Attachment 2 - PWS App C - DFSP Charleston.pdf

PDF 605 KB Posted

Attached to
Project Management, Environmental Remediation System Operation and Maintenance (O&M), Monitoring and Reporting for SE Region and DFSP Verona
Solicitation number
SPE60320R0521
Issued by

View the file

Other files

File Type Posted
Attachment 5 - PWS App F - FLC Jacksonville 9.28.20.pdf PDF
Attachment 13 - PPW - Verona 9.28.20.xlsx XLSX spreadsheet
Attachment 12 - PPW - Tampa 9.28.20.xlsx XLSX spreadsheet
Attachment 23 - QAs.pdf PDF
Amd 0004 - SF-30.pdf PDF
Attachment 3 - PWS App D - Fort Hood 9.28.20.pdf PDF
Attachment 1 - PWS 9.28.20.pdf PDF
Attachment 11 - PPW - Jacksonville 9.28.20.xlsx XLSX spreadsheet
Attachment 24 - QC Blanks.pdf PDF
Attachment 7 - PWS App H - DFSP Verona 9.28.20.pdf PDF
Attachment 6 - PWS App G - DFSP Tampa 9.28.2.pdf PDF
Attachment 9 - PPW - Ft. Hood 9.28.20.xlsx XLSX spreadsheet
Attachment 2 - PWS App C - DFSP Charleston 9.28.20.pdf PDF
Attachment 8 - PPW - Charleston 9.28.20.xlsx XLSX spreadsheet
Attachment 10 - PPW - Hunter 9.28.20.xlsx XLSX spreadsheet
RFP SPE603-20-R-0521 09.28.20.pdf PDF
Attachment 4 - PWS App E - Hunter AAF 9.28.20.pdf PDF
Amd 0003 - SF-30.pdf PDF
RFP SPE603-20-R-0521 9.25.20.pdf PDF
Amd 0002 - SF-30.pdf PDF
Attachment 14 - PPQ 9.15.20.docx DOCX document
Amd 0001 - SF-30.pdf PDF
Amd 0001 - RFP SPE603-20-R-0521 9.3.20.pdf PDF
Attachment 18 - WD - DFSP Jacksonville.pdf PDF
Attachment 1 - PWS.pdf PDF
Attachment 7 - PWS App H - DFSP Verona.pdf PDF
Attachment 9 - PPW - Ft. Hood.xlsx XLSX spreadsheet
Attachment 15 - WD - DFSP Charleston.pdf PDF
Attachment 20 - WD - DFSP Verona.pdf PDF
Attachment 12 - PPW - Tampa.xlsx XLSX spreadsheet
Attachment 11 - PPW - Jacksonville.xlsx XLSX spreadsheet
Attachment 13 - PPW - Verona.xlsx XLSX spreadsheet
Attachment 3 - PWS App D - Fort Hood.pdf PDF
Attachment 22 - JV Consent Form.docx DOCX document
Attachment 17 - WD - Hunter AAF.pdf PDF
RFP SPE603-20-R-0521.pdf PDF
Attachment 16 - WD - Ft Hood.pdf PDF
Attachment 6 - PWS App G - DFSP Tampa.pdf PDF
Attachment 21 - DFSP Verona Historical Electrical Bills.pdf PDF
Attachment 10 - PPW - Hunter.xlsx XLSX spreadsheet
Attachment 8 - PPW - Charleston.xlsx XLSX spreadsheet
Attachment 4 - PWS App E - Hunter AAF.pdf PDF
Attachment 14 - PPQ.docx DOCX document
Attachment 19 - WD - DFSP Tampa.pdf PDF
Attachment 5 - PWS App F - FLC Jacksonville.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Appendix C

DFSP CHARLESTON, SC Site Specific Information

SPE603-20-R-0521

ATTACHMENT 2

PERFORMANCE WORK STATEMENT (PWS)

APPENDIX C

DEFENSE FUEL SUPPLY POINT CHARLESTON, SC

SITE SPECIFIC INFORMATION

26 August 2020

Defense Fuel Supply Point Charleston, SC

DFSP Charleston Terminal

SECTION 1.0 INTRODUCTION

Defense Fuel Support Point (DFSP) Charleston Terminal occupies approximately 44 acres in

Hanahan, SC and includes seven 80,000-barrel aboveground storage tanks (ASTs). The facility also includes a Truck Rack Area where tanker trucks are loaded for fuel distribution, the Rail Car Area where fuel is transferred to rail cars, an office building, a fuels laboratory, bottle room at the fuels laboratory, a pump station, various piping for fuel distribution, and a common oil/water separator

(OWS) for the facility. The facility, identified as the Fuel Terminal, is an active fuel terminal supplying military customers in the city of Charleston and surrounding areas with jet propellant

(JP)-5 and JP-8.

1.1 Environmental History:

Groundwater contamination within and around the DFSP originates from known and suspected releases of petroleum hydrocarbons. A known release occurred around Tank 1 in 1975 when 84,000 gallons of jet fuel were leaked. Other releases are suspected in the vicinity of Tank 3, the Truck

Rack, and the Fuels Laboratory, based on detections of benzene, toluene, ethylbenzene, xylenes

(BTEX), methyl tertiary butyl ether (MTBE), and naphthalene in groundwater and soils. At the pump station, which is adjacent to the rail yard on the eastern side of the facility, other volatile organic compounds (VOC) including cyclohexane, 2-hexanone, 4-methyl-2-pentanone, and methyl-cyclohexane were detected in groundwater samples. The source has not been determined.

