Nellis_Appendix_AF_17_Feb_17.docx

DOCX document 66 KB Posted

Attached to
Base Notice: Operation and Maintenance of Fuel Facilities - SPE603-18-R-0507
Solicitation number
SPE603-18-R-0507
Issued by

About this file

Nellis Appendix AF 17 Feb 17

View the file

Other files

File Type Posted
Grand_Forks_Appendix_AF_21_Feb_17.docx DOCX document
Hill_Appendix_AF_10_Jan_17.docx DOCX document
Mountain_Home_Appendix_AF_10_Feb_17.docx DOCX document
Ellsworth_Appendix_AF__10_Jan_17.docx DOCX document
Minot_Appendix_AF_10_Jan_17.docx DOCX document
AF_Consolidated_PWS_-_as_of_9_Jun_17.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nellis AFB

APPENDIX AF

AIR FORCE INSTALLATION INFORMATION

I. INSTALLATION LISTING

1. Contracted Fuels Management Operations Services ^*:

Buckley AFB, CO
Kirtland AFB, NM
Schriever AFB, CO
Cape Canaveral AFS, FL
JB McGuire-Lakehurst, NJ (Lakehurst)
Sheppard AFB, TX
Cheyenne Mtn, CO
Laughlin AFB, TX
Tinker AFB, OK
Columbus AFB, MS
Malmstrom AFB, MT
Wright Patterson AFB, OH
Edwards AFB, CA
Maxwell AFB, AL
Vance AFB, OK
F.E. Warren AFB, WY
Patrick AFB, FL
Vandenburg AFB, CA
Gila Bend AAF, AZ
Peterson AFB, CO
Keesler AFB, MS
Randolph AFB, TX

2. Contracted Bulk Storage:

a. CONUS

Altus AFB OK
Hill AFB, UT*
Nellis AFB, NV
Barksdale AFB, LA
Holloman AFB, NM
Offutt AFB, NE*
Beale AFB, CA
Hurlburt Field, FL
Robins AFB, GA*
Cannon AFB, NM
JB McGuire-Dix-_Lakehurst, NJ (McGuire)
Scott AFB, IL
Davis Monthan AFB, AZ
Langley AFB, VA
Seymour Johnson AFB, NC
Dover AFB, DE
Little Rock AFB, AR
Shaw AFB, SC
Dyess AFB, TX
Luke AFB, AZ
Travis AFB, CA
Eglin AFB, FL*
McConnell AFB, KS
Tyndall AFB, FL
Ellsworth AFB, SD
Minot AFB, ND
Whiteman AFB, MO
Fairchild AFB, WA
Moody AFB, GA
Grand Forks AFB, ND
Mountain Home AFB, ID

b. OCONUS

Anderson AFB, GU+
Aviano AB, IT*
Eielson AFB, AK
Incirlik, AB, TU *
Elmendorf AFB, AK
Lajes Field Azores *
Kadena AB, JA
RAF Lakenheath, UK *
Misawa AB, JA
RAF Mildenhall, UK *
Osan AB, RK
Ramstein AB, GE *

Spangdahlem AB, GE *

^ Note: FSC, Product Issues, Accounting/Auditability, Quality Surveillance/Lab, Cryogenics, and Retail Service Station at these locations are the Contractor’s responsibility.

* Note: PM at these locations is the government’s responsibility IAW C-5.3.2 + Note: PLDS at these locations is the Contractor’s responsibility IAW C-5.6.2 Nellis AFB

APPENDIX AF (cont’)

AIR FORCE INSTALLATION INFORMATION

II. INSTALLATION SPECIFIC INFORMATION

A. BASE

(1) INTRODUCTION

-- Nellis AFB Fuels Management Flight is the most dynamic fuels operation in the CONUS, supporting one of the largest fighter bases in the world.

-- Third busiest fuels operation in the Air Force issuing 63M gals of JAA annually, facilitating 37K combat training sorties -- Receives and Issues 123M gals of JAA annually, huge throughput for a 2.7M gallon system -- Orchestrates precise fuel support for 19 high intensity combat training exercises (RED FLAG, GREEN FLAG, JFEX, WIC and USAFWS AI) annually -- Hosts/integrates 175 Total Force (AD/AFRC/ANG) fuels augmentees annually for the execution of second to none fuel support for the United States Air Force Warfare Center and Team Nellis -- Reasonable for providing 166 home station fighter aircraft, 6 wings, 52 tenant units, and base populace of over 11K personnel with world class jet and ground fuel support

SUMMARY

Nellis’ Fuels Management Flight provides responsive base fuel support assisting the USAFWC’s mission and Team Nellis in developing full spectrum capabilities through responsive, realistic, and relevant testing, tactics development, and advanced training across all levels of war.

APPENDIX AF (cont’)

(2) HOURS OF OPERATION

Normal hours for fuels operations are identified below. Contractor must be capable of providing 24 hours x 7 days per week PWS coverage when required including for weather, natural disaster, exercise, or other contingency operations.

Operation
Mon-Fri
Sat-Sun
Holidays/After Hrs

Fuels Management

Accounting

Lab

Operations (FSC)

Operations (Distribution)

Operations (Bulk Storage)
Normal hours Mon-Fri 0500-2300
N/A
N/A

Operations (Cryogenics)

Recognized holidays:

New Year’s Day: 1 January Martin Luther King’s Birthday: 3rd Monday in January President’s Day: 3rd Monday in February Memorial Day: Last Monday in May Independence Day: 4 July Labor Day: 1st Monday in September Columbus Day: 2nd Monday in October Veterans Day: 11 November Thanksgiving Day: 4th Thursday in November Christmas Day: 25 December

NOTE (1): If the holiday falls on Saturday—the previous Friday shall be observed as the holiday. If the holiday falls on Sunday—the next Monday shall be observed as the holiday.

NOTE (2): Fuels Operations shall operate during normal or required extended hours of operation and on observed holidays unless authorized to close by the Wing Commander or designee. If closed, standby personnel shall be identified to MOC and Security Forces and be available to respond within 1 hr.

(3) WORKLOAD INFORMATION

Base workload/requirements are provided below. Quantities and durations are estimates only and subject to variation. Variation does not directly correspond to additional requirement or staffing without validation and/or increase in normal hours of operation by the Contracting Officer.

Item

Average number of receipts per month, grade, quantity, normal shifts of receipts and mode of delivery
20 JAA, 250K gals, Day shift and B-Shift/Pipeline
Average duration of each receipt mode
4 hrs
Number of trucks/railcars which can be offloaded simultaneously.
4
Number of trucks/railcars which can be on-loaded simultaneously (only use for bulk deliveries i.e. DFSP TO DFSP).
n/a
Can receipt/fill/transfer operations occur simultaneously?
No
Do tank truck receipts require Contractor escort?
No
Do barge receipts require Contractor booming? If not, who booms?
N/A
Base average annual jet fuel gallons issued
61M
Average transfers (WEEKLY)
Quantity Avg: 1.1M gals

Number of transfers: 10 Normal days and times for transfers:

Mon-Fri 0600H/1800H

Average number of refuels per shift (DAILY)
N/A
Average number of fillstands per shift (DAILY)
Bulk: A- 1 B- 0 C-0

Hydrants: N/A

Number of refuelers which can be filled simultaneously.
Bulk: 2

Hydrants: N/A

Number of hydrant outlets which can be operated simultaneously.
N/A
Number of hydrant outlets normally operated simultaneously per shift.
N/A
Number of refueling vehicles (R-11) normally operated simultaneously per shift.
N/A
Number of base organizational tanks supported.
N/A
Average Monthly organizational tank issues (servicing’s and quantity).
N/A
Average Monthly C-300 Fillstands
N/A
Describe current base provided grounds maintenance or describe Contractor’s responsibility (Grass and Snow)
No
Describe current base provided entomology/pest control services or describe Contactor’s responsibility
Yes
Number of oil/water separators within Contractors Area of Responsibility
0
Number of emergency generators for POL facilities within Contractors AOR
1
Average Annual Cryogenic Receipts Per Year (quantity and receipts)
N/A
Average Monthly Cryogenic Servicing’s Per Month (quantity and servicing’s)
N/A
Pre-Identified Confined Spaces*
0
How many times in the last year has the Contractor been called in outside of normal duty hours
5

Level of DLA Energy/USACE RM Provided (Quarterly, Semi-Annually, Annually) Annually

NOTES: * Confined Spaces shall be validated by Contractor through CE.

