Attachment 4 - PPW Amd 02.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Alaska - Systems O&M and Remediation Federal contract opportunity
Solicitation number
SPE603-20-R-0509
Issued by
Defense Logistics Agency Energy

View the file

Other files for this federal contract opportunity

Other files attached to Alaska - Systems O&M and Remediation, newest first.
File Type Posted
Amd 0008 - SF-30.pdf PDF
SF30.pdf PDF
Amd 0007.pdf PDF
Amend 06.pdf PDF
SPE60320R0509 Q-A.pdf PDF
Solicitation - Amd 0005.pdf PDF
Attachment 1 - PWS Amd 05.pdf PDF
Amd 0005 SF30.pdf PDF
0004 SF 30.pdf PDF
Amd 0004 Solicitation.pdf PDF
Amd 0003 SF30.pdf PDF
Solicitation - Amd 03.pdf PDF
Amd 0002 - SF 30.pdf PDF
Attachment 3 - PWS App D Amd 01.pdf PDF
Solicitation - Amd 01.pdf PDF
Attachment 5 - PPQ Amd 01.docx DOCX document
Amd 01 - SF 30.pdf PDF
Attachment 4 - PPW Amd 01.xlsx XLSX spreadsheet
Attachment 2 - PWS App C Amd 01.pdf PDF
Attachment 1 - PWS Amd 01.pdf PDF
Attachment 6 - JV Consent Form.docx DOCX document
Attachment 5 - PPQ.docx DOCX document
Attachment 7 - Alaska Historic Electric Data.pdf PDF
Attachment 1 - PWS.pdf PDF
Attachment 2 - PWS App C.pdf PDF
Attachment 4 - PPW.xlsx XLSX spreadsheet
Attachment 8 - Wage Determinations.pdf PDF
Attachment 3 - PWS App D.pdf PDF
Solicitation.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Eielson PPW

Eielson Air Force Base Price Proposal
COMPANY & LOCATION:PROPOSAL VERSION NO.:
PREPARER NAME:DATE PREPARED:
TASKREF #ITEM DESCRIPTIONEST QTYUNITUNIT PRICETOTAL PRICE
Eielson Air Force Base: Known Specific PWS Tasks
Initial Project Initiation IAW PWS 3.1 Task 1001The Contractor will identify the primary POC to DLA. Activities included within the project initiation task include but are not limited to the project kickoff meeting and the documents associated with the Contract sites.1EA$0.00
Project Mgmt Review Meetings & Quarterly Status Meetings IAW PWS Task 4.3.1002Beginning 3 Months post award: quarterly status meetings, generally 2 hours long; includes information per PWS Para. 4.3.1.16EA$0.00
Quality Control Plan IAW PWS Task 2.12003Per PWS 2.12, prepare and submit an initial written QCP.1EA$0.00
PMP and IMS IAW PWS 4.2.1 and 4.2.3004Initial Project Management Plan & Integrated Management Schedule1EA$0.00
Quarterly updates to PMP and IMS IAW PWS 4.2.1 and 4.2.3.005Provide quarterly updates as set forth ein PWS 4.2.1 and 4.2.3 IGCE INFO: 8 hours Proj Manager15EA$0.00
Attachment 2 Appendix C Task 10-Moose Creek Semiannual Groundwater Monitoring006Moose Creek Groundwater Monitoring (Low or High)8LUMP SUM$0.00
Attachment 2 Appendix C Task 11-Tanker Row Annual Groundwater Monitoring007Tanker Row Groundwater Monitoring annual event4LUMP SUM$0.00
Attachment 2 Appendix C Task 12-Moose Creek Stakeholder Meetings008Moose Creek Stakeholder meetings8LUMP SUM$0.00
Attachment 2 Appendix C Task 13-Eielson Take Off Pad Groundwater Monitoring009ETOP Groundwater Sampling 20221LUMP SUM$0.00
Attachment 2 Appendix C Task 14-Manchu Road Groundwater Monitoring Event010Manchu Road Groundwater Monitoring 20221LUMP SUM$0.00
Attachment 2 Appendix C Task 15-O&M/Electricity Moose Creek Remedial System011Remedial System O&M including electricity4YEARS$0.00
Attachment 2 Appendix C Task 16-Decision Document Addendums: Moose Creek and Manchu Road Sites012Decision Document Addendums - Moose Creek & Manchu Rd. sites2LUMP SUM$0.00
Attachment 2 Appendix C Task 17-Moose Creek Five-Year Review (5YR)013Moose Creek Five-Year Review1LUMP SUM$0.00
Eielson Air Force Base: Items Reference List for Unknown Requirements
Develop a Health & Safety (HASP) IAW Sec 4.2.4 of the PWS014HASP detailing the safe work practices as set forth1EA$0.00
Conduct soil gas survey IAW PWS 3.0 - Task 5015Price per unit (10 points/unit) <=4' depth1EA$0.00
016Price per unit (10 points/unit) >10' but <=14' depth1EA$0.00
017Mobilization cost for soil gas survey1LUMP SUM$0.00
Conduct geophysical survey IAW PWS 3.0 Task 5018Price per unit (10,000 linear feet) to include in report of findings1LUMP SUM$0.00
Locate, install, and sample soil borings IAW PWS 3.0 Task 5019Price per boring <=10'1LUMP SUM$0.00
020Price per foot of boring >=11 and <=20'1EA$0.00
021Price per foot of boring >= 21' and <=60'1EA$0.00
022Price per foot of boring >=61 and <=150'1EA$0.00
023Mobilization cost for soil boring1LUMP SUM$0.00
Locate, Install and sample monitoring wells IAW PWS 3.0 Task 5 (Includes decommissioning of wells)024Price per 2" Monitoring Well <=10'1LUMP SUM$0.00
025Cost per foot of 2" monitoring well >= 11' and <= 21'1EA$0.00
026Cost per foot of 2" monitoring well >=21 and <=60'1EA$0.00
027Cost per foot of 2" monitoring well >= 61 and <=150'1EA$0.00
028Price per 4" monitoring well <=10'1LUMP SUM$0.00
029Cost per foot of 4" monitoring well from >=11' and <=20'1EA$0.00
030Cost per foot of 4" monitoring well from 21 to 60 feet1EA$0.00
031Cost per foot of 4" monitoring well from 61 to150 feet1EA$0.00
032Cost per foot to Close/Decommission 2" dia. well1EA$0.00
033Cost per foot to Close/Decommission 4" dia. well1EA$0.00
034Mobilization cost for monitoring well installation/decommissioning1LUMP SUM$0.00
Conduct well development IAW PWS 3.0 Task 5035Price for one well development1LUMP SUM$0.00
Conduct Direct Push Testing (DPT) IAW PWS 3.0 Task 5036Cost per unit of DPT (5 bores per unit)1EA$0.00
037Mobilization for DPT testing1LUMP SUM$0.00
Perform soil boring survey IAW PWS 3.0 Task 5038Price of 10 soil borings/unit1EA$0.00
Conduct analytical testing IAW PWS 3.0 Task 3; Cost per test for the following procedures:0396010 (Individual metal)1EA$0.00
0408081 (Organochlorine Pesticides)1EA$0.00
0418082 (PCBs)1EA$0.00
0428151 (Chlorinated Herbicides)1EA$0.00
0438260 (Full List Volatile Organic Compounds)1EA$0.00
0448260 (BTEX/MTBE/Naphthalene)1EA$0.00
0458270 (Semi-Volatile Organic Compounds)1EA$0.00
0468270-SIM (Polyaromatic Hydrocarbons)1EA$0.00
04790651EA$0.00
048624 (Purgeables)1EA$0.00
049625 (Semivolatile Organic Compounds)1EA$0.00
050TCLP Metals1EA$0.00
0519045 (pH)1EA$0.00
0521010 (Ignitability)1EA$0.00
053AK 101 (GRO)1EA$0.00
054AK 102 (DRO)1EA$0.00
055AK 103 (RRO)1EA$0.00
056TO 15 Air sample1EA$0.00
Install and maintain recovery well IAW PWS 3.0 Task 5057Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1LUMP SUM$0.00
058Price per foot of 6" recovery well from 11 to 20 Feet1EA$0.00
059Price per foot of 6" recovery well from 21 to 60 Feet1EA$0.00
060Price per foot of 6" recovery well from 61 to 120 Feet1EA$0.00
061Mobilization cost for 6" recovery well1EA$0.00
062Monthly price for 6" recovery well system O&M1EA$0.00
063Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1EA$0.00
064Mobilization cost for pump installation on existing 4" monitoring well1EA$0.00
065Monthly price for 4" recovery well system O&M1EA$0.00
Conduct pump testing IAW PWS 3.0 Task 5066Lump sum price for pump test1EA$0.00
Report preparation, duplication and distribution IAW PWS 3.0 Task 4067Lump sum price for report preparation, duplication, and distribution1EA$0.00
Additional Environmental Services Associated with PWS 3.0 Tasks 1-9 and Appendix C068Project Manager1PER HOUR$0.00
069Engineer I1PER HOUR$0.00
