Specifications 22031_Part2.pdf

PDF 4 MB Posted

Attached to
751/22031. ABG; Manistique Fire Shop at Wyman SF Nursery
Solicitation number
RFQ - 171 - 230000000095
Issued by
Schoolcraft County, Mayville Village, Michigan

About this file

This is a request for proposals for the Manistique Fire Shop at Wyman SF Nursery project in Schoolcraft County and Mayville Village, Michigan. The project involves the installation of HVAC, plumbing, and electrical systems, as well as the procurement of various HVAC equipment and components such as fire-tube boilers, fuel-fired heaters, ductwork, air outlets and inlets, and related accessories. Interested bidders must submit their proposals electronically through the SIGMA VSS system by the 2:00 pm deadline. Contractors experiencing issues with SIGMA VSS are advised to contact the SIGMA Help Desk or the Office of Design and Construction for assistance. The contract will be awarded based on the State's evaluation of the submitted proposals.

The pricing terms and funding sources are not explicitly provided in the document. However, it notes that the project is being conducted by the State of Michigan, and any set-asides, incumbents, or other salient details about the current contracting environment are not mentioned. Bidders are advised to review the full scope of work and specifications carefully when preparing their proposals.

View the file

Other files

File Type Posted
Addendum No. 2 FINAL.pdf PDF
Plans 22031_Part2.pdf PDF
Specifications 22031_Part3.pdf PDF
Plans 22031_Part1.pdf PDF
Advertisment 22031.pdf PDF
Specifications 22031_Part1.pdf PDF
Addendum 1 22031.pdf PDF
Plans 22031_Part3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[M12-02548]

HVAC Insulation 23 07 00 - 1

SECTION 23 07 00

HVAC INSULATION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. HVAC piping insulation, jackets and accessories.

B. Related Sections:

1. Section 09 90 00 - Painting and Coating: Execution requirements for painting insulation jackets and covering specified by this section.

1.2 SUBMITTALS

A. Section 01300 - Submittals.

B. Product Data: Submit product description, thermal characteristics and list of materials and thickness for each service, and location.

1.3 QUALITY ASSURANCE

A. Test pipe insulation for maximum flame spread index of 25 and maximum smoke developed index of not exceeding 450 in accordance with ASTM E84.

B. Pipe insulation manufactured in accordance with ASTM C585 for inner and outer diameters.

C. Factory fabricated fitting covers manufactured in accordance with ASTM C450.

1.4 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience.

B. Applicator: Company specializing in performing Work of this section with minimum three years experience.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Section 01600 – Material and Equipment.

B. Accept materials on site in original factory packaging, labeled with manufacturer's identification, including product density and thickness.

C. Protect insulation from weather and construction traffic, dirt, water, chemical, and damage, by storing in original wrapping.

23 07 00 - 2

1.6 ENVIRONMENTAL REQUIREMENTS

A. Section 01600 – Material and Equipment.

B. Install insulation only when ambient temperature and humidity conditions are within range recommended by manufacturer.

C. Maintain temperature before, during, and after installation for minimum period of 24 hours.

1.7 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.8 WARRANTY

A. Section 00700 – General Conditions: 5. Warranties.

PART 2 PRODUCTS

2.1 PIPE INSULATION

A. See schedule on Drawings for pipe insulation.

2.2 PIPE INSULATION JACKETS

A. Vapor Retarder Jacket:

1. ASTM C921, white Kraft paper with glass fiber yarn, bonded to aluminized film.

2. Water Vapor Permeance: ASTM E96/E96M; 0.02 perms.

B. PVC Plastic Pipe Jacket:

1. Product Description: ASTM D1785, One piece molded type fitting covers and sheet material, off-white color.

2. Thickness: 10 mil.

3. Connections: Pressure sensitive color matching vinyl tape.

C. ABS Plastic Pipe Jacket:

1. Jacket: One piece molded type fitting covers and sheet material, off-white color.

2. Minimum service temperature: -40degrees F.

3. Maximum service temperature of 180 degrees F.

4. Water Vapor Permeance: ASTM E96/E96M; 0.02 perms.

5. Thickness: 30 mil.

6. Connections: Brush on welding adhesive.

D. Aluminum Pipe Jacket:

1. ASTM B209.

2. Thickness: 0.016 inch thick sheet.

23 07 00 - 3

3. Finish: Smooth <________>.

4. Joining: Longitudinal slip joints and 2 inch laps.

5. Fittings: 0.016 inch thick die shaped fitting covers with factory attached protective liner.

6. Metal Jacket Bands: 3/8 inch wide; 0.015 inch thick aluminum.

E. Field Applied Glass Fiber Fabric Jacket System:

1. Insulating Cement/Mastic: ASTM C195; hydraulic setting on mineral wool.

2. Glass Fiber Fabric:

a. Cloth: Untreated; 9 oz/sq yd weight.

b. Blanket: 1.0 lb/cu ft density.

c. Weave: 5 x 5.

3. Indoor Vapor Retarder Finish:

a. Cloth: Untreated; 9 oz/sq yd weight.

b. Vinyl emulsion type acrylic, compatible with insulation, white color.

2.3 PIPE INSULATION ACCESSORIES

A. Vapor Retarder Lap Adhesive: Compatible with insulation.

B. Covering Adhesive Mastic: Compatible with insulation.

C. Piping 1-1/2 inches diameter and smaller: Galvanized steel insulation protection shield. MSS SP- 69, Type 40. Length: Based on pipe size and insulation thickness.

D. Piping 2 inches diameter and larger: Wood insulation saddle, hard maple. Inserts length: not less than 6 inches long, matching thickness and contour of adjoining insulation.

E. Closed Cell Elastomeric Insulation Pipe Hanger: Polyurethane insert with aluminum jacket single piece construction with self-adhesive closure. Thickness to match pipe insulation.

F. Tie Wire: 0.048 inch stainless steel with twisted ends on maximum 12 inch centers.

G. Mineral Fiber Hydraulic-Setting Thermal Insulating and Finishing Cement: ASTM C449/C449M.

H. Insulating Cement: ASTM C195; hydraulic setting on mineral wool.

I. Adhesives: Compatible with insulation.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions and Section 01040 – Coordination.

B. Verify piping, has been tested before applying insulation materials.

C. Verify surfaces are clean and dry, with foreign material removed.

23 07 00 - 4

3.2 INSTALLATION - PIPING SYSTEMS

A. Piping Exposed to View in Finished Spaces: Locate insulation and cover seams in least visible locations.

B. Continue insulation through penetrations of building assemblies or portions of assemblies having fire resistance rating of one hour or less. Provide intumescent firestopping when continuing insulation through assembly. Finish at supports, protrusions, and interruptions. Refer to Section 07 84 00 for penetrations of assemblies with fire resistance rating greater than one hour.

