SPECIFICATIONS ARFQ DEP24-24 AML - Fords Run Drainage Project.pdf
PDF 1 MB Posted
- Attached to
- AML - Fords Run Drainage Project
- Solicitation number
- ARFQ 0313 DEP2400000024 3
- Issued by
- Barbour County, West Virginia
About this file
This is a construction specifications document issued by the West Virginia Department of Environmental Protection (WVDEP), Office of Abandoned Mine Lands and Reclamation for the Fords Run Drainage Project in Barbour County, West Virginia. The project addresses drainage and erosion issues resulting from previous coal mining and refuse disposal operations. The scope of work encompasses mobilization and demobilization, construction layout and surveying, site preparation including clearing and grubbing, demolition of a 48-inch RCP pipe and building foundations, construction of riprap and limestone rock channels, erosion and sediment control measures, fill placement and compaction, soil cover installation, and revegetation of disturbed areas. Key work items include temporary erosion controls (silt fence, check dams, stabilized construction entrances, dewatering systems), removal and preservation of the existing RCP pipe for the property owner's use, construction of three drainage channels with specific linings (Claymax GCL and riprap for DC-2 and DC-3; riprap for DC-1), and comprehensive revegetation with fertilizer, limestone, and seed application. The project location is accessible via CR24 North in Philippi, West Virginia, with coordinates N39° 09' 38.9" – W80° 01' 09.4".
The project requires lump-sum bidding for mobilization and demobilization (not to exceed 10% of total bid), construction layout (not to exceed 5% of total bid), quality control (not to exceed 3% of total bid), and site preparation (not to exceed 10% of total bid), with unit price bidding for measurable items such as crushed stone, guardrail, silt fence, erosion control products, and revegetation by acreage. The contractor must obtain or be designated as co-applicant to the NPDES Construction Stormwater General Permit (WV0115924) and assume full responsibility for permit compliance, including payment of any violations or fines resulting from negligence. The WVDEP will obtain the encroachment permit from WVDOH and will apply for the Notice of Termination upon project completion. The contractor is responsible for obtaining all other required permits including stream activity permits, burning permits, and water quality certifications. Quality control requirements include concrete testing (4,000 psi minimum compressive strength at 28 days), grout testing (2,000 psi minimum), CLSM testing (150 psi minimum), soil compaction verification, limestone and sandstone durability testing, and certified technician oversight. As-built plans must be submitted in both paper and electronic formats (PDF and AutoCAD 2011-2017) prior to final invoicing, with detailed specifications for layer organization, contours, dimensions, and identification of all installed components. The project specifications reference the 2023 WVDOT Standard Specifications for Roads and Bridges and requires compliance with AASHTO, ASTM, and OSHA standards throughout construction and completion.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION SPECIFICATIONS
Fords Run Drainage Project
BARBOUR COUNTY, WEST VIRGINIA
STATE OF WEST VIRGINIA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
ABANDONED MINE LANDS AND RECLAMATION
Issued September 12, 2022 – Rev. 0.0
Issued November 4, 2022 – Rev. 1.0
Issued March 27, 2023 – Rev. 2.0
TABLE OF CONTENTS
PAGE NO.
I. SPECIAL PROVISIONS
1. LOCATION/SITE DESCRIPTION 1
County Road Map Site Location 3
2. REFERENCE SPECIFICATIONS/DEFINITIONS 4
3. SCOPE OF WORK 5
4. BORROW (DISPOSAL) AREAS 6
5. DISPOSAL OF UNSUITABLE MATERIAL 7
6. PERMITS, LICENSES, AND FEES 7
7. NPDES STORM WATER REQUIREMENTS 7
8. CONSTRUCTION SIGN 10
9. CONTRACTOR INFORMATION FORM (AVS) 12
10. CITATION OF OTHER SPECIFICATIONS 12
II. TECHNICAL SPECIFICATIONS
1.0 MOBILIZATION AND DEMOBILIZATION 13
2.0 CONSTRUCTION LAYOUT 15
3.0 QUALITY CONTROL 20
4.0 SITE PREPARATION 25
5.0 EROSION AND SEDIMENT CONTROL 35
6.0 REVEGETATION 42
7.0 DRAINAGE STRUCTURES 50
8.0 UNCLASSIFIED EXCAVATION 60
9.0 ASPHALT PAVEMENT 68
10.0 ADMINISTRATION 72
11.0 SUBSURFACE INVESTIGATION 73
12.0 UTILITIES 74
13.0 TRAFFIC CONTROL 77
APPENDIX
Boring Logs
Fords Run Drainage Project – Rev. 2.0 – Issued 03.27.23
FORDS RUN DRAINAGE PROJECT
I. SPECIAL PROVISIONS
1. LOCATION / SITE DESCRIPTION
According to the OSM51 report, the Lower Kittanning Coal was deep mined by the Ketchum
Coal Company at this site in the 1960’s. This site has also been used for coal refuse disposal and, according to information provided, reclamation work has been performed on two previous occasions to grade the refuse and construct armored drainage features to carry surface runoff downslope to Fords Run. Fords Run is carried to the site in a grouted channel and then passes below the toe of the refuse through a 48-inch diameter RCP. This pipe is blocked and leaking into an adjacent channel just downstream of the inlet and this leakage then combines with red
AMD from the refuse and flows to Fords Run just downstream of the outlet of the 48-inch RCP.
Failed drainage channels carrying surface runoff from the refuse reclamation area have caused substantial erosion and overflow at the inlet to Fords Run RCP. This overflow floods the adjacent county road and causes refuse to accumulate on the highway.
The project goal is to repair, replace, and reconfigure grading and drainage from the old refuse reclamation project to prevent erosion and overflow to the highway. As part of this project, Fords Run will be returned to a channel and the existing 48-inch RCP will be removed and backfilled. The pipe removed will be stockpiled onsite for the property owner’s use.
