SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf
PDF 15 KB Posted
- Solicitation number
- N4008526R9078
About this file
This is a Guide Specification for hydronic pipe cleaning and flushing procedures issued by the Marine Corps Base Camp Lejeune Public Works Division in August 2010.
The specification establishes performance requirements for cleaning and flushing hydronic systems to remove organic soil, hydrocarbons, flux, pipe mill varnish, pipe compounds, iron oxide, and similar deleterious substances, with removal of tightly adherent mill scale not required. The cleaning compound must be an alkaline phosphate or non-phosphate detergent/surfactant suitable for system wetted metals without deleterious effects. Corrosion inhibitors such as sodium nitrite and molybdate are prohibited; sodium sulfite is the only allowable corrosion inhibitor. Trisodium phosphate is the suggested detergent, while sodium sulfite, sodium lauroyl sarcosinate, and dipotassium phosphate are used for water treatment. All chemicals must be acceptable for discharge into sanitary sewer.
Execution requirements include maintaining water temperature at 120°F using the existing steam heating system, bypassing terminal units during initial flushing, and circulating the detergent solution for a minimum of 48 hours while maintaining system pressure. Following terminal device flushing for an additional 48 hours, the system must be drained and flushed with fresh water until clear. Final water treatment must achieve sodium sulfite levels of 30-100 ppm, sodium lauroyl sarcosinate of 30-100 ppm, and pH of 8.5-9.5. Chemical levels must be retested at one day, one week, and four weeks post-treatment, with documentation submitted to the government contracting officer and Camp Lejeune mechanical design branch. A permanent 12"×12" engraved sign displaying system volume and chemical parameters must be installed in the mechanical room, along with material safety data sheets for all treatment chemicals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEJUNEMASTERS
PUBLI C WORKS DI VI SI ON CLGS- 23 24 00
MARI NE CORPS BASE August 2010 CAMP LEJEUNE, NORTH CAROLI NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
GUI DE SPECI FI CATI ON
SECTION 23 24 00
HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES
08/10
PART 1 GENERAL
1.1 PERFORMANCE REQUIREMENTS
Cleaning and flushing shall remove organic soil, hydrocarbons, flux, pipe mill varnish, pipe compounds, iron oxide, and like deleterious substances. Removal of tightly adherent mill scale is not required.
1.2 DELIVERY, STORAGE, AND HANDLING
Handle and store detergent to protect equipment, environment and persons.
Store detergent according to manufacturer's recommendations.
1.3 ENVIRONMENTAL REQUIREMENTS
All chemicals shall be acceptable for discharge into sanitary sewer.
1.4 SUBMITTALS
NOTE: Revi ew Submi t t al Descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect .
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
NOTE: Ref er t o t he par agr aph above ent i t l ed " Phasi ng of Wor k" . I f t hi s par agr aph appl i es t o t he const r uct i on cont r act , modi f y t he ent i r e " SUBMI TTALS" par agr aph by phasi ng ( maybe by r epeat i ng t he var i ous submi t t al s f or each phase) t o f aci l i t at e t he submi t t al pr ocess.
SD-03 Product Data
Cleaning Detergent
Water Treatment Chemicals and Chemical Supplier
PART 2 PRODUCTS
2.1 MATERIALS
The cleaning compound/ detergent shall be an alkaline phosphate or
SECTION 23 24 00 Page 1 non-phosphate detergent/surfactant/specific to remove organic soil, hydrocarbons, flux, pipe mill varnish, pipe compounds, iron oxide, and like deleterious substances, with or without inhibitor, suitable for system wetted metals without deleterious effects.
Cleaning compound/detergent shall not contain corrosion inhibitors such as sodium nitrite, molybdate, etc. The only corrosion inhibitor that may be used in conjunction with detergent is sodium sulfite (an oxygen scavenger).
Suggested detergent is trisodium phosphate.
Sodium sulfite, sodium lauroly sarcosinate, and dipotossium phosphate are used for water treatment .
PART 3 EXECUTION
3.1 PROTECTION
Do not exceed service factor amperage on pump motor.
3.1.1 Special Techniques
a. Use existing steam heating system to maintain a water temperature of 120F.
b. Close terminal unit service valves and open bypass valve.
Flushing bypass should connect upstream of the terminal unit supply service valve and downstream of the return service valve.
If necessary, provide temporary piping or hose to bypass terminal unit. Remove any component which may be damaged. In lieu of providing a bypass, three-way valves may be driven 100 percent to bypass. If three-way valves are utilized, do not close service valves.
c. Fill system with water and detergent solution to manufacture's specified water/detergent concentration, heat to 120F. Test both systems to determine system volume using fluorescent dye and fluorometric analysis.
d. Operate system pump, hot water pump and circulate solution for a minimum of 48 hrs, while maintaining 120 F. From bottom of air/solids separator, bleed water as necessary while filling system thru standard fill station ensuring to maintain the manufacturer's specified water/detergent concentration. Modulate drain to maintain system pressure. Do not exceed service factor amperage on pump motor. Throttle discharge valve as necessary.
The pump start up strainer shall remain in place. Periodically clean the pump strainer. Also, periodically check and clean terminal unit strainers during the 48 hours of cleaning.
e. Open terminal device service valves, three-way valves, and close bypass valves. Flush each terminal device. Ensure to clean all strainers before opening terminal device service valves. Repeat "Step d" for the terminal devices for a minimum of 48 hour.
f. Drain system and thoroughly flush with fresh water. Demonstrate to Government that system water runs clear. Coordinate with Construction Manager to provide sample water opacity.
SECTION 23 24 00 Page 2
g. Clean all strainers. Remove pump startup strainer.
h. The water shall be treated to the following chemical parameters:
Sodium sulfite: 30-100 ppm Sodium lauroyl sarcosinate: 30-100 ppm pH: 8.5 - 9.5 (use Dipotassium Phosphate as pH buffer)
The water chemical levels shall be retested in one day, one week and four weeks following initial treatment. If the chemical levels are not within the range specified above, additional treatment shall be conducted to bring the levels within range.
Prepare a report documenting the water system volume, pH, and sulfite concentration levels for the initial treatment and the subsequent three retests and necessary treatment. Submit report to government contracting officer and the Camp Lejeune mechanical design branch.
Provide material safety data sheets (MSDS) for treatment chemicals and permanently locate a copy in each mechanical room.
Provide one plastic sign no smaller than 12"x12" square with engraved lettering ½" in height. Sign shall be located in the mechanical room. It shall be hung on the wall in an area with an unobstructed view and near the respective chemical shot feeder.
The sign shall state the respective system volume (determined from testing and verified by hand calculations) and the following:
"This hydronic system is treated to the following chemical parameters:
Sodium sulfite: 30-100 ppm Sodium lauroyl sarcosinate: 30-100 ppm pH*: 8.5 - 9.5
System Volume:
*use Dipotassium Phosphate as pH buffer"
-- End of Section --
SECTION 23 24 00 Page 3
| 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES |
| PART 1 GENERAL |
| 1.1 PERFORMANCE REQUIREMENTS |
| 1.2 DELIVERY, STORAGE, AND HANDLING |
| 1.3 ENVIRONMENTAL REQUIREMENTS |
| 1.4 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| PART 3 EXECUTION |
| 3.1 PROTECTION |
| 3.1.1 Special Techniques |
File details come from the government source that posted it. Updated .