This document is an API-570 Piping Inspection Report for the Naval Air Station Key West's tank farm piping system, conducted by TSP Tank Services LLC on November 27, 2023. The inspection, performed by certified API-570 piping inspector Robert Sherby and overseen by Ronald E. Swan Jr., PE, examined the aboveground and underground piping circuits transferring aviation fuel from the on-base tank farm to truck loading stations.

The inspection identified multiple areas of corrosion, coating failures, and potential maintenance issues across five pipe circuits (A, AN, AS, B, and C). Key recommendations include repairing coating failures, replacing a filter gasket and pressure gauge, monitoring pipe pitting, removing an absorbent pad from pilot valve tubing, and evaluating the passive cathodic protection system. While the piping system was deemed suitable for its intended service, the estimated repair costs range from $50 to $20,000, with most significant expenses related to coating repairs and system evaluation. The report provides detailed ultrasonic thickness measurements and visual inspection data to support its findings and recommendations.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report Date: November 30, 2023 Report Version: 1.0

TSP Tank Services

25000 Capitol, Redford, Michigan 48239

(734) 838-0426 | tanks@tspenvironmental.com

Aboveground Piping System API-570 Inspection Report

Naval Air Station Key West Tank Farm Piping System

Robert Sherby Piping Inspector

API-570 Inspector: 103788

© 2023 TSP Tank Services, LLC

Aboveground Piping System API-570 Inspection Report Tank Farm Piping System

NAS Key West Boca Chica, FL 33040

Prepared For:

Data Monitor Systems 316 South Midwest Boulevard Midwest City, Oklahoma 73130

Prepared By:

TSP Tank Services, LLC 25000 Capitol

Redford, Michigan 48239

Project Number: L23069

November 30, 2023 Version: 1.0

TABLE OF CONTENTS

1 – Executive Summary 2 – Introduction 3 – Description of the Piping System

3.1 – Piping System History

4 – Observations and Inspection Results

4.1 – Methodology

4.2 – Inspection Results

4.2.1 – Circuit A: Tank Discharge Piping within Tank Farm Area

4.2.2 – Circuit AN: Tank Discharge Piping to AOA

4.2.3 – Circuit AS: Tank Discharge Piping to AOA

4.2.4 – Circuit B: Exposed

4.2.5 – Circuit C: Key Pipeline Supply Piping

5 – Recommendations

5.1 – Critical Repairs (Prior to Return to Service)

5.2 – Code-Required Repairs (Mandatory for Recertification)

5.2.1 – Repair Coating Failures and Corrosion

5.2.2 – Replace Top Gasket on Filter F2

5.2.3 – Replace Illegible Pressure Gauge

5.3 – Recommended Repairs

5.3.1 – Monitor Pitting in Circuit AN

5.3.2 – Remove Absorbent Pad from Pilot Valve Tubing

5.3.3 – Evaluate Passive Cathodic Protection System

5.3.4 – Label Pipe Contents and Flow Directions

6 – Engineer's Estimate of Repairs 7 – Suitability for Service Statement

TABLE OF APPENDICES

Appendix 1 – Piping System Layout Appendix 2 – Photographs Appendix 3 – Piping Inspection Checklists Appendix 4 – Nondestructive Testing Data Appendix 5 – Qualifications of Inspection Professionals

1 – EXECUTIVE SUMMARY

On November 27, 2023, TSP Tank Services LLC (TSP) inspected the tank farm piping system located at NAS Key West, Boca Chica, FL 33040.

The inspection was performed by Mr. Robert Sherby., a certified API-570 piping inspector, and overseen by Mr. Ronald E. Swan, Jr., PE., a certified API-570 piping inspector and registered Professional Engineer in the State of Florida. Inspection was conducted according to the methodology outlined in the API-570 standard as supplemented by the professional experience of Mr. Swan. The work performed included:

• Visual inspection of the piping, pipe fittings, valves, and other equipment installed along the pipe circuits included in the Scope of Work.

• Visual inspection of the piping support structures associated with the piping inspected.

• Visual inspection of pipe welds and flanges.

• Ultrasonic Thickness testing of pipe walls, elbows, and tees.

• Photographic documentation of observed variances from code requirements.

• Analysis of data resulting in a fitness for service determination.

• Recommendation of critical, mandatory, and optional maintenance tasks.

Based on visual inspection and data collected, the piping system is suitable for its intended service.

The following variances from API-570 requirements were observed. These variances should be corrected as soon as possible to bring the piping system into compliance with API-570:

• Remove corrosion and repair coating failures.

• Replace top gasket on filter F2.

• Repair pitting in pipe AN.

• Replace illegible pressure gauge.

The following conditions were observed which do not reflect variances from API-570 but which may, nevertheless, impact the longevity or functionality of the piping system. Correction of these conditions is recommended as part of an ongoing maintenance process:

• Remove absorbent pad wrapped around pilot valve tubing.

• Perform an operability evaluation on passive cathodic protection equipment (current condition unknown).

• Label pipe contents and flow direction in accordance with regulations.

2 – INTRODUCTION

An API-570 piping inspection is an engineered approach to determining the current condition of a pipe or piping system. The inspection process is designed to meet the requirements of various federal and state regulations, industry standards, and best practices. Periodic inspections performed by a certified professional provide a reference point for pipe conditions, enabling owners and operators to plan and budget for maintenance and regulatory compliance activities.

Inspections are performed using a variety of techniques under the guidance of the relevant regulations and inspection standards and the professional experience of the piping inspector.

Inspection techniques are selected to develop high quality data regarding the current condition of the piping system. This inspection was completed using non-destructive examination techniques which allow the condition of the piping to be determined without damaging or disabling the piping system. Techniques employed during this inspection included:

• Visual Inspection – A visual accounting by the piping inspector of the condition of the piping system. Visual inspection by an experienced professional can identify many variances and provide guidance for the remainder of the inspection effort.

• Ultrasonic Thickness Testing – A testing method which uses sound waves to determine the thickness of plates, pipe walls, and coatings. TSP uses a dual-element transducer which allows separate determination of metal and coating thickness.

Each of the inspection techniques are performed by individuals trained and experienced in their use. Our testing staff have been certified to at least Level 1 of the SNT-TC-1A standard published by the American Society for Nondestructive Testing in each of the testing methods described above.