C. Piping Systems Conveying Fluids Below Ambient Temperature:

1. Insulate entire system including fittings, valves, unions, flanges, strainers, flexible connections, and expansion joints.

2. Furnish factory-applied or field-applied vapor retarder jackets. Secure factory-applied jackets with pressure sensitive adhesive self-sealing longitudinal laps and butt strips. Secure field-applied jackets with outward clinch expanding staples and seal staple penetrations with vapor retarder mastic.

3. Insulate fittings, joints, and valves with molded insulation of like material and thickness as adjacent pipe. Finish with glass cloth and vapor retarder adhesive or PVC fitting covers.

D. Glass Fiber Board Insulation:

1. Apply insulation close to equipment by grooving, scoring, and beveling insulation. Fasten insulation to equipment with studs, pins, clips, adhesive, wires, or bands.

2. Fill joints, cracks, seams, and depressions with bedding compound to form smooth surface.

On cold equipment, use vapor retarder cement.

3. Cover wire mesh or bands with cement to a thickness to remove surface irregularities.

E. Extruded Polystyrene Insulation:

1. Wrap elbows and fitting with vapor retarder tape.

2. Seal butt joints with vapor retarder tape.

F. Hot Piping Systems less than 140 degrees F:

1. Furnish factory-applied or field-applied standard jackets. Secure with outward clinch expanding staples or pressure sensitive adhesive system on standard factory-applied jacket and butt strips or both.

2. Insulate fittings, joints, and valves with insulation of like material and thickness as adjoining pipe. Finish with glass cloth and adhesive or PVC fitting covers.

3. Do not insulate unions and flanges at equipment, but bevel and seal ends of insulation at such locations.

G. Hot Piping Systems greater than 140 degrees F:

1. Furnish factory-applied or field-applied standard jackets. Secure with outward clinch expanding staples or pressure sensitive adhesive system on standard factory-applied jacket and butt strips or both.

2. Insulate fittings, joints, and valves with insulation of like material and thickness as adjoining pipe. Finish with glass cloth and adhesive or PVC fitting covers.

3. Insulate flanges and unions at equipment.

H. Inserts and Shields:

23 07 00 - 5

1. Piping 1-1/2 inches Diameter and Smaller: Install galvanized steel shield between pipe hanger and insulation.

2. Piping 2 inches Diameter and Larger: Install insert between support shield and piping and under finish jacket.

a. Insert Configuration: Minimum 6 inches long, of thickness and contour matching adjoining insulation; may be factory fabricated.

b. Insert Material: Compression resistant insulating material suitable for planned temperature range and service.

3. Piping Supported by Roller Type Pipe Hangers: Install galvanized steel shield between roller and inserts.

I. Insulation Terminating Points:

1. Coil Branch Piping 1 inch and Smaller: Terminate hot water piping at union upstream of the coil control valve.

2. Condensate Piping: Insulate entire piping system and components to prevent condensation.

J. Closed Cell Elastomeric Insulation:

1. Push insulation on to piping.

2. Miter joints at elbows.

3. Seal seams and butt joints with manufacturer’s recommended adhesive.

4. When application requires multiple layers, apply with joints staggered.

5. Insulate fittings and valves with insulation of like material and thickness as adjacent pipe.

K. High Temperature Pipe Insulation:

1. Install in multiple layers to meet thickness scheduled.

2. Attach each layer with bands. Secure first layer with bands before installing next layer.

3. Stagger joints between layers.

4. Finish with canvas jacket.

L. Pipe Exposed in Mechanical Equipment Rooms or Finished Spaces: Finish with PVC jacket and fitting covers.

M. Buried Piping: Insulate only where insulation manufacturer recommends insulation product may be installed in trench, tunnel or direct buried. Install factory fabricated assembly with inner all-purpose service jacket with self-sealing lap, and asphalt impregnated open mesh glass fabric, with 1 mil thick aluminum foil sandwiched between three layers of bituminous compound; outer surface faced with polyester film.

N. Prepare pipe insulation for finish painting. Refer to Section 09 90 00.

3.3 SCHEDULES

A. See Drawings for schedules.

END OF SECTION

Facility Natural-Gas Piping 23 11 23 - 1

SECTION 23 11 23

FACILITY NATURAL-GAS PIPING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Natural gas piping buried within 5 feet of building.

2. Natural gas piping above grade.

3. Unions and flanges.

4. Valves.

5. Pipe hangers and supports.

6. Strainers.

7. Natural gas pressure regulators.

8. Natural gas pressure relief valves.

9. Underground pipe markers.

B. Related Sections:

1. Section 09 90 00 - Painting and Coating: Product requirements for painting for placement by this section.

2. Section 23 05 29 - Hangers and Supports for HVAC Piping and Equipment: Product requirements for pipe hangers and supports [and firestopping] for placement by this section.

3. Section 23 05 53 - Identification for HVAC Piping and Equipment: Product requirements for valve and pipe identification for placement by this section.

1.2 REFERENCES

A. American National Standards Institute:

1. ANSI Z21.15 - Manually Operated Gas Valves for Appliances, Appliance Connector Valves and Hose End Valves.

B. American Society of Mechanical Engineers:

1. ASME B16.3 - Malleable Iron Threaded Fittings.

2. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes.

3. ASME B16.33 - Manually Operated Metallic Gas Valves for Use in Gas Piping Systems Up to 125 psig (sizes 1/2 - 2).

4. ASME B31.9 - Building Services Piping.

5. ASME Section IX - Boiler and Pressure Vessel Code - Welding and Brazing Qualifications.

C. ASTM International:

1. ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-

Coated, Welded and Seamless.

2. ASTM A234/A234M - Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service.

3. ASTM B88 - Standard Specification for Seamless Copper Water Tube.

4. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

23 11 23 - 2

D. American Welding Society:

1. AWS D1.1 - Structural Welding Code - Steel.

E. Manufacturers Standardization Society of the Valve and Fittings Industry:

1. MSS SP 58 - Pipe Hangers and Supports - Materials, Design and Manufacturer.

2. MSS SP 67 - Butterfly Valves.

3. MSS SP 69 - Pipe Hangers and Supports - Selection and Application.

4. MSS SP 78 - Cast Iron Plug Valves, Flanged and Threaded Ends.

5. MSS SP 89 - Pipe Hangers and Supports - Fabrication and Installation Practices.

6. MSS SP 110 - Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared

Ends.

