Attachment 7 - PWS App H - DFSP Verona 9.28.20.pdf

PDF 530 KB Posted

Attached to
Project Management, Environmental Remediation System Operation and Maintenance (O&M), Monitoring and Reporting for SE Region and DFSP Verona
Solicitation number
SPE60320R0521
Issued by

View the file

Other files

File Type Posted
Attachment 5 - PWS App F - FLC Jacksonville 9.28.20.pdf PDF
Attachment 13 - PPW - Verona 9.28.20.xlsx XLSX spreadsheet
Attachment 12 - PPW - Tampa 9.28.20.xlsx XLSX spreadsheet
Attachment 23 - QAs.pdf PDF
Amd 0004 - SF-30.pdf PDF
Attachment 3 - PWS App D - Fort Hood 9.28.20.pdf PDF
Attachment 1 - PWS 9.28.20.pdf PDF
Attachment 11 - PPW - Jacksonville 9.28.20.xlsx XLSX spreadsheet
Attachment 24 - QC Blanks.pdf PDF
Attachment 6 - PWS App G - DFSP Tampa 9.28.2.pdf PDF
Attachment 9 - PPW - Ft. Hood 9.28.20.xlsx XLSX spreadsheet
Attachment 2 - PWS App C - DFSP Charleston 9.28.20.pdf PDF
Attachment 8 - PPW - Charleston 9.28.20.xlsx XLSX spreadsheet
Attachment 10 - PPW - Hunter 9.28.20.xlsx XLSX spreadsheet
RFP SPE603-20-R-0521 09.28.20.pdf PDF
Attachment 4 - PWS App E - Hunter AAF 9.28.20.pdf PDF
Amd 0003 - SF-30.pdf PDF
RFP SPE603-20-R-0521 9.25.20.pdf PDF
Amd 0002 - SF-30.pdf PDF
Attachment 14 - PPQ 9.15.20.docx DOCX document
Amd 0001 - SF-30.pdf PDF
Amd 0001 - RFP SPE603-20-R-0521 9.3.20.pdf PDF
Attachment 18 - WD - DFSP Jacksonville.pdf PDF
Attachment 1 - PWS.pdf PDF
Attachment 7 - PWS App H - DFSP Verona.pdf PDF
Attachment 9 - PPW - Ft. Hood.xlsx XLSX spreadsheet
Attachment 2 - PWS App C - DFSP Charleston.pdf PDF
Attachment 15 - WD - DFSP Charleston.pdf PDF
Attachment 20 - WD - DFSP Verona.pdf PDF
Attachment 12 - PPW - Tampa.xlsx XLSX spreadsheet
Attachment 11 - PPW - Jacksonville.xlsx XLSX spreadsheet
Attachment 13 - PPW - Verona.xlsx XLSX spreadsheet
Attachment 3 - PWS App D - Fort Hood.pdf PDF
Attachment 22 - JV Consent Form.docx DOCX document
Attachment 17 - WD - Hunter AAF.pdf PDF
RFP SPE603-20-R-0521.pdf PDF
Attachment 16 - WD - Ft Hood.pdf PDF
Attachment 6 - PWS App G - DFSP Tampa.pdf PDF
Attachment 21 - DFSP Verona Historical Electrical Bills.pdf PDF
Attachment 10 - PPW - Hunter.xlsx XLSX spreadsheet
Attachment 8 - PPW - Charleston.xlsx XLSX spreadsheet
Attachment 4 - PWS App E - Hunter AAF.pdf PDF
Attachment 14 - PPQ.docx DOCX document
Attachment 19 - WD - DFSP Tampa.pdf PDF
Attachment 5 - PWS App F - FLC Jacksonville.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Appendix H

DFSP VERONA, NY Site Specific Information

SPE603-20-R-0521

ATTACHMENT 7

PERFORMANCE WORK STATEMENT (PWS)

APPENDIX H

DEFENSE FUEL SUPPLY POINT VERONA, NY

SITE SPECIFIC INFORMATION

26 August 2020

Defense Fuel Support Point Verona, NY

SECTION 1.0 INTRODUCTION

The Defense Fuel Support Point (DFSP) Verona (Site) is a DLA permitted inactive bulk fuel facility. The Site is located in the Town of Verona in Oneida County, in mid-central New York.

It is between Syracuse on the west and Utica on the east. The site is located at Latitude 43°

7’27” north and Longitude 75° 35’35” west.

