Altus_Appendix_AF.docx.pdf
PDF 659 KB Posted
- Attached to
- AF GOCO Bulk Storage Services Federal contract opportunity
- Solicitation number
- SPE603-18-R-0518
- Issued by
- Defense Logistics Agency
About this file
Appendix AF - Altus AFB, OK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Draft_PWS.pdf | ||
| Whiteman_Appendix_AF.docx.pdf | ||
| Offutt_Appendix_AF.docx.pdf | ||
| Scott_Appendix_AF_10_Jan_17.docx.pdf | ||
| McConnell_Appendix_AF_17_Feb_17.docx.pdf | ||
| Dyess_Appendix_AF_10_Jan_17_(004).docx.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Altus AFB
APPENDIX AF
AIR FORCE INSTALLATION INFORMATION
I. INSTALLATION LISTING
1. Contracted Fuels Management Operations Services
Buckley AFB, CO Kirtland AFB, NM Schriever AFB, CO
Cape Canaveral AFS, FL JB McGuire-Lakehurst, NJ (Lakehurst)
Sheppard AFB, TX
Cheyenne Mtn, CO Laughlin AFB, TX Tinker AFB, OK
Columbus AFB, MS Malmstrom AFB, MT Wright Patterson AFB, OH
Edwards AFB, CA Maxwell AFB, AL Vance AFB, OK
F.E. Warren AFB, WY Patrick AFB, FL Vandenburg AFB, CA
Gila Bend AAF, AZ Peterson AFB, CO
Keesler AFB, MS Randolph AFB, TX
2. Contracted Bulk Storage:
a. CONUS
Altus AFB OK Hill AFB, UT* Nellis AFB, NV
Barksdale AFB, LA Holloman AFB, NM Offutt AFB, NE*
Beale AFB, CA Hurlburt Field, FL Robins AFB, GA*
Cannon AFB, NM JB McGuire-Dix-
_Lakehurst, NJ
(McGuire)
Scott AFB, IL
Davis Monthan AFB, AZ Langley AFB, VA Seymour Johnson AFB, NC
Dover AFB, DE Little Rock AFB, AR Shaw AFB, SC
Dyess AFB, TX Luke AFB, AZ Travis AFB, CA
Eglin AFB, FL* McConnell AFB, KS Tyndall AFB, FL
Ellsworth AFB, SD Minot AFB, ND Whiteman AFB, MO
Fairchild AFB, WA Moody AFB, GA
Grand Forks AFB, ND Mountain Home AFB, ID
b. OCONUS
Anderson AFB, GU+ Aviano AB, IT*
Eielson AFB, AK Incirlik, AB, TU *
Elmendorf AFB, AK Lajes Field Azores *
Kadena AB, JA RAF Lakenheath, UK *
Misawa AB, JA RAF Mildenhall, UK *
Osan AB, RK Ramstein AB, GE *
Spangdahlem AB, GE *
^ Note: FSC, Product Issues, Accounting/Auditability, Quality Surveillance/Lab, Cryogenics, and Retail Service Station at these locations are the Contractor’s responsibility.
* Note: PM at these locations is the government’s responsibility IAW C-5.3.2
+ Note: PLDS at these locations is the Contractor’s responsibility IAW C-5.6.2
APPENDIX AF (cont’)
II. INSTALLATION SPECIFIC INFORMATION
A. BASE
(1) INTRODUCTION
Altus AFB mission is directed to the training and retraining of pilots in the KC-135, KC-46 and C-17 airframes, as well as loadmasters and inflight refuelers. Fuels Management Flight provides clean, dry aviation/ground fuel to support this mission. This mission is directly affected by the timely, professional execution of bulk storage, who receives fuel via tank truck delivery, and supplements our Tanker/South ramp hydrant facilities through transfers.
(2) HOURS OF OPERATION
Normal hours for fuels operations are identified below. Contractor must be capable of providing 24 hours x 7 days per week PWS coverage when required including for weather, natural disaster, exercise, or other contingency operations.
Operation Mon-Fri Sat-Sun Holidays/After Hrs
Fuels Management
Accounting
Lab
Operations (FSC)
Operations (Distribution)
Operations (Bulk Storage) 0600 - 2300
Operations (Cryogenics)
Recognized holidays:
New Year’s Day: 1 January
Martin Luther King’s Birthday: 3rd Monday in January
President’s Day: 3rd Monday in February
Memorial Day: Last Monday in May
Independence Day: 4 July
Labor Day: 1st Monday in September
Columbus Day: 2nd Monday in October
Veterans Day: 11 November
Thanksgiving Day: 4th Thursday in November
Christmas Day: 25 December
NOTE (1): If the holiday falls on Saturday—the previous Friday shall be observed as the holiday. If the holiday falls on Sunday—the next Monday shall be observed as the holiday.
NOTE (2): Fuels Operations shall operate during normal or required extended hours of operation and on observed holidays unless authorized to close by the Wing Commander or designee. If closed, standby personnel shall be identified to MOC and Security Forces and be available to respond within 1 hr.
(3) WORKLOAD INFORMATION
Base workload/requirements are provided below. Quantities and durations are estimates only and subject to variation. Variation does not directly correspond to additional requirement or staffing without validation and/or increase in normal hours of operation by the Contracting Officer.
Item
Average number of receipts per month, grade, quantity, normal shifts of receipts and mode of delivery
440 Tank Trucks of JAA (3.3M gals), 3 Tank Trucks of DS2 (18.5K gals)
0600 – 1800
Average duration of each receipt mode 15-25 minutes per offload header
Number of trucks/railcars which can be offloaded simultaneously.
Number of trucks/railcars which can be on-loaded simultaneously (only use for bulk deliveries i.e. DFSP TO DFSP).
Can receipt/fill/transfer operations occur simultaneously?
Normal Operations; Yes.
Do tank truck receipts require
Contractor escort?
No
Do barge receipts require Contractor booming? If not, who booms?
N/A
Base average annual jet fuel gallons issued 40 Million JAA
Average transfers (WEEKLY)
Quantity Avg: 557K
Number of transfers: 10
Normal days and times for transfers:
M-F 0600 - 2300
Average number of refuels per shift
(DAILY)
N/A
Average number of fillstands per shift
(DAILY)
Bulk: N/A
Hydrants: N/A
Number of refuelers which can be filled simultaneously.
Bulk: N/A
Hydrants: N/A
Number of hydrant outlets which can be operated simultaneously.
N/A
Number of hydrant outlets normally operated simultaneously per shift.
N/A
Number of refueling vehicles (R-11) normally operated simultaneously per shift.
N/A
Number of base organizational tanks supported.
N/A
Average Monthly organizational tank issues (servicing’s and quantity).
N/A
Average Monthly C-300 Fillstands 2
Describe current base provided grounds maintenance or describe Contractor’s responsibility (Grass and Snow)
Non DLA Contracted grass removal / Contractor clears snow/ice within scope of responsibility
Describe current base provided entomology/pest control services or describe Contactor’s responsibility
Base has a dedicated pest control
Number of oil/water separators within
Contractors Area of Responsibility
Number of emergency generators for
POL facilities within Contractors AOR
Average Annual Cryogenic Receipts
Per Year (quantity and receipts) N/A
Average Monthly Cryogenic
Servicing’s Per Month (quantity and servicing’s)
N/A
Pre-Identified Confined Spaces* Inside tank/on top of floating roof
How many times in the last year has the Contractor been called in outside of normal duty hours
Level of DLA Energy/USACE RM
Provided (Quarterly, Semi-Annually, Annually)
Will be awarded in 2017-2018
NOTES: * Confined Spaces shall be validated by Contractor through CE.
(4) BASE SPECIFIC REQUIREMENTS
A unique requirement for Altus is our ongoing receipt via tank truck instead of via pipeline. These operations take place typically from 0600 – 1800, where bulk storage will offload tank trucks and provide DD Form 250 and DLA Form 2046 to FSC for accounting.
(5) FACILITIES
The following on-site installation facilities may be used by the Contractor in performance of the PWS tasks. The facilities may be changed, by the local installation, from time to time to meet mission requirements. The Contractor will be notified prior to any change of location.
Facility
Number
Bldg
Name/Area Installed Equipment/Description
(I.e. Main office, Lab, Pumphouse 1, Bulk
Storage, A Row Hydrants)
(I.e. generator, # pumps, # filter separators, # hydrant outlets, PRTs # fillstands, # receipt headers, # dispensers, etc.)
385 385 Main office 3 Computer systems
385 385 Main office 3 Computer systems, 3 portable large-sized generators
385 385 Bulk Storage
2 transfer pumps, 4 offloading headers, 4 filter separators, 2 fillstands, 1 bowser, dike drain
379 379 Tank 379 Jet-A Fuel Tank, water draw off, dike drain
381 381 Tank 381 Jet-A Fuel Tank, water draw off, dike drain
378 378 Tank 378 DS-2 Fuel tank, offloading header, fillstand, dike drain
391 391 Storage (Equipment) N/A
(6) PETROLEUM STORAGE TANKS
Facility
Tank
Number
Function
(Bulk/Hydrant/MSS)
Safe Fill
(gallons)
Product
Grade
Type
UST/AST
Primary Receipt
Mode
Alternate Receipt
Mode
379 379 Bulk 971,429 JAA AST Tank Truck Tank Truck
381 381 Bulk 970,929 JAA AST Tank Truck Tank Truck
378 378 Bulk 16,657 DS2 AST Tank Truck Tank Truck
(7) Cryogenic Storage Tanks
Facility Number Tank
Number
Safe Fill
(gallons)
Product
Grade
(8) EQUIPMENT (EAID)
The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks.
Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are listed on the Custodian Authorization/Custodian
Receipt Listing (CA/CRL).
NOMENCLATURE MANUFACTURER NSN PART/MODEL SERIAL NO PRICE LOCATION
(9) EQUIPMENT (NON-EAID)
The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks.
Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are NOT listed on the CA/CRL.
(10) INFORMATION TECHNOLOGY EQUIPMENT (ITEC)
The following on-site installation equipment may be used for the Contractor in performance of PWS tasks.
The following ITEC is identified on the local installations Communications Squadron Asset Inventory
Management (AIM) list under Account ####. Monitors are not tracked in AIM but are accountable.
HP 5765-7245363 MXL7410J96 Bldg 385
HP 5765-7254479 MXL7410J95 Bldg 385
HP 5765-7274463 MXL7410J33 Bldg 385
(11) ITEC (DLA-ENERGY)
The following on-site Defense Logistics Agency-Energy (DLA-Energy) ITEC may be used by the Contractor in performance of PWS tasks.
(12) AUTOMATED INFORMATION TECHNOLOGY (AIT) EQUIPMENT
The following on-site Defense Logistics Agency-Energy (DLA-Energy) AIT may be used by the Contractor is performance of PWS tasks.
SYSTEM DESCRIPTION SERIAL NO MODEL NO MFR LOCATION
(13) LAND MOBILE RADIOS (LMR)
The following on-site installation LMRs may be used by the Contractor in performance of PWS tasks. The LMRs are identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account
DESCRIPTION PART NO SERIAL NO LOC
(14) VEHICLES
The following on-site installation vehicles may be used by the Contractor for performance of PWS tasks. This listing is subject to change as vehicles are replaced and/or added to/deleted from the fleet.
TYPE REGISTRATION NO NSN
FUEL GRADE
DISPENSED
(15) Base Specific Additional Publications/Forms (addition to Appendix C)
PUBLICATION TITLE
File details come from the government source that posted it.