1980 – Several environmental investigations have been conducted since the discovery of groundwater contamination, with a complete summary of the early investigation and remediation activities are available from the USGS. A groundwater sampling program was established and has been ongoing since 1990 with quarterly samples collected since 1992.

July 2009 - A slurry of Oxygen Releasing Compound-Advanced™ (ORC-A) was injected into 11 site wells to enhance oxygen levels in the aquifer, stimulate aerobic biodegradation, and decrease naphthalene concentrations in the groundwater.

2012 – Free product thickness levels ranged from 0.01 to 2.24 feet (ft), but were typically less than one foot. Dissolved benzene and naphthalene concentrations continued to exceed site-specific cleanup goals (CGs). At this time, naphthalene is the most prevalent compound found at the DFSP.

DLA has requested that the DPE system be shut down as recent data indicates that it is no longer effective in removing source contamination; however, SCDHEC maintained that the system must remain in operation until all off-site contamination has been addressed.

November 2014 – Eighty-five direct push technology (DPT) sampling points were installed via DPT rig or hand auger to continue a site characterization that began in May/June 2012. Of the 59 soil samples collected, 12 had exceedances of 10 analytes including naphthalene, ethylbenzene, toluene, benzo(b)flouranthene, benzo(k)flouranthene, chrysene, dibenzo(a,h)anthracene, m-, p-, and o-xylenes. Of the 82 groundwater samples collected, 15 had exceedances of 6 VOCs including naphthalene, benzene, 1,2-dichloroethane, benzo(a)pyrene, methylene chloride, and penta-chlorophenol. While there were detections of other VOCs and SVOCs in soil and groundwater, no other compounds were detected at concentrations exceeding regulatory criteria.

January 2015 –Sulfate Enhanced Bioremediation (SEB) was used to target select areas of the site. A sulfate substrate (EAS provided by EOS Remediation, LCC) was injected into the subsurface via temporary injection points to deliver sulfate to the indigenous microbial population in order to enhance the biological degradation of the site contaminants. Three extraction wells in the vicinity of the injection activities were idled prior to injection to prevent removal of the substrate. The injection points were installed by a Geoprobe™ 7822 DPT rig. After the SEB amendments were injected into the subsurface, each well was permanently abandoned by a driller licensed in the State of South

Carolina in accordance with South Carolina Well Standards and Regulations R-61.71.

Calendar Year 2015 – Corrective Actions performed included the operation of: Tank 1 SVE system, Tank 3 SVE system, Truck Rack SVE system, groundwater extraction wells, and GWTP.

Activities also included quarterly groundwater and monthly GWTP influent and effluent monitoring.

During the quarterly groundwater monitoring events, samples were analyzed for BTEX, naphthalene, and MTBE. Only benzene and naphthalene were detected above their CGs in 2015. The majority of concentrations detected in excess of their CGs were identified at off-site properties to the north and west of the DFSP.

Surface water samples were also collected from SW-1, which were also analyzed for BTEX, naphthalene, and MTBE. Concentrations for these COCs were not detected at, or in excess of, the respective laboratory method detection limits in the SW-1 samples.

Free product was not detected during any of the gauging events. The geochemical evaluation indicated that in areas where fuel compounds are present, the aquifer is under anaerobic conditions.

Overall, evidence suggests that microbial degradation has occurred in the past and is likely continuing. However, the rate of degradation was unable to be determined.

February 2016 – January 2017 – Long response actions (LTRA) were performed at the site, which included the 13 groundwater extraction wells, three independent SVE systems, GWTP, and associated infiltration gallery. During this reporting period, the following activities were performed:

• Replacement of the three-independent SVE systems

• Retrofitting and repairs to the GWTP

• Operation and maintenance (O&M) of the remedial systems

• Performance of quarterly groundwater monitoring events

• Implementation of three biological injection events to target on-site hydrocarbon mass proximal to the Tank 1, Tank 3 and Truck Rack Areas.

During the operational period, the groundwater treatment plant recovered, treated, and discharged approximately 2,433,230 gallons of groundwater. As a result of the biological injection program, the

SVE systems were operated at limited capacity during the operating period, and therefore, measurable vapor-phase recovery was not monitored or measured during that time. Additional monitoring of the biological injection program was performed to determine the overall effectiveness of the program.

Monthly groundwater gauging events at the site have not identified free-phase petroleum since

August 2014. Results of the quarterly groundwater sampling program indicate that CGs for all constituents have been reached, with the exception of benzene and naphthalene. Benzene and naphthalene CGs have been met at all locations sampled with the exception of two on-site and six off-site locations. It was noted that the remedial system mass recovery rates are limited and system operation will not address off-site contamination to the west and north of the site. It was recommended to discontinue monthly free product gauging events and deactivation of the groundwater extraction and soil vapor extraction remedial systems for one quarter (three months) to evaluate for potential rebound of dissolved-phase contaminant levels.

SECTION 2.0 GENERAL CONTRACT REQUIREMENTS

2.1 Remedial Requirements

At the request of the DLA, and concurred to by SCDHEC, remedial operations at the site were temporarily suspended on September 22, 2017 for and extended rebound study. Remediation operations are still suspended.

