Att 6 QAPs Conformed AMD 0002.pdf

PDF 13 MB Posted

Attached to
Western Pacific & Middle East Bulk Petroleum Purchase Program (WESTPAC) Federal contract opportunity
Solicitation number
SPE602-22-R-0707
Issued by
Defense Logistics Agency Energy

About this file

This solicitation is for the annual bulk petroleum purchase program to supply fuel requirements for the Western Pacific and Middle East regions from January 1, 2023 through December 31, 2023. The Defense Logistics Agency Energy seeks to procure 243,060,000 gallons of Naval Distillate (F76), 71,882,000 gallons of Turbine Fuel Aviation (JP5), and 323,240,000 gallons of Turbine Fuel Aviation (JA1) including some gallons that require additives. Delivery will be via tanker, shallow draft tanker, tanker truck, railcar, and pipeline with FOB destination tanker offers not accepted. Offerors must submit pricing through the Offer Entry Tool by the closing date, and offers must be in English and U.S. dollars.

View the file

Other files for this federal contract opportunity

Other files attached to Western Pacific & Middle East Bulk Petroleum Purchase Program (WESTPAC), newest first.
File Type Posted
22R0707_Min_Cost_Bid_Evaluation.pdf PDF
22R0707_Min_Cost_Solution_Contractor_Summary.pdf PDF
22R0707_Min_Cost_Bid_Award.pdf PDF
22R0707_Summary_of_Awards.pdf PDF
SPE60222R0707 AWARD SUMMARY.pdf PDF
SF30 SPE60222R0707 AMD 0006.pdf PDF
SF1449 SPE60222R0707 Conformed AMD 0006.pdf PDF
SF1449 SPE60222R0707 Conformed AMD 0005.pdf PDF
SF30_SPE60222R0707 AMD 0005.pdf PDF
SF1449 SPE60222R0707 Conformed AMD 0004.pdf PDF
SF30 SPE60222R0707 AMD 0004.pdf PDF
SF30 SPE60222R0707 AMD 0003.pdf PDF
SF1449 SPE60222R0707 Conformed AMD 0003 .pdf PDF
SF1449 SPE60222R0707 Conformed AMD 0002 .pdf PDF
Att 1 Fill-Ins WORD VERSION Conformed AMD 0002.docx DOCX document
SPE60222R0707 AMD 0002.pdf PDF
SPE60222R0707 Questions and Answers 2.pdf PDF
SPE60222R0707 PREPROPOSAL SLIDES.pdf PDF
SPE60222R0707 Questions and Answers 1.pdf PDF
SPE60222R0707 AMD 0001.pdf PDF
SPE60222R0707 Conformed AMD 0001.pdf PDF
Att 7 OET Guidance.pdf PDF
Att 1 Fill-Ins WORD VERSION.docx DOCX document
Tab 09 RFP WP 22R0707.pdf PDF
Att 8 Map Coordinate Desk Guide.pdf PDF
Att 5 AFRICOM Foreign Vendor Info Sheet.pdf PDF
Att 6 QAPs.pdf PDF
Att 3 DL2019 Small Business.pdf PDF
Att 4 F76 Traceability Sheet.pdf PDF
Att 2 Equal Value Exchanges of Fuel.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

PDF (DLA)DLA FORM 1889, OCT 2011

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET 1 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

Print Form Email Form Clear Export Data Import Data About Check for Newer Version Contact Us

REV DESCRIPTION DATE APPROVED

NEW DLA ENERGY QAP E40.01

REVISIONS

QAP E40.01 MATERIAL INSPECTION AND RECEIVING REPORT (MIRR)/WIDE AREA WORKFLOW

(WAWF) ENERGY RECEIVING REPORT (ERR) (BULK FUEL/DIRECT DELIVERY AVIATION FUEL).

Required in all bulk fuel solicitations/contracts and direct delivery aviation fuel solicitations/contracts. DLA FORM 1889 dated .

QAP E40.01 MATERIAL INSPECTION AND RECEIVING REPORT (MIRR)/WIDE AREA WORKFLOW

(WAWF) ENERGY RECEIVING REPORT (ERR) (BULK FUEL/DIRECT DELIVERY AVIATION FUEL)

(DLA ENERGY JUL 2014)

(a) The requirements listed in paragraphs (b) and (c) are in addition to the other Wide Area Workflow (WAWF) requirements included in this contract. Whenever access to the WAWF system is limited or not available (i.e., during an extended loss of internet connectivity), the Contractor shall notify the Contracting Officer and request permission to submit documents manually until the WAWF system is again available for use. Manual documentation shall be completed in accordance with DFARS Appendix F.

(b) Test reports shall be entered into the WAWF system by means of the Statement of Quality tab.

Instructions for entering test information into the Statement of Quality Tab can be found in the WAWF Vendor Energy Receiving Report (ERR)/Combo Desktop Reference which can be downloaded at https://wawftraining.eb.mil/xhtml/ unauth/web/wbt/wawfra/vendor/VendorIndex.xhtml.

(c) Use the guidelines below for the submission of fuel quality testing data and supporting documentation for each ERR/Combo.

(1) MARINE SHIPMENTS. Submit a completed ERR/Combo and test reports via the Statement of Quality tab for all products shipped. If more than one shipping tank was used for the lift, a complete laboratory analysis for each shipping tank must be entered in the Statement of Quality tab. Also, clearly indicate the quantity of product shipped from each tank in the block titled “Quantity shipped from this tank”. Upload scanned copies, via the Attachments tab, of quantity determination documents and other shipping documents requested by the Quality Assurance Representative (QAR).

(2) PIPELINE SHIPMENTS. Submit a completed ERR/Combo and input the test results via the Statement of Quality tab for the total quantity of product shipped from each shipping tank used to fill the order. If more than one shipping tank was used for the shipment, a complete laboratory analysis for each shipping tank must be entered in the Statement of Quality tab. Also, clearly indicate the quantity of product shipped from each tank in the block titled “Quantity shipped from this tank”. Upload scanned copies, via the Attachments tab, of quantity determination documents and other shipping documents requested by the QAR.

(3) TRUCK, RAIL CAR AND INTERMODAL CONTAINER SHIPMENTS. When loading from source tank has finished for each shipment, submit a completed ERR/Combo and input test results via the Statement of Quality tab, for product received from that source tank. If only one shipment is made from a shipping tank, enter that quantity in the “Quantity shipped from this tank” block located on the Statement of Quality tab. If more than one shipment is made from the same shipping tank, the “Quantity shipped from this tank” block can either be left blank or be annotated with the quantity shipped during each individual shipment. Upload scanned copies, via the Attachments tab, of quantity determination documents and other shipping documents requested by the QAR.

