge and continuous starter cleat fastened to the wood deck.

SPECIFICATIONS Page 2 of 4 CSD-26-100-O

Apply high-temperature butyl sealant tape or roofing sealant as recommended by the manufacturer along all metal-to-metal lap joints and perimeter transitions as needed.

• Protect all exterior vertical, horizontal and plants and grasses during performance of the work.

• Provide and maintain temporary weather protection, including tarpaulins, plastic sheeting, temporary seals, or other necessary means to protect the building interior and structure from inclement weather, rain, and water infiltration during the performance of the work.

• Professionally clean the area, impacted by the work after roof overlay work is complete. Cleaning means and methods to be approved by DAGS.

• Properly dispose of all construction debris, rubbish, and demolished materials daily.

Qualifications of the Bidders:

If requested by the State contractors may be asked to be provide documents demonstrating their Contractor or Contractor’s Responsible Managing Employee (RME) Qualifications. Documents, at the time of bidding, include:

1. A valid State of Hawaii Specialty Contractor’s C-42 License. The Contractor shall possess the license throughout the duration of the contract and or any extensions.

The Contractor shall provide a copy of the specified license and contractor license number as applicable.

2. The contractor shall have a minimum of two (2) consecutive years of Hawaii Specialty Contractor’s C-42 experience. The experience shall include a minimum of two (2) years in managing contracts like this project in size and scope.

3. The State may request a list of similar projects to substantiate the bidder’s/contractor’s experience. The list shall contain a minimum of three (3) different roof repair projects and shall include a) name of the company, b) point of contact, c) phone number, d) description of work performed, and e) size of the project (cost wise).

Quality of Work:

All services performed will be subject to inspection, and correct any substandard work as requested by the contracting officer. Provide a one (1) year written labor warranty on all repair – Contractor will not be held liable for acts of vandalism.

Contractors shall provide all supervision necessary to coordinate and inspect their own work.

SPECIFICATIONS Page 3 of 4 CSD-26-100-O

Safety:

Contractors shall close off area(s) and post signs indicating the area(s) are closed to pedestrian traffic and walkways. Equipment, apparatus, or rope coils on the ground level shall be marked off with cones and signs warning pedestrian traffic. Contractors shall provide all safety cones and signs.

Reporting Damages:

Any existing damage that are discovered on various exterior building systems and grounds systems shall be reported to the contracting officer prior to the start of work.

Any damage to building exteriors, structures, vehicles, plants and other items in the area and adjoining properties caused by the Contractor or any of its personnel shall be repaired and/or replaced by the Contractor at their own expense and to the satisfaction of the contracting officer or his designated representative and any injured party.

Scheduling:

Work shall be performed within 90 calendar days from the date stipulated in the Notice to Proceed, or within the performance period noted on the HiEPRO solicitation. Contractor will coordinate with the Contract Administrator or his designated representative a schedule of work prior to the issuance of the Notice to Proceed. Schedules of work may change or be adjusted at any time, upon agreement by both parties.

Parking:

The Contractor may be allowed to drive and park on driveways and parking stalls controlled by DAGS. If the Contractor would like to use these driveways and loading zones, the Contractor shall directly contact the DAGS, West Hawaii District Office for information and request authorization to use the driveways and parking stalls. Contact the DAGS West Hawaii District Office at (808) 980-3030.

Bid Submittals:

Bid Prices shall include all costs for all labor, equipment, supplies, applicable taxes (including the current Hawaii General Excise Tax) and any other expenses incurred to provide the roof repairs and all other services included in the work being solicited.

This solicitation is intended to allow the State to proceed with roofing repairs, based on the availability of funds.

Extra Work:

SPECIFICATIONS Page 4 of 4 CSD-26-100-O

The Contractor shall submit a separate Proposal for all work items not covered by the contract. This work is additional to the Contract and is subject to review and approval by the Contract Administrator. If the Proposal is found acceptable, and without further solicitation of other Bidders, the Contract Administrator shall authorize the work. Payment for extra authorized work will be by Purchase Order and/or Purchasing Card.

Contract Administrator:

Contract Administrator shall be Jesse Drake, Engineer, West Hawaii District Office, or his designated representative. He may be contacted by calling (808) 980-3030 or by e-mail at jesse.c.drake@hawaii.gov.