3 – DESCRIPTION OF THE PIPING SYSTEM

The piping system subject to inspection is the primary system used to transfer aviation fuel from the on-base tank farm to the truck loading station located within the airfield operations area (AOA). Transfer piping to the AOA originates at each of the five aboveground storage tanks (ASTs) as 6-inch piping (Circuit A), flows through a pump house in the tank farm area, and continues through two parallel 6-inch pipes (Circuits AN1 and AS2) underground to the truck loading stations. Supply piping to the ASTs originates as 6-inch piping at a truck loading station in the tank farm area (Circuit B) and as 4-inch piping supplied by Key Pipeline (Circuit C3) which combine to 6-inch piping servicing the ASTs (Circuit B).

Non-scaled isometric drawings, adapted from drawings provided by the Owner, showing the inspected piping are included in Appendix 1.

3.1 – Piping System History

The following history of the piping system was disclosed to the piping inspector at the time of the inspection by the Owner’s representative. The piping system may have a more extensive history than described below. The piping inspector has not independently verified the information contained in this section.

• 2018 – API 570 Visual Inspection of Fuel Lines A and B performed by TEAM Industrial Services.

1 Circuit AN was identified as Circuit B in the previous inspection report. We identify this circuit as Circuit AN to clarify that it is the northern parallel extension of Circuit A.

2 Circuit AS was identified as Circuit A in the previous inspection report. We identify this circuit as Circuit AS to clarify that it is the southern parallel extension of Circuit A.

3 Circuit C was not included in the previous inspection report.

4 – OBSERVATIONS AND INSPECTION RESULTS

On November 27, 2023, TSP Tank Services LLC (TSP) inspected the tank farm piping system located at NAS Key West, Boca Chica, FL 33040. The inspection was performed by Mr. Robert Sherby, a certified API-570 piping inspector and overseen by Mr. Ronald E. Swan, Jr., P.E., a certified API-570 piping inspector and a registered Professional Engineer in the State of Florida.

4.1 – Methodology

The solvent piping system was inspected using the methodology specified by API-570. Specific work required to successfully complete this inspection included:

• Localized cleaning of pipe and pipe component exteriors, as required.

• External visual inspection by a certified API-570 Inspector.

• Ultrasonic Thickness (UT) measurement of the exterior pipe sections, elbows, and tees at the locations required by API-570 by an SNT-TC-1A certified UT technician.

TSP utilized various equipment to accomplish the piping inspection. A backhoe was used to access piping testing locations located underground. TSP utilized safety equipment in accordance with TSP, Owner, and OSHA requirements. UT equipment was calibrated and verified in accordance with TSP policy and SNT-TC-1A practice.

4.2 – Inspection Results

A description of the current condition of the piping system has been developed based on data collected during the inspection effort.

The piping, pipe components, and pipe supports were subjected to visual inspection.

Photographs of significant conditions are included in Appendix 2. Visual inspection checklists, included in Appendix 3, were completed for each pipe segment.

UT testing was performed in accordance with API-570 requirements at pipe elbows, tees, 10 pipe diameters downstream from each elbow in the direction of flow, midpoints of pipe segments between 50 and 100 feet in length, and every 50 feet along pipe lengths over 100 feet. UT readings were collected at each corrosion monitoring location (CML), at locations described by API-570 as most likely to experience erosion. Thickness measurement records and remaining life calculations are included in Appendix 4.

Specific observations and analysis for each pipe section are provided in the sections below.

4.2.1 – Circuit A: Tank Discharge Piping within Tank Farm Area

Circuit A consists of piping extending from the five ASTs to the pump house within the tank farm area. Circuit piping is 6-inches within the tank farm expanding to 12 inches outside the tank containment prior to entering the pump house. Circuit A splits into two circuits (AN and AS) downstream of the pump house.

Visual inspection identified the following conditions regarding this section of pipe:

• Corrosion on valves near CML 30.

• Corrosion on pipe support near CML 29.

• Corrosion on flange fasteners near CML 25.

• Valve coating failure with corrosion near CML 24.

• Top coating is starting to fail near CML 22.

• Yellow stripes peeling and fading near CML 17.

• Coating failures on valve bonnet flange near CML 15.

• Coating failures on valves near CML 20.

• Coating failure under pipe near CML 20.

• Pipe support columns corroded near CML 36.

• Absorbent pad wrapped around small diameter pilot valve tubing, near CML 44A.

UT measurements were collected at 45 CMLs along the length of the pipe. The minimum reading was 0.263 inches.

4.2.2 – Circuit AN: Tank Discharge Piping to AOA

Circuit AN consists of the 6-inch north piping extending from the tee downstream of the pump house in the tank farm area to the truck loading stations in the AOA. The circuit is aboveground within the tank farm area transitioning to underground near the tank farm fence line and continuing underground for the remainder of its run.

Circuit AN is protected by a white epoxy coating along its aboveground extent. The pipe is wrapped in protective material at the soil to air interface and along its underground extent.

Inspection found cementitious coating on the pipe where it was exposed for the previous inspection. TSP applied a coal tar coating in the locations exposed for the current inspection.

Visual inspection identified the following conditions regarding this section of pipe:

• Coating cracking on pressure relief valve piping near CML 10.

• Corrosion on support bases near CML 7.

• Corrosion on support pillars near CML 6.

• Pitting below pipe with estimated 0.030” to 0.040” depth near CML Dig 8.

UT measurements were collected at 8 CMLs along the length of the pipe. The minimum reading was 0.254 inches.

4.2.3 – Circuit AS: Tank Discharge Piping to AOA

Circuit AS consists of the 6-inch south piping extending from the tee downstream of the pump house in the tank farm area to the truck loading stations in the AOA. The circuit is aboveground within the tank farm area transitioning to underground near the tank farm fence line and continuing underground for the remainder of its run.

Circuit AS is protected by a white epoxy coating along its aboveground extent. The pipe is wrapped in protective material at the soil to air interface and along its underground extent.

Inspection found cementitious coating on the pipe where it was exposed for the previous inspection. TSP applied a coal tar coating in the locations exposed for the current inspection.

Visual inspection identified the following conditions regarding this section of pipe:

• Corrosion at paint chip near CML 9.