DISTRIBUTION

STATEMENT - A

APPROVED FOR

PUBLIC RELEASE

DISTRIBUTION IS

"UNLIMITED"

DATE

07/08/2014

APPROVED BY

07/08/2014

REVIEWED BY

07/07/2014

PREPARED BY

DRAWING NUMBERSCALE

CODE ID NO.

52838

SIZE

NSN

MULTIPLE

ITEM

DLA ENERGY QAP E40.01

DLA Land & Maritime DLA Troop Support DLA Aviation clear

DEFENSE LOGISTICS AGENCY ENERGY

8725 JOHN J. KINGMAN RD

FORT BELVOIR, VIRGINIA 22060-6222

DLA Energy

SHEET 2 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

NEW DLA ENERGY QAP E40.01

THIS PAGE INTENTIONALLY LEFT BLANK

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION

(SQAP)

DRAWING NUMBERSCALE CODE ID NO.

8725 JOHN J. KINGMAN RD

PDF (DLA)

DLA FORM 1889, OCT 2011

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: NEW description: DLA ENERGY QAP E40.01 revdate:

revapproved:

revcomments:

apprdate: 07/08/2014 apprBy:

reviewdate: 2014-07-08 revBy:

prepdateA: 2014-07-07 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E40.01 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN RD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

DEFENSE LOGISTICS AGENCY ENERGY Page 1 of 1

8725 JOHN J. KINGMAN ROAD

DISTRIBUTION STATEMENT – A: APPROVED FOR PUBLIC RELEASE. DISTRIBUTION IS UNLIMITED

Signature

Prepared by:

Quality/Technical Support

Office Approval:

Contracting Approval:

C1.02 ASSIST DATABASE OF SPECIFICATIONS (DEC 2016)

Unless otherwise specified, current versions of defense or federal specifications and standards, military handbooks, commercial item descriptions, qualified product lists, and other related technical documents cited in this solicitation/contract can be accessed from the Department of Defense (DoD) Acquisition Streamlining and Standardization Information System

(ASSIST) database at https://assist.dla.mil under ASSIST-Quick Search or http://quicksearch.dla.mil. ASSIST is the official source for all Defense Standardization Program documents and contains the most current information on documents prepared by DoD, as well as information on how to acquire referenced non-Government standards that have been adopted for

DoD use. Note that commercial or foreign specifications are not located on ASSIST and must be obtained from the relevant sponsoring organization (e.g. ASTM, SAE, API, ISO, etc.). Registered ASSIST account holders may establish profiles to receive automatic E-mail alerts when changes are planned or made to documents of interest by selecting criteria on the [Alert

Portal Profile Maintenance] screens accessed from the [User Profile] menu. Users may also view or download a bi-monthly summary of changes to the ASSIST database under the [ASSIST Update] menu.

Basic instructions on how to use ASSIST:

1. Go to http://quicksearch.dla.mil/.

2. Type in the numeric portion of the specification or Qualified Product List (QPL) and click on the Search button.

3. Look through the search results to find the desired document and click on the Document ID.

a. For specifications: click on the .pdf link under Media.

b. For QPL information: click on the View Qualified Product Database (QPD) data link to open the QPD

i. Click on the link in the “Govt Designation” Column to view qualified products

1. To view qualified source plants, click on the Source Plants link under the Related Links column http://quicksearch.dla.mil/

2017-08-07T09:00:32-0400

TAYLOR.LORI.L.1391585080

2017-08-07T09:22:23-0400

SHEPHERD.SANDRA.S.1012568459

2017-11-20T09:19:52-0500

BANISZEWSKI.DANIEL.J.1287388698

STURGEON.STEVEN.A

LAN.JR.1009816565

Digitally signed by

STURGEON.STEVEN.ALAN.JR.1009816565

Date: 2022.03.28 15:50:06 -04'00'

MILLS.KEITH.10501831

MILLS.KEITH.1050183110

Date: 2022.03.28 15:34:49 -04'00'

HEIDBREDER.MICHAE

L.G.1139641082

HEIDBREDER.MICHAEL.G.1139641082

Date: 2022.03.28 15:27:41 -04'00'

(March 2022)

TABLE I, Sample Retention1

LOCATION MINIMUM QUANTITY RETENTION PERIOD 1

Bulk Tank Cars/Tank Truck/Intermodal Container

Additives 0.5-gallon (2 liters)2 Until receipt and quality verification of each lot/batch

Fuels 1 gallon (3 liters) 2 15 days for fuels/45 days for lubricating oils

Lubricating Oils 0.25 gallons (1 liter) 2

AVGAS Drums 0,25 gallons (1 liter) (multi-drum composite) 3 45 days

Shipping Tank(s)

2 gallons (8 liters) for Aviation Turbine Fuels 1 gallon (3 liters) for all other Fuels, Lubricating Oils, and Additives

45 days

Tanker/Barge/Pipeline (Composite Line at Custody Transfer Point)

2 gallon (8 liters) for Aviation Turbine

1 gallon (3 liters) for all other Fuels

Tanker/Barge (Composite)

F.O.B. Origin 2 gallons (8 liters) for Aviation Turbine

1 gallon (3 liters) for all other fuels

F.O.B. Destination 2 gallons (8 liters) Until shore tests on-specification Tanker/Barge (Each Compartment)

F.O.B. Origin 1 gallon (3 liters) 45 days F.O.B. Destination 1 gallon (3 liters) Until shore test on-specification

NOTES:

1. Unless otherwise noted in this document or applicable contract, the retention period shall be for the stated number of days after the sample has been taken from the location indicated.

2. If the conveyance is compartmentalized, a proportional sample shall be taken from each compartment such that a total of one liter is collected from the conveyance.

3. A one-liter composite sample of each product lot shall be taken from a predetermined number of randomly selected drums IAW Table III of API MPSM, Chapter 8.1 (ASTM D 4057).