DFSP Verona was constructed in 1959 as a fuel storage and transfer facility. All fueling operations ceased at the facility as of September 2014. When operational, DFSP Verona’s purpose was to provide Jet Propulsion Fuel Grade JP-4 (1959-1992) and JP-8. The New York

State Thruway (I-90) is visible to the south of the site. Exit 33 off the Thruway is within one half mile of the site. The property is roughly rectangular in shape with its longer sides on a SW/NE axis. The longer side on SE border of the property runs along County Road 83, also known as

Main Street in Verona. The opposite NW longer side runs along a Conrail railroad line.

There are eight buildings on the site as well as three large above ground jet fuel storage

Tanks surrounded by containment dikes. There is also an overhead fuel pumping station to load tank trucks. A fuel additive tank and slop tank are located near the overhead fuel pumping station. An open air pump building is located next to the overhead fuel pumping station. There is also a 179,000 gallon water storage tank immediately adjacent to the Fire/Foam building.

At the time of the1977-78 acquisition, the plat map for the site indicates four fuel storage tanks were located on the site. Three of the tanks had a capacity of 80,000 barrels of jet fuel

(3,360,000 gallons per tank) and one tank had the capacity of 54,000 barrels of aviation gas

(2,268,000 gallons). In 2011, Fuel Tank #4, the smallest tank, has been razed.

The three remaining fuel storage tanks, the office building, and the maintenance and support buildings are located in the southwestern portion of the property. The shape of this main activity area resembles a smaller rectangle located within the larger rectangle shape of the property. The southernmost tip of the property is approximately 150 feet from the New York State Thruway.

Exit 33 from the Thruway is east of this point by less than one-half mile. The northwester portion of the property between the main activity area and the railroad line is open meadowland with some trees along the railroad embankment.

Northeast of the main activity area there is approximately 50% of the total acreage of the property. That area is separated from the main operations area by a tall chain-link fence. This undeveloped land extends from Main Street to the railroad line. It has been left fallow or farmed on a rental basis by local farmers. The land across Main Street to the east of the main activity area contains single family housing units and small commercial office establishments located in a residential housing type of unit.

1.1 Environmental History:

The site was first acquired in April, 1959 by Verona Terminal Storage from the State of New

York. Verona Terminal Storage then leased the site to the United States in May, 1959 for use as a fuel storage facility.

In the lease, the United States was granted the right to acquire the site. The acquisition process began with passage of Public Law 94-367 in July 1976 to provide funds for the “Taking” of the land based upon the declared needs of the US Air Force for its fuel storage program. The official

“Declaration of Taking” notice was filed in December, 1977, and ended with a judgment for

$270,000 as the just compensation for the property in June, 1979. The United States acquired fee simple ownership of the property “subject however, to existing easements for public roads and highways, public utilities, railroads, and pipelines.”

The original purpose of the Property was to serve as a fuel storage support facility for the

Griffiss Air Force Base located in Rome, New York. Over the years, the DFSP served this mission and also served other military bases in the area. Griffiss AFB was closed as part of Base

Realignment and Closure of 1995. The other military users of the site were closed or found other facilities to suit their purposes.

In 2013, a small release of 30 to 40 gallons at the loading dock was reported; this spill was remediated and closed in March 2013. In August 2013 a petroleum odor was detected from a soil sample, and in June 2015 petroleum-impacted soil was discovered during removal of underground storage tank (UST) 121. Both these events were closed in December 2016 with contamination in place according to a New York State Department of Conservation (NYSDEC) letter dated 6 December 2016 addressed to the DLA.2 As a result, ongoing Land Use Controls

(LUCs)/Institutional Controls (ICs) are required at the DFSP. DLA is responsible for funding

LUCs/ICs until the DFSP can be transferred to the USAF.

1992-2014 – DLA operated the DFSP to support the needs of various military-related organizations. During facility closure activities conducted in 2015, fuel storage tanks were cleaned and associated fuel system components were removed, and associated petroleum-impacted soil was excavated and disposed off-site as part of the Military Construction

(MILCON) project

2015-2017 - DFSP plans, programs and permits were terminated (i.e. SPCCP, FRP, OPA 90

Exercises, UST Operator Certification, MOSF permit, SWPPP). The OWS and AFFF fire suppression system was closed in 2017. SPDES permit terminated. OWS (Tank 116 UST) remains in place for possible future use if the facility is ever reactivated. Concrete grit chamber, sludge box and coalescing filters were cleaned of liquids and solids. Storm water rerouted to

Stony Creek bypassing OWS. The AFFF system was flushed using clean potable water to include all associated piping. 15,110 gallons were removed from the system, bladders and drums. The site has been in caretaker status since 2015.

