SF30_SPE602-22-R-0701 AMD 2.pdf
PDF 57 KB Posted
- Solicitation number
- SPE602-22-R-0701
- Issued by
-
Defense Logistics Agency Energy
About this file
This document contains an amendment to a solicitation and questions and answers related to a bulk petroleum products procurement for the Atlantic/Europe/Mediterranean region by the Defense Logistics Agency Energy. Key details include: the solicitation number is SPE602-22-R-0701; the closing date for responses is December 10, 2021; the ordering period is from date of award through June 30, 2023 with delivery from July 1, 2022 through June 30, 2023 and a 30-day carryover period; delivery methods include tanker FOB origin and pipeline both FOB origin and destination; the usage of the Bulk Offer Entry Tool for submissions is mandatory; questions addressed include product origin requirements, vessel flagging, set-asides, prior contract information access, additives responsibilities, pricing indexes, and pipeline ingress points; the NAICS code is 324110.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE602 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60222R0701
X
2021 NOV 10
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of his amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and his amendment, and is received prior to he opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of he following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edi ion unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By comple ing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM PRODUCT
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
11/30/2021
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 3 PAGES
SPE60222R0701 - 0002
Block 14 Cont'd:
1. Amendment 0002 is hereby issued to answer questions received from prospective offerors relating to solicitation SPE602-22-R-0701 and the Pre-proposal conference slides dated November 17, 2021.
a. Question: Will the products be required to be US made or can foreign products be provided (from non-prohibited countries)?
Answer: In compliance with DFARS 252.225-7021, product must be U.S. made, or derive from a designated country.
b. Question: Does the tankers need to be US flagged vessels?
Answer: There is no FOB Destination tanker on this solicitation. All tanker deliveries are FOB origin. Thus, the government take responsibility of transportation to the destination.
c. Question: Will there be set-aside volume amounts for small businesses?
Answer: No. This is an overseas requirement, and all work will be performed entirely outside of the United States and its outlying areas.
d. Question: Attempted to gain a report on the current contract through CIS and WAWF without success.
Answer: The prior contract cycle’s information is currently unavailable in the Contract Information System. Please use the Sam.gov website to gain information from last AEM cycle contract awards. You may use the following link: https:// sam.gov/opp/d67a893c5f6b46a3a6e1a9820e9b1c8f/view
e. Question: If a vendor bids on a T line item (TXXXX), can vendor select an ingress point anywhere along the CEPS or just those listed in the schedule of supplies?
Answer: All throughputs (TXXXX), have their own entry point(s). All associated line items must use any of the entry points provided under the throughput in the delivery notes. If the entry point is not listed in the solicitation, then this entry point is not permitted for use.
f. Question: If a vendor bids on a T line item (TXXXX), does it apply to all the numeric lines items below it, or do we have to specify which locations?
Answer: Please consult preproposal Master Deck slide page #6. The schedule overview presented lists all locations you may offer to. Vendor is responsible for meeting all requirements of these locations as detail in the solicitation schedule. To include, but not limited to, quantity, mode, FOB, additives, delivery notes.
g. Question: Who determines the price for transportation via the CEPS?
Answers: Contractors are responsible for transportation to DFSP CEPS. The government is responsible for transportation from DFSP CEPS to the final destinations. Please read delivery notes carefully.
h. Question: Who, where, and when are the additives blended with the jet fuel for those line items with ingress via
CEPS?
Answer: Throughput T0003 is FOB Origin and requires SDA as the only additive entering the pipeline system. However, France pipeline entry points into the CEPS: Marseilles (Lavera), Feyzin, and Le Havre do not require SDA. For tanker deliveries, all fuel must be additized with SDA; the only acceptable point of entry is Marseilles, France.
Accordingly, all blending operations for all line items under T0003 will be conducted by the government, at the customer level, and will not be the responsibility of the contractor unless entering the CEPS via Marseilles (Lavera), Feyzin, or Le Havre. In other words, contractors are only required to provide JA1 with SDA to DFSP CEPS if not using the France entry points via pipeline.
i. Question: What is the logistics like for delivery?
Answer: Contractors are responsible for logistics in order to meet the requirements depicted in the schedule.
j. Question: Is there a rack from where we pick up via trucks for delivery?