Substantial AMD flows from the mine refuse and as mentioned, this seepage is flowing onto
CR24 and is also affecting an active permit operated by Kanawha Energy (Permit # P-0713-00)
Mine No. 10 Prep Plant. This uncontrolled AMD and refuse have prompted complaints from the permit holder, DEP, and the WVDOH. A limestone rock toe will be constructed to capture and properly convey this seepage to Fords Run.
The general scope of work is as follows;
1. Temporary erosion and sediment control measures will be implemented including;
temporary sump, pump, and dewatering bag(s), rock check dams, super silt fence, and stabilized construction entrances as shown on the Plans. The construction sequence has been planned to utilize proposed permanent channels to prevent run-on into disturbed areas during construction and promote maintenance of vegetative buffers.
2. Clearing and grubbing.
3. Stripping and removal/stockpile of surface soil suitable for use as soil cover.
4. Demolition (48-Inch RCP Pipe Removal) and existing building foundation/slab.
5. Riprap channel and rock toe construction.
6. Channel repair, replacement, and re-alignment.
7. Erosion repair and grading of refuse.
8. Borrow and Waste Site Development.
9. Installation of soil cover.
10. Installation of an underdrain to improve drainage at an existing underdrain outlet.
11. Revegetation.
Drainage channels DC-2 and DC-3 will be lined with Claymax GCL and riprap as shown on the
Plans. DC-1 will be lined with riprap. These new channels will be constructed to capture surface drainage and convey the same to Fords Run.
Directions to site:
From Interstate 79 take Exit 115 (Stonewood/Nutter Fort).
Turn Right off of the exit and follow WV-20 South for 3.9 miles.
Turn left onto WV-57 East for 12 miles.
Turn left onto US-119 North
Follow US-119 North to Philippi for 2.3 miles
Turn right onto North Main Street in Philippi
From Main Street turn left onto CR24 North (Pike Street)
Go 1.5 miles to the site on the right.
Coordinate Location of the Site: N39º 09’ 38.9” – W80º 01’ 09.4”
A County Highway Map with the site location follows on the next page.
2. REFERENCE SPECIFICATIONS/DEFINITIONS
All references to “Owner” in these Specifications shall mean West Virginia Department of Environmental Protection (WVDEP), Office of Abandoned Mine Lands and
Reclamation.
All references to “Engineer” in these Specifications shall mean the Regional
Engineer or authorized representative.
All references to “ASTM” shall mean the American Society of Testing and Material
Specifications, Latest Edition unless otherwise noted.
All references to “AASHTO Specifications” shall mean the Standard Specifications for
Transportation Materials and Methods of Sampling and Testing by the American
Association of State Highway and Transportation Officials, latest edition, and all subsequent addenda thereto.
All references to “WVDOT Standard Specifications” shall mean State of West Virginia
Department of Transportation, Division of Highways Standard Specifications for
Roads and Bridges, adopted 2023, and all subsequent addenda thereto.
All references to the “Contractor” shall be understood to mean the successful bidder and
/or firm or corporation undertaking the execution of the work under the terms of these
Specifications.
All references to “OSHA” shall be understood to mean The Occupational Safety and
Health Administration and the standards set in the Occupational Safety and Health Act of
1970.
All references to “refuse” and/or “mine spoil” shall be understood to mean all coal refuse, shale, sandstone, and other rock fragments that were generated and disposed of as such within the project area during mining and processing of coal.
All references to “AMD” shall be understood to mean all acid mine drainage discharges from the project site.
All references to “OSMRE” shall be understood to mean Office of Surface Mining
Reclamation and Enforcement.
All references to “NEPA” shall be understood to mean National Environmental Policy
Act.
All reference to “NPDES” shall be understood to mean National Pollutant Discharge
Elimination System
3. SCOPE OF WORK
The work covered by the Special Provisions and Technical Specifications consists of furnishing all labor, plant, power, equipment, and supplies, and performing all operations necessary for the completion of the project. The Contractor shall perform all operations necessary for:
• Mobilization/Demobilization of necessary and sufficient sized equipment to the project areas to complete the project within the stated time frames.
• Survey and construction layout of grading, facilities, constructions, and appurtenances shown on the Plans.
• Quality control.
• Erosion and sediment control during construction in accordance with the approved Construction Stormwater Permit and Plans.
• Clearing and grubbing of the site and, removal of debris, trash, junk, tree roots, and associated material.
• Stripping, segregation, and stockpiling topsoil and soils suitable for use as soil cover that are generated by the project excavation.
• Dewatering ponds and treatment of the same before discharge, if necessary.
• Control of groundwater springs, normal runoff, and storm drainage during construction so that work can be performed in the dry.
• Excavation, backfill, fill placement as required to construct the project complete.
• Construction of surface drainage control channels and bench drainage improvement.
• Construction of crushed limestone rock toe.
• Removal, preservation, and backfill of existing 48-inch RCP pipe.
• Placement of soil cover and re-vegetation of disturbed areas.
The Contractor also shall be responsible for surveying, including establishing construction baseline, measuring, and developing all completed quantities on the job, and for ordering, purchase and delivery of any and all materials required for construction or required for development of support areas. The Contractor shall perform all other operations as incidental to the program as specified herein.
4. BORROW (DISPOSAL) AREAS
It is the intent of this project to balance cut and fill and that all material used as fill will be generated from site excavations and the borrow area. A borrow area for random fill, and soil cover is shown on the Plans. Excess or unsuitable materials will be placed as waste fill in the borrow area as directed and approved by the DEP.