• Corrosion on support bases near CML 7.

• Corrosion on support pillars near CML 6.

UT measurements were collected at 8 CMLs along the length of the pipe. The minimum reading was 0.248 inches.

4.2.4 – Circuit B: Exposed

Circuit B consists of piping extending from the five ASTs to the pump house within the tank farm area. Circuit piping is 6-inches within the tank farm expanding to 12 inches outside the tank containment prior to entering the pump house. Circuit A splits into two circuits (AN and AS) downstream of the pump house.

Visual inspection identified the following conditions regarding this section of pipe:

• Corrosion on valves near CML 30.

• Valve coating failure with corrosion near CML 24.

• Coating failures on valve bonnet flange near CML 15.

• Coating failures on valves near CML 20.

• Coating failure under pipe with corrosion near CML 20.

• Valve coating is cracking near CML 13.

• Minor corrosion on small diameter piping near CML 31.

• Pipe support columns corroded near CML 36.

• Gray patch coating near CML 37.

• Gray coating patch over corrosion, support base corroding near CML 37.

• Support base corrosion on 4th and 5th support from downstream elbow near CML 38.

• Pressure gauge illegible near CML 44A.

UT measurements were collected at 35 CMLs along the length of the pipe. The minimum reading was 0.233 inches.

4.2.5 – Circuit C: Key Pipeline Supply Piping

Circuit C consists of piping extending from Key Pipeline to a tee where it joins with Circuit B before continuing to the ASTs. Circuit piping is 4 inches within the tank farm area. The soil to air interface is wrapped in a protective material. Inspection was limited to aboveground piping downstream of the soil to air interface.

Visual inspection identified the following conditions regarding this section of pipe:

• Corrosion on support base near CML 7.

• Corrosion on support pillars near CML 6.

• Coating failure and corrosion near CML 13C.

• Leak on filter F2 from bad top gasket seal near CML 16C.

• Surface corrosion everywhere including pipes and fasteners near CML 16C.

UT measurements were collected at 16 CMLs along the length of the pipe. The minimum reading was 0.234 inches.

5 – RECOMMENDATIONS

Based on the data collected during the inspection, TSP offers the following recommendations for the repair and maintenance of the piping system.

5.1 – Critical Repairs (Prior to Return to Service)

The recommendations of this section are made to address defects relative to Code which prevent any portion of the piping system from remaining in service in accordance with API-570.

Although the underlying defects may be repaired by any method that conforms to API-570, these recommendations are believed, based on TSP's experience, to provide an efficient and cost-effective means to return the piping to service.

SECTION INTENTIONALLY BLANK

NO CRITICAL REPAIRS REQUIRED

5.2 – Code-Required Repairs (Mandatory for Recertification)

The recommendations in this section are made to address defects relative to Code for which repair is mandatory prior to certification of the piping system as compliant with the requirements of API-570. The repairs in this section should be performed during the Owner's next regular maintenance cycle. Although the underlying defects may be repaired by any method that conforms to API-570, these recommendations are believed, based on TSP's experience, to provide an effective and efficient means to resolve the defects noted.

5.2.1 – Repair Coating Failures and Corrosion

Visual inspection of the aboveground pipe circuits found localized corrosion failures with associated corrosion on the pipe spools, valves, supports, and flange fasteners. Although the coating failures are currently small and isolated, coating failure and corrosion are progressive, and the affected areas are likely to expand. TSP recommends that coating in damaged areas be removed and that a new exterior coating be applied. Coating removal should be completed in accordance with the SPCC-SP6 (Commercial Cleaning) standard published by the Society for Protective Coatings. The replacement coating should be a two-part epoxy coating applied in accordance with manufacturer recommendations. Coating replacement should be performed by a firm experienced in the application of coatings to aboveground piping.

5.2.2 – Replace Top Gasket on Filter F2

Visual inspection of the piping on Circuit C noted drips on Filter F2 originating from the top cover of the filter basket. The dripping indicates a leak from the cover of the filter consistent with a gasket failure. TSP recommends replacing the gasket on the cover of Filter F2.

5.2.3 – Replace Illegible Pressure Gauge

Visual inspection of the piping on Circuit B near the truck fill station found a pressure gauge with an illegible dial. The damage to the dial appears to be consistent with environmental damage and a broken seal on the gauge face. TSP recommends replacing the pressure gauge.

5.3 – Recommended Repairs

The recommendations in this section are made in regard to conditions observed during the inspection which do not violate Code, but which the Owner may nevertheless wish to address.

Based on TSP's experience, completing the recommendations of this section is likely to yield improvement to the quality, longevity, or safety of the piping system.

5.3.1 – Monitor Pitting in Circuit AN

Visual inspection of the pitting on Circuit AN found pitting on the bottom of Circuit AN at CML Dig 8 with a depth of approximately 0.030 to 0.040 inches. Based on UT data collected at the CML, the remaining pipe thickness is approximately 0.214 to 0.224 inches, which is well within API- 570 tolerances for minimum pipe thickness. Although the pitted area was encapsulated by coal tar prior to closing the excavation at Dig 8, pitting can be progressive and should be monitored during future inspections.

5.3.2 – Remove Absorbent Pad from Pilot Valve Tubing

Visual inspection of the piping in Circuit B near the truck fill station found an absorbent pad wrapped around and fastened to the pilot valve tubing. The absorbent pad may disguise leaks in the small diameter tubing. The absorbent pad may also cause water to become trapped against the tubing and cause accelerated corrosion. TSP recommends removing the absorbent pad from the tubing and correcting any issues which may be present under the pad.

5.3.3 – Evaluate Passive Cathodic Protection System

According to information provided by the Owner, the underground piping is protected against corrosion by a passive cathodic protection system. The condition of the system is currently unknown, and evaluation of the system was not included in the scope of work for this inspection.

Cathodic protection is critical to ensuring the long-term integrity of the pipe against environmental factors. TSP recommends evaluating the cathodic protection system.

5.3.4 – Label Pipe Contents and Flow Directions

Visual inspection found the pipe circuits well labeled at its termination points (truck station, pump house, and tanks) but unlabeled along its aboveground runs. Various regulations and industry best practices affect the labeling requirements on pipe, with recommendations generally for labeling at termination points, valves, and every 50 to 100 feet along the pipe so that operators and first responders can quickly identify the contents and flow directions of pipe segments in case of emergency. TSP recommends reviewing applicable regulations and adding labeling as necessary for both standard operation and emergency response.