2018 Perfluorooctane sulfonate (PFOS) and perfluorooctanoic acid (PFOA) -The site has been regulated as Potentially Inactive. A Potentially Inactive hazardous waste disposal site (Class P -potential registry site)] by the New York Department of Conservation (DEC) under NYDEC

Law Title 13 § 27-1301 - 1321. This statute allows the site owner to petition for a hearing to modify or remove the site classification of the site as a potential hazardous waste disposal site.

The NYSDEC may request a Record of Decision (ROD). In July 2017 and July 2018 DLA collected groundwater samples from monitoring wells at the site and found perfluorinated compounds (PFC)s in the groundwater. In December 2018 and January 2019, a second Site

Investigation was conducted, and included the ground water sampling of 8 monitoring wells. A

Site Characterization Report was drafted April 2019.

2019 February - Last open spill report 17-08575 polyfluoroalkyl substances (PFAS) and PFOA was closed by the New York State Department of Environmental Conservation (NYSDEC).

September 2019 -DLA initiated a mitigation action that included additional characterization, excavation and thermal treatment of PFAS-contaminated soil. Pilot treatment tests may be indefinitely delayed.

2018 - The NYSDEC verbally approved action for an Environmental Baseline Survey (EBS).

Type 6 ATSM Standard Classification of Property types based upon release of a hazardous substance (PFOS) to the environment. Type 6 - An area or parcel of real property where release, disposal, or migration or some combination thereof, of hazardous substances has occurred, but required response actions have not yet been initiated.

November 2019-Guidance from NYSDEC, 30 MWs prompted sampling w/possible step out monitoring wells (MWs) being installed to define the PFOS area of impact. The area will be defined by additional soil boring samples. Reporting completed December 2019.

1.2 Operational Status

The site is an inactive DFSP and currently in Caretaker and Long Term Monitoring (LTM) status.

SECTION 2.0 GENERAL CONTRACT REQUIREMENTS

The contractor shall implement all activities within the framework of ongoing remediation efforts at the DFSP Verona. The contractor shall coordinate with the incumbent DLA

Environmental Services contract SP0600-14-D-5424. The contractor shall coordinate in a timely manner and in accordance with ongoing environmental services processes to support DLA or

DOD Service/Activity personnel, other DLA contractors reporting and data call requirements, and in cooperation with communities, regulators, and other government entities. This site does not require that key personnel project manager has performed similar work with at least two in-situ projects as there is no in-situ projects as a future requirement.

SECTION 3.0 PERFORMANCE REQUIREMENTS

3.1 Site Remediation Performance Requirements

For DFSP Verona, the following actions are requested to be completed by contractor upon receipt of a task order (see PWS Section 2.2.1):

3.1.1 Caretaker Services - [Proposal Price Worksheet (PPW) Reference Item 001-005] IAW with PWS Requirement Tasks 2, 4, and 5, the contractor shall provide all labor tools, materials, supplies, and equipment to provide the following tasks:

Ground Maintenance - [PPW Reference Item 001] The contractor shall provide ground maintenance including; mow, cut and trim all grasses, weeds and other vegetation.

Upon issuance of a Task Order, the contractor shall cut all grasses to 4 inches or less within 20 feet of facilities (buildings, tanks, area above underground tanks, pits, pipelines, and fire hydrants) and within 10 ft. on both sides of all roads where ground and elevation conditions permit.

The contractor shall not use herbicides as it is prohibited.

Snow Removal - [PPW Reference Item 002] Upon issuance of a Task Order, the contractor shall provide removal of snow providing access for any area. Estimated frequency for snow removal is 2/week x 1 month during snow periods.

The contractor shall preform snow removal tasks when accumulation is greater than 4 inches.

The contractor shall ensure snow removal provides adequate access to main entrance to administration building and restoration areas.

The contractor shall coordinate all snow removal activities with the DLA Installation

Operations Energy Environmental Specialist COR before starting work.

Surveillance - [PPW Reference Item 003] The Contractor shall conduct a weekly surveillance service to ensure the DFSP infrastructure is safe, secure, and maintained for current and future environmental services.

The contractor shall annotate security checks in a log detailing the date performed, any actions/comments, note any maintenance issues needing attention for future repair consideration (i.e. fence repair, locks, lights, etc.), areas checked, and person completing the surveillance service.