TABLE II, Minimum Sampling and Testing Requirements for Petroleum Products Series 1, 1,13

ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE2 TEST REQUIRED3

1.a Prior to Loading

Before acceptance of new materiel and after establishment of new batch4

(Procurement) Each shore storage tank Single Tank Composite or All

Levels A

1.b Prior to loading (Government Stock) Each shore storage tank Single Tank Composites or All

Levels B-11, 5

1.c After line pack but prior to loading

(Procurement & Government Stock) As close to the custody transfer point as possible Line Sample C6,7 Dedicated System B-1 Non-Dedicated System

1.d In coordination with vessel crew (Procurement & Government Stock) Each vessel cargo compartment Manual method or onboard ship equipment Gauge or Ullage Report (Dry

Tanks) 1.e D uring Loading

After first in 9 (Procurement) Vessel cargo compartment(s) Spot C6,7,8 1.f After first in 9(Government Stock) Vessel cargo compartment(s) Spot Appearance and Density6,7,8

1.g After first in 9

(Replenishment at sea) Each vessel cargo compartment Spot C6,7,8

1.h During loading

As close to the custody transfer point as possible Line Sample Hourly Visual6,8, Retain10

Discard retain after passing 1.j tests

1.i

A fter Loading

After loading

Each vessel cargo compartment

All Level (Combine All Levels into one

Multiple Compartment Composite Sample)

C 6,11

Remainder of B-112

(Retain fuel for B-1 referee testing)

1. Additional requirements to include retain samples may be required. See Quality Assurance Provisions (C or E-QAP) for further details or DFSP QCP.

2. Refer to ASTM International D4057 for sampling procedures.

3. Test results shall be compared against the quality release certificate. Any discrepancies shall be identified, investigated, and resolved.

4. Upon procurement at refineries, blending installations, etc. and at main installations including national depots & ocean importing points on establishment of new batches.

5. Government-owned stocks previously tested at any type B level test within 90 days need only type C (test FSII & SDA if present).

6. Test for FSII and SDA only if line injected.

7. If sample fails appearance (see 5.11.4.3) perform particulate matter IAW 5.2.1.10.1. Maximum particulate IAW Table I.

8. Lubricity also required for F-76 only if line injected.

9. First in shall be done after one (1) meter or after line displacement whichever is the greater.

10. For all tanker, barge, and pipeline shipments, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable if they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in QAP E-1. For Government Shipments, pull a 1-quart sample hourly and retain until passing of 1.j B-1 tests.

11. Vessel may sail after “C” Tests; Remainder of B-1 tests to be completed before arrival at next load or discharge port. Test report will be provided to designated discharge port.

12. Type A level testing required for FOB Destination Procurements (unless otherwise specified by contract).

13. If a YON is being used as a barge, the QA requirements for waterborne transfer of petroleum products must be observed.

Series 2, 1,8

ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE 2 TEST REQUIRED3

2.a

Prior to Shipm ent

Before acceptance of new materiel and after establishment of new batch4

(Procurement) Each Shipment Storage Tank Single Tank Composite or All Levels A10

2.b Prior to shipment (Government Stock) Each Shipment Storage Tank Single Tank Composite or All Levels B-15

2.c After line pack but prior to loading/shipment

As close to the custody transfer point as possible Line Sample C6,7 Dedicated System

B-1 Non-Dedicated System

2.d

D uring Shipm ent

Immediately after start of loading/shipment

Downstream of the filter separator (if equipped) or closest to the custody transfer point as possible Line Sample C6

2.e Hourly after start of loading or shipment

Pipeline Only point as possible Line Sample

Apperance6

(Retain fuel for B-1 referee testing)

2.f

Daily on first fill and anytime a new tank is placed on issue (after line displacement) TT, TC, ISO, Refuelers or other over the road transportation modes only point as possible (Loading Rack or Fill Point)

Line Sample Color (by visual method) and Appearance6.

If visual fails perform C7

2.g fter Loading

Daily for each conveyance mode *Not required for pipeline operations

Each Cargo Compartment or another point that provides a representative sample All Level

Appearance on each compartment

C on composite 6,7,9

1. Additional contractual requirements to include retain samples may be required. See Contract Quality Assurance Plans (C or E-QAPs) for further details

2. Refer to ASTM International D4057 for sampling procedures.

3. Test results shall be compared against the quality release certificate. Any discrepancies shall be identified, investigated, and resolved.

4. Upon procurement at refineries, blending installations, etc., and at main installations including national depots & ocean importing points on establishment of new batches.

5. Government-owned stocks that have been tested previously at any type B level test within 90 days need only type C (test FSII & SDA if present. Test for lubricity for F-76 when LIA is injected outbound only).

6. Test for FSII and SDA only if line injected.

7. If sample fails appearance (see 5.11.4.3), perform particulate matter IAW ¶ 5.2.1.10.1. Maximum particulate IAW IGRL

8. Type A level testing required for FOB Destination Procurements (unless otherwise specified by contract).

9. Road tank truck vehicles with multiple compartments shall have a 1-quart representative sample obtained from each compartment.

10. Filtration time testing is required for JP-4, JP-5 & JP-8 and shall meet MIL-STD-3004-1 Table I or contract requirement, whichever is more stringent.

Series 3, product receipt and discharges for tankers and barges6, 7, 8, 10

ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE TEST REQUIRED

3.a

Prior to D ischarge

Prior to discharge (Multi Product Cargo)

From each vessel cargo compartment All Level Appearance and Density1,2

3.b From each vessel cargo compartment

(Combine All Levels into one

B-13

3.c (Single Product Cargo) (Procurement & Government Stock) From each vessel cargo compartment

(Combine All Levels into one

C4,5

3.d D uring

Within 30 minutes after start and each hour after until completion

Dock/Discharge Manifold Header Line Sample / Retain

Perform Appearance test5,9 and then retain fuel for

Referee testing

3.e At 1 hour after start, Midpoint and 1 hour prior to completion

Dock/Discharge Manifold Header Line Sample Particulate (if applicable)

3.f A fter

After receipt by waterborne vessel (Procurement & Government Stock) Receipt tank All Level B-1

3.g If remainder of fuel will be shipped to another DFSP

Each vessel compartment with fuel remaining on board All Level Retain until discharged at next destination

1. Test for flash point on high flash cargo tanks if low and high flash cargoes are carried together aboard the same vessel without segregated venting systems

2. If on-spec, discharge is authorized.

3. It is preferred that B-1 testing is completed before discharge. In the event capabilities do not exist or time does not allow, the vessel can be discharged once appearance and density testing is completed on each compartment per Table IX 3.a, and C5 testing on the volumetric composite in 3.b. If B-1 testing is not completed prior to discharge, volumetric composite for 3b. shall be retained until receiving tank testing passes. Once discharging is completed, a B-1 test will be performed on the receiving tanks per Table IX 3.i. If receiving tank fails, a B-1 will be performed on retained fuel.

4. Discharge is authorized after conformance with type C tests, and the provisions of Section 5.1.3.1 are met. Retain composite sample until the receiving tank analysis is complete. If product fails, perform B-1 tests on retain composite to help determine the cause of the off-specification problem.

5. For aviation fuel delivery, FSII and SDA shall be tested only if line injected. This requires an additional quart sample.