The need for an offsite waste or borrow area is not anticipated and any offsite waste area(s) and/or any borrow area(s) required must be approved by WVDEP. Should the
Contractor decide to obtain and utilize any borrow areas outside of construction limits, or move material from one property owner to another, unless designated on the plans, the
Contractor shall be responsible to obtain from the property owner(s) of the borrow areas, all necessary rights of entry, including rights of entry for WVDEP and OSMRE for inspection purposes. The said rights of entry agreement must state that the property owner(s) indemnify and hold harmless the WVDEP for Contractor’s action for any injury or damages whatsoever resulting from the use of the property.
The Contractor also shall submit a borrow/disposal area reclamation plan for prior approval by WVDEP. The Contractor shall observe the following NEPA compliance schedule relative to selecting and utilizing any off site borrow areas and/or any waste disposal areas.
a. No borrow (disposal) site operations will affect a site listed in, eligible for or proposed to be listed in the National Register of Historic Places.
b. No borrow (disposal) operations will be located within one-quarter mile of any federally listed established or prospective component of the National Wild and
Scenic River System under 16 USC 1274 and 1276.
c. Borrow (disposal) site operations will not cause a significant encroachment within the base floodplain (CE.O. 11988: Floodplain Management).
d. Borrow (disposal) site operations will not be located in or affect a critical habitat of a federally listed endangered or threatened species under 16 USC 1531, et. seq.
e. No borrow (disposal) operations will occur in wetland areas which are designated by appropriate agencies.
f. Borrow (disposal) site operations will be consistent with any approved plans governing ambient air quality.
g. Adherence to these mitigation measures does not relieve the Contractor of the obligation or responsibility to obtain any other federal, state, or local approvals required to use borrow (disposal) areas and conduct such activities.
h. Documentation: Copies of borrow (disposal) site approvals and concurrences will be submitted to the WVDEP prior to the commencement of reclamation activities.
i. Site Monitoring: Borrow (disposal) activities will be monitored by the state to ensure compliance with contractual requirements, applicable federal, state, and local laws, and any permit conditions.
5. DISPOSAL OF UNSUITABLE MATERIAL
All waste areas shall be obtained in accordance with Special Provisions Section IV
(Borrow/Disposal Areas) of these specifications. All unsuitable materials (wood, trash, debris, and garbage) as determined by the Engineer shall be wasted by the Contractor, at his/her expense, outside the limits of work conforming to the requirements of Section
4.3.10 of these Specifications. Wood may be burned in conformity with Section 4.3.9 of these Specifications.
The Contractor shall observe the NEPA compliance schedule relative to selecting and utilizing any off-site disposal areas in accordance with Special Provisions Section IV of these Specifications.
6. PERMITS, LICENSES AND FEES
The Contractor shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.
Permits required for this project may include but not be limited to: WVDOH
Encroachment Permit, Water Quality Certification from WVDEP, and burning permits from WVDNR and WVDEP Office of Air Quality. A copy of the permit/permits as procured shall be furnished to the Owner prior to initiation of the work under this
Contract. The WVDEP will obtain the NPDES (construction stormwater) from WVDEP.
Contractor shall be responsible for any Stream Activity Permits necessary to complete the project work. The WVDEP will also obtain the Encroachment Permit from the WVDOH.
7. NPDES STORMWATER REQUIREMENTS
The WVDEP-AML has obtained a Construction Storm Water General Permit for this project from the WVDEP Division of Water and Waste Management (WVDEP
DWWM). The registration for this reclamation project will be modified to include the
Contractor as Co-Applicant #2, with the WVDEP-AML being Co-Applicant #1. As such, the Contractor shall assume responsibility for compliance with the terms and conditions of the permit including modifications and any future correspondence such as registration renewal invoices, inspection reports, and notices of violation shall be forwarded to the Contractor. Upon award of the contract, the Contractor shall complete a
Co-Applicant #2 signature page and submit the completed form to WVDEP-AML prior to scheduling a Pre-Construction Conference.
Upon receipt of the completed form, WVDEP-AML will request the WVDEP DWWM to modify the existing NPDES registration for this project to make the Contractor the Co-
Applicant #2 to the permit.
The WVDEP DWWM will notify the Contractor and WVDEP-AML when the successful transfer of registration under WV/NPDES Storm Water Construction General Permit
(No. WV0115924) is completed. A Notice to Proceed will not be issued until the contractor signs the co-applicant form and submits to the Office of Abandoned Mine
Lands. Once the transfer has been completed, the WVDEP will continue to be responsible for any modification fees and annual renewal fees incurred up until the date of the final inspection of the project that occurs after completion of construction activities at the site. The Contractor shall be responsible for any and all costs associated with violations and fines assessed against the project that are a result of the Contractor’s negligence, carelessness, or failure to install permanent controls as part of the work as scheduled.
The WVDEP shall apply for a Notice of Termination (NOT) from WVDEP DWWM via the Construction Storm Water website http://www.dep.wv.gov/Programs/stormwater/csw/Documents/Construction upon completion of construction activities at the site. The NOT shall be issued by
WVDEP DWWM upon completion of the project. The Contractor will continue to be bound by the terms and conditions of the permit until the NOT has been approved by
WVDEP DWWM. Once the project is complete, the Contractor will still bear responsibility for the NPDES registration until a NOT is received from the WVDEP
DWWM.
http://www.dep.wv.gov/Programs/stormwater/csw/Documents/Construction
Co-Applicant #2 Signature Page
Co-Applicant #2: _____________________________________________
New and/or Modification of NPDES Storm Water of Construction Project Name:
BY COMPLETING AND SUBMITTING THIS APPLICATION, I HAVE REVIEWED AND UNDERSTAND
AND AGREE TO THE TERMS AND CONDITIONS OF THE GENERAL PERMIT (WV0115924) ISSUED ON
JANUARY 10, 2019, WITH AN EFFECTIVE DATE OF FEBRUARY 9, 2019, AND EXPIRATION DATE OF
FEBRUARY 9, 2024. I UNDERSTAND THAT PROVISIONS OF THE PERMIT ARE ENFORCEABLE BY
LAW, VIOLATION OF ANY TERM AND CONDITION OF THE GENERAL PERMIT AND /OR OTHER
APPLICABLE LAW OR REGULATIONS CAN LEAD TO ENFORCEMENT ACTION.