The contractor shall immediately contact DLA Installation Operations Energy

Environmental Specialist COR and/or local law enforcement if an illegal violation, safety issue and/or security issue needs immediate attention.

The contractor shall inspect existing fencing, gate mechanism, and bird exclusion screening at Tanks 2 and 3 from ground level.

The contractor shall make recommendations for repairs when required.

Maintenance - [PPW Reference Item 004] The contractor shall perform repairs and take corrective actions identified during Surveillance.

The contractor shall inspect and repair existing fencing, gate mechanism and bird exclusion screening at Tanks 2 and 3. from ground level.

The contractor shall make recommendations for repairs and when requestedrequired.

Utility Bills - [PPW Reference Item 005 004]

The Contractor will pay monthly electric bills for light operations to the National Grid

Company.

Copies of the National Grid invoice must be uploaded into WAWF for payment.

Historical cost data is available for review.

The contractor must establish an electric account with utility provider within ten (10) days of award of the Task Order so incumbent contractor can close out their billing responsibilities as of 31 Oct 2020. The incoming contractor shall assume responsibilities for electrical payment effective 1 Nov 2020.

3.1.2 – Semi-Annual Ground Water Sampling, Work Plan, and After Sampling Reporting -

[PPW Reference Item 006 005]

The contractor shall provide all labor tools, materials, supplies, and equipment to provide the following Work Plan (WP), groundwater sampling and after sampling reporting tasks:

Work Plan

IAW PWS Requirement Tasks 2 and 5, the Contractor will prepare one Draft WP for semi-annual groundwater sampling. The WP will document procedures to be utilized as part of the groundwater sampling activities to be performed in accordance with (IAW), NYSDEC approval process, regulations and guidance. The Contractor shall provide a tentative schedule of deliverables and field actions in the task order proposal and submit a final schedule within 10 business days of task order award. The Contractor shall provide a draft WP to the COR and shall assume 10 days for DLA approval. Upon revision of DLA comments and approval, DLA will forward the DLA-approved Draft documents to NYSDEC for their review and comments and allow for a 30 day review period. After receipt of NYSDEC comments, the Contractor will finalize the WP within 30 days. DLA will then forward WP to NYSDEC for approval.

Semi-Annual Groundwater Sampling

IAW PWS Requirement Tasks 2 and 3, the contractor shall conduct sampling and analysis of thirty eight (38) monitoring well(s). This task includes low flow sampling of currently installed wells using a peristaltic pump, laboratory analysis for Polyfluorinated and Polycarboxylic Acids

(PFAS). The contractor shall review existing reports/studies/relevant documents. The contractor shall dispose of Investigation Derived Waste (IDW) and or other waste generated during the performance of this task. However, IDW such as purge water may be poured on the ground with

NYDEC approval. Other IDW shall be contained in drums or bulk containment for treatment/disposal as non-hazardous waste at a RCRA permitted facility. Prior to shipment of waste for treatment or disposal, the contractor shall verify that the chosen disposal facility is listed on the DLA Disposition Services’ Qualified Facility List located at:

https://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/QualifiedFaciliti esList/. Monitoring well specifications, site conditions and assumptions are provided below:

The contractor shall perform groundwater sampling semi-annually to monitor PFAS in groundwater and shall use existing monitoring well network.

Existing Monitoring Well Parameters:

38 total wells from 1-2-inch diameter

Average depth to groundwater of 5-15 feet bgs https://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/QualifiedFacilitiesList/ https://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/QualifiedFacilitiesList/

Average total well depth 15-20 feet bgs

Assumptions:

Stage 1 Data/QC Analysis and standard turnaround time

QA/QC sampling but no split samples required

Data Management

Perform data evaluation/validation, including Stage 1 lab data review

Safety Level D

Semi-Annual Groundwater Sampling Reporting

IAW PWS Requirement Tasks 2 and 4 and within 30 days following receipt of analytical data from each event, the Contractor will submit an electronic draft of the Monitoring Report

(separate Report for each event) to the COR for review. The Reports will document the groundwater sampling event IAW NYSDEC regulations and guidance and historical site

Reports. The Contractor shall provide the draft Reports to the COR and shall assume 10 days for

DLA approval. Upon revision of DLA comments and approval, DLA will forward the DLA-approved Draft documents to NYSDEC for their review and comments and allow for a 30 day review period. After receipt of NYSDEC comments, the Contractor will finalize the Report within 30 days. . DLA will then forward the Report to NYSDEC for approval.