The Contractor shall implement all activities within the framework of ongoing remediation efforts at the DFSP Charleston. The Contractor shall coordinate with the incumbent DLA Environmental

Services Contractor DLA Environmental Services contract SP0600-15-D-5503 to identify ongoing projects, upcoming requirements and transition all contracted requirements to the Contractor.

Contractor shall coordinate in a timely manner and in accordance with ongoing environmental services processes to support DLA or DOD Service/ Activity personnel, other DLA contractors reporting and data call requirements, and in cooperation with communities, regulators, and other government entities.

SECTION 3.0 PERFORMANCE REQUIREMENTS

3.1 Site Remediation Performance Requirements

For DFSP Charleston Terminal, the following actions are required to be completed by contractor upon receipt of a task order (see PWS Section 2.2.1):

3.1.1 Semi-Annual Groundwater Sampling – [Proposal Price Worksheet (PPW) Reference

Item 001]

IAW PWS Requirement Tasks 3 and 4, the contractor shall conduct sampling and analysis of sixty-five (65) monitoring well(s). This task includes low flow sampling of currently installed wells on a semi-annual basis using a peristaltic pump, laboratory analysis for TPH and VOCs. The contractor shall include review of existing reports/studies/relevant documents in its proposal. The contractor shall dispose of Investigation Derived Waste (IDW) such as purge water, drill cuttings or other waste generated during the performance of this task. IDW shall be contained in drums or bulk containment for treatment/disposal as non-hazardous waste at a RCRA permitted facility. Prior to shipment of waste for treatment or disposal, the contractor shall verify that the chosen disposal facility is listed on the DLA Disposition Services’ Qualified Facility List located at https://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/QualifiedFacilitiesL ist/. Monitoring well specifications, site conditions and assumptions are provided below.

Existing Well Specifications:

Fifty (50) 2-inch wells

Five (5) 4-inch wells

Ten (10) 6-inch wells

Average sample depth of 10 feet below ground surface (bgs)

Average depth to groundwater of 15 foot bgs

Average total well depth of 25 feet bgs https://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/QualifiedFacilitiesList/

Sampling Analysis and Data Reporting Requirements:

Stage 1 Data/QC Analysis and standard turnaround time

QA/QC sampling but no split sampling required at this time

Perform data evaluation/validation including Stage 1 lab data review

Submit data electronically

Submit a standard monitoring report semi-annually

Safety Level D

3.1.2 System Deconstruction and Well Abandonment – [PPW Reference Item 002]

IAW PWS Requirement Tasks 2, 3, 4, and 9, the contractor shall abandon all existing monitoring wells IAW SCDHEC requirements and provide a report documenting well abandonment and

SCDHEC’s acknowledgement/approval of abandonment. Note that there are 26 wells in the tank secondary containment areas. The contractor shall provide proposed design/procedure to repair/seal containment for review and approval by the COR/CS/CO in coordination with DLA engineering.

Closure design for those wells must demonstrate closure of the containment breaches will be protective of infiltration by fuel in the event of a leak. Contractor shall dismantle, document and retain on site the dismantled system components. The contractor shall coordinate with the

COR/CS/CO to engage DLA Disposition Services for removal of the dismantled systems.

Average well depth is 12 feet bgs

Average depth to groundwater - 15 foot bgs

Thirteen (13) 6-inch groundwater extraction wells

Existing Well Assumptions:

Assume monitoring wells have concrete/steel collars and are constructed of PVC schedule 40

Wells are installed in unconsolidated overburden

Safety Level D

Existing System Components:

On-site groundwater treatment plant (GWTP) and its associated infiltration gallery

Three (3) dual phase Soil Vapor Extraction (SVE) systems

Existing System Assumptions:

Prepare dismantled equipment for turn over to DLA Disposition Services

3.1.3 Feasibility Study – [PPW Reference Item 003]

IAW PWS Requirement Tasks 2, 3, 4, and 5, the contractor shall conduct a feasibility study evaluating potential remedial strategies for the site. The contractor shall include labor necessary to review current and historical reports and data as part of the scope. A Conceptual Site Model (CSM) has been prepared, but has not yet been approved by SCDHEC and completion date is indeterminate.

The contractor’s proposal shall include labor to review/incorporate CSM findings in the final report as needed. The study may include installation of additional borings/wells and collection of additional data. The final report shall include the remedial strategies evaluated, order of magnitude of costs, recommending implementation (if warranted) pilot tests and a recommended course of action based on the information evaluated. The study shall be provided as described in Section 3.4

TASK 4 – Reports of the PWS.

Existing Well Specifications: See 3.1.1 and 3.1.2above.

Assumptions:

Low site complexity

Limited level of study detail and documentation

Submit data electronically

3.1.4 Annual Environmental Regulations Review – [PPW Reference Item 007]

IAW with PWS Requirement Tasks 2, 4, and 5, the contractor shall provide an annual

Environmental Compliance Review of new/upcoming environmental regulations that apply to the site. This requirement will consist of an email to the COR/CS/CO with the relevant regulation notated and a brief summary stating how the regulation is applicable to the site. If no new/relevant regulations are identified, then the contractor shall provide an email stating negative results/findings.