F. National Fire Protection Association:

1. NFPA 54 - National Fuel Gas Code.

G. Underwriters Laboratories Inc.:

1. UL 842 - Valves for Flammable Fluids.

1.3 SYSTEM DESCRIPTION

A. Where more than one piping system material is specified, provide compatible system components and joints. Use non-conducting dielectric connections when joining dissimilar metals in systems.

B. Provide flanges, unions, or couplings at locations requiring servicing. Use unions, flanges, or couplings downstream of valves and at equipment connections. Do not use direct welded or threaded connections to valves, equipment.

C. Provide pipe hangers and supports in accordance with ASME B31.9.

D. Use plug, or ball valves for shut-off and to isolate equipment, part of systems, or vertical risers.

1.4 SUBMITTALS

A. Section 01300 - Submittals.

B. Product Data:

1. Piping: Submit data on pipe materials, fittings, and accessories. Submit manufacturers catalog information.

2. Piping Specialties: Submit manufacturers catalog information including capacity, rough-in requirements, and service sizes for the following:

a. Strainers.

b. Natural gas pressure regulators.

c. Natural gas pressure relief valves.

C. Welders Certificates: Certify welders employed on the Work, verifying AWS qualification within previous 12 months.

23 11 23 - 3

1.5 CLOSEOUT SUBMITTALS

A. Section 01700 – Contract Closeout.

B. Operation and Maintenance Data: Submit for gas pressure regulators installation instructions, spare parts lists, and exploded assembly views.

1.6 QUALITY ASSURANCE

A. Perform natural gas Work in accordance with NFPA 54.

B. Perform Work in accordance with ASME B31.9 code for installation of piping systems and ASME Section IX for welding materials and procedures.

C. Furnish shutoff valves complying with ASME B16.33 or ANSI Z21.15.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience.

B. Installer: Company specializing in performing Work of this section with minimum three years experience.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Section 01600 – Material and Equipment.

B. Accept valves on site in shipping containers with labeling in place. Inspect for damage.

C. Protect piping and fittings from soil and debris with temporary end caps and closures. Maintain in place until installation. Furnish temporary protective coating on cast iron and steel valves.

1.9 ENVIRONMENTAL REQUIREMENTS

A. Section 01600 – Material and Equipment.

B. Do not install underground piping when bedding is wet or frozen.

1.10 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.11 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Requirements for coordination and Section 01040 – Coordination.

23 11 23 - 4

PART 2 PRODUCTS

2.1 NATURAL GAS PIPING, BURIED WITHIN 5 FEET OF BUILDING

A. Steel Pipe: ASTM A53/A53M Schedule 40 black.

1. Fittings: ASTM A234/A234M forged steel welding type.

2. Joints: ASME B31.9, welded.

3. Jacket: AWWA C105 polyethylene jacket or double layer, half-lapped 10 mil polyethylene tape.

2.2 NATURAL GAS PIPING, ABOVE GRADE

A. Steel Pipe: ASTM A53/A53M Schedule 40 black.

1. Fittings: ASME B16.3, malleable iron, or ASTM A234/A234M forged steel welding type.

2. Joints: Threaded for pipe 2 inch and smaller; welded for pipe 2-1/2 inches and larger.

2.3 REGULATOR VENT PIPING, ABOVE GRADE

A. Indoors: Same as natural gas piping, above grade.

B. Outdoors: PVC pipe, tubing, and fittings, UL 651.

2.4 UNIONS AND FLANGES

A. Unions for Pipe 2 inches and Smaller:

1. Ferrous Piping: Class 150, malleable iron, threaded.

2. Copper Piping: Class 150, bronze unions with soldered.

3. Dielectric Connections: Union with galvanized or plated steel threaded end, copper solder end, water impervious isolation barrier.

B. Flanges for Pipe 2-1/2 inches and Larger:

1. Ferrous Piping: Class 150, forged steel, slip-on flanges.

2. Copper Piping: Class 150, slip-on bronze flanges.

3. Gaskets: 1/16 inch thick preformed neoprene gaskets.

2.5 BALL VALVES

A. Manufacturers:

1. Milwaukee Valve Company Model.

2. NIBCO, Inc. Model.

3. Substitutions: Section 01300 - Submittals.

B. 1/4 inch to 1 inch: MSS SP 110, Class 125, two piece, threaded ends, bronze body, chrome plated bronze ball, reinforced teflon seats, blow-out proof stem, lever handle, UL 842 listed for flammable liquids and LPG, full port.

C. 1-1/4 inch to 3 inch: MSS SP 110, Class 125, two piece, threaded ends, bronze body, chrome plated bronze ball, reinforced teflon seats, blow-out proof stem, lever handle, UL 842 listed for flammable liquids and LPG, conventional port.

23 11 23 - 5

2.6 PLUG VALVES

A. Manufacturers:

1. DeZURIK, Unit of SPX Corp. Model.

2. Homestead Valve Model.

3. Substitutions: Section 01300 – Submittals.

B. 2 inches and Smaller: MSS SP 78, Class 150, semi-steel construction, round port, regular opening, pressure lubricated, teflon packing, threaded ends. Furnish one plug valve wrench for every ten plug-valves with minimum of one wrench.

C. 2-1/2 inches and Larger: MSS SP 78, Class 150, semi-steel construction, round port, regular opening, pressure lubricated, teflon packing, flanged ends. Furnish wrench-operated.

2.7 PIPE HANGERS AND SUPPORTS

A. Manufacturers:

1. Glope Pipe Hanger Products Inc. Model.

2. Michigan Hanger Co. Model.

3. Superior Valve Co. Model.

4. Substitutions: Section 01300 - Submittals.

B. Conform to NFPA 54,.

C. Hangers for Pipe Sizes 1/2 to 1-1/2 inch: Malleable iron, adjustable swivel, split ring.

D. Hangers for Pipe Sizes 2 inches and Larger: Carbon steel, adjustable, clevis.

E. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods.

F. Wall Support for Pipe 3 inches and Smaller: Cast iron hook.

G. Vertical Support: Steel riser clamp.

H. Floor Support: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.

I. Copper Pipe Support: Carbon steel ring, adjustable, copper plated.

J. Sheet Lead: ASTM B749, 2.5 lb/sq ft inch thick.

2.8 STRAINERS

A. Manufacturers:

1. Spirax Sarco, Inc. Model.

2. Substitutions: Section 01300 - Submittals.

23 11 23 - 6

B. 2 inch and Smaller: Screwed brass or iron body for 175 psig working pressure, Y pattern with 1/32 inch stainless steel perforated screen.