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED AND AM FAMILIAR
WITH THE INFORMATION SUBMITTED ON THIS FORM AND ALL ATTACHMENTS AND THAT, BASED
ON MY INQUIRING OF THOSE INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAINING THE
INFORMATION. THE INFORMATION SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND
BELIEF, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT
PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINE AND
IMPRISONMENT.
(CO-APPLICANT #2 SIGNATURE) DATE
Print Name: ___________________________________________
Print Title: ___________________________________________
Address: ___________________________________________
City: _____________________State: _______ Zip:___________
Telephone Number: (_____ )________-____________________
Email: ______________________________________________
FEIN: ______________________________________________
8. CONSTRUCTION SIGN
1. Work Required.
The work to be performed under this Section consists of providing all labor, material, and equipment necessary to install a project sign as indicated on the detail included herein and as specified herein.
2. Materials.
(a) Sign face shall be 3/4" Marine Exterior plywood or aluminum or composite material. Posts and cross-brace shall be No. 2 Grade Pine or Fir, kiln dried and pressure treated.
(b) Hardware:
(1) All hardware shall be manufactured from good, commercial-quality material and meet all applicable ASTM standards.
(2) Spikes and nails shall be common wire-type and shall meet AISI steel specifications 1010 or 1020.
(3) All hardware shall be hot-dip galvanized in accordance with
ASTM A-153.
3 Execution.
(a) Project Sign. The sign board shall be cut to the dimensions shown on the detail herein. The sign shall be painted with one (1) coat of primer and two
(2) coats of white enamel. All exterior cut edges shall be smooth sanded prior to painting. All edges shall be double primed. The letters, border and strips shall be painted as shown on the detail drawing. Posts and cross-brace shall be painted with two (2) finished coats of brown enamel.
The Contractor shall bolt the sign to posts and provide required cross-bracing.
The posts shall be set in gravel base and sign erected, as shown on the drawing. One (1) sign is required and is to be located at the discretion of the
Inspector.
(b) Payment. Payment for the work which shall include installation of the project sign shall be part of the lump-sum bid for "Mobilization".
9. CONTRACTOR INFORMATION FORM (AVS)
Vendor must complete the Contractor Information Form (AVS) to request an eligibility evaluation from the Office of Surface Mining Reclamation and Enforcement
(https://www.osmre.gov/programs/regulating-coal-mines/avs). This requirement applies to Contractors and their Sub-contractors and is found under OSMRE’s regulations at
CFR Title 30, Chapter VII, Subchapter R, Part 874.16:
https://www.ecfr.gov/current/title-30/chapter-VII/subchapter-R/part-874
Vendors should submit the most recent version with their bid documents. Form must be signed and dated within the last 30 days for vendors' bid to be considered for any current solicitation.
10. CITATION OF OTHER SPECIFICATIONS
Whenever the Specifications for this contract refer to the specifications of any society, institute, association or government organization, then such specifications cited shall become a part of this contract as if written in full. Commonly used abbreviations have the following meanings:
ASTM - American Society for Testing Materials
ASA - American Standards Association
AWWA - American Water Works Association
AASHTO - American Association of State Highway and Transportation Officials
ACI - American Concrete Institute
WVDOH – West Virginia Department of Highways
Where reference is made to a Specification, it shall be the latest revision at the time called for bids, except as noted on the Plans or elsewhere herein.
https://www.osmre.gov/programs/regulating-coal-mines/avs https://www.ecfr.gov/current/title-30/chapter-VII/subchapter-R/part-874
II. TECHNICAL SPECIFICATIONS
1.0 MOBILIZATION AND DEMOBILIZATION
1.1 DESCRIPTION
This work shall consist of the performance of construction preparatory operations, including the movement of personnel and equipment to the project sites and for the establishment of the Contractor’s offices, buildings and other facilities including the construction of all temporary access roads as necessary to begin work on a substantial phase of the contract. The location of the Contractor’s office to be established shall be approved by the WVDEP. It also shall include all demobilization activities involving the removal from the site of all plant, equipment, supplies and personnel after completion of the work including cleanup of all rubbish and waste materials generated during the construction of this project and restoration of any damage to existing site improvements resulting from the Contractor’s activities at the site. This item shall also include the installation of the project sign at the beginning of the project and the removal of the sign prior to the Final Inspection and installation of a rain gauge as shown on the drawings.
All equipment and material storage areas shall be approved by the WVDEP.
Upon receipt of a notice to proceed, the Contractor shall initiate and complete measures necessary to commence the work. Mobilization shall also consist of delivering to the site and assembling in working order all necessary equipment, materials, and supplies to be furnished by the Contractor to complete the work.
Demobilization shall consist of the removal from the site of all the Contractor’s equipment and materials after completion of the work and cleanup of the site. Work shall be done to the satisfaction of the Regional Engineer.
1.2 METHOD OF MEASUREMENT
The method of measurement will be per lump sum.
1.3 BASIS OF PAYMENT
The bid for “Mobilization and Demobilization” shall be a lump sum and cannot be more than
10% of the TOTAL AMOUNT BID for the project. Partial payments will be as follows:
(a) One-half of the amount bid will be released to the Contractor with the first estimate payable, not less than 15 days after the start of work at the project site.
(b) The final one-half of the amount bid shall be released with the estimate payable after the work is accepted by the WVDEP and when the Contractor has submitted and received approval for one paper (hard copy) and one copy of a cd-rom with all “as-built” plans, in accordance with Specification Section 2.3.5.