3.1.5 Emergency Spill Consultation – [PPW Reference Item 008]

IAW PWS Requirement Tasks 2, 3, 4, 5, and 8, the contractor shall provide Spill Consultation for

DFSP Charleston. The contractor shall provide a project manager to travel to the site of a release as requested by DLA. The Contractor will respond within eight hours (8), including travel time, when notified of an emergency or requirements outside of core working hours by DLA such as a fuel release or a discovery of contamination that requires immediate emergency services to mitigate the risk to human health and the environment. This requirement is applicable for responding to both on and off-site (those beyond the sites in the site-specific appendices) area emergencies. The Project

Manager shall inspect the spill site, determine what on-site and off-site impacts have occurred or might occur, observe spill response activities, provide recommendations going forward and any other information the PM believes may be relevant. This information should be provided as soon as possible via telephone to the COR, CS and/or CO, followed up with a brief summary detailing the

PM’s observations via email within 24 hours. The Contractor PM should complete the inspection within ten (10) hours of arrival at the site unless otherwise approved by the CS/CO. The Contractor

PM’s role here is to be DLA’s “eyes and ears” at the spill site. The contract does not require direct spill response or spill response management, only consultation.

3.2 Site Compliance Performance Requirements

IAW PWS Requirement Task 7 the contractor shall provide environmental compliance services if needed. DFSP Charleston is designated as a Permitted Facility by DLA, meaning DLA is responsible for all environmental compliance at the facility. While there are no specific needs at this time, potential compliance requirements that may be required under this contract include but are not limited to:

NPDES Discharge monitoring, reporting or permitting

Permit renewal/application preparation

Air emissions monitoring, reporting or permitting

Natural/cultural resources surveys

SPCC/FRP preparation/support

Wetlands surveys

Tank/system closure application preparation and oversight

NEPA support

Compliance audit support

Asbestos sampling/remediation/disposal

Coastal Zone Management Act support

Charleston Fuel Pipeline Facility

SECTION 1.0 INTRODUCTION

Joint Base Charleston is a United States military facility located partly in the City of North

Charleston, South Carolina and partly in the City of Goose Creek, South Carolina. The facility is under the jurisdiction of the United States Air Force 628th Air Base Wing, Air Mobility Command

(AMC).[2]

The facility is an amalgamation of the United States Air Force Charleston Air Force Base and the

United States Navy Naval Support Activity Charleston, which were merged on 1 October 2010. A joint civil-military airport, JB Charleston shares runways with Charleston International Airport for commercial airlines operations on the south side of the airfield and general aviation aircraft operations on the east side.

1.1 Environmental History:

Defense Fuel Support Point (DFSP) Charleston is located at 5862 North Rhett Extension, Hanahan, SC. The DFSP terminal is an active fuel terminal supplying military customers in Charleston and surrounding areas with jet propellant (JP)-5 and JP-8. An eight-inch diameter underground pipeline is used to transport fuel from DFSP Charleston to Charleston Air Force Base (AFB). A leak was detected along this pipeline in 1993 in the airfield adjacent to South Aviation Road on the south side of the AFB. Approximately 500 gallons of JP-4 and 500 gallons of hydrocarbon-impacted groundwater were removed from the site using a vacuum truck immediately following discovery of the leak.

December 1993 – A leak was detected in the pipeline in the airfield adjacent to Perimeter Road that transports fuel from DFSP Charleston to Charleston Air Force Base (CAFB). Jet fuel was released to the environment before the leak was discovered and repaired. Initial response activities removed approximately 500 gallons of JP-4 and 500 gallons of hydrocarbon-impacted groundwater using a vacuum truck. The leak resulted in subsurface contamination consisting of a small area of free product (residual jet fuel) surrounded by a larger plume of dissolved fuel constituents. Since

September 1995, quarterly sampling of groundwater and surface water has been ongoing to determine the extent of contamination.

https://en.wikipedia.org/wiki/North_Charleston https://en.wikipedia.org/wiki/North_Charleston https://en.wikipedia.org/wiki/South_Carolina https://en.wikipedia.org/wiki/Goose_Creek,_South_Carolina https://en.wikipedia.org/wiki/United_States_Air_Force https://en.wikipedia.org/wiki/628th_Air_Base_Wing https://en.wikipedia.org/wiki/Air_Mobility_Command https://en.wikipedia.org/wiki/Joint_Base_Charleston#cite_note-joint_base-2 https://en.wikipedia.org/wiki/United_States_Air_Force https://en.wikipedia.org/wiki/Charleston_Field https://en.wikipedia.org/wiki/United_States_Navy https://en.wikipedia.org/wiki/Naval_Support_Activity_Charleston https://en.wikipedia.org/wiki/Charleston_International_Airport

October 1994 to July 2000 – An interim free product recovery system recovered approximately

15,000 gallons of free product. This recovery system was shut down in July 2000 due to high water levels and electrical problems. February 2002 – A revised Corrective Action Plan (CAP) was prepared recommending dual-phase (soil vapor and water) extraction with on-site treatment of extracted groundwater and soil vapor as the preferred corrective action. Site-specific cleanup goals were approved by SCDHEC in July 2003. However, planned activities, including the installation of additional upgradient groundwater monitoring wells, were deferred pending completion of remediation construction activities for the Pipeline site. Free product and impacted groundwater pump-out activities were also suspended at the site.

