Amendment 0009.pdf
PDF 14 KB Posted
- Solicitation number
- SPE60322R0504
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE603 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60322R0504
X
2022 FEB 24
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 3 PAGES
SPE60322R0504 - 0009
Amendment 0009 is being established to provide the UPDATED Period of Performance for Solicitation SPE603-22-R-0504 for NAS Patuxent River, MD and to provide the updated Performance Work Statement (PWS), dated January 4, 2023.
A. The PERIOD OF PERFORMANCE has changed to following:
Four-year BASE Period: JULY 1, 2023 to JUNE 30, 2027 Five-year Option Period: JULY 1, 2027 to JUNE 30, 2032 6mth Option to extend: JULY 1, 2032 to December 31, 2032
B. The Performance Work Statement (PWS) dated January 4, 2022 provides all additions which have been highlighted throughout the PWS. (See Attachment) All removals/additions are stated below.
C-1.6.1 Workload:
ADDED: At the start of Option Years Period of Performance, the contractor shall continue ground fuel delivery services for JP-5 and Gasoline products (Only). The Diesel Ground Fueling Services shall not be required to be performed by the contractor.
C-2.1.8 NAVAIR Aviation Fuel Development :
REMOVED: Development services executed by fuel service contractor are NOT covered under MUCG. Should NAVAIR choose to utilize the DLA Energy contracted fuels services, requests for such services must be submitted to the DLA Energy Contracting Officer 30 days prior to service start date. A proposal must be submitted by the contractor within 10 days that includes equipment and services beyond the scope of contract. The proposal will be negotiated with DLA Energy Contracting Officer and NAVAIR, in advance for payment via firm fixed price and contract modification. Given the aviation fuel development services dates and tasking, the contractor must, by whatever means deemed most cost-effective plan for and support all requirements. The Military Interdepartmental Purchase Request (MIPR) is the only method available and accepted for transferring funds for services. Before contractor is authorized to proceed, MIPR must be accepted by DLA Energy not less than seven days prior to services.
C-2.4 Ground Fuels:
REMOVED: and 100LL ADDED: during the Base Period of Performance. At the start of Option Years Period of Performance, the contractor shall continue Customer Tank Fueling Services for JP-5 and Gasoline products (Only). The Diesel Ground Fueling Services shall not be required to be performed by the contractor.
C-2.4.2 Delivery:
REMOVED: 100LL
ADDED: during the Base Period of Performance. At the start of Option Years Period of Performance, the contractor shall continue Customer Tank Fueling Services for JP-5 and Gasoline products (Only). The Diesel Ground Fueling Services shall not be required to be performed by the contractor.
APPENDIX A: Facility Specific Information
ADDED to TABLE: Test Cells REMOVED from TABLE:
Test Cells, Generators, Convault Tanks0730-1530ARAR Boilers0730-1530ARAR
PAGE 68 NAS Patuxent River Customer Tanks
REMOVED from PAGE 68:
MWR B.336 Flying Club Fuel for PRIVATE AIRPLANES 1 P-336 500 250 AVIATION GAS MWR Golf Course Maintenance- Fueling and MO GAS (PD-1693B) MWR Golf Course Maintenance- Fueling and MO GAS (PD-1693C) MWR Golf Course Maintenance- Fueling and MO GAS (P-2779) NAWC B.2657 CTR Boat Fuel for Boats 1 P-1823A 1000 350 MOGAS, DIESEL NAWC B.2657 CTR Boat Fuel for Boats 1 P-1824A 1000 350 MOGAS, DIESEL
ADDED to PAGE 73:
The contractor will provide these Customer Tank Fueling Services during the Base Period of Performance. At the start of Option Years Period of Performance, the contractor shall continue Customer Tank Fueling Services for JP-5 and Gasoline products (Only). The Diesel Product, Ground Fueling Services shall not be required to be performed by the contractor.
C. Negotiations are tentatively set to close on January 24, 2023 and will be confirmed via formal letter once closed.
The tentative date for FPRs is January 25, 2023, by 3:00pm, local Fort Belvoir, VA time, which will also be confirmed in the above referenced formal letter. FPRs must be sent via email to tina.williams@dla.mil and keecha.elliott@dla.mil and shall reference solicitation SPE603-22-R-0504. If you have any questions, please contract Tina Williams at (571-474-5483).
D. All other terms and conditions of the solicitation remain unchanged.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES
SPE60322R0504 - 0009
Attachments
List of Attachments
Description File Name ATTACH_Updated_Perfor mance_Work_Statement
PAX River PWS (1-4-23).
File details come from the government source that posted it. Updated .