6 – ENGINEER'S ESTIMATE OF REPAIRS

TSP offers the following estimates of repair costs based on the recommendations of Section 5 of this report. These estimates are based on TSP's professional experience with piping system repairs and are intended to be used for planning and budgeting purposes. Actual repair costs may be higher or lower than the estimates listed below.

Scope of Work Estimated Cost

Repair coating failures and corrosion. $15,000 - $20,000

Replace top gasket on Filter F2. $50 - $100 (Owner’s staff)

Replace illegible pressure gauge. $250 - $300

Monitor pitting on Circuit AN at Dig 8. $0 (Include in next inspection)

Remove absorbent pad from Circuit B. $0 (Operating staff)

Evaluate passive cathodic protection system. $2,000 - $3,000

Label pipe contents and flow directions. $5,000 - $7,500

Cost estimates do not include measures for temporary access or service that may be required when the piping system is removed from service.

7 – SUITABILITY FOR SERVICE STATEMENT

On November 27, 2023, TSP Tank Services LLC (TSP) inspected the tank farm piping system at NAS Key West, Boca Chica, FL 33040. The inspection was performed by Mr. Robert Sherby, a certified API-570 piping inspector and overseen by Mr. Ronald E. Swan, Jr., P.E., a certified API- 570 piping inspector and a registered Professional Engineer in the State of Florida.

Based on the data collected during this inspection and in reference to the criteria established by API-570, the piping system is suitable for its intended service. This suitability for service determination is based on the current condition of the piping system, its known history, and an understanding of its intended future use. TSP recommends that the piping be re-inspected in the event that the system is placed into service for a different use, including use with a different product, or if there is any material change in the condition of the piping, fittings, or pipe components.

Owners and operators should carefully review all relevant regulations to ensure that the operation of the piping system meets the established requirements, including requirements for future periodic inspections.

This inspection was performed by individuals qualified in the engineering and testing methods used for its completion. Documentation of personnel qualifications is included in Appendix 5.

Robert Sherby Piping Inspector

API-570 Inspector: 103788

Appendix 1 – Piping System Layout

B

A

A

CTEE B&C

TANK

TANK

TANK

TANK

AN

AS

Undergound To Truck Offload

L23069-ABC-APL

Aboveground Pipe Layout

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2023 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2023-11-27

Ronald E. Swan, Jr.

Robert Sherby

Naval Air Station Key West, Florida

DMS Fuel Piping

A

A

30 28

1AN

1C

1AS

12C

13C

14C

15C

16C

41A

41B

42A

42B

43B

44B

45B

43A

44A

45A

CTEE B&C

TANK

TANK

TANK

TANK

AN

AS

Undergound To Truck Offload

L23069-ABC-APM

Aboveground Pipe Measurements

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2023 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2023-11-27

Ronald E. Swan, Jr.

Robert Sherby

Naval Air Station

Appendix 2 – Photographs

Photographic Log

NAS Key West, Boca Chica, FL 33040

Pipe ID: A&B Location: Tank 945 Description: Elbows and equipment near tank.

Pipe ID: B Location: CML 30 Description: Coating failure on support base.

Pipe ID: B Location: CML 30 Description: Coating failure and corrosion on support base.

Pipe ID: A&B Location: CML 27 Description: Corrosion on stainless-steel sample ports.

Pipe ID: A&B Location: Tank 958

Pipe ID: A Location: CML 25 Description: Corrosion on flange fasteners.

Pipe ID: B Location: CML 25 Description: Corrosion on flange fasteners.

Pipe ID: A Location: CML 23 Description: Coating failure and corrosion on valve flange.

Pipe ID: B Location: CML 23 Description: Coating failure and corrosion on valve bonnet flange.

Pipe ID: A Location: CML 22 Description: Coating failure on elbow.

Pipe ID: B Location: CML 22 Description: Coating repairs on top of pipe.

Pipe ID: A&B Location: CML 21 Description: Enclosures for pipe passing through containment.

Pipe ID: A&B Location: Tank 944

Pipe ID: B Location: CML 15

Pipe ID: A Location: CML 15

Pipe ID: A&B Location: Tank 938

Pipe ID: A Location: Tank 938 Description: Coating failure on valve bonnet flange

Pipe ID: B Location: CML 20 Description: Coating failure on underside of pipe elbow.

Pipe ID: B Location: CML 20 Description: Coating failure on underside of pipe elbow.

Pipe ID: A Location: CML 18 Description: Valve with bottom side coating failure.

Pipe ID: A Location: CML 18 Description: Coating failure on bottom of valve.

Pipe ID: A&B Location: CMLs 10-11 Description: Pipes entering pump house.

Pipe ID: AN&AS Location: CML 10 Description: Top layer of coating failed.

Pipe ID: AN&AS Location: CML 10 Description: Corrosion on small diameter pressure relief valves.

Pipe ID: AS Location: CML 9 Description: Chipped coating and corrosion.

Pipe ID: C Location: CML 9 Description: Coating failure and corrosion on flange fasteners.

Pipe ID: AN&AS Location: CML 7 Description: Coating failure and corrosion on support bases.

Pipe ID: AN, AS, and C Location: CMLs 5-6 Description: Coating failure on support beam.

Pipe ID: AN&AS Location: CML 1 Description: Corrosion on valves. Condition of pipe wrap at soil to air interface.

Pipe ID: C Location: CML 1 Description: Pinhole corrosion on pipe elbow.

Pipe ID: C Location: CML 1 Description: Pinhole corrosion on pipe elbow.

Pipe ID: C Location: CML 12C Description: Corrosion on valve flanges.

Pipe ID: C Location: CML 13C Description: Corrosion on pipe.

Pipe ID: C Location: CML 14C Description: Coating failure and corrosion on pipe elbow.

Pipe ID: C Location: CML 15C Description: Coating failure and corrosion on elbow.

Pipe ID: C Location: CML 16C Description: Condition of valve downstream of filter manifold.

Pipe ID: C Location: Filter manifold Description: General view of filter manifold.