Nothing herein shall be construed to limit or preclude partial payments otherwise provided for by the Contract. No deduction will be made nor will any increase be made, in the lump sum mobilization and demobilization item amount regardless of decreases or increases in the final total contract amount or for any other cause.
1.4 PAY ITEM
Item 1.0 “Mobilization and Demobilization” per lump sum. Cannot be more than 10% of the TOTAL AMOUNT BID for the project.
2.0 CONSTRUCTION LAYOUT
2.1 DESCRIPTION
This item consists of furnishing, placing, and maintaining construction layout stakes, (based on the original baselines and/or control points in the plans), necessary for the proper performance of the work under this contract including borrow/waste areas.
Construction limits must be clearly flagged prior to any disturbance. Pre-construction cross sections must be provided (and approved) a minimum of one (1) week prior to the start of any “unclassified excavation”. It shall further consist of determining the exact units of measure for payment. It also consists of checking and making any field adjustment to the plan alignment, grades and elevations as considered necessary by the
Engineer. Additionally, this item shall also include the preparation of “As-Built” Plans including the Reclamation Plan and any others specifically requested by the WVDEP.
All “As-Built” Plans shall be provided prior to the Final Inspection Meeting. This item will be paid according to the following schedule: 25% confirmation cross-sections, 25% initial layout and LODs, 25% for layout throughout/end of construction, 25% on acceptance of as-builts.
2.2 MATERIALS
Conventional survey stakes, hubs, batter boards, flagging, templates, straightedges and other devices necessary for laying out all parts of the work.
2.3 CONSTRUCTION METHODS
2.3.1 The Contractor shall be responsible for the proper layout of the work. The Owner will provide the Contractor with survey information regarding the baselines and the existing surface features shown on the Construction Drawings. The Contractor shall make all calculations involved and shall furnish and place all layout stakes.
2.3.2 The Contractor shall provide field forces and shall set all additional stakes as needed, such as offset stakes, reference point stakes, slope stakes, grade stakes, stakes for drainage, or other structures, supplementary bench marks, and any other horizontal or vertical controls necessary to secure a correct layout of the work including the re-establishment of the survey and construction baselines (as necessary), as shown on the Construction Drawings.
2.3.3 The Contractor shall be responsible for assuring the layout staking work is in conformance to the lines, grades, elevations, dimensions, and locations shown on the Construction Drawings or as required by the Engineer. The Contractor shall furnish a copy of his/her survey records for review by the Engineer and for the
Owner's permanent file. These records shall be furnished as they are completed during the progress of the work.
Any inspection or review of the Contractor's layout by the Engineer and the acceptance of all or any part of it shall not relieve the Contractor of his/her responsibility to secure the proper dimensions, grades, and elevations of the several parts of the work.
2.3.4 The Contractor shall exercise care in the preservation of stakes and benchmarks, including existing property line markers, and shall have them reset at his/her expense when any are damaged, lost, displaced or removed.
The Contractor shall use competent personnel and suitable equipment for the layout work required and shall provide that it be done under the supervision of, or directed by, a Licensed Land Surveyor registered in the State of West Virginia.
As the survey is completed, the Licensed Land Surveyor shall certify that the site layout is complete for all necessary grades (both cut and fill), location and grades of all ditches, all cross-sections related to cut-fill where grade lines are necessary for construction and or billing. This layout shall include location stakes and cut-fill lines marked on the stakes for each pre-manufactured or formed on site structures (manholes, drop inlets, headwalls, etc.). The layout shall also include centerline stake with cut-fill lines for each channel and any areas of excavation and re-grade. The certified layout and cross-sections surveyed must be submitted to the WVDEP for approval prior to beginning construction for each item.
2.3.5 As-Built plans shall be provided to the WVDEP prior to the Final Invoicing. All work completed by the WV Licensed Land Surveyor on the As-Builts must be certified by the Licensed Land Surveyor as to completeness and accuracy of the plan submittal. The As-Builts shall be provided in two forms of electronic format in PDF and AutoCAD 2011-2017 on either CD-ROM, DVD, or USB memory stick and one paper copy of the plans with the same size and scale as contained on the original plans. The As-Builts Shall include the following:
1. Show all permanent work in place, and any deviations from original plans.
2. The preferred coordinate system and elevation datum need to be specified.
3. Show all horizontal and vertical dimensions (including invert elevations) of all installed components (i.e., pipes, drop inlets, mine seals, drainage channels, splash pads, manholes, etc.), as well as surveyed locations of the installed structures. Any other items deemed necessary (provided in the contract) by the WVDEP shall be included in the As-Builts.
4. Cut-fill sections shall have the area of the section marked by the section for easier calculation.
5. Have the lines on the plans shown in either color or line type to distinguish between our original plan lines, the contractor’s original survey lines and the final grade lines. This will apply for all cross-sections on the project.
6. All waste and borrow areas shall be shown and labeled.
7. Revegetation that is paid for by acreage, shall be per plan view acreage and shall be shown on a separate Autocad layer. The enclosed areas shall not include any graveled surfaces, paved surfaces, roads, ponds, treatment components, all non-vegetated channels, buildings, etc. (including any non-vegetated areas).
8. In Autocad, the zero (0) layer shall not be used to draw on other than to insert blocks for future insertion on appropriate layer.
9. As a standard, new baseline and final contours shall be provided with 2 feet minor contours and 10 feet major contours. Major contours shall have the elevation labeled. Contour Labels shall not break the contour line (see setting in AutoCad).
10. Any control points shall be shown with coordinates and elevations labeled.
If WV DEP provided control points, contractor shall reference elevations and coordinates to them. If no control points were set, then new points shall be set and utilized.
11. Any underdrains or other structures inaccessible after covering, shall be surveyed for location, prior to covering.
12. Show total quantities for all items on the project. The format shall be in a tabular form (i.e., Bid Schedule or Summary of Quantities).