March 2011 – A treatment system was constructed and the groundwater and soil vapor extraction

(SVE) system began operation. The remediation system at the Pipeline Site includes 20 dual-phase recovery wells, on-site treatment for extracted vapors, on-site treatment for extracted groundwater, various pipe runs and wiring, and a permitted National Pollutant Discharge Elimination System

(NPDES) outfall. The recovery wells contain plumbing for SVE as well as groundwater extraction.

The extracted vapor is treated using granular activated carbon (GAC) before being exhausted to the atmosphere. Extracted groundwater is piped to the on-site Groundwater Treatment Plant (GWTP) located approximately 900 feet northwest of the well field. Extracted groundwater is treated by air stripping and GAC before being discharged to the surface water by way of the NPDES outfall. The treatment system, combined with Natural Attenuation (NA) is supporting reductions of chemicals of concern: benzene, toluene, ethylbenzene, xylenes (BTEX), Methyl tertiary-butyl ether (MTBE), and naphthalene.

2012 – Groundwater monitoring was performed at the Pipeline Site which identified the presence of

BTEX, naphthalene, and MTBE in groundwater, but were not detected in surface water samples collected in the on-site water- bearing ditch. Benzene and MTBE are the only two compounds that exceeded clean up goals in groundwater. The treatment system is ongoing, combined with quarterly sampling events conducted each year to assess BTEX, naphthalene, and MTBE concentrations, which will continue until cleanup goals are met. Overall, the number of monitoring wells with measurable thicknesses of LNAPL as well as the magnitude of LNAPL thickness over time has decreased. In January 2012, the maximum LNAPL thickness was 1.63 feet; in April 2012, the maximum thickness was 0.01 foot; in August 2012, no wells had measurable LNAPL, and in

November 2012 the maximum measured thickness was 0.05 foot.

2013 to 2014 – Monitoring wells located within the CAFB Pipeline Site were scheduled to be sampled on a quarterly basis during the 12-month period of July 2013 through June 2014. Activities to maintain the Pipeline Site remediation system operation was scheduled during this time as well.

The treatment system was operational and active, combined with quarterly sampling events conducted each year to assess BTEX, naphthalene, and MTBE concentrations until cleanup goals are met. Free Product Recovery included gauging all wells and checking for free product on a bi-monthly basis. Any identified free product was pumped, or manually recovered, into containers for characterization and disposal.

2014 – Groundwater monitoring activities and data indicate that BTEX, naphthalene, and MTBE were present in groundwater at detectable concentrations, but were not detected in surface water samples collected in the on-site water-bearing ditch. Benzene and MTBE are the only two compounds that exceeded SSTLs in groundwater and MTBE only exceeded the RBSL in one well.

Based on the site’s conceptual model (CSM) and data collected to date, quarterly, semiannual, and annual sampling frequencies were recommended to improve efficiency.

2015 – Groundwater monitoring performed at the CAFB Pipeline Site confirmed the continued presence and dissolution of BTEX, naphthalene and MTBE in groundwater at the site. Two compounds (benzene and MTBE) were detected at concentrations exceeding SSTLs; CoCs were not detected in surface water samples collected from the on-site ditch. The groundwater/SVE remediation system, which was activated in March 2011, continued to effectively remove contaminant mass from the underlying aquifer.

February 2016 – 2016 Annual Corrective Action Progress Report (CAPR) required by SCDHEC covering the period February 1, 2016 through January 31, 2017. Site activities conducted during this reporting period included remedial system operation & maintenance (O&M), quarterly groundwater sampling, and the implementation of a groundwater recirculation program. SCDHEC provided comment December 12, 2017.

March 2016 – The groundwater recirculation program was implemented at the site on March 24, 2016 and remained in operation through September 22, 2017. The objective of this program was to modify the existing remedial infrastructure and incorporate a closed-loop groundwater recirculation system to enhance the in-situ bioremediation of dissolved-phase petroleum compounds at the Site.

The activities were completed using an oxygenation unit with the existing pump-and-treat (P&T) components and reinjecting amended groundwater to existing recovery wells. Clean-up goals (CG) for benzene (12 μg/L) were exceeded at eight locations; the CG for MTBE (40 μg/L) was exceeded at one location.

SECTION 2.0 GENERAL CONTRACT REQUIREMENTS

2.1 Remedial Requirements

At the request of the DLA, and concurred to by SCDHEC, remedial operations at the site were temporarily suspended on September 22, 2017 for and extended rebound study. Remediation operations are still suspended.

The Contractor shall implement all activities within the framework of ongoing remediation efforts at the DFSP Charleston. The Contractor shall coordinate with the incumbent DLA Environmental

Services Contractor DLA Environmental Services contract SP0600-15-D-5503 to identify ongoing projects, upcoming requirements and transition all contracted requirements to the Contractor.

Contractor shall coordinate in a timely manner and in accordance with ongoing environmental services processes to support DLA or DOD Service/ Activity personnel, other DLA contractors reporting and data call requirements, and in cooperation with communities, regulators, and other government entities.

