Addendum 1 22031.pdf
PDF 313 KB Posted
- Solicitation number
- RFQ - 171 - 230000000095
- Issued by
- Schoolcraft County, Mayville Village, Michigan
About this file
This document is Addendum No. 1 for the Manistique Fire Shop Garage at Wyman State Forest Nursery project in Manistique, Michigan. The addendum is issued by UP Engineers and Architects, Inc. and modifies the original plans and specifications. Key details include the addition of a 24'x42'8" and 10'x64' concrete approach, deletion of a 6" concrete slab with 6x6-6/6 and 1'-0" thickened edge, and changes to the exterior wall sheathing and roof sheathing requirements. The contract opportunity is for the construction of the Manistique Fire Shop Garage at the Wyman State Forest Nursery located in Schoolcraft County, Michigan.
The addendum also provides instructions for submitting questions and bids through the SIGMA VSS system. Bid attachments must be uploaded to SIGMA VSS, and individual attachments cannot exceed 6 MB. Emailed submissions may be accepted on a case-by-case basis if SIGMA VSS issues arise. The contract will be awarded by the State of Michigan, with the project location being in the jurisdictions of Schoolcraft County and Mayville Village.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications 22031_Part2.pdf | ||
| Addendum No. 2 FINAL.pdf | ||
| Plans 22031_Part2.pdf | ||
| Specifications 22031_Part3.pdf | ||
| Plans 22031_Part1.pdf | ||
| Advertisment 22031.pdf | ||
| Specifications 22031_Part1.pdf | ||
| Plans 22031_Part3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
707 Ashmun Street Sault Ste. Marie, MI 49783
906-635-0511 • 800-867-0511 • Fax: 906-635-0612
Offices also in:
Houghton
Iron Mountain Ishpeming Marinette
U.P. Engineers & Architects, Inc.
www.UPEA.com
[M12-02548]
ADDENDUM NO. 1
MANISTIQUE FIRE SHOP GARAGE
AT WYMAN STATE FOREST NURSERY
MANISTIQUE, MI
ADDENDUM NO. 1 is issued December 27, 2022, to clarify, modify, and/or change the original plans and specifications issued by UP Engineers and Architects. This ADDENDUM NO. 1 is hereby made part of the Contract Documents for the contract noted below.
File No. 751/22031.ABG, Manistique Fire Shop Garage at Wyman State Forest Nursery
Please acknowledge receipt of this ADDENDUM NO. 1 on the appropriate blank on the Bid Form and also include this addendum with the bid package.
GENERAL
1. See attached sign in sheet from the pre-bid walk through.
2. Contractor to follow MDOT specifications for HMA.
PLANS
3. SHEET C102 - Site Layout Plan should read PROP. 24’-0”x42’8” 8” THICK CONCRETE APPROACH & PROP. 10’-0”x64’-0” 8” THICK CONCRETE
APPROACH.
4. SHEET S101 - Foundation Plan - DELETE NOTE “’6” CONC. SLAB w/6X6-6/6
AND 1’-0” THICKENED EDGE. COORDINATE WITH CIVIL. SOIL BASE
COMPACTED PER CIVIL. (TYP)
5. SHEET A301 – Detail A4 - Contractor shall provide a 2’-0” ribbon of pressure treated ½” ply.wd around the bottom of the entire perimeter exterior walls.
6. SHEET A301 - Contractor shall provide ½” ply.wd as stated on detail A4/A301.
5/8” OSB Roof Sheathing is acceptable in lieu of 5/8” Ply.wd Roof Sheathing as stated on detail A4/A301. Contractor shall also provide “H” clips between trusses.
7. SHEETS A301 and A203 - Delete note ¼” METAL PANEL CEILING SHOWN ON
DETAIL C2/A203, A3/A203, & A4/A301 AND REPLACE WITH 7/16” OSB.
END OF ADDENDUM NO. 1
Prepared by:
U.P. Engineers & Architects, Inc
END OF ADDENDUM NO. 1