6. Refer to ASTM International D4057 for sampling procedures.

7. Flash Point at the receiving point is not required for product used by the U.S. Army. This fuel is tested IAW Petroleum Laboratory Operations (TM 4-43.31)

8. Type A level testing required for FOB Destination Procurements (unless otherwise specified by contract).

9. Test for additives if line injected downstream of the injector. (If line injecting LIA into F-76, test for lubricity.)

10. If a YON is being used as a barge, the QA requirements for waterborne transfer of petroleum products must be observed.

TABLE III, Tests required aviation gasoline3

PROPERTIES B-1 TEST B-2 TEST B-3 TEST C TEST

Appearance 1,2 X X X X

Color (Visual) X X X X Density or API gravity X X X X Distillation X X X Copper strip corrosion X X X Existent gum X X Vapor pressure X X Free water determination2 X X X Lead content X X Potential gum X Color (Saybolt)

Freeze Point

Knock Value Total Sulfur Oxidation Stability

1. Obtain sample in a clear round 1 quart glass bottle, swirl the bottle vigorously so a vortex is formed. Visually check for sediment at the point of the vortex. If sediment is visible, an investigation is necessary in order to determine the source of the contaminant (a spot larger than 3 mm diameter indicates corrective action may be required to prevent the delivery of contaminated fuel).

2. AVGAS samples shall be checked for particulate and water. Particulate shall be determined visually upstream of filter separators and/or by the particle assessment method downstream of the filter separator. Free water shall be determined downstream of filter separator using a water detector (AEL Aqua-Glo test method or Hydro-Light).

3. For determining correct testing results (rounding protocol) see 4.2.2.2.1 Testing Rounding Protocol

TABLE IV, Tests required for aviation turbine 7

Appearance 1 X X X X Color (visual) X X X X Density or API gravity X X X X Particulate matter X X X Distillation X X X Copper strip corrosion X X X Freezing point X X X Existent gum X X X Vapor pressure (JP-4 only) X X X Flash point (except JP-4) 11 X X X X Water reaction2 Lead content (If contaminated with leaded fuels suspected)

X X X

Fuel system icing inhibitor 3 X X X Filtration time X X X

MSEP (JP-4, JP-8, F-24, F-27, Jet A & Jet A-1) 4,5

Conductivity (JP-4 and JP-8, F-24, F-27 & Jet A-1) 6

Thermal stability (B-1 requirement applies only to JPTS and marine/multi-product mode receipt tank sample)10

X X

Color (Saybolt) X

Acid number X

Peroxide Number 8 X

Fatty Acid Methyl Ester (FAME) 9 X X X

1. Obtain sample in a clear round 1 quart glass bottle, swirl the bottle vigorously so a vortex is formed. Visually check for sediment at the point of the vortex. If sediment is visible, an investigation is necessary to determine the source of the contaminant (a spot larger than 3 mm diameter indicates corrective action may be required to prevent the delivery of contaminated fuel).

2. Optional or at the request of Service Control Point.

3. If product contains FSII, product shall be checked on delivery into a bulk storage tank and every month thereafter.

4. If the capability does not exist to perform this test at the terminal, send sample to the nearest Service laboratory that has capability. In the event operational necessity dictates issue of product before results are obtained from the Service laboratory, shipments may be made, however, when laboratory results indicate failure, notify DLA Energy Quality Operations Division.

5. In all cases where MSEP is measured, conductivity will also be measured using ASTM D2624. For unadditized Jet A that is injected outbound of a facility an MSEP shall be performed using either D7224 or D8073 where possible. If either method is not available testing may be conducted with D3948. Passing results for D3948 will be considered acceptable. Failing fuels shall be retested using D7224 or D8073. If the fuel passes D7224 with a minimum limit of 85 or D8073 with a limit of 88 the fuel is considered to be acceptable with no further action. If the fuel fails D7224 or D8073, an investigation shall be performed.

6. If fuel contains conductivity additive, wait approximately 2 minutes after obtaining sample for charges in the fuel to dissipate before performing CU testing.

7. For determining correct reporting of test results (rounding protocol) see 4.2.2.2.1 Testing Rounding Protocol

8. Only applicable to Jet A use by the Navy.

9. Only for product transported through multi-product systems, including marine transport.

10. For JPTS: Ellipsometer (ETR) or Interferometer (ITR) IAW QAP C16.08-13. ETR is the referee. For all other fuels, follow specification requirements (excluding MSC chartered/contracted tankers and barges in dedicated/long term service).

11. Flash Point at the receiving point is not required for product used by the U.S. Army. This fuel is tested in accordance with Petroleum Laboratory Operations (TM 4-43.31).

TABLE V, Support for secure fuel 4

JP-5 Jet A Jet A-1 7 JP-8 F-24 Min. Max. Min. Max. Min. Max. Min. Max. Min. Max.

Appearance 2 C&B C&B C&B C&B C&B C&B C&B C&B C&B C&B

Gravity, API @ 60 °F D1298/D4052 36.0 48.0 37.0 51.0 37.0 51.0 37.0 51.0 37.0 51.0

Density at 15°C (kg/m3) 788 845 775 840 775 840 775 840 775 840 Weight: lb/USG Calculated 6.6 7.0 6.5 7.0 6.5 7.0 6.5 7.0 6.5 7.0 Distillation (°C) D86 3

10% Recovered 205 205 205 205 205 20% Recovered Report Report 50% Recovered Report Report Report Report Report 90% Recovered Report Report Report Report Report Final Boiling Point 300 300 300 300 300 Freezing point, °C D5972/D2386

-46

-40

-47

-47

-40

Flash point, °C D93/D56 60 38 38 38 38

Particulate Matter (mg/L) D2276, D5452, MIL- DTL- 83133

0.5

Conductivity (pS/m) D2624 Report Report 50 700 50 700 Copper strip corrosion D130 No.1 No.1 No.1 No.1 No.1 Existent gum (mg/100 mL) D381 7 7 7 7 7 FSII, (vol %) D5006 1 0.07 0.20 0.04 0.15 0.04 0.15 Thermal Stability D3241

Change in pressure drop, mm Hg 25 25 25 25 25 One of the tube deposit rating methods shall be run:

(1) Ellipsometer (ETR) 6 (nm) or Interferometer (ITR) (nm)

(2) Heater tube deposit, Visual Tube Rating

(VTR)

< 3

< 3 < 3 < 3 < 3

Fatty Acid Methyl Ester (FAME) 5

1. Only use FSII meeting specification MIL-DTL-85470, Inhibitor, Icing, Fuel System, High Flash, NATO Code S-1745.

2. Fuel shall be clear, bright, and free of water and sediment on visual examination. Sample will be taken downstream of final filtration on refueler or hydrant servicing equipment.