SECTION 3.0 PERFORMANCE REQUIREMENTS

3.1 Site Remediation Performance Requirements

For Charleston Pipeline Site, the following actions are required to be completed by contractor upon receipt of a task order (see PWS Section 2.2.1):

3.1.1 Semi-Annual Ground Water Sampling – [PPW Reference Item 004]

IAW PWS Requirement Tasks 3 and 4, the contractor shall conduct sampling and analysis of thirty-six (36) monitoring well(s) This task includes low flow sampling of currently installed wells on a semi-annual basis using a peristaltic pump, laboratory analysis for TPH and VOCs. The contractor shall include review of existing reports/studies/relevant documents in its proposal. The contractor shall dispose of Investigation Derived Waste (IDW) such as purge water, drill cuttings or other waste generated during the performance of this task. IDW shall be contained in drums or bulk containment for treatment/disposal as non-hazardous waste at a RCRA permitted facility. Prior to shipment of waste for treatment or disposal, the contractor shall verify that the chosen disposal facility is listed on the DLA Disposition Services’ Qualified Facility List located at https://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/QualifiedFacilitiesL ist/. The contractor shall consider disposal costs and transportation costs in order to provide the best value to the government for waste disposal. Monitoring well specifications, site conditions and assumptions are provided below.

Existing Monitoring Well Parameters:

Sixteen (16) 2-inch wells

Five (5) 4-inch wells

Fifteen (15) 6-inch wells o Average sample depth of 15 feet below ground surface

(bgs)

Average depth to groundwater - 10 foot bgs

Average total well depth - 27 feet bgs

Assumptions:

Stage 1 Data/QC Analysis and standard turnaround time

QA/QC sampling but no split sampling required

Perform data evaluation/validation, including Stage 1 lab data review

Submit data electronically

Submit a standard monitoring report semi-annually

3.1.2 System Deconstruction and Well Abandonment – [PPW Reference Item 005]

IAW PWS Requirement Tasks 2, 3, 4, and 9, the contractor shall abandon all existing monitoring wells IAW SCDHEC and provide a report documenting well abandonment and SCDHEC’s acknowledgement/approval of abandonment. Contractor shall dismantle, document and retain on site the dismantled system components. The contractor shall coordinate with the COR/CS/CO to engage DLA Disposition Services for removal of the dismantled systems.

Abandon Twenty (20) two-inch wells, eight (8) 4-inch wells, Twenty (20) 6-inch extraction wells

Average well depth is 27 feet bgs

Assume monitoring wells have concrete/steel collars and are constructed of PVC schedule 40

Wells are installed in unconsolidated overburden

Safety Level D

System Parameters:

On-site groundwater treatment plant (GWTP) and its associated infiltration gallery

Two (2) dual phase independent Soil Vapor Extraction (SVE) systems

3.1.3 Feasibility Study – [PPW Reference Item 006]

IAW PWS Requirement Tasks 2, 3, 4, and 5, the contractor shall conduct a feasibility study evaluating potential remedial strategies for the site. The contractor shall include labor necessary to review current and historical reports and data as part of the scope. A Conceptual Site Model (CSM) has been prepared, but has not yet been approved by SCDHEC and completion date is indeterminate.

The contractor’s proposal shall include labor to review/incorporate CSM findings in the final report as needed. The study may include installation of additional borings/wells and collection of additional data. The final report shall include the remedial strategies evaluated, order of magnitude of costs, recommending implementation (if warranted) pilot tests and a recommended course of action based on the information evaluated. The study shall be provided as described in Section 3.4

TASK 4 – Reports of the PWS.

Existing Well Specifications: See 3.1.1 and 3.1.2 above.

Low site complexity

Limited level of study detail and documentation

Submit data electronically

3.1.4 Annual Environmental Regulations Review – [PPW Reference Item 007]

IAW PWS Requirement Tasks 2, 4, and 5, the contractor shall provide an annual Environmental

Compliance Review of new/upcoming environmental regulations that apply to the site. This requirement will consist of an email to the COR/CS/CO with the relevant regulation notated and a brief summary stating how the regulation is applicable to the site. If no new/relevant regulations are identified, then the contractor shall provide an email stating negative results/findings.

3.1.5 Emergency Spill Consultation – [PPW Reference Item 008]

IAW PWS Requirement Tasks 2, 3, 4, 5, and 8, the contractor shall provide Spill Consultation for

DFSP Charleston. The contractor shall provide a project manager to travel to the site of a release as requested by DLA. The Project Manager shall inspect the spill site, determine what on-site and off-site impacts have occurred or might occur, observe spill response activities, provide recommendations going forward and any other information the PM believes may be relevant. This information should be provided as soon as possible via telephone to the COR, CS and/or CO, followed up with a brief summary detailing the PM’s observations via email within 24 hours. The

Contractor PM should complete the inspection within ten (10) hours of arrival at the site unless otherwise approved by the CS/CO. The Contractor PM’s role here is to be DLA’s “eyes and ears” at the spill site. The contract does not require direct spill response or spill response management, only consultation.

3.2 Site Compliance Performance Requirements

IAW PWS Requirement Task 7 the contractor shall provide environmental compliance services if needed. DFSP Charleston is designated as a Permitted Facility by DLA, meaning DLA is responsible for all environmental compliance at the facility. While there are no specific needs at this time, potential compliance requirements that may be required under this contract include but are not limited to:

NPDES Discharge monitoring, reporting or permitting

Permit renewal/application preparation

Air emissions monitoring, reporting or permitting

Natural/cultural resources surveys

SPCC/FRP preparation/support

Wetlands surveys

Tank/system closure application preparation and oversight

NEPA support

Compliance audit support

Asbestos sampling/remediation/disposal

Coastal Zone Management Act support

Type Well # Value Type Well # Value

CAFB‐HP‐01 $1,326.00 DFSP‐MW‐1 $1,326.00

CAFB‐HP‐02 $1,326.00 DFSP‐MW‐2 $1,326.00

CAFB‐HP‐03 $1,326.00 DFSP‐MW‐3 $1,326.00

CAFB‐INT‐1 $1,326.00 DFSP‐MW‐4 $1,326.00

CAFB‐INT‐2 $1,326.00 DFSP‐MW‐5 $1,326.00

CAFB‐INT‐3 $1,326.00 DFSP‐MW‐6 $1,326.00

CAFB‐MW‐1 $1,326.00 DFSP‐MW‐7 $1,326.00

CAFB‐MW‐2 $1,326.00 DFSP‐MW‐8 $1,326.00

CAFB‐MW‐3 $1,326.00 DFSP‐MW‐9 $1,326.00

CAFB‐MW‐4 $1,326.00 DFSP‐MW‐10 $1,326.00

CAFB‐MW‐5 $1,326.00 DFSP‐MW‐11 $1,326.00

CAFB‐MW‐6 $1,326.00 DFSP‐MW‐12 $1,326.00

CAFB‐MW‐7 $1,326.00 DFSP‐MW‐13 $1,326.00

CAFB‐MW‐8 $1,326.00 DFSP‐MW‐14 $1,326.00

CAFB‐MW‐9 $1,326.00 DFSP‐MW‐15 $1,326.00

CAFB‐MW‐10 $1,326.00 DFSP‐MW‐15R $1,326.00

CAFB‐MW‐11 $1,326.00 DFSP‐MW‐24 $1,326.00

CAFB‐MW‐12 $1,326.00 DFSP‐MW‐25 $1,326.00

CAFB‐MW‐13 $1,326.00 DFSP‐MW‐25R $1,326.00

CAFB‐MW‐14 $1,326.00 DFSP‐MW‐27 $1,326.00

CAFB‐MW‐15 $1,326.00 DFSP‐MW‐41 $1,326.00

CAFB‐MW‐16 $1,326.00 DFSP‐MW‐42 $1,326.00

CAFB‐MW‐17 $1,326.00 DFSP‐MW‐42R $1,326.00

CAFB‐MW‐18 $1,326.00 DFSP‐MW‐43 $1,326.00

CAFB‐MW‐19 $1,326.00 DFSP‐MW‐43R $1,326.00

CAFB‐MW‐20 $1,326.00 DFSP‐MW‐44 $1,326.00

CAFB‐MW‐21 $1,326.00 DFSP‐MW‐44R $1,326.00

CAFB‐MW‐22 $1,326.00 DFSP‐MW‐45 $1,326.00

CAFB‐MW‐23 $1,326.00 DFSP‐MW‐45R $1,326.00

CAFB‐MW‐24 $1,326.00 DFSP‐MW‐46 $1,326.00

CAFB‐MW‐25 $1,326.00 DFSP‐MW‐46R $1,326.00

CAFB‐PZ‐28 $1,326.00 DFSP‐MW‐47 $1,326.00

CAFB‐PZ‐29 $1,326.00 DFSP‐MW‐47R $1,326.00

CAFB‐PZ‐30 $1,326.00 DFSP‐MW‐48 $1,326.00

CAFB‐PZ‐31 $1,326.00 DFSP‐MW‐49 $1,326.00

CAFB‐PZ‐32 $1,326.00 DFSP‐MW‐50 $1,326.00

CAFB‐RW‐1 $1,628.00 DFSP‐MW‐51 $1,326.00

CAFB‐RW‐2 $1,628.00 DFSP‐MW‐52 $1,326.00

CAFB‐RW‐3 $1,628.00 DFSP‐MW‐53 $1,326.00

CAFB‐RW‐4 $1,628.00 DFSP‐MW‐54 $1,326.00

CAFB‐RW‐5 $1,628.00 DFSP‐MW‐55 $1,326.00

CAFB‐RW‐6 $1,628.00 DFSP‐MW‐56 $1,326.00

CAFB‐RW‐7 $1,628.00 DFSP‐MW‐57 $1,326.00

CAFB‐RW‐8 $1,628.00 DFSP‐MW‐58 $1,326.00

DFSP Charleston, SC M o n it o ri n g W e lls

M o n it o ri n g W e lls

DFSP Charleston Pipeline Site, SC

CAFB‐RW‐9 $1,628.00 DFSP‐MW‐59 $1,326.00

CAFB‐RW‐10 $1,628.00 MW‐04 $1,326.00

CAFB‐RW‐11 $1,628.00 MW‐04R $1,326.00

CAFB‐RW‐12 $1,628.00 MW‐05 $1,326.00

CAFB‐RW‐13 $1,628.00 MW‐06 $1,326.00

CAFB‐RW‐14 $1,628.00 MW‐07 $1,326.00

CAFB‐RW‐15 $1,628.00 MW‐08 $1,326.00

CAFB‐RW‐16 $1,628.00 MW‐09 $1,326.00

CAFB‐RW‐17 $1,628.00 MW‐10 $1,326.00

CAFB‐RW‐18 $1,628.00 MW‐11 $1,326.00

CAFB‐RW‐19 $1,628.00 MW‐12A $1,326.00

CAFB‐RW‐20 $1,628.00 MWGS‐22 $1,326.00

CAFB‐SG‐1 $1,628.00 MWGS‐22R $1,326.00

CAFB‐SG‐2 $1,628.00 MWGS‐29B $1,326.00

CAFB‐Ditch‐1 $1,326.00 MWGS‐30B $1,326.00

CAFB‐Ditch‐2 $1,326.00 MWGS‐31A $1,326.00