3.1.3 Project Initialization – [PPW Reference Item 006]

IAW PWS Requirement Task 1, the contractor shall Review all historical documents provided by DLA and/or prior contractor. Provide the Project Management Plan which includes: Quality

Control Plan (QCP)), Health and Safety Plan (HASP), Integrated Management Schedule (IMS), Staffing Management Plan (SMP), Risk Management Plan (RMP), and Government Furnished

Equipment (GFE)/Government Furnished Property (GFE) Listing.

3.2 Site Compliance Requirements

DFSP Verona is designated as a Permitted Facility by DLA, meaning DLA is responsible for all environmental compliance at the facility. While there are no specific permits or needs at this time, potential compliance requirements that may be required under this contract include but are not limited to:

NPDES Discharge monitoring, reporting or permitting

Permit renewal/application preparation

Air emissions monitoring, reporting or permitting

Natural/cultural resources surveys

Environmental Baseline Survey updates to reflect property reclassification milestones

SPCC/FRP preparation/support

Wetlands surveys

Tank/system closure application preparation and oversight

NEPA support

Compliance audit support

Asbestos sampling/remediation/disposal

DFSP Verona

Groundwater Elevations

January 8, 2019

Location TOR Elevation Depth to Water GW Elevation TOR Elev. May 2016 Difference between 2019 and 2016

MW‐2R 500.89 5.65 495.24 93.77 407.12

MW‐7R 507.59 4.32 503.27 101.06 406.53

MW‐10R 496.05 4.98 491.07 89.47 406.58

MW‐13 509.64 7.21 502.43 102.35 407.29

MW‐29 497.12 7.13 489.99

MW‐30 498.47 6.21 492.26

MW‐31 500.55 16.42 484.13

MW‐32 499.77 5.84 493.93

MW‐33 502.67 4.55 498.12

MW‐34 506.40 5.13 501.27

MW‐35 504.88 3.60 501.28

MW‐36 501.61 4.20 497.41

MW‐37 502.23 4.96 497.27

Note: Top of riser (TOR) elevation survey performed by TK&K on January 10, 2019.

Benchmark was finished floor of the Administration Lab Building (506.81 ft).

Table 2 ‐ Well Gauging

DFSP Verona Site Characterization

November 4, 2019

Location TOR Elevation (asml) Depth to Water (ft.) GW Elevation (asml)

MW‐2R 500.89 5.87 495.02

MW‐3R 504.72 3.46 501.26

MW‐4 490.36 5.58 484.78

MW‐5 488.75 14.35 474.40

MW‐7R 507.61 3.98 503.63

MW‐8R 507.54 4.43 503.11

MW‐9 488.82 13.70 475.12

MW‐10R 495.98 4.78 491.20

MW‐13 509.69 6.65 503.04

MW‐16R 495.15 5.95 489.20

MW‐23R 500.79 3.34 497.45

MW‐24 503.16 1.88 501.28

MW‐25 505.08 5.48 499.60

MW‐27 501.17 1.45 499.72

MW‐29 497.12 7.14 489.98

MW‐30 498.47 5.55 492.92

MW‐31 500.55 16.19 484.36

MW‐32 499.77 5.23 494.54

MW‐33 502.67 4.32 498.35

MW‐34 506.40 4.76 501.64

MW‐35 504.88 3.31 501.57

MW‐36 501.61 4.22 497.39

MW‐37 502.23 4.70 497.53

MW‐38 502.74 5.29 497.45

MW‐39 502.56 4.09 498.47

MW‐40 495.78 3.10 492.68

MW‐41 482.98 8.67 474.31

MW‐42 482.86 8.01 474.85

MW‐43 484.64 11.86 472.78

MW‐44 470.51 3.43 467.08

MW‐45 471.88 3.93 467.95

MW‐46 473.24 3.73 469.51

MW‐47 485.72 7.60 478.12

MW‐48 495.68 3.20 492.48

MW‐49 503.65 Frozen at 6.1

MW‐50 505.14 4.57 500.57

MW‐51 505.01 4.64 500.37

MW‐52 505.58 5.14 500.44

Table 2 ‐ Well Gauging

DFSP Verona Site Characterization

November 4, 2019

MW‐53 503.67 3.49 500.18

Depth to water was recorded on January 7, 2020

Top of riser (TOR) elevation survey was performed by TK&K on November 7, 2019 and January 9, 202

Benchmark was finished floor of the Administration Lab Building (506.81 ft).

asml ‐ above mean sea level