C. 2-1/2 inch to 4 inch: Flanged iron body for 175 psig working pressure, Y pattern with 3/64 inch stainless steel perforated screen.

D. 5 inch and Larger: Flanged iron body for 175 psig working pressure, basket pattern with 1/8 inch stainless steel perforated screen.

2.9 UNDERGROUND PIPE MARKERS

A. Manufacturers:

1. Pipemarker; Brimar Industries, Inc..

2. Substitutions: Section 01300 - Submittals.

B. Plastic Detectable Ribbon Tape: Bright colored, continuously printed, minimum 6 inches wide by 4 mil thick, manufactured for direct burial service. Magnetic and detectable, imprinted with "Natural Gas Service" in large letters.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 013000 - Administrative Requirements: Coordination and project conditions and Section 01040 Coordination.

B. Verify excavations are to required grade, dry, and not over-excavated.

3.2 PREPARATION

A. Ream pipe and tube ends. Remove burrs.

B. Remove scale and dirt, on inside and outside, before assembly.

C. Prepare piping connections to equipment with flanges or unions.

3.3 INSTALLATION - INSERTS

A. Provide inserts for placement in concrete forms.

B. Provide inserts for suspending hangers from reinforced concrete slabs and sides of reinforced concrete beams.

C. Provide hooked rod to concrete reinforcement section for inserts carrying pipe 4 inches and larger.

D. Where concrete slabs form finished ceiling, locate inserts flush with slab surface.

23 11 23 - 7

E. Where inserts are omitted, drill through concrete slab from below and provide through-bolt with recessed square steel plate and nut flush with top of slab.

3.4 INSTALLATION - PIPE HANGERS AND SUPPORTS

A. Install hangers and supports in accordance with ASME B31.9.

B. Support horizontal piping hangers as scheduled.

C. Install hangers to provide minimum 1/2 inch space between finished covering and adjacent work.

D. Place hangers within 12 inches of each horizontal elbow.

E. Install hangers to allow 1-1/2 inch minimum vertical adjustment. Design hangers for pipe movement without disengagement of supported pipe.

F. Support vertical piping at every floor. Support riser piping independently of connected horizontal piping.

G. Where installing several pipes in parallel and at same elevation, provide multiple pipe hangers or trapeze hangers.

H. Install pipe hangers and supports in accordance with Section 23 05 29.

3.5 INSTALLATION - BURIED PIPING SYSTEMS

A. Install natural gas piping in accordance with NFPA 54.

B. Verify connection to existing piping system size, location, and invert are as indicated on Drawings.

C. Remove scale and dirt on inside of piping before assembly.

D. Install pipe on prepared bedding.

E. Route pipe in straight line.

F. Install pipe to allow for expansion and contraction without stressing pipe or joints.

G. Install plastic ribbon tape continuous over top of pipe. buried 6 inches below finish grade, above pipe line.

3.6 INSTALLATION - ABOVE GROUND PIPING SYSTEMS

A. Install natural gas piping in accordance with NFPA 54.

B. Provide non-conducting dielectric connections wherever jointing dissimilar metals.

C. Route piping in orderly manner and maintain gradient.

23 11 23 - 8

D. Where required, bend pipe with pipe bending tools in accordance with procedures intended for that purpose.

E. Install piping to conserve building space and not interfere with use of space.

F. Size and install gas piping to provide sufficient gas to supply maximum appliance demand at pressure higher than appliance minimum inlet pressure.

G. Group piping whenever practical at common elevations.

H. Install piping to allow for expansion and contraction without stressing pipe, joints, or connected equipment.

I. Sleeve pipe passing through partitions, walls and floors. Refer to Section 23 05 29.

J. Provide clearance for installation of insulation and access to valves and fittings.

K. Provide access where valves and fittings are not exposed.

L. Provide support for utility meters in accordance with requirements of utility company.

M. Install vent piping from gas pressure reducing valves to outdoors and terminate in weatherproof hood. Protect vent against entry of insects and foreign material.

1. Minimum Vent Size: Connection size at regulator vent connection.

2. Run individual vent line from each relief device, independent of breather vents.

N. Breather vents may be manifolded together with piping sized for combined appliance vent requirements.

O. Prepare pipe, fittings, supports, and accessories not pre-finished, ready for finish painting. Refer to Section 09 90 00.

P. Install identification on piping systems including underground piping. Refer to Section 23 05 53.

Q. Install valves with stems upright or horizontal, not inverted.

R. Protect piping systems from entry of foreign materials by temporary covers, completing sections of the Work, and isolating parts of completed system.

S. Provide new gas service. Gas service distribution piping to have initial minimum pressure of 11 inch wg.

3.7 FIELD QUALITY CONTROL

A. Section 01650 – Facility Start-Up.

B. Where gas appliance will be damaged by test pressure, disconnect appliance and cap piping during pressure test. Reconnect appliance after pressure test and leak test connection.

23 11 23 - 9

C. Where gas appliance is designed for operating pressures equal to or greater than piping test pressure, provide gas valve to isolate appliance or equipment from gas test pressure.

D. Pressure test natural gas piping in accordance with NFPA 54.

E. Where new branch piping is extended from existing system, pressure test new branch piping only.

Leak test joint between new and existing piping with noncorrosive leak detection fluid or other approved method.

F. When pressure tests do not meet specified requirements, remove defective work, replace and retest.

G. Immediately after gas is applied to a new system, or a system has been restored after gas service interruption, check pipe for leakage.

1. Where leakage is detected, shut off gas supply until necessary repairs are complete.

H. Do not place appliances in service until leak testing and repairs are complete.

3.8 SCHEDULES

A. Pipe Hanger Spacing:

PIPE SIZE

Inches

STEEL

PIPE

MAXIMUM

HANGER

SPACING

Feet

STEEL PIPE

MINIMUM

HANGER

ROD

DIAMETER

Inches

1/2 6 3/8 3/4 7 3/8 1 7 3/8 1-1/4 7 3/8 1-1/2 9 3/8 2 10 3/8 2-1/2 10 1/2 3 10 1/2

Hydronic Piping 23 21 13 - 1

SECTION 23 21 13

HYDRONIC PIPING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Heating water piping, buried.