3. Distillation property criteria are specified in ASTM D86 scale units. ASTM D2887 results shall be converted to estimated D86 results by application of the correlation in Appendix X4, “Correlation for Jet and Diesel Fuel (Procedures A and B)” of D2887 for comparison with the specified property criteria. Distillation residue and loss limits provide control of the distillation process during the D86 test method and do not apply to D2887.

4. Alternate test methods may be performed provided they are authorized by the specification of the product being tested. Referee test methods are preferred.

5. Only for product transported through multi-product systems. FAME (fatty acid methyl esters) is defined as material meeting the limits of EN14214 or ASTM D6751. FAME that fails to meet the biodiesel quality standards are not permitted in aviation turbine fuel.

6. Tube deposit rating shall be measured by ASTM D3241 ETR Ellipsometer (ETR), when available: otherwise, use Interferometer (ITR) or visual (VTR). ETR shall be the referee procedure, otherwise ITR.

7. DEF STAN 91-091, ASTM D1655 and GOST R 52050 are acceptable.

TABLE VI, Tests required for automotive gasoline

Appearance X X X X Color (Visual) X X X X Water and Particulate (Visual Check) X X X X Density or API gravity X X X X Distillation X X X

Vapor pressure X X

Copper strip corrosion X X Unwashed gum/Solvent-washed gum X X 1 Knock rating (RON and MON) X 2 X 2 Oxidation stability X

1. Unwashed gum, without solvent wash, shall not increase by more than 2 mg as compared to the original product. In the event of gum increase exceeding 2 mg, run type A test as defined in the legend.

2. Perform only if Lead Content is performed and fails and/or contamination with another product is suspected. In the case of pipeline, this test shall be performed when considered necessary.

TABLE VII, Tests required for E85 (ASTM D5798) 1, 2

Appearance X X X X Water X X X Ethanol Volume X X X

Vapor Pressure X X X

Sulfur X X Acidity X Solvent Washed Gum X X pH X Unwashed Gum X Copper X X

1. For cleaning see 5.9.4.2

2. In accordance with DOE Handbook for Handling, Storing and Dispensing E85 and Other Ethanol- Gasoline Blends, it is recommended at a minimum to test the following every one to two months: electrical conductivity, particulate content, hydrocarbon content (D5501 with D5798), water content and RVP. The DOE Guidebook link is https://www.afdc.energy.gov/uploads/publication/ethanol_handbook.pdf (May need to save file vs open document) https://www.afdc.energy.gov/uploads/publication/ethanol_handbook.pdf

TABLE VIII, Tests required for diesel fuels and kerosene

Appearance 1 X X X X Color (Visual) X X X X Density X X X X Distillation X X

Flash point X X X X Carbon residue (F-76 only) X X Cloud point X Pour point (F-76 only) X Copper strip corrosion X

Cetane index 2 X Viscosity (F-76 only) X Water & sediment by centrifuge X

Particulate (F-76 only) X X Storage stability (F-76 only) X Sulfur 3, 4 X X

Fatty Acid Methyl Ester (FAME) (F-76 only) X X

Lubricity (F-76 only) X X

1. For NATO F-76, if the sample has no visible particulates, but is otherwise not clear and bright per ASTM D4176, procedure 1, then the product shall meet the requirements of ASTM D2709, 0.05 percent volume of water and sediment, maximum. The fuel is acceptable for appearance if the water and sediment content is

0.05 percent volume or less. If the sample fails ASTM D4176, procedure 1, because it contains visible sediment or particulate matter, but meets the requirement of 10 mg /L, maximum, in accordance with ASTM D5452 or ASTM D6217, then the fuel shall be considered acceptable provided all other requirements are met.

2. Cetane Index can only be run if no ignition improvers are present. Otherwise, Cetane number shall be given.

3. Kerosene. Grade No.-1K only, if intended for non-flue connected burner.

4. Sulfur testing is required for ULSD or LSD believed to be contaminated with a higher sulfur content fuel.

TABLE IX, Test required for BDI

Appearance 1 X X X X Distillation X X Flash Point X X X X Cloud Point or LTFT/CFPP X

Viscosity X

Copper Strip Corrosion X

Water and Sediment X

Sulfur X Ramsbottom Carbon Residue X X Particulate Content X X Acid Number X

Ash Content X

Biodiesel Content X X X Oxidation Stability X

NOTE:

1. Obtain a sample in a clear round 1 quart bottle, swirl the bottle vigorously so a vortex is formed. Visually check for sediment at the point of the vortex. If sediment is visible, an investigation is necessary in order to determine the source of contamination.

TABLE X, Tests required for burner fuel oils

BS&W 1 (centrifuge) X X X X Density/API Gravity X X X X Viscosity X X Ash X Carbon Residue X Sediment by extraction X Pour point X

NOTE:

1. Perform only if water is observed.

TABLE XI, Tests required for residual marine fuel (RME 180 grade)

Kinematic Viscosity X X X X Density at 15o C X X X X Flash Point X X X X

CCAI X

Hydrogen Sulfide X Acid Number X Total sediment aged X X Carbon Residue X X

Pour Point X

Water X X Ash X Sodium X

TABLE XII, Tests required for residual marine fuel (RMG 380 grade)

Kinematic Viscosity X X X X Density at 15o C X X X X Flash Point X X X X

CCAI X

Hydrogen Sulfide X

Total sediment aged X X

Water` X X

Ash X Sodium X

TABLE XIII, Test required for marine gas oil (DMA grade)

Kinematic Viscosity X

Density at 15 o C X X X Flash Point X X X X Cetane Index X Sulfur X Oxidation Stability X X

Carbon Residue X X

Appearance X X X X Fatty Acid Methyl Ester (FAME) X X

TABLE XIV, Tests required for bulk lubrication oils 1, 2

PROPERTIES B-1 TEST C TEST

Appearance (to include visual sediment & water) X X Emulsion test 3 X Density or API Gravity X X Viscosity 4 X Flash point X

Foam test X Water 3 X

Solid contaminants 3 X

1. For application of these tests see Table IX.

2. B-2 tests are listed in Table XXII.

3. Only if the specification has this requirement.

. For MIL-PRF-17331 and MIL-PRF-9000 viscosity is not required unless the tank has been in long term storage for 3 months.