13. Changes (deviations) should be on separate “Change” layer, not on the original layers from the original plan.
14. Items to be identified and labeled are listed in the following table.
ITEMS TO BE IDENTIFIED AND LABELED
ITEMS AUTOCAD LAYER REQUIRED
☒ Baseline Survey after Clearing & Grubbing, if required YES
☒ Intermediate Surveys, if required YES
☒ Final Survey YES
☒ Revegetation YES
☒ Pipes, Valves, Manholes YES
Mine Seals, Bat Gates NA
☒ Underdrains, Clean Outs YES
☒ Drainage Channels & Ditches, Splash Pads, Culverts, Drop Inlets YES
Ponds, Wetlands, Water Treatment Structures NA
Sludge Pumps, Sludge Cells, Geo-Tube Pads, Sludge Valves NA
Buildings, Residential/Commercial Structures, Concrete Pads NA
Pump Vaults, Air Release Valves, Pump Line Connections NA
☒ Fencing around Structures and Property Lines YES
☒ Utilities (i.e., Overhead/Underground Electric, Gas, Water, Sewer) YES
☒ Buried Lines (i.e., Electric, communication, chemical, water, sewer) YES
☒ Gas Vents, Piezometers, Monitoring Wells, Core Drilling YES
☒ Roads, Driveways, Sidewalks YES
☒ Unforeseen Areas (i.e., Slips, Seeps, Subsidence Areas, Boreholes) YES
☐ Other, As Defined:____________________________________________
2.4 METHOD OF MEASUREMENT & BASIS OF PAYMENT
Measurement and payment for furnishing, setting, maintaining, and resetting the stakes when necessary, and for furnishing all engineering personnel, equipment, materials, and all incidentals thereto, shall be by the lump sum bid for “Construction Layout”. The lump sum payment also shall include the cost for providing the Engineer pre-and post-construction ground line cross-sections for all disturbed or re-graded areas including borrow areas and “As-Built” Plans as described herein. Said lump sum bid cannot be more than 5% of the TOTAL AMOUNT BID for the project. Neither deduction nor increase will be made in the lump sum “Construction Layout” item amount regardless of decreases or increases in the final total contract amount or for any other cause. This item will be paid according to the following schedule: 25% confirmation cross-sections, 25% initial layout and LODs, 25% retainage for layout throughout/end of construction, 25% on acceptance of as-builts.
2.5 PAY ITEM
Item 2.0, “Construction Layout”, per lump sum cannot be more than 5% of the TOTAL
AMOUNT BID for the project.
3.0 QUALITY CONTROL
3.1 DESCRIPTION
This Work shall consist of testing for verification that the materials supplied, and the work performed are in accordance with these Specifications. Work shall be performed to the satisfaction of the State to be considered complete.
3.2 MATERIALS
The Contractor shall submit a minimum of two (2) copies of shop drawings, catalog cuts and material certifications (as applicable) to the Engineer for all offsite materials to be incorporated into the Work. At least 1 copy submitted must be electronic. Written approval from the Engineer will be required prior to incorporation of these items into the Work.
The Contractor shall submit at least two (2) copies of the results of all tests conducted on in-situ material, concrete, and grout to be used in this project. At least 1 copy must be electronic.
Test sampling of concrete shall be in accordance with ASTM C172. Temperature testing of concrete will be in accordance with ASTM C1064. Slump testing of concrete will be in accordance with ASTM C143. Air content of the concrete shall be tested according to
ASTM C231, ASTM C173, or ASTM C138. Concrete cylinders formed for compressive strength testing shall be formed in accordance with ASTM C31. Concrete compressive strength testing shall be in accordance with ASTM C39. Four concrete test cylinders shall be made and tested: one test cylinder shall be tested 7 days age, one test cylinder at
14 days age, one test cylinder shall be tested at 28 days age, and one cylinder shall be held as a spare. Concrete must have a compressive strength of at least 4,000psi within 28 days, a slump of 1-4 inches, an air content of 6-7.5%, and a temperature of 50°F-90°F at pouring to be acceptable, unless otherwise specified in the Plans or these Specifications.
Concrete used in road crossings, such as headwalls or wingwalls for a culvert crossing a road, must meet the requirements of Section 601 of the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition and the MM-109, as applicable. In the event of a conflict between these Specifications, the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition or the MM-109, then the most stringent requirement shall prevail. In the event of a conflict between the above that is more fundamental, such as what material to use or what construction methods to employ, then the order of priority would be the MM-109 (for roads only) then the WVDOT Supplemental Specifications, 2023 Edition (for roads or bridges only), and then these Specifications. Outside of work on, under, or near roads and bridges, these Specifications prevail entirely.
Notwithstanding the above, a conflict in one requirement does not relieve the Contractor of abiding by all other requirements in these Specifications.
For ease of reference, the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition can be found at the below:
https://transportation.wv.gov/highways/TechnicalSupport/specifications/Documents/20
23_Standard_%2812-16-22%29.pdf
These requirements apply to both pre-cast concrete and concrete that is cast in place.
Unacceptable concrete must be replaced at the Contractor’s expense. Custom concrete mixes outside of these tolerances can be approved by the Engineer on a case-by-case basis. The State reserves the right to reject concrete based on a visual inspection without waiting on testing results.
Test sampling and compressive strength testing of grout shall be in accordance with
ASTM C1019. Slump testing of grout shall be in accordance with ASTM C143. Grout must have a compressive strength of at least 2,000psi within 28 days and a slump of 8-
11 inches to be acceptable, unless otherwise specified in the Plans or these
Specifications. Unacceptable grout must be replaced at the Contractor’s expense.
Custom grout mixes outside of these tolerances can be approved by the Engineer on a case-by-case basis. The State reserves the right to reject grout based on a visual inspection without waiting on testing results.