CAFB‐Ditch‐3 $1,326.00 MWGS‐31B $1,326.00

CAFB‐Ditch‐4 $1,326.00 MWGS‐32A $1,326.00

CAFB‐VMP‐1 $1,326.00 MWGS‐32B $1,326.00

CAFB‐VMP‐2 $1,326.00 MWGS‐33A $1,326.00

CAFB‐VMP‐3 $1,326.00 MWGS‐34A $1,326.00

CAFB‐VMP‐4 $1,326.00 MWGS‐35 $1,326.00

CAFB‐VMP‐5 $1,326.00 MWGS‐36 $1,326.00

Air/water Knockout

Tank N/A

MWGS‐37 $1,326.00

Vacuum Pump $14,850.00 MWGS‐38 $1,326.00

Vapor‐phase carbon $13,000.00 MWGS‐38R $1,326.00

Liquid Transfer Pumps $5,890.00

MWGS‐39 $1,326.00

2" high Density

Polyethylene transfer line $350.00

RW‐1 $1,628.00

Oil‐Water Separator $21,039.76 RW‐2 $1,628.00

Surge tank $1,015.99 RW‐3 $1,628.00

Air stripper $14,850.00 RW‐4 $1,628.00

Particulate filters $264.75 W‐001 $1,628.00

Liquid Phase Granulated

Active Carbon

$13,000.00

W‐103 $1,628.00 Vapor Phase Carbon $13,000.00 W‐108 $1,628.00

DW‐1 $1,628.00

$192,746.50 EW‐1 $1,628.00

EW‐2 $1,628.00

EW‐5 $1,628.00

EW‐6 $1,628.00

EW‐7 $1,628.00

R e co ve ry W e lls

M o n it o ri n g W e lls

Tr u ck R ac k D u al ‐P h as e S V E

Sy st e m s

G ro u n d w at e r

Tr e at m e n t P la n t

Estimated Total

EW‐8 $1,628.00

EW‐9 $1,628.00

EW‐10 $1,628.00

EW‐11 $1,628.00

EW‐12 $1,628.00

EW‐13 $1,628.00

EW‐14 $1,628.00

EW‐15 $1,628.00

EW‐16 $1,628.00

EW‐17 $1,628.00

EW‐18 $1,628.00

ST1‐1 $1,628.00

ST1‐2 $1,628.00

ST1‐3 $1,628.00

ST1‐4 $1,628.00

ST1‐5 $1,628.00

ST1‐6 $1,628.00

ST1‐7 $1,628.00

ST1‐8 $1,628.00

ST1‐9 $1,628.00

ST1‐10 $1,628.00

ST1‐11 $1,628.00

ST1‐12 $1,628.00

ST1‐13 $1,628.00

ST1‐14 $1,628.00

ST1‐15 $1,628.00

ST1‐16 $1,628.00

ST1‐17 $1,628.00

ST1‐18 $1,628.00

SVE‐1 $1,628.00

SVE‐2 $1,628.00

SVE‐3 $1,628.00

SVE‐4 $1,628.00

SVE‐5 $1,628.00

SVE‐6 $1,628.00

SVE‐7 $1,628.00

SVE‐8 $1,628.00

SVE‐9 $1,628.00

SVT3‐1 $1,628.00

SVT3‐2 $1,628.00

SVT3‐3 $1,628.00

SVT3‐4 $1,628.00

SVT3‐5 $1,628.00

SVT3‐6 $1,628.00

SVT3‐7 $1,628.00

R e co ve ry W e lls

SVT3‐8 $1,628.00

SVT3‐9 $1,628.00

SVT3‐10 $1,628.00

SVT3‐11 $1,628.00

SVT3‐12 $1,628.00

SVT7‐1 $1,628.00

SVT7‐2 $1,628.00

Oil‐Water Separator $21,039.76

Surge tank $1,015.99

Air stripper $14,850.00

Particulate filters $264.75

Liquid Phase Granulated

Active Carbon $13,000.00 Vapor Phase Carbon $13,000.00

Air/water Knockout Tank N/A

Vacuum Pump $1,844.40

Vapor‐phase carbon beds $13,000.00

Heat Exchanger $8,750.00 2" high Density

Polyethylene transfer line $350.00

3 Air/water Knockout

Tanks N/A

3 Liquid Transfer Pumps $5,533.20

2 Vacuum Pumps $3,688.80

Vapor‐phase carbon beds $13,000.00

Heat Exchanger $8,750.00 2" high Density

Polyethylene transfer line $350.00

3 Air/water Knockout

Tanks N/A

Vacuum Pump $1,844.40

Vapor‐phase carbon beds $13,000.00

Heat Exchanger $8,750.00 2" high Density

Polyethylene transfer line $350.00

$342,347.30

G ro u n d w at e r

Tr e at m e n t P la n t

Tr u ck R ac k D u al ‐P h as e S V E

Sy st e m s

Ta n k D u al ‐P h as e S V E Sy st e m s

Ta n k D u al ‐P h as e S V E

Sy st e m s

Estimated Total

Attachment 2 - PWS App C - DFSP Charleston
DFSP Charleston Equipment Inventory