2. Heating water piping, above ground.

3. Radiant heating piping.

4. Equipment drains and over flows.

5. Unions and flanges.

6. Pipe hangers and supports.

7. Valves.

B. Related Sections:

1. Section 09 90 00 - Painting and Coating: Product requirements Painting for placement by this section.

2. Section 23 05 29 - Hangers and Supports for HVAC Piping and Equipment: Product requirements for pipe hangers and supports, sleeves, for placement by this section.

3. Section 23 05 53 - Identification for HVAC Piping and Equipment: Product requirements for pipe identification for placement by this section.

4. Section 23 07 00 - HVAC Insulation: Product requirements for Piping Insulation for placement by this section.

5. Section 23 21 16 - Hydronic Piping Specialties: Product and execution requirements for piping specialties used in heating and cooling piping systems.

6. Section 23 21 23 - Hydronic Pumps: Product and execution requirements for pumps used in heating and cooling piping systems.

1.2 REFERENCES

A. American Society of Mechanical Engineers:

1. ASME B16.3 - Malleable Iron Threaded Fittings.

2. ASME B16.18 - Cast Copper Alloy Solder Joint Pressure Fittings.

3. ASTM F876 - Standard Specification for Crosslinked Polyethylene (PEX) Tubing.

4. ASTM F877 - Standard Specification for Crosslinked Polyethylene (PEX) Plastic Hot-and

Cold-Water Distribution Systems.

B. American Welding Society:

1. AWS A5.8 - Specification for Filler Metals for Brazing and Braze Welding.

2. AWS D1.1 - Structural Welding Code - Steel.

23 21 13 - 2

1.3 SYSTEM DESCRIPTION

A. Provide compatible system components and joints. Use non-conducting dielectric connections whenever jointing dissimilar metals in open systems.

B. Provide flanges, union, and couplings at locations requiring servicing. Use unions, flanges, and couplings downstream of valves and at equipment or apparatus connections. Do not use direct welded or threaded connections to valves, equipment or other apparatus.

C. Provide pipe hangers and supports in accordance with ASME B31.1,.

D. Use gate or ball valves for shut-off and to isolate equipment, part of systems, or vertical risers.

E. Use globe or ball valves for throttling, bypass, or manual flow control services.

F. Use spring loaded check valves on discharge of hot water pumps.

G. Use plug valves for throttling service. Use non-lubricated plug valves only when shut-off or isolating valves are also provided.

H. Use 3/4 inch ball valves with cap for drains at main shut-off valves, low points of piping, bases of vertical risers, and at equipment. Pipe to nearest floor drain.

I. Flexible Connectors: Use at or near pumps where piping configuration does not absorb vibration.

1.4 SUBMITTALS

A. Section 01300 - Submittals.

B. Shop Drawings: Indicate schematic layout of heating piping system, including equipment, critical dimensions, and sizes.

C. Product Data:

1. Piping: Submit data on pipe materials, fittings, and accessories. Submit manufacturers catalog information.

2. Valves: Submit manufacturers catalog information with valve data and ratings for each service.

3. Hangers and Supports: Submit manufacturers catalog information including load capacity.

1.5 CLOSEOUT SUBMITTALS

A. Section 01700 – Contract Closeout.

B. Operation and Maintenance Data: Submit instructions for installation and changing components, spare parts lists, exploded assembly views.

23 21 13 - 3

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with ASME B31.1 code for installation of piping systems and ASME Section IX for welding materials and procedures.

B. Perform Work in accordance with AWS D1.1 for welding hanger and support attachments to building structure.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience , and with service facilities within 100 miles of Project.

B. Fabricator or Installer: Company specializing in performing Work of this section with minimum three years experience.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Section 01600 – Material and Equipment.

B. Accept valves on site in shipping containers with labeling in place. Inspect for damage.

C. Provide temporary end caps and closures on piping and fittings. Maintain in place until installation.

D. Protect piping systems from entry of foreign materials by temporary covers, completing sections of the Work, and isolating parts of completed system.

1.9 ENVIRONMENTAL REQUIREMENTS

A. Section 01600 – Material and Equipment.

B. Do not install underground piping when bedding is wet or frozen.

1.10 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.11 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Requirements for coordination and Section 01040 – Coordination.

PART 2 PRODUCTS

2.1 HEATING WATER PIPING, ABOVE GROUND

A. Copper Tubing: ASTM B88, Type L, drawn.

1. Fittings: ASME B16.18, cast brass, or ASME B16.22 solder wrought copper.

23 21 13 - 4

2. Tee Connections: Mechanically extracted collars with notched and dimpled branch tube.

3. Joints: Solder, lead free, ASTM B32, 95-5 tin-antimony, or tin and silver, with melting range 430 to 535 degrees F.

2.2 RADIANT HEATING PIPING

A. Polyethylene Pipe: ASTM F876 and ASTM F877, cross-linked polyethylene, 100 psig operating pressure at 180 degrees F.

1. Fittings: Brass and copper.

2. Joints: Mechanical compression fittings.

2.3 FLUE AND COMBUSTION AIR PIPING

A. Per Manufacturer’s requirements.

2.4 UNIONS AND FLANGES

A. Unions for Pipe 2 inches and Smaller:

1. Ferrous Piping: Class 150, malleable iron, threaded.

2. Copper Piping: Class 150, bronze unions with soldered.

3. Dielectric Connections: Union with galvanized or plated steel threaded end, copper solder end, water impervious isolation barrier.

4. PVC Piping: PVC.

5. CPVC Piping: CPVC.

B. Flanges for Pipe 2-1/2 inches and Larger:

1. Ferrous Piping: Class 150, forged steel, slip-on flanges.

2. Copper Piping: Class 150, slip-on bronze flanges.

3. PVC Piping: PVC flanges.

4. CPVC Piping: CPVC flanges.

5. Gaskets: 1/16 inch thick preformed neoprene gaskets.

2.5 GATE VALVES

A. 2 inches and Smaller: MSS SP 80, Class 150, bronze body, bronze trim, threaded bonnet, rising stem, hand-wheel, inside screw with back-seating stem, solid wedge disc, solder ends.

2.6 GLOBE VALVES

A. Manufacturers:

1. Crane Valve, North America Model.

2. Milwaukee Valve Company Model.

3. NIBCO, Inc. Model.

4. Substitutions: Section 01300 - Submittals.

B. 2 inches and Smaller: MSS SP 80, Class 125, bronze body, bronze trim, threaded bonnet, hand wheel, teflon composition disc, solder ends.