Test sampling of Controlled Low Strength Material (CLSM) – also known as flowable fill – shall be in accordance with ASTM D5971 and ASTM D4832. CLSM compressive strength testing shall be in accordance with ASTM D4832. CLSM must have a compressive strength of at least 150psig within 28 days. CLSM used for road crossings must have a pH of 5.0-13.0 and must meet the requirements of Section 219 of the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition and the
MM-109, as applicable. In the event of a conflict between these Specifications, the
WVDOT Standard Specifications for Roads and Bridges, 2023 Edition, or the MM-
109, then the most stringent requirement shall prevail. In the event of a conflict between the above that is more fundamental, such as what material to use or what construction methods to employ, then the order of priority would be the MM-109 (for roads only) then the WVDOT Standard Specifications for Roads and Bridges, 2023
Edition (for roads or bridges only), and then these Specifications. Outside of work on, under, or near roads and bridges, these Specifications prevail entirely. Notwithstanding the above, a conflict in one provision does not relieve the Contractor of abiding by all other requirements in these Specifications. Unacceptable CLSM must be replaced at the Contractor’s expense. Custom CLSM mixes outside of these tolerances can be approved by the Engineer on a case-by-case basis, subject to the above MM-109 and
WVDOT Standards above. The State reserves the right to reject CLSM based on a visual inspection without waiting on testing results.
https://transportation.wv.gov/highways/TechnicalSupport/specifications/Documents/2023_Standard_%2812-16-22%29.pdf https://transportation.wv.gov/highways/TechnicalSupport/specifications/Documents/2023_Standard_%2812-16-22%29.pdf
At a minimum, the pipe / fill compaction tests will include moisture content and density tests of the soil in accordance with the provisions of ASTM D698 (Standard Proctor) field density tests following compaction. A new Standard Proctor will be run when soil type changes occur on site and/or at the direction of the Engineer or State representative.
Soil tests shall determine the optimal additives required for areas of soil disturbance to be fully re-vegetated (3 tons per acre preferred minimum). Normally, this includes – at a minimum – soil pH test results as well as available nutrients within the soil, including, at a minimum: nitrogen (N), phosphorus (P), potassium (K), calcium (Ca), magnesium
(MG), and Sulfur (S). At a minimum, the soil testing report will recommend what soil amendments in which concentrations are ideal for regrowth. If problems with re-vegetation occur, additional, more specialized tests may be required to be performed at the Engineer’s discretion and the Contractor’s expense.
Limestone and Sandstone shall be subjected to a Sodium Sulfate test in accordance with
AASHTO T104. Limestone shall be tested for calcium carbonate equivalent. Stone shall have a maximum weighted loss of twelve (12) percent when subjected to five (5) cycles of the Sodium Sulfate Soundness Test – ASTM C88 (ASTM C88-05 Standard
Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium
Sulfate), as modified by the American Association of State Highway and
Transportation Officials (AASHTO) T-104. Limestone shall be commercially supplied and have a calcium carbonate equivalency of 70% or greater. The stone shall consist of particles of clean, hard, tough, durable rock, free from adherent coating. The State reserves the right to reject limestone based on a visual inspection without waiting on testing results.
Sandstone shall be certified to be non-acid producing. Sandstone to be sound, non-acid producing, durable, non-calcareous sandstone from a State approved source. Shale is not acceptable. The sandstone shall consist of particles of clean, hard, tough, durable rock, free from adherent coating. The State reserves the right to reject sandstone based on a visual inspection without waiting on testing results.
Note that the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition and the MM-109 (if applicable) specify quality control and testing procedures that ARE
REQUIRED for any applicable asphalt replacement repaving, shoulder stone, guardrail replacement, etc. The Contractor is to ensure these are implemented, that materials and installations permanently installed meet or exceed all required tests, and the Contractor shall provide the results to the State and the WVDOH for record.
3.3 TESTS REQUIRED
Concrete Tests for Compressive Strength, Slump
Test, Air Content, Temperature
Every 50 CY or at least once per day (whichever is greater)
Grout Tests for Compressive Strength and
Slump Test
Every 50 CY or at least once per day (whichever is greater)
CLSM Tests for Compressive Strength, pH testing (if under a roadway)
Every 100 CY or at least once per day (whichever is greater)
Pipe Compaction Testing for Backfill Material Density Per Engineer; 1 Lot of 5 tests per day (min)
Fill Compaction Testing for Backfill Material Density 1 Lot of 5 tests per day (min)
Soil Test Varies As Needed
Material
Certification
Manufacturer Certification for all purchased materials
On or Before Delivery
Limestone Sodium Sulfate test, calcium carbonate equivalent
On or Before Delivery
Sandstone Certification that rock is non-acid producing and sodium sulfate test
On or Before Delivery
3.4 CONSTRUCTION METHODS
The Contractor shall select an independent testing laboratory for testing. The laboratory shall be under the direct supervision of a Registered Professional Engineer or PhD. The laboratory must be approved by the State, prior to testing.
The Contractor shall furnish a certified technician to perform the required testing at the project site. The certified technician shall submit a copy of their certification, and a copy of that certification shall be submitted to State at the Pre-Construction Conference. The certified technician shall be responsible for chain of custody of any samples that leave the site.
Testing shall be performed as required by these Specifications and / or as ordered by the
Engineer or State representative in writing. The Engineer will determine the locations and time of any testing herein specified and the need and extent of any testing in addition to that which is herein specified.
The Contractor shall be responsible for performing laboratory tests of the coal, mine spoil, and any natural soil to identify the compaction requirements for their use as fill and cover material, respectively. In addition, field density tests shall be performed in accordance with these Specifications. All test results shall be submitted to the Engineer for approval of compaction criteria prior to finalizing compacting the fill material and after fill material is placed to verify that the required compaction is obtained.