TABLE XV, Type B-2 tests for bulk lubricating oils 2

CHARACTERISTICS

SPECIFICATION

MIL-PRF-6081

(LA6)

MIL-PRF-9000

(LO6)

MIL-PRF-17331

(LTL)

MIL-PRF-32644

(CLB)

Appearance / workmanship X X X X Color X

Viscosity @ 100°C X X X Viscosity @ 54°C

Viscosity @ 40°C X 1 X X X Viscosity @ -40°C X

Viscosity @ -54°C X

Relative density X

Pour point X X X Acid number X X X Total Base number X Copper strip corrosion X X X Corrosion & oxidation stability X

Evaporation loss

Precipitation number

Ash/Sulfated Ash X X Emulsion X

Foam test X X1 X Water content X

Particulate content / trace sediment X X X Trace metals

Hydrolytic stability

Minimum retest frequency (months) 36 24 24 36 Visual check frequency (months) 12

Military symbol(s) None 9250 2190-TEP None

NATO Code Numbers O-133 O-278 O-250 None

1. Option A may be used for Government owned 2190 TEP if the conditions are met as required by ASTM D892.

2. For packaged product information refer to MIL-STD-3004-2. Only an approved laboratory under the DoD Shelf-Life Program can authorize a shelf-life extension of any item. For laboratories that cannot perform the full B-2 series tests, recommend the following statement be included in the remarks section of the lab report: "All required tests for shelf-life extension were not performed. This lab report does not give authorization to extend the shelf-life extension of this item."

TABLE XVI, Conversion chart for tank trucks (TT) tank cars (TC), tank wagons (TW), tank & trailer (TRR), and intermodal containers

(IMC)1, 2

Last Product Carried

PRODUCT TO BE LOADED5

Gasolines: MUR, MUM, MUP, EFM, E85, 100, 130, JP-4, JAB

Aviation Turbine Fuels: JAA/A1, JP-8, F-24, JP-5, TS1, KS1/R/N, Aviation Turbine

Fuel3: JPTS

RP1/RP2 JP-10/PF1 Diesel Fuel: F-76 FSII Lubricating Oils

Diesel Fuels:

DF1, DF2,

DS1, DS2,

DSS, DSW,

BDI, MGO

Gasolines4 MUR, MUM, MUP, EFM, E85, 100, 130, JP-4, JAB

Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry

Aviation Turbine Fuels4, 9

JAA/A1, JP-8, F-24,

JP-5, TS1, KS1/R/N,

Drain/Empty

Drain/Empty

Steam/Dry

Aviation Turbine Fuel3 JPTS Drain/Empty Drain/Empty Drain/Empty Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam Dry Steam/Dry

RP1/RP2 Steam/Dry Steam/Dry Steam/Dry Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry J10/PF-1 Steam Dry Steam/Dry Steam/Dry Steam Dry Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Petroleum Solvent or Paint Thinner Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry

Diesel Fuel: F-76 Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Drain/Empty Steam/Dry Steam/Dry Drain/Empty Diesel Fuels4 DF1, DF2, DS1, DS2, DSS, DSW, MGO

Steam/Dry Steam/Dry7 Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Drain/Empty

FSII (SIH) Drain/Empty Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Drain/Empty Steam/Dry Steam/Dry Lubricating Oils NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD Steam/Dry6 Steam/Dry Biodiesel Blends(<B15)4

DF1, DF2, DS1, DS2, DSS,

DSW

Steam/Dry7

NO LOAD

Biodiesel Blends(>B15):

DF1, DF2, DS1, DS2,

BDI

Steam/Dry8

Heavy Fuel Oils, Distillate Fuels4 FS1, FS2, FS4, FS5, FS6

Residual Fuel Oils:

ISO 8217, class F (IFOs)

Naphtha Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry

TABLE XVI Continued, Conversion chart for tank trucks (TT) tank cars (TC), tank wagons (TW), tank & trailer (TRR), and intermodal containers (IMC)1, 2

1. For previous cargoes not listed, contact DLA Energy Product Technology and Standardization Division at DLAEnergyProductTechnology@dla.mil for acceptability/cleaning procedures.

2. General Instructions for Tank Cars and Trucks

a. Conveyances (all) shall be dry and free from loose rust, scale, and dirt

b. Saran lined equipment should not be steam cleaned; water wash should suffice.

c. Petroleum products shall not be loaded into the conveyances where the previous cargo was caustic, acid, or chlorinated solvents.

d. Tank trucks and cars in liquid fertilizer service shall not load aviation turbine fuels directly but shall carry out at least two loads of commercial gasoline prior to the aviation turbine fuel load.

e. Conversion of Government-owned tank cars from liquid fertilizer service to aviation turbine fuel service shall only be done when no other alternative exists. Tank cars being converted from liquid fertilizer service to a petroleum product shall be adequately cleaned to remove all traces of liquid fertilizer. At a minimum, the equipment must be steam cleaned; dried and must be free from loose rust, scale, and dirt. After cleaning, but before loading aviation turbine fuels, at least two loads of commercial gasoline shall be carried prior to loading aviation turbine fuel. Equipment with unlined compartments should have its compartments lined with an approved coating at this time. Conveyances carrying their initial load of aviation turbine fuel following conversion shall not be released from the loading until they have been sampled a minimum of 24 hours after loading. In accordance with MIL-STD-3004-1A, samples shall undergo type B-2 testing plus Thermal Stability Test (if required by the product specification). After type B-2 tests indicate compliance with specification requirements, the conveyance can be released pending results of the Thermal Stability tests. The conveyance shall not be unloaded until the loading point notifies the destination that the Thermal Stability test (when required) has passed. When the above condition applies, the DD-250, Wide Area Workflow (WAWF) Energy Receiving Report (ERR) or equivalent form shall be so noted.

3. To be loaded only in aluminum or stainless-steel conveyance, or other conveyance lined with an approved epoxy coating. If equipment is coated, clean with hot fresh water not exceeding58°C (136°F) and dry thoroughly.

4. If previous cargo contained dye marker, all traces of color must be removed.

5. If product to be loaded does not contain dye, then the vehicle shall not contain any traces of dye prior to loading.

6. Drain/empty only when same specification product is being loaded.

7. Prior to loading the aviation fuels listed, the conveyance must have carried a previous non-FAME cargo and then be steam cleaned and dried. Trucks that have previously carried biodiesel create a risk of cross-contamination of aviation turbine fuel with residual biodiesel components. Diesel fuel may contain up to 5% FAME without reporting it as biodiesel.

Because of the difficulties in making a load-rack of the presence of FAME in the previous load, the more stringent “Steam/Dry is required.

8. Drain and empty if loading biodiesel blend.

9. Cargos carrying dyed kerosene shall use the steam/dry cleaning procedure.

mailto:DLAEnergyProductTechnology@dla.mil

TABLE XVII, Minimum Requirements for the Preparation of Barge and Tanker Cargo Tanks 1, 2

LAST PRODUCT CARRIED

(For information regarding 2nd and 3rd to last cargoes see note 8.)

