RFP_ATT_1_Tech_Proposal_Questionnaire.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- SPE600-16-R-0706
- Issued by
-
Defense Logistics Agency Energy
About this file
RFP ATT 1 Tech Proposal Questionnaire
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATT X
| TECHNICAL PROPOSAL QUESTIONNAIRE ATTACHMENT 1 |
| Bullet points and 10 point font may be used in responses. |
Responses to this attachment will not count toward the page count of the proposal. However, narrative responses within this attachment should not exceed a total of five (5) pages, not including any required supporting documentation (e.g., maps, copies of agreements, etc.)
Identify your strategy to address situations outside of your control (e.g., road blockage, product being commandeered by third party, personnel loss of life/injury?)
Identify the signed agreements you have in place for contracted trucking assets.
How do you evaluate the condition and capacities of owned/subcontracted trucking assets to ensure capability to provide sufficient transportation of product?
Provide a map (separate sheet) identifying the locations of each entity/facility with whom you have an agreement.
Identify the distance and estimated travel time from each facility to the nearest DFSP.
What processes and controls are in place to ensure accountability of product, trucks, submittal of daily fuel delivery logs, etc.?
What processes are in place to ensure compliance with industry safety and environmental standards?
Address the dispensing of fuel (truck-to-truck transfer) and fuel spills. Include other fuel delivery methods that will be used to increase safety of personnel and well-being of the environment.
Site any awards, statistics, etc. to support the superiority of your safety and environmental record during disaster support.
What equipment and plan do you have in place to maintain communication with delivery assets that may be in areas where the communication infrastructure is inoperable? (e.g., an asset in the field has received conflicting information and needs your staff to validate the correct information with a designated Government official).
SPE600-16-R-0706
ATTACHMENT 1
File details come from the government source that posted it. Updated .