Only new and first-class materials, which conform to the requirements of these
Specifications, shall be used unless specified otherwise. When requested by the State, the
Contractor shall furnish a written statement of the origin, composition, and manufacturer of any or all materials (manufactured or produced) that are to be used in the work. The sources of supply of each material used shall be approved by the Engineer before delivery is started. If, at any time, sources previously approved fail to produce materials acceptable to the State, the Contractor shall furnish materials from other approved sources.
3.5 METHOD OF MEASUREMENT AND BASIS OF PAYMENT
There shall be no measurement of the “Quality Control” item as it is a lump sum. The quality control work done will be paid at the contract lump sum price bid for this item.
Said lump sum bid cannot be more than 3% of the TOTAL AMOUNT BID for the project. Nothing herein shall be construed to limit or preclude partial payments on this item up to 100% of the quality control bid amount. Neither deduction nor increase will be made in the lump sum “Quality Control” item amount regardless of decreases or increases in the final total contract amount or for any other cause.
3.6 PAY ITEM
Item 3.0, “Quality Control”, per lump sum cannot be more than 3% of the TOTAL
AMOUNT BID for the project.
4.0 SITE PREPARATION
4.1 DESCRIPTION
4.1.1 Clearing & Grubbing
Work performed under this section shall include the removal and disposal of all trees, stumps, shrubs and any other vegetation, wood, debris, junk, garbage of any nature from those areas specified below and/or shown on the Plans within the limits of disturbance (LOD), and/or any other areas as approved by WVDEP.
Development and reclamation of staging areas is included as subsidiary to the Site
Preparation item and no separate payment will be made.
This item shall also include stripping and stockpiling topsoil from the construction area for use as soil cover and re-vegetation. The scope of this item also includes road stabilization. Asphalt Paving is described and will be paid for under Item 9.0
Asphalt Pavement. Quantities of 1 ½-inch Crusher Run and AASHTO No. 1
Stone are included as pay items for stabilization onsite at the discretion of the
WVDEP. This material is separate from Asphalt Repair paid under Section 9.0.
This work shall also include the preservation from injury to all vegetation, utilities or other objects to remain as shown on the Design Drawings.
4.1.2 Demolition of Structures
Demolition required on this project includes the removal of the existing 48-inch diameter RCP pipe and the removal of the existing foundations and slab associated with the old building shown on the Plans. Demolition will be incidental to this pay item with the exception of the removal and preservation
(stockpiling) of the 48-inch RCP. Should other mining structures or debris be encountered, this work shall consist of complete demolition and removal of such buildings, mining related structures and equipment, existing ruins and foundation structures, concrete pads, walls, pavement and existing drainage conveyances and facilities including corrugated metal pipe, rock, RR track, and stone masonry walls located within the limits of disturbance as are specifically designated on the
Plans for removal or as directed by the WVDEP if within the limits of disturbance and not shown on the Plans. Boulders, pads, walls, and foundation ruins shall be broken in accordance with Specification Section 4.3.20 and buried in the deepest portion of the fill areas as directed by the WVDEP. Demolition debris shall be broken to manageable particles maximum 24 inches in any direction and placed as fill within the areas shown on the plans to be filled. Broken pieces shall not be consolidated in one area, but shall be dispersed throughout fill areas to ensure compaction requirements are achieved. Masonry walls, foundations, and concrete slabs may be present and will require demolition and disposal. Buried ruins, structures, other debris, including abandoned mining equipment, may exist and be encountered during excavation operations. All onsite garbage (as well as any other debris of any type and quantity encountered), mining equipment, and metal structures or items encountered shall be removed from the site to an off-site disposal area in accordance with Special Provisions Section V or to a landfill approved by the State of West Virginia to accept this type of debris. The
Contractor is advised to perform a thorough site reconnaissance to quantify all garbage and debris within the construction limits whether designated on the plan or not, for removal prior to submitting his or her bid.
4.1.3 Access Roads
The Contractor will be required to improve and maintain existing access roads into all-weather access roads for the duration of the project. All existing access roads shall be left in a condition equal to or better than existing at the time of mobilization, and shall be repaired and maintained during construction (except when culvert, ditch and road construction are being performed) to the satisfaction of the WVDEP. All travel and upgrading operations performed on existing access roads shall be confined to the width of the existing road, unless shown otherwise on the Plans. Final grading, re-vegetation, stabilization (resurfacing with stone or asphalt pavement), and providing final drainage control for existing access roads shall be performed as shown on the Plans and as directed and approved by the
WVDEP after reclamation operations for the project have been completed.
The Contractor shall maintain and protect traffic, protect work in progress, protect adjacent property from excess dust resulting from the construction and maintain traffic through, around, or adjacent to the construction area. The Contractor’s hauling and supply vehicles will travel paved, gravel, and dirt roads in close proximity to local resident’s homes, businesses, driveways, and other constructions. As such, the safety and convenience of these people shall be of utmost importance in the Contractors execution of work as shown on the Plans and herein specified. The Contractor shall be required to comply with all
WVDOT rules, regulations, weight limits, speed limits associated with and posted on nearby public and/or private roads used by the Contractor to access the project.
The Contractor will be required to coordinate his operations with each resident and provide unrestricted access to them at all times. At the discretion of the
WVDEP and as required by the WVDOT or local municipality, the Contractor will be required to employ flag persons to direct traffic while hauling materials on and off site and other constructions. All materials used for traffic control shall be in accordance with the current WVDOT manual; “Manual on Temporary Traffic
Control On Streets and Highways”.
An MM109 encroachment permit has been obtained from the WVDOT. The
Contractor will fully implement this Plan or modify the same as required by the
WVDOT when work on or nearby the DOH right of way is conducted.
Implementation of the requirements of the encroachment permit and the traffic control plan shall be paid for under the Traffic Control Item 13.0. The
Contract…