23 21 13 - 5

C. 2-1/2 inches and Larger: MSS SP 85, Class 125, cast iron body, bronze trim, hand wheel, outside screw and yoke, flanged ends. Furnish chain-wheel operators for valves 6 inches and larger mounted over 8 feet above floor.

2.7 BALL VALVES

A. Manufacturers:

1. NIBCO, Inc. Model.

2. Stockham Valves & Fittings Model.

3. Substitutions: Section 01300 Submittals.

B. 2 inches and Smaller: MSS SP 110, one piece bronze body, chrome plated brass ball, regular port, teflon seats, blow-out proof stem, solder or threaded ends, lever handle.

2.8 PLUG VALVES

A. Manufacturers:

1. Flow Control Equipment, Inc. Model.

2. Homestead Valve Model.

3. Substitutions: Section 01300 - Submittals.

B. 2 inches and Smaller: MSS SP 78, Class 150, semi-steel construction, round port, regular opening, pressure lubricated, teflon packing, threaded ends. Furnish one plug valve wrench for every ten plug-valves with minimum of one wrench.

2.9 CHECK VALVES

A. Horizontal Swing Check Valves:

1. Manufacturers:

a. Milwaukee Valve Company Model.

b. NIBCO, Inc. Model.

c. Substitutions: Section 01300 - Submittals.

2. 2 inches and Smaller: MSS SP 80, Class 150, bronze body and cap, bronze seat, teflon disc, solder or threaded ends.

3. 2-1/2 inches and Larger: MSS SP 71, Class 125, cast iron body, bolted cap, bronze or cast iron disc, flanged ends.

B. Spring Loaded Check Valves:

1. Manufacturers:

a. Milwaukee Valve Company Model.

b. NIBCO, Inc. Model.

c. Substitutions: Section 01300 Submittals.

C. 2 inches and Smaller: MSS SP 80, bronze body, in-line spring lift check, silent closing, teflon disc, integral seat, solder or threaded ends.

D. 2-1/2 inches and Larger: MSS SP 71, Class 125, wafer style, cast iron body, bronze seat, center guided bronze disc, stainless steel spring and screws, flanged ends.

23 21 13 - 6

2.10 PIPE HANGERS AND SUPPORTS

A. Manufacturers:

1. Michigan Hanger Co. Model.

2. Superior Valve Co. Model.

3. Substitutions: Section 01300 - Submittals.

B. Conform to ASME B31.1,.

C. Hangers for Pipe Sizes 1/2 to 1-1/2 inch: Malleable iron, adjustable swivel, split ring.

D. Hangers for Cold Pipe Sizes 2-1/2 inches and Larger: Carbon steel, adjustable, clevis.

E. Hangers for Hot Pipe Sizes 2 to 4 inches: Carbon steel, adjustable, clevis.

F. Hangers for Hot Pipe Sizes 6 inches and Larger: Adjustable steel yoke, cast iron roll, double hanger.

G. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods.

H. Multiple or Trapeze Hangers for Hot Pipe Sizes 6 inches and Larger: Steel channels with welded spacers and hanger rods, cast iron roll.

I. Wall Support for Pipe Sizes 3 inches and Smaller: Cast iron hooks.

J. Wall Support for Pipe Sizes 4 inches and Larger: Welded steel bracket and wrought steel clamp.

K. Wall Support for Hot Pipe Sizes 6 inches and Larger: Welded steel bracket and wrought steel clamp with adjustable steel yoke and cast iron roll.

L. Vertical Support: Steel riser clamp.

M. Floor Support for Cold Pipe: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.

N. Floor Support for Hot Pipe 4 inches and Smaller: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.

O. Floor Support for Hot Pipe Sizes 6 inches and Larger: Adjustable cast iron roll and stand, steel screws, and concrete pier or steel support.

P. Copper Pipe Support: Carbon steel rings, adjustable, copper plated.

Q. Hanger Rods: Mild steel threaded both ends, threaded one end, or continuous threaded.

R. Inserts: Malleable iron case of galvanized steel shell and expander plug for threaded connection with lateral adjustment, top slot for reinforcing rods, lugs for attaching to forms; size inserts to suit threaded hanger rods.

23 21 13 - 7

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions and Section 01040 – Coordination.

B. Verify excavations are to required grade, dry, and not over-excavated.

3.2 PREPARATION

A. Ream pipe and tube ends. Remove burrs.

B. Remove scale and dirt on inside and outside before assembly.

C. Prepare piping connections to equipment with flanges or unions.

D. Keep open ends of pipe free from scale and dirt. Protect open ends with temporary plugs or caps.

E. After completion, fill, clean, and treat systems. Refer to Section 23 25 00.

3.3 INSTALLATION - INSERTS

A. Provide inserts for placement in concrete forms.

B. Provide inserts for suspending hangers from reinforced concrete slabs and sides of reinforced concrete beams.

C. Provide hooked rod to concrete reinforcement section for inserts carrying pipe 4 inches and larger.

D. Where concrete slabs form finished ceiling, locate inserts flush with slab surface.

E. Where inserts are omitted, drill through concrete slab from below and provide through-bolt with recessed square steel plate and nut flush with top of slab.

3.4 INSTALLATION - PIPE HANGERS AND SUPPORTS

A. Install in accordance with ASME B31.9 [MSS SP 89].

B. Support horizontal piping as scheduled.

C. Install hangers to provide minimum 1/2 inch space between finished covering and adjacent work.

D. Place hangers within 12 inches of each horizontal elbow.

E. Use hangers with 1-1/2 inch minimum vertical adjustment. Design hangers for pipe movement without disengagement of supported pipe.

23 21 13 - 8

F. Support vertical piping at every floor. Support riser piping independently of connected horizontal piping.

G. Where installing several pipes in parallel and at same elevation, provide multiple pipe hangers or trapeze hangers.

H. Provide copper plated hangers and supports for copper piping.

I. Prime coat exposed steel hangers and supports. Refer to Section 09 90 00. Hangers and supports located in crawl spaces, pipe shafts, and suspended ceiling spaces are not considered exposed.

J. Provide clearance in hangers and from structure and other equipment for installation of insulation and access to valves and fittings.

K. Install pipe hangers and supports in accordance with Section 23 05 29.

3.5 INSTALLATION - ABOVE GROUND PIPING SYSTEMS

A. Install piping in accordance with ASME B31.1.

B. Route piping parallel to building structure and maintain gradient.

C. Install piping to conserve building space, and not interfere with use of space.

D. Group piping whenever practical at common elevations.

E. Sleeve pipe passing through partitions, walls and floors. Refer to Section 23 05 29.

F. Install pipe identification in accordance with Section 23 05 53.

G. Install piping to allow for expansion and contraction without stressing pipe, joints, or connected equipment. Refer to Section 23 05 16.