Answer: Truck mode deliveries are not the responsibility of the vendor. The requirements schedule methods of delivery are FOB origin Tanker, and FOB origin/destination pipeline. Please consult slide 6 and 7 under the preproposal Master Deck.
k. Question: There are some split deliveries between tankers and pipeline. How does this work?
Answer: Some schedule requirements call for either delivery option. Please read the delivery notes carefully.
l. Question: Does the vendor deliver via tanker/barge a portion and via trucks from a pipeline for other portion?
Answer: No. The requirements schedule methods of delivery are FOB origin Tanker, and FOB origin/destination pipeline.
Please consult slide 6 and 7 under the preproposal Master Deck.
m. Question: What are the volumes to be delivered in tanker ships?
Answer: All volumes (tanker, or pipe) are listed in the requirements schedule. Throughout the duration of the contract, orders will be placed based on customer demand at the specified date needed for each individual order.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES
SPE60222R0701 - 0002
n. Question: Is the tanker fuel discharged directly or are there further logistics that must be considered?
Answer: All tanker deliveries will discharge to the specific pipeline system or transported to the end requirements locations as the Government’s responsibility via the Government’s transportation depicted under each DFSP in the requirements schedule.
o. Questions: Some delivery maximums are quite low in terms of the total. How often are the deliveries?
Answer: Throughout the duration of the contract, orders will be placed based on customer demand at the specified date needed for each individual order. The Government agrees to purchase, during the period of this contract and in accordance with the terms of this contract, at least a quantity (or quantities) of product that, under the contract terms, will be not less than 75 percent of the total original estimated contract volume. Please refer to I86.12 DELIVERY-ORDER LIMITATIONS – SCOPE OF CONTRACT of the solicitation for more information.
p. Question: Reference page 15, Master Deck file, would any other ingress (CEPS point) in Germany be an acceptable exception or deviation?
Answer: All exceptions will be reviewed but may or may not be approved. However, the only acceptable pipeline entry points into DFSP CEPS are: France: Marseilles (Lavera), Feyzin, Le Havre Belgium: Antwerp, Ghent Netherlands:
Rotterdam (Pernis) Germany: Lingen CEPS will only accept origin pipeline deliveries. The only acceptable point of entry for tanker deliveries is Marseilles, France. Please refer to the requirements schedule in the solicitation.
q. Question: Reference page 85, Master Deck file, pricing, AEM default escalators are 5 day-wrap averages; is that based on the low, mean, or high price for JP5/JP8/JA1: Platts Jet CIF NWE CARGO PJAAU00?
Answer: All the Platts prices used in the AEM solicitation are midpoint prices, also called mean prices.
r. Question: Reference pages 13 & 14, AEM+-+RFP+SPE602-22-R-0701_Final, Line Item T0003 indicated the following additive:
a. SDA
However, under various line items, for example, line item 0013, the following additives are required:
a. FSII
b. SDA
c. CI
If a vendor wanted to bid on a particular line item (0013), where would blending occur if the fuel was offered through
DFSP CEPS?
Answer: Because throughput T0003 is FOB Origin and only allows SDA to be included, all blending operation for line items 0013 will be conducted at the customer level. In other words, contractors are only required to provide JA1 with SDA to DFSP CEPS.
s. Question: If a vendor offer on T0003, would the vendor be offering on all the line items below T0003, and could we ingress at our preferred CEPS point?
Answer: Correct. If a company offers for the total quantity under T0003 (91,825,000 USG), then yes, the offer will cover all line items under this throughput.
t. Question: Reference page 13, AEM+-+RFP+SPE602-22-R-0701_Final, Delivery Identification, CEPS - DFSP CEPS (STATE) DE (GERMANY), however, the delivery address is . So how do we determine an ingress point?
Answer: Truck mode deliveries are not the responsibility of the vendor. The requirements schedule methods of delivery are FOB origin Tanker, and FOB origin/destination pipeline. Please consult slide 6 and 7 under the preproposal Master Deck. Acceptable pipeline entry points into DFSP CEPS are: France: Marseilles (Lavera), Feyzin, Le Havre Belgium:
Antwerp, Ghent Netherlands: Rotterdam (Pernis) Germany: Lingen CEPS will only accept origin pipeline deliveries. The only acceptable point of entry for tanker deliveries is Marseilles, France. Please refer to the requirements schedule in the solicitation.
2. All other terms and conditions remain unchanged.