070Engineer II1PER HOUR$0.00
071Engineer III1PER HOUR$0.00
072Chemist1PER HOUR$0.00
073Environmental Scientist I1PER HOUR$0.00
074Environmental Scientist II1PER HOUR$0.00
075Environmental Scientist III1PER HOUR$0.00
076Geologist I1PER HOUR$0.00
077Geologist II1PER HOUR$0.00
078Geologist III1PER HOUR$0.00
079Hydrogeologist I1PER HOUR$0.00
080Hydrogeologist II1PER HOUR$0.00
081Hydrogeologist III1PER HOUR$0.00
082Toxicologist I1PER HOUR$0.00
083Toxicologist II1PER HOUR$0.00
084Toxicologist III1PER HOUR$0.00
085Drafter1PER HOUR$0.00
086Traffic Control Engineer1PER HOUR$0.00
087Cost Accountant1PER HOUR$0.00
088Secretary1PER HOUR$0.00
089Buyer1PER HOUR$0.00
090Site Labor Foreman1PER HOUR$0.00
091Remediation System Operator1PER HOUR$0.00
092Heavy Equipment Operator1PER HOUR$0.00
093Laborer1PER HOUR$0.00
094Drill Rig Operator1PER HOUR$0.00
095Environmental Technician1PER HOUR$0.00
096Utility Truck1PER DAY$0.00
097O2 Explosimeter1PER DAY$0.00
098Groundwater Sampling Pump1PER DAY$0.00
099Flame Ionization OCA1PER DAY$0.00
100Air Velocity Meter1PER DAY$0.00
101Field GC1PER DAY$0.00
102Furnish and fill with soil or water DOT approved 55 gallon drum1EA, DRUM$0.00
103Furnish and fill with soil roll-off bin1EA, BIN$0.00
104Shipping of soil and water samples for analytical testing price for each 25 lb shipping container1EA, COOLER$0.00
105Disposable Bailers1EACH$0.00
106Tedlar Bags1PER DOZEN$0.00
107Pickup Truck 1/2 ton1PER DAY$0.00
108Air Compressor (7CFM)1PER DAY$0.00
109Generator (4000K watt)1PER DAY$0.00
110CAD Equipment Use Charge1PER DAY$0.00
111Photoionization Detector1PER DAY$0.00
112Groundwater Multimeter1PER DAY$0.00
113Deionized Water1CASE$0.00
Multiple: Generally associtated with Task 5 requirements114Oil/water interface probe rental, per day1EA$0.00
Multiple: Generally associtated with Task 5 requirements115Nitrile gloves, case1CASE$0.00
Multiple: Generally associtated with Task 5 requirements116Alconox, 50 1/2 ox packets (box)1BOX$0.00
Multiple: Generally associtated with Task 5 requirements117Drum storage locker, 14', rental per day1EA$0.00
Multiple: Generally associtated with Task 5 requirements118Disposable Tubing, 3/8", 500' roll1ROLL$0.00
Appendix C Task 13-Eielson Take Off Pad Groundwater Monitoring119Investigative Disposal of Waste IDW for ETOP sampling1LUMP SUM$0.00
Total By CLIN
CLIN 0001 - Environmental Assessment, Remediation, Response$0.00
CLIN 0002 - O&M of Remediation System$0.00
CLIN 0003 - DLA HQ Environmental Support ServicesN/A
Total Offered Price$0.00

Whittier PPW

DFSP Whittier Price Proposal
COMPANY & LOCATION:PROPOSAL VERSION NO.:
PREPARER NAME:DATE PREPARED:
TASKREF #ITEM DESCRIPTIONEST QTYUNITUNIT PRICETOTAL PRICE
DFSP Whittier: Known Specific PWS Tasks
Initial Project Initiation IAW PWS 3.1 Task 1001The Contractor will identify the primary POC to DLA. Activities included within the project initiation task include but are not limited to the project kickoff meeting and the documents associated with the Contract sites.1EA$0.00
Project Mgmt Review Meetings & Quarterly Status Meetings IAW PWS Task 4.3.1002Beginning 3 Months post award: quarterly status meetings, generally 2 hours long; includes information per PWS Para. 4.3.1.16EA$0.00
Quality Control Plan IAW PWS Task 2.12003Per PWS 2.12, prepare and submit an initial written QCP.1EA$0.00
PMP and IMS IAW PWS Tasks 4.2.1 and 4.2.3004Initial Project Management Plan & Integrated Management Schedule1EA$0.00
Quarterly updates to PMP and IMS IAW PWS Tasks 4.2.1 and 4.2.3005Provide quarterly updates as set forth in PWS 4.2.1 and 4.2.3 IGCE INFO: 8 hours Proj Manager15EA$0.00
Attachment 3 Appendix D Task 10-Whittier Summer/High Groundwater Monitoring Events006Whittier High/Summer Groundwater Sampling inc. AKRR Ins. Requirements4LUMP SUM$0.00
Attachment 3 Appendix D Task 11-Whittier Winter/Low Groundwater Monitoring Events007Whittier Low/Winter Groundwater Sampling4LUMP SUM$0.00
Attachment 3 Appendix D Task 12-O&M/Electricity Whittier Remedial System Operation008Remedial System O&M including electricity4EA$0.00
Attachment 3 Appendix D Task 13-Alaska Railroad Annual Fee for Site Access at Whittier, AK009Annual payment of AK Railroad Right of Entry Fee4ANNUAL$0.00
Attachment 3 Appendix D Task 14-Decision Document Addendum: Former DFSP Whittier010Revision/Update of Decision Document1LUMP SUM$0.00
Attachment 3 Appendix D Task 15-Former DFSP Whittier Well Maintenance and Assessment011Well Maintenance and Assessment1LUMP SUM$0.00
Attachment 3 Appendix D Task 16-Five Year Review (5YR), FORMER DFSP Whittier012Five Year Review1LUMP SUM$0.00
DFSP Whittier: Items Reference List for Unknown Requirements
Develop a Health & Safety (HASP) IAW Sec 4.2.4 of the PWS013HASP detailing the safe work practices as set forth1EA$0.00
Conduct soil gas survey IAW PWS 3.0 - Task 5014Price per unit (10 points/unit) <=4' depth1EA$0.00
015Price per unit (10 points/unit) >10' but <=14' depth1EA$0.00
016Mobilization cost for soil gas survey1LUMP SUM$0.00
Conduct geophysical survey IAW PWS 3.0 Task 5017Price per unit (10,000 linear feet) to include in report of findings1LUMP SUM$0.00
Locate, install, and sample soil borings IAW PWS 3.0 Task 5018Price per boring <=10'1LUMP SUM$0.00
019Price per foot of boring >=11 and <=20'1EA$0.00
020Price per foot of boring >= 21' and <=60'1EA$0.00
021Price per foot of boring >=61 and <=150'1EA$0.00
022Mobilization cost for soil boring1LUMP SUM$0.00
Locate, Install and sample monitoring wells IAW PWS 3.0 Task 5 (Includes decommissioning of wells)023Price per 2" Monitoring Well <=10'1LUMP SUM$0.00
024Cost per foot of 2" monitoring well >= 11' and <= 21'1EA$0.00
025Cost per foot of 2" monitoring well >=21 and <=60'1EA$0.00
026Cost per foot of 2" monitoring well >= 61 and <=150'1EA$0.00
027Price per 4" monitoring well <=10'1LUMP SUM$0.00
028Cost per foot of 4" monitoring well from >=11' and <=20'1EA$0.00
029Cost per foot of 4" monitoring well from 21 to 60 feet1EA$0.00
030Cost per foot of 4" monitoring well from 61 to150 feet1EA$0.00
031Cost per foot to Close/Decommission 2" dia. well1EA$0.00
032Cost per foot to Close/Decommission 4" dia. well1EA$0.00
033Mobilization cost for monitoring well installation/decommissioning1LUMP SUM$0.00
Conduct well development IAW PWS 3.0 Task 5034Price for one well development1LUMP SUM$0.00
Conduct Direct Push Testing (DPT) IAW PWS 3.0 Task 5035Cost per unit of DPT (5 bores per unit)1EA$0.00
036Mobilization for DPT testing1LUMP SUM$0.00
Perform soil boring survey IAW PWS 3.0 Task 5037Price of 10 soil borings/unit1EA$0.00
Conduct analytical testing IAW PWS 3.0 Task 3; Cost per test for the following procedures:0386010 (Individual metal)1EA$0.00
0398081 (Organochlorine Pesticides)1EA$0.00
0408082 (PCBs)1EA$0.00
0418151 (Chlorinated Herbicides)1EA$0.00
0428260 (Full List Volatile Organic Compounds)1EA$0.00
0438260 (BTEX/MTBE/Naphthalene)1EA$0.00
0448270 (Semi-Volatile Organic Compounds)1EA$0.00
0458270-SIM (Polyaromatic Hydrocarbons)1EA$0.00
04690651EA$0.00
047624 (Purgeables)1EA$0.00
048625 (Semivolatile Organic Compounds)1EA$0.00
049TCLP Metals1EA$0.00
0509045 (pH)1EA$0.00
0511010 (Ignitability)1EA$0.00
052AK 101 (GRO)1EA$0.00
053AK 102 (DRO)1EA$0.00
054AK 103 (RRO)1EA$0.00
055TO 15 Air sample1EA$0.00
Install and maintain recovery well IAW PWS 3.0 Task 5056Price of 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1LUMP SUM$0.00
057Price per foot of 6" recovery well from 11 to 20 Feet1EA$0.00
058Price per foot of 6" recovery well from 21 to 60 Feet1EA$0.00
059Price per foot of 6" recovery well from 61 to 120 Feet1EA$0.00
060Mobilization cost for 6" recovery well1EA$0.00
061Monthly price for 6" recovery well system O&M1EA$0.00
062Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1EA$0.00
063Mobilization cost for pump installation on existing 4" monitoring well1EA$0.00
064Monthly price for 4" recovery well system O&M1EA$0.00
Conduct pump testing IAW PWS 3.0 Task 5065Lump sum price for pump test1EA$0.00
Report preparation, duplication and distribution IAW PWS 3.0 Task 4066Lump sum price for report preparation, duplication, and distribution1EA$0.00
Additional Environmental Services Associated with PWS 3.0 Tasks 1-9 and Attachment 3 Appendix D067Project Manager1PER HOUR$0.00
068Engineer I1PER HOUR$0.00
069Engineer II1PER HOUR$0.00
070Engineer III1PER HOUR$0.00
071Chemist1PER HOUR$0.00
072Environmental Scientist I1PER HOUR$0.00
073Environmental Scientist II1PER HOUR$0.00
074Environmental Scientist III1PER HOUR$0.00
075Geologist I1PER HOUR$0.00
076Geologist II1PER HOUR$0.00
077Geologist III1PER HOUR$0.00
078Hydrogeologist I1PER HOUR$0.00
079Hydrogeologist II1PER HOUR$0.00
080Hydrogeologist III1PER HOUR$0.00
081Toxicologist I1PER HOUR$0.00
082Toxicologist II1PER HOUR$0.00
083Toxicologist III1PER HOUR$0.00
084Drafter1PER HOUR$0.00
085Traffic Control Engineer1PER HOUR$0.00
086Cost Accountant1PER HOUR$0.00
087Secretary1PER HOUR$0.00
088Buyer1PER HOUR$0.00
089Site Labor Foreman1PER HOUR$0.00
090Remediation System Operator1PER HOUR$0.00
091Heavy Equipment Operator1PER HOUR$0.00
092Laborer1PER HOUR$0.00
093Drill Rig Operator1PER HOUR$0.00
094Environmental Technician1PER HOUR$0.00
095Utility Truck1PER DAY$0.00
096O2 Explosimeter1PER DAY$0.00
097Groundwater Sampling Pump1PER DAY$0.00
098Flame Ionization OCA1PER DAY$0.00
099Air Velocity Meter1PER DAY$0.00
100Field GC1PER DAY$0.00
101Furnish and fill with soil or water DOT approved 55 gallon drum1EA, DRUM$0.00
102Furnish and fill with soil roll-off bin1EA, BIN$0.00
103Shipping of soil and water samples for analytical testing price for each 25 lb shipping container1EA, COOLER$0.00
104Disposable Bailers1EACH$0.00
105Tedlar Bags1PER DOZEN$0.00
106Pickup Truck 1/2 ton1PER DAY$0.00
107Air Compressor (7CFM)1PER DAY$0.00
108Generator (4000K watt)1PER DAY$0.00
109CAD Equipment Use Charge1PER DAY$0.00
110Photoionization Detector1PER DAY$0.00
111Groundwater Multimeter1PER DAY$0.00
112Deionized Water1CASE$0.00
113Hydrasleeve sampling equipment1LUMP SUM$0.00
114utility vehicle for clearing site1WEEK$0.00
Multiple: Generally associtated with Task 5 requirements115Oil/water interface probe rental, per day1PER DAY$0.00
Multiple: Generally associtated with Task 5 requirements116Nitrile gloves, case1CASE$0.00
Multiple: Generally associtated with Task 5 requirements117Alconox, 50 1/2 Box packets (box)1BOX$0.00
Multiple: Generally associtated with Task 5 requirements118Drum storage locker, 14', rental per day1PER DAY$0.00
Multiple: Generally associtated with Task 5 requirements119Disposable Tubing, 3/8", 500' roll1ROLL$0.00
Total By CLIN
CLIN 0001 - Environmental Assessment, Remediation, Response$0.00
Total Offered Price$0.00

File details come from the government source that posted it. Updated .