H. Provide access where valves and fittings are not exposed.

I. Slope hydronic piping and arrange systems to drain at low points. Use eccentric reducers to maintain top of pipe aligned.

J. Where pipe support members are welded to structural building framing, scrape, brush clean, and apply one coat of zinc rich primer to welds.

K. Prepare unfinished pipe, fittings, supports, and accessories, ready for finish painting. Refer to Section 09 90 00.

L. Install valves with stems upright or horizontal, not inverted.

M. Insulate piping; refer to Section 23 07 00.

23 21 13 - 9

3.6 FIELD QUALITY CONTROL

A. Section 01 70 00 - Execution and Closeout Requirements: Field inspecting, testing, adjusting, and balancing.

B. Test heating water piping system in accordance with ASME B31.9.

3.7 SCHEDULES

A. Copper and Steel Pipe Hanger Spacing:

PIPE SIZE

Inches

COPPER

TUBING

MAXIMUM

HANGER

SPACING

Feet

STEEL PIPE

MAXIMUM

HANGER

SPACING

Feet

COPPER

TUBING

HANGER

ROD

DIAMETER

Inches

STEEL PIPE

HANGER

ROD

DIAMETER

Inches

1/2 5 7 3/8 3/8

3/4 5 7 3/8 3/8

1 6 7 3/8 3/8

1-1/4 7 7 3/8 3/8

1-1/2 8 9 3/8 3/8

2 8 10 3/8 3/8

2-1/2 (Note 1) 9 11 1/2 1/2

3 10 12 1/2 1/2

4 12 14 1/2 5/8

5 13 16 1/2 5/8

6 14 17 5/8 3/4

8 16 19 3/4 3/4

10 18 22 3/4 7/8

12 19 23 3/4 7/8

14 22 25 7/8 1

16 23 27 7/8 1

18 25 28 1 1

20 27 30 1 1-1/4

24 28 32 1-1/4 1-1/4

B. Note 1: Refer to manufacturer’s recommendations for grooved end piping systems.

23 21 13 - 10

C. Note 2: 20 feet maximum spacing, minimum of one hanger for each pipe section close to joint behind bell. Provide hanger at each change of direction and each branch connection. For pipe sizes 6 inches and smaller, subjected to loadings other than weight of pipe and contents, limit span to maximum spacing for water service steel pipe.

Hydronic Piping Specialties 23 21 16 - 1

SECTION 23 21 16

HYDRONIC PIPING SPECIALTIES

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Pressure gages.

2. Pressure gage taps.

3. Thermometers.

4. Thermometer supports.

5. Test plugs.

6. Flexible connectors.

7. Air vents.

8. Strainers.

9. Flow controls.

10. Relief valves.

B. Related Sections:

1. Section 23 21 13 - Hydronic Piping: Execution requirements for piping connections to products specified by this section.

2. Section 23 21 23 - Hydronic Pumps: Execution requirements for piping connections to products specified by this section.

1.2 REFERENCES

A. American Society of Mechanical Engineers:

1. ASME B40.1 - Gauges - Pressure Indicating Dial Type - Elastic Element.

2. ASME Section VIII - Boiler and Pressure Vessel Code - Pressure Vessels.

B. ASTM International:

1. ASTM E1 - Standard Specification for ASTM Thermometers.

2. ASTM E77 - Standard Test Method for Inspection and Verification of Thermometers.

C. Underwriters Laboratories Inc.:

1. UL 393 - Indicating Pressure Gauges for Fire-Protection Service.

2. UL 404 - Gauges, Indicating Pressure, for Compressed Gas Service.

1.3 PERFORMANCE REQUIREMENTS

A. Flexible Connectors: Provide at or near pumps where piping configuration does not absorb vibration.

1.4 SUBMITTALS

A. Section 01300 - Submittals.

23 21 16 - 2

B. Product Data: Submit for manufactured products and assemblies used in this Project.

1. Manufacturer’s data indicating use, operating range, total range, accuracy, and location for manufactured components.

2. Submit product description, model, dimensions, component sizes, rough-in requirements, service sizes, and finishes.

3. Submit schedule indicating manufacturer, model number, size, location, rated capacity, load served, and features for each piping specialty.

4. Submit electrical characteristics and connection requirements.

C. Manufacturer's Installation Instructions: Submit hanging and support methods, joining procedures, application, selection, and hookup configuration. Include pipe and accessory elevations.

D. Manufacturer's Certificate: Certify products meet or exceed specified requirements.

1.5 CLOSEOUT SUBMITTALS

A. Section 01700 – Contract Closeout.

B. Operation and Maintenance Data: Submit instructions for calibrating instruments, installation instructions, assembly views, servicing requirements, lubrication instruction, and replacement parts list.

1.6 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience.

B. Installer: Company specializing in performing Work of this section with minimum three years experience.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Section 01600 – Material and Equipment.

B. Accept piping specialties on site in shipping containers with labeling in place. Inspect for damage.

C. Provide temporary protective coating on cast iron and steel valves.

D. Protect systems from entry of foreign materials by temporary covers, caps and closures, completing sections of the work, and isolating parts of completed system until installation.

1.8 ENVIRONMENTAL REQUIREMENTS

A. Section 01600 – Material and Equipment.

B. Do not install instruments when areas are under construction, except rough in, taps, supports and test plugs.

23 21 16 - 3

1.9 FIELD MEASUREMENTS

A. Verify field measurements before fabrication.

1.10 WARRANTY

A. Section 00700 – General Conditions: 5. Warranties.

1.11 MAINTENANCE SERVICE

A. Section 01650 – Facility Start-Up.

1.12 MAINTENANCE MATERIALS

A. Section 01650 – Facility Start-Up.

1.13 EXTRA MATERIALS

A. Section 01650 – Facility Start-Up.

PART 2 PRODUCTS

2.1 PRESSURE GAGES

A. Gage: ASME B40.1, UL 393 with bourdon tube, rotary brass movement, brass socket, front calibration adjustment, black scale on white background.

