This document is a Questions and Answers (Q&A) file for a federal contract opportunity related to fuel servicing and maintenance at Naval Air Station (NAS) Key West. The document provides detailed responses to 17 specific questions about contract requirements, including average fuel servicing volumes (43,682 gallons), corrosion control on 13,689.68 linear feet of piping, maintenance responsibilities, and inspection protocols for various tanks and equipment.
Key highlights include contractor responsibilities for API 653 and API 570 inspections, with external tank inspections required every five years and internal inspections following specific Navy guidelines. The contract covers fuel servicing at Trumbo Point and Truman Annex, hot pit operations at Boca Chica Field, and maintenance of a 0.09-acre facility area. Notably, the API 510 inspection standard has been discontinued for Navy facilities. The government will release an attendance list with an amendment, but will not release virtual pre-proposal slides due to the sensitive nature of the discussed items.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Will the Government please specify what is the average issue for fuel servicing to Ships at Trumbo Point and Truman Annex?
1A. Based on data from the last four years, the average fuel issue to ships us 43,682 gallons.
2. Will the government please provide the amount of piping in linear feet that the contractor is required to perform corrosion control on?
2A. The contractor is required to perform corrosion control on 13,689.68 linear feet of piping.
3. Will the Government please clarify if the contractor is responsible to replace all valves less than 2.5 inches that are found defective?
3A. Yes, if a valve less than 2.5 inches is found to be defective, the contractor is responsible for its replacement by following the established procedures of the Emergency Maintenance (EM) program.
4. Will the Government please clarify if the current basket strainers on site are configured with a DP gauge?
4A. Yes, the current basket strainers on site are configured with DP gauges.
5. Will the Government please clarify if there is any additional equipment (e.g., hoses or connections), that are needed to perform fuel servicing to ships?
5A. Yes, additional equipment is required. The specific items depend on the vessel being serviced and will be coordinated with the ship's company at the time of the fueling request.
Commonly required equipment includes quick-disconnects, camlocks, and single-point connections.
6. Will the government please provide the dates of the last tank cleanings and API 653 inspections for all ASTs and Bulk Storage Stripping Tanks?
6A. The last inspection dates for the ASTs are as follows:
• Tank #938: 5-year (02/2022), 10-year (02/2022)
• Tank #944: 5-year (11/2023), 10-year (08/2019)
• Tank #945: 5-year (05/2025), 10-year (05/2015)
• Tank #958: 5-year (02/2021), 10-year (02/2021)
Please note: Bulk Storage Stripping Tanks are governed by Steel Tank Institute (STI) standards, not API standards. The related inspections are performed by in-house personnel or contractors per STI protocol.
7. At Boca Chica Field, will the Government please clarify if the manning crew for refueling services must consist of two contract personnel per Hot Pit, or two personnel total (one per Hot Pit)?
7A. For the hot pit manning crew, the personnel consist of one refueling member who operates the truck / pump (which is the contractor) the rest of the crew members are either active-duty military or contractors associated with that squadron / aircraft. In total a minimum of three members must be present for a hot pit operation, one of which is the fuels contractor.
8. Will the Government please clarify the total acreage of grounds the contractor is required to maintain?
8A. The total grounds maintenance area for the facility is 0.09 acres (approximately 4,320 square feet).
9. Will the Government please clarify the contractor's height requirement for pressure washing the tank exterior?
9A. Contractor personnel may pressure wash tank exteriors up to a height of 10 feet. Any work required above this height must be subcontracted through the Emergency Maintenance (EM) program.
10. Will the Government please clarify if the DP gauges are equipped with test buttons?
10A. Yes, the DP gauges are equipped with test buttons.
11. Will the Government please clarify if the Pressure/Thermal Relief Valves have Test Tee's installed?
11A. Yes, Test Tees are installed on the Pressure/Thermal Relief Valves.
12. Will the Government please supply the FY22 API 570 report?
12A. The FY22 API 570 report is provided as an attachment to this response.
13. C-1. 7 Key Personnel: The government identifies a Control Center Internal Pipeline Controller. Please verify if this is a valid requirement?
13A. This requirement is not applicable. Control Center Internal Pipeline Controller does not exist at NAS Key West.
14. Reference PWS Para C-4.1 Performance Requisites: The Contractor is responsible to conduct inspections, preventative/operator, recurring and enhanced recurring maintenance on the petroleum systems. Please clarify that the contractor is responsible for all costs associated with the API 510, API 570 and API 653 inspections based on their intervals for the life of the contract.
14A. The contractor is responsible for costs associated with API 570 and API 653 inspections. The API 510 standard is no longer a requirement for Navy facilities and does not apply.
• For API 653 inspections, the contractor provides and bears the cost for the initial inspection and the resulting report. The cost of any required repairs is funded by the Defense Logistics Agency (DLA) and reimbursed to the contractor through the EM program.
• For API 570 inspections, which are managed by NAVFAC EXWC, the cost of required repairs is funded by DLA and reimbursed to the contractor.
15. Reference PWS Para C-4.1.2 Description of Enhanced Recurring Maintenance Tasks:
The paragraph states the enhanced recurring maintenance should be done as dictated in UFC 3-460-03. UFC 3-460-03 Section 8-4.1 Part E: Perform an out-of-service API 653 or STI SP00l inspection to evaluate the tank for conditions which may affect the operational integrity of the tank floor, shell, roof and floating roof or pan. API 653 or STI SP00l provides a checklist to be used as part of the assessment. This inspection must be performed by an appropriately certified API 653 or STI SP00l inspector. Inspection must include all components and equipment located inside the tank containment area such as piping, pipe supports, containment valves, and product saver tanks. \1 \ The API 653 or STI SP00l inspector must recommend the date of the next inspection. IT'he inspection interval. must be based on the date the API Suitability for Service Letter is issued immediately prior to when the tank is returned to service. Frequency: As recommended by the API 653 or STI SP00 1 inspector. If there is not a previous recommendation, the inspection must be performed within ten years after the tank was placed into operation.
A. Does the government want the contractor to follow the API standard or the UFC and Suitability Letter for all API 653 Tank inspections at NAS Key West?
B. Please clarify if the complete API 653 Inspections will be conducted 10 years from the date of the last inspection or the date of the last Suitability Letter?
15A. The contractor must adhere to the following inspection schedule for API 653:
• External Inspections: Mandatory every five (5) years.
• Internal Inspections: The timeline for the next internal inspection is based on the date of the last Suitability for Service Letter. However, this interval cannot exceed the Navy's maximum requirement of twenty (20) years between internal inspections.
If the recommended date or Suitability Letter timeline surpasses this 20-year maximum, the inspection must be performed at the 20-year mark.
16. Question 4: Reference PWS Para C.4-1.4.4 API 510 Pressure Vessel Inspection: Please clarify if the API 510 Pressure Vessel Inspection is to be conducted annually or every five years? Please see the reference below as the basis for our question.
API 510
• 6.6.2 Testing and Inspection Intervals
• 6.6.2.1 Pressure-relieving devices shall be tested and inspected at intervals that are frequent enough to verify that the valves perform reliably in the particular service conditions. Other pressure-relieving devices, (e.g. rupture disks and vacuum-breaker valves) shall be inspected at intervals based on service conditions. The inspection interval for all pressure relieving devices is determined by either the inspector, engineer, or other qualified individual per the Owner User's quality assurance system.
• 6.6.2.2 Unless documented experience and/or a RBI assessment indicates that a longer interval is acceptable, test and inspection intervals for pressure-relieving devices in typical process services should not exceed:
o Five years for typical process services; and, Ten years for clean (nonfouling) and noncorrosive service
16A. The API 510 inspection standard is no longer performed at Navy facilities and can be disregarded as a maintenance requirement for NAS Key West.
17. Will the Government please release the slides from the Virtual Site Visit as well as the attendee list?
17A. The government will not be releasing the virtual pre-proposal slides due to the nature of the items discussed. An attendance list will be released with the amendment that includes these responses.