(4) BASE SPECIFIC REQUIREMENTS

(5) FACILITIES

The following on-site installation facilities may be used by the Contractor in performance of the PWS tasks. The facilities may be changed, by the local installation, from time to time to meet mission requirements. The Contractor will be notified prior to any change of location.

Facility Number
Bldg Number
Name/Area
Installed Equipment/Description
(I.e. Main office, Lab, Pumphouse 1, Bulk Storage, A Row Hydrants)
(I.e. generator, # pumps, # filter separators, # hydrant outlets, PRTs # fillstands, # receipt headers, # dispensers, etc.)
Supervisor Office/Control Room
1 generator
Pump house
2 pumps, 4 filter separators, 3 PRTs connected to tanks.
Fillstand
2 fillstands, 19 receipt headers.

(6) PETROLEUM STORAGE TANKS

Facility Number
Tank

Number Function (Bulk/Hydrant/MSS) Safe Fill (gallons) Product Grade Type

UST/AST

Primary Receipt Mode
Alternate Receipt Mode
1051
20
Bulk
323,825
JAA
AST
Pipeline
Tank Truck
1052
21
Bulk
323,663
JAA
AST
Pipeline
Tank Truck
1054
29
Bulk
673,434
JAA
AST
Pipeline
Tank Truck
1055
30
Bulk
507,939
JAA
AST
Pipeline
Tank Truck

(7) Cryogenic Storage Tanks

Facility Number
Tank

Number Safe Fill (gallons) Product Grade

N/A

(8) EQUIPMENT (EAID)

The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks. Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are listed on the Custodian Authorization/Custodian Receipt Listing (CA/CRL).

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION
N/A
N/A
N/A
N/A
N/A
N/A
N/A

(9) EQUIPMENT (NON-EAID)

The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks. Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are NOT listed on the CA/CRL.

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION

(10) INFORMATION TECHNOLOGY EQUIPMENT (ITEC)

The following on-site installation equipment may be used for the Contractor in performance of PWS tasks. The following ITEC is identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account ####. Monitors are not tracked in AIM but are accountable.

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION

(11) ITEC (DLA-ENERGY)

The following on-site Defense Logistics Agency-Energy (DLA-Energy) ITEC may be used by the Contractor in performance of PWS tasks.

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION
DLA Server
Dell
N/A
Dell optiplex
28W40R1

BLDG 1053

DLA Monitor
Gateway
N/A
TFT178OPS
MWD78BON01977

BLDG 1053

Tower
Gateway
N/A
760
39RDTK1

BLDG 1053

Monitor
HP
N/A
L17NB-7
MXG549060T

BLDG 1053

(12) AUTOMATED INFORMATION TECHNOLOGY (AIT) EQUIPMENT

The following on-site Defense Logistics Agency-Energy (DLA-Energy) AIT may be used by the Contractor is performance of PWS tasks.

SYSTEM
DESCRIPTION
SERIAL NO
MODEL NO
MFR
LOCATION

(13) LAND MOBILE RADIOS (LMR)

The following on-site installation LMRs may be used by the Contractor in performance of PWS tasks. The LMRs are identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account ####.

DESCRIPTION
PART NO
SERIAL NO
LOC

(14) VEHICLES

The following on-site installation vehicles may be used by the Contractor for performance of PWS tasks. This listing is subject to change as vehicles are replaced and/or added to/deleted from the fleet.

TYPE
REGISTRATION NO
NSN
FUEL GRADE DISPENSED

N/A

(15) Base Specific Additional Publications/Forms (addition to Appendix C)

PUBLICATION
TITLE

File details come from the government source that posted it.