Description: Coating failure and corrosion on basket strainer cover.

Description: Filter vessels. Drips from cover joint visible on Filter F2.

Description: Drips from cover joint on Filter F2.

Description: Corrosion on valves downstream of soil to air interface.

Pipe ID: AN&AS Location: Dig 8 Description: Condition of pipes as excavated.

Pipe ID: AS Location: Dig 8 Description: Condition of pipe as excavated.

Pipe ID: AN&AS Location: Dig 8 Description: Condition of pipes after coating repair.

Pipe ID: AS Location: Dig 7 Description: Condition of pipe as excavated.

Pipe ID: AN Location: Dig 7 Description: Condition of pipe after coating repair.

Pipe ID: AN&AS Location: Dig 6 Description: Condition of AN as excavated and AS after coating repair.

Pipe ID: AN&AS Location: Dig 6 Description: Condition of pipes after coating repair.

Pipe ID: AN&AS Location: Dig 5

Pipe ID: AN&AS Location: Dig 4

Pipe ID: AN&AS Location: Dig 3

Pipe ID: A&B Location: CML 33 Description: Coating repairs on Pipe B.

Pipe ID: A&B Location: CML 36-37 Description: Flange transition from coated to galvanized pipe passing under road grate.

Pipe ID: B Location: CML 36-37 Description: Condition of pipe clamp under road grate.

Pipe ID: B Location: CML 36-37 Description: Condition of pipe support under road grate.

Pipe ID: A Location: CML 36-37 Description: Condition of pipe in sump under road grate.

Pipe ID: A&B Location: CML 37 Description: Coating repair on Pipe B.

Pipe ID: A&B Location: CML 38

Pipe ID: A&B Location: CML 38

Pipe ID: B Location: CML 39 Description: Coating repair on the underside of Pipe B.

Description: Coating failure on support base with corrosion.

Description: Coating failure on support base with corrosion.

Pipe ID: A&B Location: Truck fill piping manifold.

Description: General view of truck fill piping manifold.

Pipe ID: A&B Location: Truck fill piping manifold.

Description: General view of truck fill piping manifold.

Pipe ID: A Location: East pump Description: Illegible pressure gauge.

Pipe ID: A Location: East Pump Description: Absorbent pad on small diameter tubing.

Appendix 3 – Piping Inspection Checklists

A

A

CTEE B&C

TANK

TANK

TANK

TANK

006007

009 010

AN

AS

Undergound To Truck Offload

L23069-ABC-APO

Aboveground Pipe Observations

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2023 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2023-11-27

Ronald E. Swan, Jr.

Robert Sherby

Naval Air Station

AN

AS

Undergound From Tank Farm

Undergound To Truck OffloadAN

AS025

L23069-ABC-UPO

Underground Pipe Observations

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2023 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2023-11-27

Ronald E. Swan, Jr.

Robert Sherby

Naval Air Station

Project No Date:

Project Name:

Technician:

Circuit ID:

ID

25 Dig 8 Pipe AN Pitting below pipe with estimated 0.030" to 0.040" depth

31 Pipe B Minor corrosion on small diameter piping 36 Pipes A & B

44A Pipe B Pressure gauge illegible 44A Pipe A Absorbant pad wrapped around small diameter Pilot Valve tubing

13C Pipe C Coating failure and corrosion 16C Pipe C Leak on Filter F2 from bad top gasket seal 16C Pipe C Surface corrosion everywhere including pipes and fasteners

10 Pipes A & B Coating failures on valves 10 Pipes A & B Coating failure under uipe, Pipe B has corrosion 13 Pipe B Valve coating is cracking

30 Pipes A & B Corrosion on valves 29 Pipe A Corrosion on pipe support 25 Pipe A

15 Pipes A & B Coating failures on valve bonnet flange

Tank Farm Piping

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

VISUAL INSPECTION DATA

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Nearest CML Component Description

Corrosion on flange fasteners 24 Pipes A & B Valve coating failure with corrosion 22 Pipe A Top coating starting to fail 17 Pipe A Yellow stripes peeling and fading

Coating cracking on Pressure Relief Valve piping 9 Pipe AS Corrosion at paint chip 7 Pipes AN, AS, & C Corrosion on support bases 6 Pipes AN, AS, & C Coating on support pillars

10 Pipe AN

Pipe support columns corroded 37 Pipe B Gray coating patch 37 Pipe B Gray coating patch over corrosion, support base corroding 38 Pipe B Support base corrosion on 4th & 5th support from downstream elbow

Technician:

Circuit ID:

Robert Sherby

Tank Farm Pipe A Exposed Piping

Bracing

Vibrations?

Excessive overhung weight

Supports

Thin, Small-bore alloy piping

Threaded Connections

Supports?

Shoes

Hanger distortion

X

X

Comments

X X

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

INSPECTION CHECKLIST

L20069 11/27/2023 NAS Key West Fuel Piping

Brackets

Slide plates/rollers

Leaks?

Process

Stream Tracing

Existing Clamps

Misalignment?

Pipe misalignment/restriction

Expansion joint alignment

X

X

X X

Counter balance

Support corrosion

Corrosion?

Crevice

X

Spring hangers

X

X

Coating

Soil-to-air interface

Insulation Interface

Biological Growth

Insulation?

Damage/penetrations

Missing jacketing/insulation

Sealing deterioration

Bulging

Banding broken/missing

Inspection Item Accept Reject N/A

X X X

X

X

X Corrosion on slide plates where coating failed.

X

X Localized coating failures.

X Pipe wrapped at interface.

X X

X

X

X X X

Technician:

Circuit ID: Tank Farm Pipe B Exposed Piping

Inspection Item Accept Reject N/A Comments

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

INSPECTION CHECKLIST

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Leaks?

Process X Stream Tracing X Existing Clamps X

Misalignment?

Pipe misalignment/restriction X Expansion joint alignment X

Vibrations?

Excessive overhung weight X Supports X Thin, Small-bore alloy piping X Threaded Connections X

Supports?

Shoes X Hanger distortion X Spring hangers X Bracing X Brackets X Slide plates/rollers X Counter balance X Support corrosion X Corrosion on slide plates where coating failed.

Corrosion?

Crevice X Coating X Localized coating failures.