PRODUCT TO BE LOADED

Gasolines4,5:

MUR, MUM,

MUP, EFM, E85,

100, 130, JP4, JAB

Jet Fuels:

JAA/A1, JP8,

F24, TS1,

KS1/R/N

Jet Fuel:

JP5

Jet Fuel:

JPTS

Diesel Fuel: F76 Sulfur greater than 15 ppm and less than or equal to

15ppm

Diesel Fuels with B5 or less5: DF1, DF2, DS1, DS2, DSS, DSW, MGO

Biodiesel Blends greater than B55:

DF1, DF2, DS1,

DS2, DSS, DSW

Heavy Fuel Oils:

ASTM D396 (FS4,

FS5, FS6)

ASTM D975 (No. 4D)

ISO 8217, Class F

(IFOs)

Gasolines5:: MUR, MUM, MUP, EFM, E85, 100, 130, JP4, JAB, Naphtha, Reformate and Alkylate

A, B

F

Jet Fuels:

JAA/A1, JP8, F24, TS1, KS1/R/N9

Jet Fuel: JP5 A A A F A, B A A A

Jet Fuel: JPTS A A A, B A A A A A Diesel Fuel (ULSD): F76 Sulfur less than or equal to 15 ppm

A, C

Diesel Fuel: F76 Sulfur greater than15 ppm A, C A, C A, C NO LOAD A A A A, C

Diesel Fuels with B5 or less5: DF1, DF2, DS1, DS2, DSS, DSW, MGO

Biodiesel Blends greater than B55: DF1, DF2, DS1, DS2, DSS, DSW

E

Heavy Fuel Oils: ASTM D396 (FS4, FS5, FS6) ASTM D975 (No. 4D)

ISO 8217, class F (IFOs)

A,D

Crude3 NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD Lube Oils NO LOAD NO LOAD NO LOAD NO LOAD A, D A, D A, D A Water soluble chemicals6 A,C A,C A,C F A,C A,C A,C A,C

Table XVII Continued, Water Soluble and/or Water Miscible Chemicals

Product Name Minimum Required

Cleaning Procedures

Product Name Minimum Required Cleaning Procedures

2-Butanone A,C Isopropanol, 91 % A,C 1,4 butanediol A,C Isopropanol, Anhydrous A,C 15W-50 (syn.hydrocarbons & additives) A,C Malaic Anhydride A,C 2-Butanol A,C Maquat A,C 2-Hydroxyethly Methacrylate (HEMA) A,C Methanol A,C Butendiol A,C Methyl Amyl ketone A,C CHRYSO A,C Methyl Pyrrolidone A,C Coralube 737 RB (= hexylene glycol) A,C Methyl Salicylate C8H8O3 A,C Diethanolamine, IMO 9/ UN 3082/PG III A,C Monoethanolamine A,C Diethylene Trianine A,C Mpdiol Glycol A,C Diethylketone A,C MS (mineral sprint) rule 66 A,C Dimethylacetamide (DML) A,C MTBE A,C Dipropylene Glycol A,C Eastman EB Solvent, A,C dipropylene glycol methyl ether (DPM) A,C Neodol 23-6.5 A,C Diquat concentrate A,C N-Methyl-2-Pyrrolidone, Non Haz. A,C DOW 200 A,C n-Propanol A,C DOW Froth 250 A,C Petresul 550 A,C Eastman Glacial Acetic Acid A,C Propyl Alcohol Sasol A,C Ethanol, Anhydrous A,C Propylene Carbonate, Non Haz. A,C Ethoxylated Sorbitan Laurate A,C Propylene Glycol Ethyl Ether (EPG) A,C Ethylene Carbonate, Non Haz. A,C Propylene glycol methyl ether (PM) A,C Ethylenediamine (EDA) A,C Terathane 2900 polyether glycol A,C Floquat (FL 4620 PWG) A,C Tetrahydrofuran (THF) A,C furfural alcohol A,C Triehtylene Glycol Ethyl Ether (ETG) A,C Furfurayl alcohol A,C triethanolamine 99 A,C Gamma Butyrolactone A,C Triethylene Glycol A,C Glycerol A,C Tripropylene Glycol A,C Glycol Ether DB Acetate A,C UAN (Urea Ammonia Nitrate) A,C Glycol Ether PNP A,C Hitec 614 (benzene sulfonic acid -calcium salt) A,C

TABLE XVII Continued, Vessel Cleaning Requirements Legend and Notes

A All cargo lines shall be dropped, tanks stripped, ballast residue removed.

B All cargo and vent lines shall be drained of previous product and flushed with cold water. Cargo tanks must be thoroughly machine washed using cold water. Cargo tanks must be free of water, loose rust, sludge, mud, silt, etc.

C The same as for “B,” except that hot water shall be used instead of cold. If tank interiors are coated, water temperature should not exceed 58°C (136°F).

D Cargo tanks and systems shall be processed in accordance with the instructions contained in EI HM 50 Guidelines for the cleaning of tanks and lines for marine tank vessels carrying petroleum and refined products.

E Not to be loaded without special cleaning instructions. Three clean product/zero biological content intermediate cargoes required. (See Note 5 below) F Special tank preparations and cargo handling is required for JPTS, to prevent contamination. Tanks used for loading must be stainless steel or coated with an approved epoxy. Coating must be adherent: no flaking, peeling, or blistering. Prior to loading JPTS, tank cleaning requirements are: tanks must be machine washed with hot water, if cleaning chemical and/or salt water is used, the final wash must be with fresh water.

Tank bottoms, interior bulk heads, and internals must be completely free of sediment, scale, and other contaminants. Tanks must be dry and all liquids completely removed from the tank’s lines after cleaning, must be flushed with fresh water, drained and free of all water. Loading and unloading system must be completely isolated. This will be accomplished by completely separate piping systems or by use of blinds. Valves will not be depended on to effect isolation. Cargo tank valves will not be considered as part of the “double block” requirement for cargo system segregation. No common lines will be used. Steam smothering lines should have at least two valves that can be sealed from the main line to the tanks, or a blind installed that can be readily removed. Each tank will have its own individual vent. If ship has a common vent system, tanks used for JPTS must be isolated from balance of the vent system.

1. See Vessel Cleaning Requirements Legend for cleaning type code (A, B, C, D, E, F) details.

2. This table is included as a guide only. Requirements for tanker cleaning are determined by MSC vessel cleaning policy. Contact DLA Energy Quality Operations Division for tank cleaning requirements for any product not listed in the Table. If tank contains ballast water or water used for tank cleaning/washing, every effort shall be made to remove this free water to the minimum level possible by draining or by use of a pump.

3. There are no circumstances where a crude carrier is capable of cleaning tanks, pumps and lines sufficiently to load an aviation fuel immediately after a crude cargo. Crude carriers converted to a distillate diesel, aviation fuel or naphtha-based fuel must carry three cargoes of a commercial like product without a quality incident.

4. Gas free, lift scale and mop. Consideration may be given to substituting mopping by enhanced stripping and drying per EI (Energy Institute) HM 50 Guide.

5. FAME (Fatty Acid Methyl Ester) Contamination:

Aviation Gasoline or Aviation Kerosene/Turbine Fuel (Aviation Fuel Products)

- To avoid contamination from FAME in Aviation Gasoline, Aviation Kerosene/Turbine Fuel cargoes. See below instructions.

-- Following cargoes with pure biodiesel (B100) or any cargo with FAME content greater than 5 vol % (B5): Prior to loading Aviation Fuel Product cargoes requires three intermediate cargoes of a compatible fuel product. The three intermediate cargoes SHALL NOT contain FAME content greater than 5 vol % (B5). When any of the last three cargoes have consisted of diesel or heating oil products, FAME testing shall be conducted for each cargo; attestation as described in the RFP is not sufficient for these products. Examples of diesel or heating oil products include, but are not limited to, F-76, DF1, DF2, DS1, DS2, DSS, DSW, MGO, Gasoil, FS1, FS2, FS4, FS5, FS6, and IFO. Evidence by presentation of CoQs representing the last three cargoes with FAME testing (EN 14078 and ASTM D7371) demonstrating B5 or less shall be provided as proof. In scenarios where FAME testing (EN 14078 and ASTM D7371) was not conducted for a diesel or heating oil product, or such data is unable to be provided for all three of the last cargoes, the vessel shall be assumed to contain FAME greater than 5 vol %. The vessel tanks shall be evaluated and cleaned under the Minimum Requirements for Preparation of Tanker Cargo Tanks table above under procedures for Biodiesel Blends greater than B5 procedures. Alternatively, another vessel with FAME testing for the last three cargoes conducted may be nominated instead.

-- Tanks shall be in good condition and washing shall be particularly stringent, including flushing of pumps and lines, followed by drain and mop, at a minimum. A fresh- water rinse is required if sea water is used. Uncoated tanks shall be hot water washed and have loose bottom scale removed prior to loading an aviation fuel product cargo load.

-- Following cargoes with a FAME content of 5 vol % or less (B5 or below): Prior to loading Aviation Fuel Product cargoes, recommend a hot water wash, including flushing of the pumps and lines, followed by draining, at a minimum. A fresh-water rinse is required if sea water is used.

Special note:

Specifications for sensitive grades will require extreme care during sampling to avoid contamination from previous cargoes or buildup of residues. To reduce the possibility of drawing unrepresentative samples, cleaning of sampling equipment, vapor locks, standpipes and stilling wells is recommended as part of cleaning when tanks have previously held cargoes containing FAME.

6. Water soluble chemicals: include Ethanol, Mono Ethylene Glycol, Di Ethylene Glycol. See page four (4) for additional water soluble/miscible chemicals.

7. Previous automotive and aviation gasoline cargoes for loading JPTS are unacceptable unless the concentration of lead is verified to be less than 13ppm.

8. Certain products to be loaded on a tanker must not only consider the last cargo carried, but the 2nd and 3rd to last cargoes as well. These products include aviation turbine fuels and F-76 fuel oil, naval distillate. Previous cargoes of

Crude oil and products containing FAME are addressed in notes 3 and 5. Other 2nd and 3rd to last cargoes of concern include, but are not limited to, raw vegetable oil, lubricating oils, heavy fuel oils, and various chemicals.

Determinations for acceptability of 2nd and 3rd to last cargoes carried prior to loading aviation fuel and F-76 will be made on a case-by-case basis using applicable Certificates of Analysis, Certificates of Quality and other analytical data.

9. Cargos carrying dyed kerosene shall use the A/B cleaning procedure.

Table XVIII, Test Series Definition

TYPE DESCRIPTION

A Complete specification test as per specification detailed in the contract

B-1 A limited subset of principle characteristics of the type A full test specification requirement most likely to be affected by transportation of a product.

B-2 A more rigorous subset of the type A full test specification requirement than the type B-1 test schedule and aimed at those parameters susceptible to deterioration through aging, weathering, and long-term storage conditions.

B-3 Partial analysis for contamination; in particular, for controlling the re-injection of pipeline interface products.

Appearance To confirm that no free water and/or visual solid particulate are present in the fuel and that the fuel has a “clear & bright” appearance at ambient temperature.

C A limited number of tests performed to identify and compare product properties to ensure that no major changes have taken place during the fuel transfer process by any means of transport.

C+ (C-Plus) C-test plus additional tests. These tests are to be performed to ensure that critical properties are fulfilled and/or additives are present at the correct concentration.

ENERGY QAP E1 Tables.pdf

E1 QAP v4a.pdf

DEFENSE LOGISTICS AGENCY ENERGY Page 1 of 2

C16.01 TURBINE FUEL, AVIATION (JP5) (DLA ENERGY APRIL 2018)

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT

9130-00-273-2379 Turbine Fuel, Aviation, JP-5 JP5

9130-01-499-9521 Turbine Fuel, Aviation, JP-5 (Bunker fuel overseas locations only) JP5

Product shall meet MIL-DTL-5624W, Turbine Fuel, Aviation, Grade JP-5, dated March 28, 2016.

(a) SPECIFICATION MODIFICATION: The requirements of Table I in the specification are modified as follows:

a. FILTRATION TIME TESTING. Round upwards when reporting the filtration time, in minutes. For example, a filtration time of 4 minutes, 22 seconds, would be reported as 5 minutes.

b. FLASH POINT TESTING. The referee procedure for performing flash point testing of JP-5 shall be the manual method of ASTM D93 as opposed to the automated version of ASTM D93.

c. FLASH POINT.

i. All batches of JP-5 that are presented for Government acceptance at origin and for subsequent shipment through a multiproduct pipeline, shall meet a minimum flash point requirement of 62.5°C.

ii. In the U.S. all JP-5 deliveries in California, Oregon, and Washington shall have a minimum Flash Point of 62.5 oC at the custody transfer point.

iii. In Australia all JP-5 deliveries shall have a minimum Flash Point of 61.5°C at the custody transfer point.

d. ACID NUMBER. For JP-5 delivered to Kodiak Island, Alaska, the maximum total acid number shall be 0.020 mg KOH/g.

e. MICRO-SEPAROMETER (MSEP) REQUIREMENTS.

i. Prior to initial production under this contract, the Contractor shall elect, on a one-time basis, which MSEP limit to meet for the balance of the contract.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .