Attachment 8 - PPW - Charleston 9.28.20.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- SPE60320R0521
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFSP Charleston PPW DFSP Charleston, SC Price Proposal Worksheet
| Company & Location | PROPOSAL VERSION NO.: |
| Preparer Name | DATE PREPARED: |
| Reference Item | Task Description | Est Qty | Unit | Unit Price | Total |
| Terminal Site Remediation Performance Requirements | |||||
| 001 | Semi-Annual Groundwater Sampling IAW PWS Appendix C Task 3.1.1 | 8 | Each | $0.00 | |
| 002 | System Deconstruction and Well Abandonment IAW PWS Appendix C Task 3.1.2 | 1 | Lump Sum | $0.00 | |
| 003 | Feasibility Study IAW Appendix C Task 3.1.3 | 1 | Lump Sum | $0.00 | |
| Pipeline Site Remediation Performance Requirements | |||||
| 004 | Semi-Annual Groundwater Sampling IAW PWS Appendix C Task 3.1.1 | 8 | Each | $0.00 | |
| 005 | System Deconstruction and Well Abandonment IAW PWS Appendix C Task 3.1.2 | 1 | Lump Sum | $0.00 | |
| 006 | Feasibility Study IAW Appendix C Task 3.1.3 | 1 | Lump Sum | $0.00 | |
| Site Remediation Performance Requirements | |||||
| 007 | Annual Environmental Regulations Review IAW PWS Appendix C Task 3.1.4 | 4 | Each | $0.00 | |
| 008 | Emergency Spill Consultation IAW PWS Appendix C Task 3.1.5 | 1 | Lump Sum | $0.00 | |
| 009 | Project Initiation IAW PWS Appendix C Task 3.1.6 | 1 | Lump Sum | $0.00 | |
| Assessment | |||||
| 010 | 1010 (Ignitability) | 1 | Each | $0.00 | |
| 011 | 2130 (Turbidity) | 1 | Each | $0.00 | |
| 012 | 2540 (Total Suspended Solids & Seatable Solids) | 1 | Each | $0.00 | |
| 013 | 300.0 (Chloride, Sulfate, Nitrate) | 1 | Each | $0.00 | |
| 014 | 5210 (BOD) | 1 | Each | $0.00 | |
| 015 | 5520B (Oil & Grease) | 1 | Each | $0.00 | |
| 016 | 5540 (Surfactant) | 1 | Each | $0.00 | |
| 017 | 601 (Purgeable Halocarbons) | 1 | Each | $0.00 | |
| 018 | 6010 (Individual metal) | 1 | Each | $0.00 | |
| 019 | 602 (Purgeable Aromatics) | 1 | Each | $0.00 | |
| 020 | 6020 (Individual metal) | 1 | Each | $0.00 | |
| 021 | 604 (Phenols) | 1 | Each | $0.00 | |
| 022 | 608 (Oranochlorine Pesticides and PCB’s) | 1 | Each | $0.00 | |
| 023 | 610 (Polynuclear Aromatic Hydrocarbons) | 1 | Each | $0.00 | |
| 024 | 612 (Chlorinated Hydrocarbons) | 1 | Each | $0.00 | |
| 025 | 624 (Purgeables) | 1 | Each | $0.00 | |
| 026 | 625 (Semivolatile Organic Compounds) | 1 | Each | $0.00 | |
| 027 | 7470 (Mercury) | 1 | Each | $0.00 | |
| 028 | 8015 (TPH as Gasoline [C6-12]) | 1 | Each | $0.00 | |
| 029 | 8015 (TPH as JP5 [C9-C16] w/silica gel cleanup) | 1 | Each | $0.00 | |
| 030 | 8021 (Aromatic Volatile Organic Compounds) | 1 | Each | $0.00 | |
| 031 | 8041 (Phenols) | 1 | Each | $0.00 | |
| 032 | 8081 (Organochlorine Pesticides) | 1 | Each | $0.00 | |
| 033 | 8121 (Chlorinated Hydrocarbons) | 1 | Each | $0.00 | |
| 034 | 8151 (Chlorinated Herbicides) | 1 | Each | $0.00 | |
| 035 | 8260 (BTEX/MTBE/Naphthalene) | 1 | Each | $0.00 | |
| 036 | 8260 (Full List Volatile Organic Compounds) | 1 | Each | $0.00 | |
| 037 | 8270 (Full list Semi-Volatile Organic Compounds) | 1 | Each | $0.00 | |
| 038 | 8270-SIM (Polyaromatic Hydrocarbons) | 1 | Each | $0.00 | |
| 039 | 8310 (Polyaromatic Hydrocarbons) | 1 | Each | $0.00 | |
| 040 | 8440 (Total Petroleum Hydrocarbons) | 1 | Each | $0.00 | |
| 041 | 9012 or SM 4500-CN or 335.4 (Cyanide) | 1 | Each | $0.00 | |
| 042 | 9023 (Total Organic Halides) | 1 | Each | $0.00 | |
| 043 | 9030 or SM 4500-S (Sulfide) | 1 | Each | $0.00 | |
| 044 | 9045 (pH) | 1 | Each | $0.00 | |
| 045 | CCR Title 22 Metals (6010/7470) | 1 | Each | $0.00 | |
| 046 | Encore Sample Container or Equivalent | 1 | Each | $0.00 | |
| 047 | PFOS/PFOA (EPA537M) water with 48hr TAT | 1 | Each | $0.00 | |
| 048 | SM 2320 (Alkalinity) | 1 | Each | $0.00 | |
| 049 | TCLP Metals | 1 | Each | $0.00 | |
| 050 | TO-15 | 1 | Each | $0.00 | |
| Services | |||||
| 051 | Buyer | 1 | Each | $0.00 | |
| 052 | Chemist price per hour | 1 | Each | $0.00 | |
| 053 | Cost Accountant price per hour | 1 | Each | $0.00 | |
| 054 | Drafter price per hour | 1 | Each | $0.00 | |
| 055 | Drill Rig Operator price per hour | 1 | Each | $0.00 | |
| 056 | Engineer I price per hour | 1 | Each | $0.00 | |
| 057 | Engineer II price per hour | 1 | Each | $0.00 | |
| 058 | Engineer III price per hour | 1 | Each | $0.00 | |
| 059 | Environmental Scientist I price per hour | 1 | Each | $0.00 | |
| 060 | Environmental Scientist II price per hour | 1 | Each | $0.00 | |
| 061 | Environmental Scientist III price per hour | 1 | Each | $0.00 | |
| 062 | Environmental Technician price per hour | 1 | Each | $0.00 | |
| 063 | Field Technician price per hour | 1 | Each | $0.00 | |
| 064 | Geologist I price per hour | 1 | Each | $0.00 | |
| 065 | Geologist II price per hour | 1 | Each | $0.00 | |
| 066 | Geologist III price per hour | 1 | Each | $0.00 | |
| 067 | Heavy Equipment Operator price per hour | 1 | Each | $0.00 | |
| 068 | Hydrogeologist I price per hour | 1 | Each | $0.00 | |
| 069 | Hydrogeologist II price per hour | 1 | Each | $0.00 | |
| 070 | Hydrogeologist III price per hour | 1 | Each | $0.00 | |
| 071 | Laborer price per hour | 1 | Each | $0.00 | |
| 072 | Project Manager price per hour | 1 | Each | $0.00 | |
| 073 | Remediation System Operator price per hour | 1 | Each | $0.00 | |
| 074 | Secretary price per hour | 1 | Each | $0.00 | |
| 075 | Site Labor Foreman price per hour | 1 | Each | $0.00 | |
| 076 | State Licensed Surveyor | 1 | Each | $0.00 | |
| 077 | Toxicologist I price per hour | 1 | Each | $0.00 | |
| 078 | Toxicologist II price per hour | 1 | Each | $0.00 | |
| 079 | Toxicologist III price per hour | 1 | Each | $0.00 | |
| 080 | Traffic Control Engineer price per hour | 1 | Each | $0.00 | |
| 081 | Field Technician price per hour | 1 | Each | $0.00 | |
| Miscellaneous | |||||
| 082 | ASSESSMENT - Third Party Validation | 1 | Each | $0.00 | |
| 083 | DIRECT PUSH TECHNOLOGY - Cost per unit of 5' of DPT | 1 | Each | $0.00 | |
| 084 | DIRECT PUSH TECHNOLOGY - Mobilization/Demobilization | 1 | Each | $0.00 | |
| 085 | DRUM - Furnish, fill with soil or water, dispose of non/haz DOT approved 55 gallon drum w/in 50miles | 1 | Each | $0.00 | |
| 086 | EQUIPMENT - 02/Explosimeter price per day | 1 | Each | $0.00 | |
| 087 | EQUIPMENT - Air Compressor (7 cfm) price per day | 1 | Each | $0.00 | |
| 088 | EQUIPMENT - Air Velocity Meter price per day | 1 | Each | $0.00 | |
| 089 | EQUIPMENT - Backhoe Daily Rental | 1 | Each | $0.00 | |
| 090 | EQUIPMENT - CAD Equipment Use Charge price per day | 1 | Each | $0.00 | |
| 091 | EQUIPMENT - Disposable Bailers price per unit | 1 | Each | $0.00 | |
| 092 | EQUIPMENT - Disposable Sample Tubing | 1 | Each | $0.00 | |
| 093 | EQUIPMENT - Field GC price per day | 1 | Each | $0.00 | |
| 094 | EQUIPMENT - Flame Ionization OCA price per day | 1 | Each | $0.00 | |
| 095 | EQUIPMENT - Generator (4000 watt) price per day | 1 | Each | $0.00 | |
| 096 | EQUIPMENT - Groundwater Interface Probe Daily Rental | 1 | Each | $0.00 | |
| 097 | EQUIPMENT - Groundwater Multimeter Price Per Day | 1 | Each | $0.00 | |
| 098 | EQUIPMENT - Groundwater Sampling Pump price per day | 1 | Each | $0.00 | |
| 099 | EQUIPMENT - Photoionization Detector price per day | 1 | Each | $0.00 | |
| 100 | EQUIPMENT - Pickup Truck (1/2 ton) price per day | 1 | Each | $0.00 | |
| 101 | EQUIPMENT - Tedlar Bags price per dozen | 1 | Each | $0.00 | |
| 102 | EQUIPMENT - Utility Truck price per day | 1 | Each | $0.00 | |
| 103 | EQUIPMENT - Walk Behind Compactor Daily Rental | 1 | Each | $0.00 | |
| 104 | GEOPHYSICAL SURVEY - Price per unit (10,000 linear feet) to include in report of findings | 1 | Each | $0.00 | |
| 105 | PUMP TEST - Cost of installing water table depression and free product | 1 | Each | $0.00 | |
| 106 | PUMP TEST - Mobilization cost for pump installation on existing 4" | 1 | Each | $0.00 | |
| 107 | ROLL OFF BIN DISPOSAL - flat fee transport up to 50 miles | 1 | Each | $0.00 | |
| 108 | ROLL OFF BIN DISPOSAL - per ton non-haz disposal cost | 1 | Each | $0.00 | |
| 109 | ROLL OFF BIN RENTAL - Furnish and fill with soil 10YD roll off bin, price per bin | 1 | Each | $0.00 | |
| 110 | ROLL OFF BIN RENTAL - Furnish and fill with soil 15YD roll off bin, price per bin | 1 | Each | $0.00 | |
| 111 | ROLL OFF BIN RENTAL - Furnish and fill with soil 20YD roll off bin, price per bin | 1 | Each | $0.00 | |
| 112 | ROLL OFF BIN RENTAL - Furnish and fill with soil 30YD roll off bin, price per bin | 1 | Each | $0.00 | |
| 113 | ROLL OFF BIN RENTAL - Mobilization to site | 1 | Each | $0.00 | |
| 114 | Shipping of soil and water samples for analytical testing | 1 | Each | $0.00 | |
| 115 | SOIL & GAS SURVEY - Price per unit (10 points/unit) - 14 feet depth | 1 | Each | $0.00 | |
| 116 | SOIL & GAS SURVEY - Price per unit (10 points/unit) - 4 feet depth | 1 | Each | $0.00 | |
| 117 | SOIL & GAS SURVEY - Soil Gas Survey mobilization/demobilization cost | 1 | Each | $0.00 | |
| 118 | SOIL BORING / MONITORING WELL SURVEY - State Licensed Surveyor | 1 | Each | $0.00 | |
| 119 | SOIL BORINGS - Cost per boring per foot 1 to 10 feet | 1 | Each | $0.00 | |
| 120 | SOIL BORINGS - Cost per boring per foot 11 to 20 feet | 1 | Each | $0.00 | |
| 121 | SOIL BORINGS - Cost per boring per foot 21 to 60 feet | 1 | Each | $0.00 | |
| 122 | SOIL BORINGS - Cost per boring per foot 61 to 150 feet | 1 | Each | $0.00 | |
| 123 | SOIL BORINGS - Mobilization/Demobilization cost for soil boring | 1 | Each | $0.00 | |
| 124 | Utility Line Location Services | 1 | Each | $0.00 | |
| 125 | WELL DECOMMISSION - Cost per foot 2” Well | 1 | Each | $0.00 | |
| 126 | WELL DECOMMISSION - Cost per foot 4” Well | 1 | Each | $0.00 | |
| 127 | WELL DECOMMISSION - Cost per foot 6" Well | 1 | Each | $0.00 | |
| 128 | WELL DEVELOPMENT - Price for well development flush mount | 1 | Each | $0.00 | |
| 129 | WELL INSTALL - Cost per foot of 2" PVC Well from 1 to 10 feet | 1 | Each | $0.00 | |
| 130 | WELL INSTALL - Cost per foot of 2" PVC well from 11 to 20 feet | 1 | Each | $0.00 | |
| 131 | WELL INSTALL - Cost per foot of 2" PVC well from 21 to 60 feet | 1 | Each | $0.00 | |
| 132 | WELL INSTALL - Cost per foot of 2" PVC well from 61 to 150 feet | 1 | Each | $0.00 | |
| 133 | WELL INSTALL - Cost per foot of 4" PVC well from 1 to 10 feet | 1 | Each | $0.00 | |
| 134 | WELL INSTALL - Cost per foot of 4" PVC well from 11 to 20 feet | 1 | Each | $0.00 | |
| 135 | WELL INSTALL - Cost per foot of 4" PVC well from 21 to 60 feet | 1 | Each | $0.00 | |
| 136 | WELL INSTALL - Cost per foot of 4" PVC well from 61 to 150 feet | 1 | Each | $0.00 | |
| 137 | WELL INSTALL - Cost per foot of 6" PVC well from 1 to 10 feet | 1 | Each | $0.00 | |
| 138 | WELL INSTALL - Cost per foot of 6" PVC well from 11 to 20 feet | 1 | Each | $0.00 | |
| 139 | WELL INSTALL - Cost per foot of 6" PVC well from 21 to 60 feet | 1 | Each | $0.00 | |
| 140 | WELL INSTALL - Cost per foot of 6" PVC Well from 61 to 150 feet | 1 | Each | $0.00 | |
| 141 | WELL INSTALL - Mobilization/Demobilization cost for 2"/4" well | 1 | Each | $0.00 | |
| 142 | WELL INSTALL - Mobilization/Demobilization cost for 6" well | 1 | Each | $0.00 |
| Total Offered Price | $0.00 |
| Option Period | $0.00 |
| Total Evaluated Price | $0.00 |
&"-,Bold"FOR OFFICIAL USE ONLY Source Selection Information – See FAR 2.101 and 3.104
File details come from the government source that posted it. Updated .