Soil-to-air interface X Pipe wrapped at interface.

Insulation Interface X Biological Growth X

Insulation?

Damage/penetrations X Missing jacketing/insulation X

Banding broken/missing X

Sealing deterioration X Bulging X

Technician:

Circuit ID: Pipe C Exposed Piping (Key Pipe)

Inspection Item Accept Reject N/A Comments

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

INSPECTION CHECKLIST

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Leaks?

Process X Stream Tracing X Existing Clamps X

Misalignment?

Pipe misalignment/restriction X Expansion joint alignment X

Vibrations?

Excessive overhung weight X Supports X Thin, Small-bore alloy piping X Threaded Connections X

Supports?

Shoes X Hanger distortion X Spring hangers X Bracing X Brackets X Slide plates/rollers X Counter balance X Support corrosion X Corrosion on slide plates where coating failed.

Corrosion?

Crevice X Coating X Coating failures with corrosion near filters.

Soil-to-air interface X Pipe wrapped at interface.

Insulation Interface X Biological Growth X

Insulation?

Damage/penetrations X Missing jacketing/insulation X

Banding broken/missing X

Technician:

Circuit ID: Tank Farm Pipe AN Excavated Piping

Inspection Item Accept Reject N/A Comments

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

INSPECTION CHECKLIST

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Leaks?

Process X Stream Tracing X Existing Clamps X

Misalignment?

Pipe misalignment/restriction X Expansion joint alignment X

Vibrations?

Excessive overhung weight X Supports X Thin, Small-bore alloy piping X Threaded Connections X

Supports?

Shoes X Hanger distortion X Spring hangers X Bracing X Brackets X Slide plates/rollers X Counter balance X Support corrosion X

Corrosion?

Crevice X Coating X Soil-to-air interface X In-ground piping protected by wrap / coating.

Insulation Interface X Biological Growth X

Insulation?

Damage/penetrations X Missing jacketing/insulation X

Banding broken/missing X

Technician:

Circuit ID:

Banding broken/missing X

Sealing deterioration X Bulging X

Damage/penetrations X Missing jacketing/insulation X

Biological Growth X Insulation?

Soil-to-air interface X In-ground piping protected by wrap / coating.

Insulation Interface X

Crevice X Coating X

Support corrosion X Corrosion?

Slide plates/rollers X Counter balance X

Bracing X Brackets X

Hanger distortion X Spring hangers X

Supports?

Shoes X

Thin, Small-bore alloy piping X Threaded Connections X

Excessive overhung weight X Supports X

Expansion joint alignment X Vibrations?

Misalignment?

Pipe misalignment/restriction X

Stream Tracing X Existing Clamps X

Leaks?

Process X

Tank Farm Pipe AS Excavated Piping

Inspection Item Accept Reject N/A Comments

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

INSPECTION CHECKLIST

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Appendix 4 – Nondestructive Testing Data

AN

AS

Undergound From Tank Farm

Undergound To Truck OffloadAN

AS

L23069-ABC-UPL

Underground Pipe Layout

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2023 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2023-11-27

Ronald E. Swan, Jr.

Robert Sherby

Naval Air Station

Dig 8

CML 8

Dig 7B

CML 7B

Dig 7A

CML 7A

Dig 6

CML 6A

Dig 6

CML 6B

Dig 6

CML 6C

Dig 5

CML 5

Dig 3A

CML 3A

Dig 3B

CML 3B

Dig 4A

CML 4A

Dig 4B

CML 4B

AN

AS

Undergound From Tank Farm

Undergound To Truck OffloadAN

AS

L23069-ABC-UPM

Underground Pipe Measurements

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2023 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2023-11-27

Ronald E. Swan, Jr.

Robert Sherby

Naval Air Station

Technician:

Circuit ID:

Component Thickness Measurements

CML Size 0° 90° 180° 270°

1 6" 344 340 369 340 2 6" 312 320 313 297 3 6" 302 312 296 290 4 6" 349 323 350 380 5 6" 362 379 347 355 6 6" 323 326 348 337 7 6" 366 350 368 334 8 6" 378 328 365 327 9 6" 320 308 350 313 10 6" 353 327 338 324

1 6" 337 339 335 354 2 6" 321 303 304 294 3 6" 305 328 311 295 4 6" 342 343 369 335 5 6" 366 359 287 374 6 6" 346 344 349 353 7 6" 378 343 382 347 8 6" 368 361 301 334 9 6" 305 301 287 313 10 6" 357 346 327 347

11 12" 445 451 459 441 12 12" 416 404 307 399 13 6" 314 294 276 304 14 6" 316 300 283 301 15 6" 302 301 282 303 16 6" 345 400 347 316 17 6" 330 328 334 350 18 6" 310 276 315 323 19 6" 347 324 285 301 20 6" 377 389 326 344 326 359

285Pipe A Pipe A

(Top | N | Bottom | S) (Top | IR | Bottom | OR)

276 306 328Pipe A

Pipe A (Top | OR | Bottom | IR) (Top | N | Bottom | S)

283 300 276Pipe A

Pipe A (Top | E | Bottom | W) (Top | E | Bottom | W)

316 352 282Pipe A

Pipe A (Top | N | Bottom | S)

(Top | IR | Bottom | OR)

307 382 441Pipe A

Pipe A

(OR | W | IR | E)

(Top | E | Bottom | W)

301 341

327 344

Pipe A South (IR | S | Bottom | N)

(Top | E | Bottom | W) 335 347

344 348

COMBINED PIPE A

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

ULTRASONIC THICKNESS DATA

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Tank Farm Pipe A Exposed Piping

Pipe A South Pipe A South

Axis of measurement is clockwise parallel to direction of flow. All measurements in 1/1000 of an inch.

T-min T-avg

294 306

DescriptionLine No.

Pipe A South Pipe A South Pipe A South

(OR | Top | IR | Bottom)

(IR | N | OR | S)

(OR | S | IR | N)

(Top | OR | Bottom | IR) (Top | OR | Bottom | IR) (Top | S | Bottom | N)

0 0

Pipe A North (OR | E | IR | W) 340 348 Pipe A North (Top | E | Bottom | W) 297 311 Pipe A North (Top | E | Bottom | W) 290 300 Pipe A North (Top | OR | Bottom | IR) 323 351 Pipe A North (IR | N | OR | S) 347 361 Pipe A North (OR| N | IR | S)

0 0

PIPE A SOUTH 0 0

323 334 Pipe A North (Top | OR | Bottom | IR) 334 355 Pipe A North (Top | OR | Bottom | IR) 327 350

Pipe A South Pipe A South Pipe A South Pipe A South

(OR | E | IR | W)

(Top | E | Bottom | W)

PIPE A NORTH 0 0

0 0

Pipe A North (Top | N | Bottom | S) 308 323 Pipe A North (IR | N | Bottom | S) 324 336

Technician:

Circuit ID:

Component Thickness Measurements

CML Size 0° 90° 180° 270°

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

ULTRASONIC THICKNESS DATA

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Tank Farm Pipe A Exposed Piping

Axis of measurement is clockwise parallel to direction of flow. All measurements in 1/1000 of an inch.

T-min T-avgDescriptionLine No.

21 6" 328 311 278 294 22 6" 330 329 330 367 23 6" 311 304 302 294 24 6" 316 305 309 315 25 6" 371 382 376 338 26 6" 321 340 323 302 27 6" 354 380 365 354 28 6" 336 336 355 380 29 6" 306 311 303 304 30 6" 365 383 332 330 31 6" 372 375 314 344 32 6" 333 357 326 302 33 6" 366 304 340 376 34 6" 387 356 313 328 35 6" 293 301 323 317 36 6" 343 305 359 352 37 6" 373 340 352 360 38 6" 315 322 336 330 39 6" 263 301 288 280 40 6" 348 327 348 341 41 6" 389 378 365 331 42 6" 366 370 324 379 43 6" 372 316 354 345 44 4" 325 276 322 314 45 4" 342 350 304 297

302 330 314Pipe A

Pipe A (Top | OR | Bottom | IR) (Top | IR | Bottom | OR)

309293

313 346 304Pipe A

Pipe A Pipe A

330 353 303Pipe A

Pipe A (Top | E | Bottom | W)

(Top | IR | Bottom | OR)

302 322 338Pipe A

Pipe A (Top | IR | Bottom | OR) (Top | E | Bottom | W)

336 352 354Pipe A

Pipe A (Top | IR | Bottom | OR) (Top | OR | Bottom | IR)

305 311 294Pipe A

Pipe A (Top | E | Bottom | W) (Top | S | Bottom | N)

329 339 278Pipe A

Pipe A (Top | E | Bottom | W)

(Top | OR | Bottom | IR)

(Top | OR | Bottom | IR) (Top | IR | Bottom | OR) (Top | N | Bottom | S)

Pipe A (Top | OR | Bottom | IR) 305 340 Pipe A (Top | IR | Bottom | OR) 340 356 Pipe A (Top | N | Bottom | S) 315 326 Pipe A (Top | N | Bottom | S) 263 283 Pipe A (Top | N | Bottom | S) 327 341 Pipe A (Top | IR | Bottom | OR) 331 366 Pipe A (IR | N | OR | S) 324 360 Pipe A (Top | IR | Bottom | OR) 316 347 Pipe A (Top | OR | Bottom | IR) 276 309 Pipe A (Top | IR | Bottom | OR) 297 323

0 0 0 0 0 0 0 0 0 0

0 0 0 0

0 0 0 0 0 0

Technician:

Circuit ID:

Component Thickness Measurements

CML Size 0° 90° 180° 270° 11 6" 313 332 351 329 12 6" 345 368 315 338 13 6" 299 291 290 294 14 6" 312 278 291 309 15 6" 319 300 301 297 16 6" 342 375 341 335 17 6" 376 308 368 359 18 6" 281 308 306 316 19 6" 342 310 306 307 20 6" 371 370 388 358 21 6" 310 289 304 308 22 6" 363 331 332 335 23 6" 321 304 346 313 24 6" 337 332 340 333 25 6" 365 399 391 395 26 6" 314 337 302 296 27 6" 369 387 330 362 28 6" 350 330 338 354 29 6" 315 301 304 320 30 6" 382 367 362 348 31 4" 270 273 248 262 32 255 246 233 235 33 329 292 282 318 34 313 341 286 278 35 294 271 262 270 36 270 312 297 321 37 371 361 328 353 38 276 260 265 275 39 328 302 313 315 40 340 320 294 340 41 298 281 290 284 42 289 281 279 305 43 295 291 273 272 44 311 250 311 314 45 327 296 324 363

Tank Farm Pipe B Exposed Piping

Axis of measurement is clockwise parallel to direction of flow. All measurements in 1/1000 of an inch.

Line No. Description T-min T-avg

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

ULTRASONIC THICKNESS DATA

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

13 (Top | E | Bottom | W) 290 294 14 (Top | E | Bottom | W) 278 298

11 (OR | E | IR | W) 313 331

12 (Top | IR | Bottom | OR) 315 342

17 (Top | OR | Bottom | IR) 308 353 18 (Top | N | Bottom | S) 281 303

15 (Top | N | Bottom | W) 297 304 16 (Top | IR | Bottom | OR) 335 348

21 (Top | E | Bottom | W) 289 303 22 (Top | OR | Bottom | IR) 331 340

19 (Top | N | Bottom | S) 306 316 20 (Top | IR | Bottom | OR) 358 372

25 (Top | IR | Bottom | OR) 365 388 26 (Top | E | Bottom | W) 296 312

23 (Top | E | Bottom | W) 304 321 24 (Top | S | Bottom | N) 332 336

29 (Top | E | Bottom | W) 301 310 30 (Top | IR | Bottom | OR) 348 365

27 (Top | IR | Bottom | OR) 330 362 28 (Top | OR | Bottom | IR) 330 343

33 (Top | OR | Bottom | IR) 282 305 34 (Top | IR | Bottom | OR) 278 305

31 (Top | N | Bottom | S) 248 263 32 (Top | N | Bottom | S) 233 242

37 (Top | IR | Bottom | OR) 328 353 38 (Top | N | Bottom | S) 260 269

35 (Top | N | Bottom | S) 262 274 36 (Top | OR | Bottom | IR) 270 300

41 (Top | N | Bottom | S) 281 288 42 (Top | N | Bottom | S) 279 289

39 (Top | N | Bottom | S) 302 315 40 (Top | OR | Bottom | IR) 294 324

45 (Top | OR | Bottom | IR) 296 328

43 (Top | OR | Bottom | IR) 272 283 44 (Top | OR | Bottom | IR) 250 297

Technician:

Circuit ID:

Component Thickness Measurements

CML Size 0° 90° 180° 270° 1 4" 280 318 319 298 2 4" 265 249 291 274 3 4" 257 258 264 250 4 4" 297 260 276 316 5 4" 351 298 267 295 6 4" 292 287 298 314 7 4" 346 318 302 328 8 4" 308 294 305 316 9 4" 234 234 249 237 10 4" 263 243 241 244 11 4" 251 244 260 245 12 4" 321 291 301 329 13 4" 275 268 299 285 14 4" 275 327 295 373 15 4" 278 308 304 279 16 4" 294 312 287 314

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

ULTRASONIC THICKNESS DATA

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Pipe C (OR | E | IR | W) 280 304 Pipe C (Top | E | Bottom | W) 249 270

Pipe C Exposed Piping (Key Pipe)

Axis of measurement is clockwise parallel to direction of flow. All measurements in 1/1000 of an inch.

Line No. Description T-min T-avg

Pipe C (IR | N | OR | S) 267 303 Pipe C (OR| N | IR | S) 287 298

Pipe C (Top | E | Bottom | W) 250 257 Pipe C (Top | OR | Bottom | IR) 260 287

Pipe C (Top | N | Bottom | S) 234 239 Pipe C (Top | N | Bottom | S) 241 248

Pipe C (Top | OR | Bottom | IR) 302 324 Pipe C (Top | OR | Bottom | IR) 294 306

Pipe C (Top | E | Bottom | W) 268 282 Pipe C (Top | IR | Bottom | OR) 275 318

Pipe C (Top | N | Bottom | S) 244 250 Pipe C (OR | E | IR | W) 291 311

0 0 0 0

Pipe C (Top | North | Bottom | South) 278 292 Pipe C (Top | IR | Bottom | OR) 287 302

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

Technician:

Circuit ID:

Component Thickness Measurements

CML Size 0° 90° 180° 270° 2A 2B 2C 3A 3B 273 276 274 273 3C 4A 4B 272 269 276 270 5 278 286 282 277

6A 283 290 279 296 6B 266 262 287 303 6C 286 280 271 277 7A 7B 292 266 267 267 8 258 254 267 257

Tank Farm Pipe AN Excavated Piping

Axis of measurement is clockwise parallel to direction of flow. All measurements in 1/1000 of an inch.

Line No. Description T-min T-avg

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

ULTRASONIC THICKNESS DATA

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Dig 2 Downstream (Top | N | Bottom | S) 0 0 Dig 3 USV (Top | N | Bottom | S) 0 0

Dig 2 Upstream (Top | E | Bottom | W) 0 0 Dig 2 Elbow (Top | IR | Bottom | OR) 0 0

No Data Collected No Data Collected No Data Collected No Data Collected

Dig 4A USV (Top | N | Bottom | S) 0 0 Dig 4B DSV (Top | N | Bottom | S) 269 272

Dig 3 DSV (Top | N | Bottom | S) 273 274 Dig 3 DST (Top | N | Bottom | S) 0 0No Data Collected

No Data Collected

Dig 6 Elbow (Top | E | Bottom | W) 262 280 Dig 6 Downstream (Top | E | Bottom | W) 271 279

Dig 5 (Top | E | Bottom | W) 277 281 Dig 6 Upstream (Top | E | Bottom | W) 279 287

Dig 8 (Top | E | Bottom | W) 254 259 0 0

Dig 7A (Top | E | Bottom | W) 0 0 Dig 7B (Top | E | Bottom | W) 266 273

No Data Collected

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

0 0

Technician:

Circuit ID:

Component Thickness Measurements

CML Size 0° 90° 180° 270° 2A 2B 2C 3A 3B 276 275 276 276 3C 4A 4B 278 268 272 270 5 271 262 262 248

6A 287 297 308 310 6B 278 266 275 262 6C 257 263 267 271 7A 7B 271 261 266 264 8 270 275 264 301

Tank Farm Pipe AS Excavated Piping

Axis of measurement is clockwise parallel to direction of flow. All measurements in 1/1000 of an inch.

Location Description T-min T-avg

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

PIPING SYSTEM

ULTRASONIC THICKNESS DATA

L20069 11/27/2023 NAS Key West Fuel Piping Robert Sherby

Dig 2 Downstream (Top | N | Bottom | S) 0 0 Dig 3 USV (Top | N | Bottom | S) 0 0

Dig 2 Upstream (Top | E | Bottom | W) 0 0 Dig 2 Elbow (Top | IR | Bottom | OR) 0 0

No Data Collected No Data Collected No Data Collected No Data Collected

Dig 4 USV (Top | N | Bottom | S) 0 0 Dig 4 DSV (Top | N | Bottom | S) 268 272

Dig 3 DSV (Top | N | Bottom | S) 275 276 Dig 3 DST (Top | N | Bottom | S) 0 0No Data Collected

No Data Collected

Dig 6 Elbow (Top | E | Bottom | W) 262 270 Dig 6 Downstream (Top | E | Bottom | W) 257 265

Dig 5 (Top | E | Bottom | W) 248 261 Dig 6 Upstream (Top | E | Bottom | W) 287 301

Dig 8 (Top | E | Bottom | W) 264 278 0 0

Dig 7A (Top | E | Bottom | W) 0 0 Dig 7B (Top | E | Bottom | W) 261 266

No Data Collected

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

0 0

Appendix 5 – Qualifications of Inspection Professionals

Tank Farm Pipe Layout.pdf
Sheets and Views
Tank Farm Pipe Layout-Aboveground Pipe Layout
Tank Farm Pipe Layout-Aboveground Pipe Observations
Tank Farm Pipe Layout-Aboveground Pipe Measurements
Tank Farm Pipe Layout-Underground Pipe Layout
Tank Farm Pipe Layout-Underground Pipe Observations
Tank Farm Pipe Layout-Underground Pipe Measurements

File details come from the government source that posted it. Updated .