1. Case: Steel.

2. Bourdon Tube: Brass.

3. Dial Size: 2 inch diameter.

4. Mid-Scale Accuracy: two percent.

5. Scale: Psi.

2.2 PRESSURE GAGE TAPS

A. Needle Valve: Brass, 1/4 inch NPT for minimum 300 psi.

2.3 STEM TYPE THERMOMETERS

A. Thermometer: ASTM E1, red appearing mercury, lens front tube, cast aluminum case with enamel finish.

1. Size: 7-inch scale.

2. Window: Clear glass.

3. Stem: Brass, 3/4 inch NPT, 3-1/2 inch long.

4. Accuracy: 2 percent.

5. Calibration: Degrees F.

23 21 16 - 4

2.4 THERMOMETER SUPPORTS

A. Socket: Brass separable sockets for thermometer stems with or without extensions.

B. Flange: 3 inch outside diameter reversible flange, designed to fasten to sheet metal air ducts, with brass perforated stem.

2.5 FLEXIBLE CONNECTORS

A. Corrugated stainless steel hose with single layer of stainless steel exterior braiding, minimum 9 inches long with copper tube ends; for maximum working pressure 500 psig.

2.6 STRAINERS

A. Manufacturers:

1. Amtrol.

2. Spirotherm

3. Substitutions: Section 01300 - Submittals.

B. Dip Tube Fitting: For 125 psig operating pressure; to prevent free air collected in boiler from rising into system.

2.7 RELIEF VALVES

A. Bronze body, Teflon seat, stainless steel stem and springs, automatic, direct pressure actuated capacities ASME certified and labeled.

PART 3 EXECUTION

3.1 INSTALLATION - THERMOMETERS AND GAGES

A. Install one pressure gage for each pump, locate taps before strainers and on suction and discharge of pump; pipe to gage.

B. Install gage taps in piping

C. Install pressure gages with pulsation dampers. Provide needle valve to isolate each gage. Extend nipples to allow clearance from insulation.

D. Install thermometers in piping systems in sockets in short couplings. Enlarge pipes smaller than 2-1/2 inches for installation of thermometer sockets. Allow clearance from insulation.

E. Install thermometer sockets adjacent to controls systems thermostat, transmitter, or sensor sockets.

F. Coil and conceal excess capillary on remote element instruments.

G. Provide instruments with scale ranges selected according to service with largest appropriate scale.

23 21 16 - 5

H. Install gages and thermometers in locations where they are easily read from normal operating level. Install vertical to 45 degrees off vertical.

I. Adjust gages and thermometers to final angle, clean windows and lenses, and calibrate to zero.

3.2 INSTALLATION - HYDRONIC PIPING SPECIALTIES

A. Locate test plugs adjacent to control device sockets.

B. Where large air quantities accumulate, provide enlarged air collection standpipes.

C. Install manual air vents at system high points.

D. For automatic air vents in ceiling spaces or other concealed locations, install vent tubing to nearest drain.

E. Provide air separator on suction side of system circulation pump and connect to expansion tank.

F. Provide drain and hose connection with valve on strainer blow down connection.

G. Provide pump suction fitting on suction side of base mounted centrifugal pumps. Remove temporary strainers after cleaning systems.

H. Provide combination pump discharge valve on discharge side of base mounted centrifugal pumps.

I. Support pump fittings with floor mounted pipe and flange supports.

J. Provide radiator valves on water inlet for the following terminal heating unit types: radiation, unit heaters, and fan coil units.

K. Provide radiator-balancing valves on water outlet for the following terminal heating unit types:

radiation, unit heaters, and fan coil units.

L. Provide relief valves on pressure tanks, low-pressure side of reducing valves, heat exchangers, and expansion tanks.

M. Select system relief valve capacity greater than make-up pressure reducing valve capacity. Select equipment relief valve capacity to exceed rating of connected equipment.

N. Pipe relief valve outlet to nearest floor drain.

O. Where one line vents several relief valves, make cross sectional area equal to sum of individual vent areas.

3.3 FIELD QUALITY CONTROL

A. Section 01650 – Facility Start-Up.

23 21 16 - 6

3.4 CLEANING

A. Section 01700 – Contract Closeout.

3.5 PROTECTION OF INSTALLED CONSTRUCTION

A. Section 01700 – Contract Closeout.

B. Do not install hydronic pressure gauges until after systems are pressure tested.

3.6 SCHEDULES

A. Pressure Gages.

1. Pumps.

2. Expansion tanks.

B. Pressure Gage Tapping Location:

1. Boiler - inlets and outlets.

C. Stem Type Thermometers:

1. Boilers - inlets and outlets.

Hydronic Pumps 23 21 23 - 1

SECTION 23 21 23

HYDRONIC PUMPS

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. System lubricated circulators.

2. In-line circulators.

B. Related Sections:

1. Section 23 21 13 - Hydronic Piping: Execution requirements for connection to pumps specified by this section.

2. Section 23 21 16 - Hydronic Piping Specialties: Product and execution requirements for piping specialties installed in hydronic systems adjacent to pumps.

1.2 REFERENCES

A. National Electrical Manufacturers Association:

1. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum).

B. Underwriters Laboratories Inc.:

1. UL 778 - Motor Operated Water Pumps.

1.3 PERFORMANCE REQUIREMENTS

A. Provide pumps to operate at system fluid temperatures without vapor binding and cavitation, are non-overloading in parallel or individual operation, and operate within 25 percent of midpoint of published maximum efficiency curve.

1.4 SUBMITTALS

A. Section 01300 - Submittals.

B. Product Data: Submit certified pump curves showing performance characteristics with pump and system operating point plotted. Include NPSH curve when applicable. Include electrical characteristics and connection requirements. Submit also, manufacturer model number, dimensions, service sizes, and finishes.

C. Manufacturer's Installation Instructions: Submit application, selection, and hookup configuration with pipe and accessory elevations. Submit hanging and support requirements and recommendations.

D. Manufacturer's Certificate: Certify products meet or exceed specified requirements.

23 21 23 - 2

1.5 CLOSEOUT SUBMITTALS

A. Section 01700 – Contract Closeout.

B. Operation and Maintenance Data: Submit installation instructions, servicing requirements, assembly views, lubrication instructions, and replacement parts list.

C. Maintain one copy of each document on site.

1.6 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years documented experience.

B. Installer: Company specializing in performing Work of this section with minimum three years documented experience.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Section 01600 – Material and Equipment.

B. Protect systems from entry of foreign materials by temporary covers, completing sections of the work, and isolating parts of completed system.

1.8 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.9 WARRANTY

A. Section 00700 – General Conditions: 5. Warranties.

B. Furnish five year manufacturer warranty for pumps.

1.10 EXTRA MATERIALS

A. Section 01650 – Facility Start-Up.

B. Furnish one set of mechanical seals for each pump pumps.

C. Furnish 2 sets of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .