AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60016R0700
X
2015 DEC 03
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
8725 JOHN J KINGMAN RD STE 4950
FT BELVOIR VA 22060-6222
USA
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUED ON NEXT PAGE
1. The purpose of Amendment 0010 is to respond and provide clarification to potential offerors questions.
This amendment also clarifies a statement placed at the end of the negotiation letter that was sent out to offerors who provided offers for this solicitation prior to the close date of January 6, 2016.
2. This amendment corrects Section B of the solicitation to reflect that under Line Item 0012 the additive SDA is required.
3. It also amends the concentration levels for SDA to between 50 picosiemens per meter (pS/m) and 600 picosiemens per meter for CEPS ingress point Rotterdam.
4. It updates the Quality Assurance Provision C16.64-1 TURBINE FUEL, AVIATION (JP8) (INLAND EAST GULF/OFFSHORE) (ROCKY MOUNTAIN /WEST) (WESTPAC) (ATL/EUR/MED) (PC&S) (DLA ENERGY JAN 2016)
(a) Nomenclature for Aviation Turbine Fuel (JP8) is shown below:
NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT CODE
9130-01-031-5816 Turbine Fuel, Aviation JP8
(b) INCIDENTAL CONTAMINANTS. Particulate Matter and Fatty Acid Methyl Ester (FAME) content shall not exceed the limits outlined in Table III of MIL-DTL-83133J dated December 16, 2015.
(c) SPECIFICATION MODIFICATIONS. Aviation Turbine Fuel (JP8) shall conform to MIL-DTL-83133J modified as follows:
(1) TESTING
(i) FILTRATION TIME (FT) TESTING. For filtration time testing round upwards when reporting the filtration time, in minutes. For example, a filtration time of 10 minutes, 18 seconds, would be reported as 11 minutes.
(ii) MICROSEPAROMETER (MSEP) RATING LIMITS.
(A) Prior to initial production under this contract, the Contractor shall elect, on a one-time basis, which MSEP limit will be met for the balance of the contract. If the Contractor introduces fuel system icing inhibitor (FSII), corrosion inhibitor/lubricity improver (CI/LI), and/or static dissipater additive (SDA) after verification of product conformance with the MSEP requirement, the product is not required to meet a fixed limit on subsequent MSEP tests.
(B) If the Contractor elects to verify conformance with the MSEP requirement on a sample of product that does not contain FSII and CI/LI, an additional MSEP test shall be performed on a hand blend containing aviation turbine fuel, FSII, CI/LI, and antioxidant (AO; AO only if required). The FSII shall be included in this hand blend at a concentration of 0.07 to 0.10 volume percent and the amount of the CI/LI included shall be within the concentration range specified in QPL-25017. The additional MSEP result of this hand blend is a REPORT ONLY requirement, and shall be recorded corresponding to item 750X on the Standardized Report Form (see Attachment ). This result shall be recorded with an asterisk next to it, and with a footnote below, stating, “*MSEP result is a ‘Report Only’ requirement. Original result of (fill in actual result) on product containing the following additives: (fill in combination of additives).”
(iii) WORKMANSHIP. The workmanship criteria in MIL-DTL-83133J, paragraph 3.4, is revised to read, “At the custody transfer point, the finished fuel shall be clear and bright and visually free from undissolved water and particulate matter in accordance with Standard Test Method for Free Water and Particulate Contamination in Distillate Fuels, ASTM D4176, Procedure 2, with a result of Rating 1, maximum. If the sample fails ASTM D4176 only because it contains visible particulate matter, but meets the particulate matter requirements of 1.0 mg/L maximum as stated in MIL-DTL- 83133J, Table III, the workmanship criteria is met. In case of dispute as determined by sample results taken from the custody transfer point, the fuel shall be clear and bright at 21 degrees Celsius (70 degrees Fahrenheit) and shall contain no more than 1.0 mg/L of particulate matter. The sample in dispute shall be taken into an area where the sample is permitted to slowly equilibrate to 21 degrees Celsius (70 degrees Fahrenheit).
(2) SPECIAL LOCATION REQUIREMENTS
(i) Rocky Mountain/West. Aviation fuel movement via the Chevron Pipeline (Utah, Idaho, or Washington state entry points) shall be limited to total sulfur content of 0.15 mass percent, maximum.
(ii) Alaska. For fuels refined in Alaska and delivered to Alaska locations, the total Acid number shall be relaxed to 0.020 mg KOH/g maximum.
(d) ADDITIVES. Additives are required for deliveries of JP8 per MIL-DTL-83133J, unless addition is excluded by specific solicitation line item, applicable contract clause, or other contractual requirement.
(1) The CI/LI additive(s) used shall be of the type and concentration cited in QPL-25017. To locate this information: (1) Go to the Acquisition Streamlining and Standardization Information System (ASSIST) QuickSearch website (URL http://quicksearch.dla.mil/), (2) type "QPL-25017" in the Document ID field, press the Search button, (3) click the QPL- 25017 search result under Document ID, (4) click the "View QPD Data" link under Overview, and (5) click the “MIL-PRF- 25017 CATEGORY 1” link under Govt Designation. The concentration range for each additive is listed under the “Source Notes” link under the far right column of the table.
(2) Metal deactivator additive shall not be used in JP8 unless the Contractor has obtained written consent from the Contracting Officer.
(3) The requirement for static dissipater additive (SDA) (see MIL-DTL-83133J, paragraph 3.3.3 and fuel electrical conductivity requirement in Table I) shall not apply unless stated otherwise in the Schedule.
(4) Line injection of additives (FSII, CI/LI and SDA) from shipping tank to delivery conveyance is permitted under the following conditions:
(i) A laboratory hand blend containing the required additives and aviation turbine fuel must be tested to verify compliance with the specification.
(ii) Additives must be proportionately injected throughout the entire loading process to ensure the additive is homogeneously blended into the product. The Contractor shall maintain records evidencing the homogeneous blending of all line injected additives. Such records shall include meter or tank gauge readings or test results taken at intervals to provide confidence in the injection process.
(iii) When FSII is line injected, additive concentration must be verified based on a representative sample from each shipping conveyance.
(iv) When SDA is line injected, and insufficient time is available for the fuel to reach equilibrium before departure of the shipping conveyance, the Contractor is not required to report or verify the conductivity level on a representative sample from the conveyance. This does not relieve the Contractor of the requirement to inject SDA homogeneously and in sufficient quantity to obtain a conductivity level which the Contractor would anticipate to be within the specification limits once the fuel is at equilibrium. The receiving activity will measure the conductivity and advise the Contractor if it does not meet the specification requirements and the Contractor shall adjust the SDA injection quantity accordingly.
(5) SPECIAL LOCATION REQUIREMENTS (AEM ONLY)
(i) For deliveries to La Spezia, Italy, the CI/LI shall be 3.5 g/m3 above the minimum effective concentration as identified in QPL-25017. See paragraph (c)(1) above.
(ii) When antioxidants (AO) are added to the hydrotreated portion of the finished product, the percentage of the blend that has been hydrotreated shall be reported.
(iii) The requirement for static dissipater additive (SDA) (see MIL-DTL-83133J, paragraph
3.3.3 and fuel electrical conductivity requirement in Table I) shall not apply unless stated otherwise in the Schedule.
5. This amendment also corrects the formatting of C16.01 TURBINE FUEL, AVIATION (JP5) (BULK) (DLA ENERGY DEC 2015)
(a) Product shall meet MIL-DTL-5624V, Turbine Fuel, Aviation, Grade JP-5, dated July 11, 2013.
NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT CODE
9130-00-273-2379 Turbine Fuel, Aviation, JP-5 JP5 9130-01-499-9521 Turbine Fuel, Aviation, JP-5 (Bunker fuel overseas locations only) JP5
(e) SPECIFICATION MODIFICATION: The requirements of Table II in the specification are modified as follows:
(1) FILTRATION TIME TESTING. Round upwards when reporting the filtration time, in minutes. For example, a filtration time of 4 minutes, 22 seconds, would be reported as 5 minutes.
(2) HYDROGEN CONTENT. ASTM D5291 is an acceptable test method in addition to ASTM D3701 and ASTM D7171.
(3) FLASH POINT TESTING. The referee procedure for performing flash point testing of JP-5 shall be the manual version of ASTM D93 as opposed to the automated version of ASTM D93.
(4) FLASH POINT.
(i) All batches of JP-5 that are presented for Government acceptance at origin and for subsequent shipment through a multiproduct pipeline, shall meet a minimum flash point requirement of 62.5°C.
(ii) In the U.S. all deliveries of JP-5 in the states of California, Oregon, and Washington shall have a minimum Flash Point of 62.5 oC at the custody transfer point.
(iii) In Australia all deliveries of JP-5 shall have a minimum Flash Point of 61.5°C at the custody transfer point.
(5) ACID NUMBER. For JP-5 fuels delivered to Kodiak Island, Alaska, the maximum total acid number shall be
0.020 mg KOH/g.
(6) MICRO-SEPAROMETER (MSEP) REQUIREMENTS.
(i) Prior to initial production under this contract, the Contractor shall elect, on a one-time basis, which MSEP limit will be met for the balance of the contract. If the Contractor introduces Fuel System Icing Inhibitor (FSII) and/or Corrosion Inhibitor/Lubricity Improver (CI/LI) after verification of product conformance with the MSEP requirement, the product is not required to meet a fixed limit on subsequent MSEP tests.
(ii) If the Contractor elects to verify conformance with the MSEP requirement on a sample of product that does not contain FSII and CI/LI, an additional MSEP test shall be performed on a hand blend containing jet fuel, FSII, CI/LI, and Antioxidant (only if required). The FSII shall be added to this hand blend at a concentration range between 0.10 volume percent minimum and 0.15 volume percent maximum. The amount of the CI/LI added to this hand blend shall be within the concentration range specified in QPL- 25017. The MSEP result on this hand blend is a REPORT ONLY requirement and shall be recorded corresponding to item 750X on the Standardized Test Report Form (see Attachment ). This result shall be recorded with an asterisk next to it, and with a footnote below, stating, “*MSEP result is a ‘Report Only’ requirement.
Original result of (fill in actual result) on product containing the following additives: (fill in combination of additives).”
(6) ADDITIVES.
(i) Additives are required for deliveries of JP-5, per MIL-DTL-5624V, unless addition is excluded by specific solicitation line item, applicable contract clause, or other contractual requirement. FSII included in jet fuel shall conform to MIL-DTL-85470B, Inhibitor, Icing, Fuel System, High Flash, Notice 1 dated March 24, 2004.
(ii) The CI/LI additive(s) used shall confirm to MIL-PRF-25017H Inhibitor, Corrosion/Lubricity Improver, Fuel Soluble, w/Amendment 1, dated August 4, 2011 and be of the type and concentration cited in the Qualified Products Database (QPD). To locate this information: (1) Go to the Acquisition Streamlining and Standardization Information System (ASSIST) QuickSearch website (URL http://quicksearch.dla.mil/), (2) type "QPL-25017" in the Document ID field, press the submit button, (3) click the QPL-25017 search result underDocument ID, and (4) ication" link located in the upper right side of the webpage to be directed to
QPL-25017.
Only the following CI/LI additives are approved for shipment to North Atlantic Treaty Organization (NATO) countries:
CI/LI CONCENTRATION, GRAMS/CUBIC METER
Innospec Fuel Specialties, LLC DCI-4A 9 – 24 Innospec Fuel Specialties, LLC DCI-6A 9 – 15 Afton Chemical Corp., Hitec 580 15 – 22.5 Nalco Co, Nalco 5403 12 – 22.5 Nalco Co, Nalco 5405 11 – 11 Baker Petrolite Corp., Tolad 4410 9 – 22.5 Baker Petrolite Corp., Tolad 351 9 – 24
Dorf Ketal Chemicals, Unicor J 9 – 22.5 GE Betz Inc., Spec-Aid 8Q22 9 – 24
(3) Line injection ofadditives (FSII and CI/LI) from shipping tank to delivery conveyance or other free on board (FOB) point is permitted under the following conditions:
(i) Additives must be proportionately injected throughout the entire loading process to ensure the additive is homogeneously blended into the jet fuel. The Contractor shall maintain records evidencing the homogeneous blending of all line injected additives. Such methods may include meter or tank gauge readings or test results taken at intervals to provide confidence in the injection process.
(ii) When FSII is required, additive concentration must be verified based on a representative sample from each shipping conveyance.
(iii) Conformance to specification requirements at the custody transfer point is required, however, prior to shipment, a laboratory hand blend of JP-5 fuel with all additives required by this contract shall be tested to verify compliance with therequired specification (except for MSEP). MSEP analysis shall be performed per the Contractor’s election in MIL-DTL-5624V.
(d) REPORTS. Refer to the MATERIAL INSPECTION AND RECEIVING REPORT contract provision for reporting requirements.
(e) ADDITIONAL REQUIREMENTAPPLICABLE TO DEEP FREEZE PROGRAM ONLY. The Deep Freeze Program is for Antarctic operations of the Department of Defense and other federal agencies, whereby JP-5 sulfur content shall not exceed 0.0015 mass-percent (15 ppm).
(f) BATCH SAMPLING: The Contractor shall provide one 20 mL sample per each individual tank in a procurement batch. The sample from each tank/batch shall be either an all-level sample or a composite of upper, middle, and lower samples. A copy of the full-specification test report shall accompany each sample. The sample container will be any 20 mL amber borosilicate vial with a polytetrafluoroethylene (PTFE) lined screw cap. A tracking number for the samples shall be provided to: Robert Morris at Robert.morris@nrl.navy.mil or (202) 767-3845. Samples shall be shipped to:
US Naval Research Laboratory ATTN: Robert Morris, Code 6181 JP-5 Component Analysis Library Project 4555 Overlook Ave.,S.W.
Washington D.C. 20375-5320
The paperwork provided with these samples shall include the following information: Contract Number Contractor’s Name Product Refinery Location Quantity of Tank/Batch For samples containing synthetic components, include the following additional information: Manufacturer of synthetic component Batch Number Date of Test Report Quantity of Tank/Batch Percent Composition Production Component Feedstock
6. This Amendment corrects the formatting of F1.09 Determination of Quantity (DLA Energy AUG 2015) - F1.09a Conversion Factor Table listed.
Quantity. The quantity of supplies furnished under this contract shall be determined as follows:
Free on Board (f.o.b.) origin. All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
Deliveries into tanker or barge. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tanker or barge, the quantity shall be determined (at the Contractor's option) on the basis of calibrated meter; or Shipping/shore tank measurement.
Deliveries into pipeline. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a pipeline, the quantity shallbe determined (at the Contractor's option) on the basis of calibrated meter; or shipping tank measurements.
Deliveries into rail tank car. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor's option) on the basis of calibrated loading rack meter; or, using calibrated scales; or certified capacity table for the rail tank car.
Deliveries into tank truck, truck and trailer, or tank wagon. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tank truck, truck and trailer or tank wagon, the quantity shall be determined (at the Contractor's option) on the basis of calibrated loading rack meter; or weight, using calibrated scales; or certified capacity table for the conveyance or container.
Deliveries into intermodal container. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into an intermodal container, the quantity shall be determined (at the Contractor's option) on the basis of calibrated loading rack meter, loading either through top or bottom tank outlets (top loading requires loading gantry or "fall arrest" system), or certified capacity table for the container, or weight, using calibrated scales.
F.o.b. destination.
Deliveries by tanker or barge.
On items requiring delivery on an f.o.b. destination basis by tanker or barge, the invoice quantity shall be determined (at the Government's option) on the basis of calibrated meters onthe receiving tank system; or receiving tank measurements. All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
Deliveries by pipeline.
On items requiring delivery by pipeline on an f.o.b. pipeline junction or f.o.b. destination basis, the invoice quantity shall be determined (at the Government's option) on the basis of calibrated meters on the pipeline junction or the receiving tank system; or receiving tank measurements.
F.o.b. pipeline junction is definedas the junction between a Contractor-owned or controlled pipeline and a Government-owned or controlled pipeline.
All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
Deliveries by rail tank car.
On items requiring delivery on an f.o.b. destination basis by rail tank car, the quantity of supplies furnished under this contract shall be determined (at the Government's option) on the basis of calibrated meter on the receiving tank system; or weight, using calibrated scales at the receiving location; or certified capacity table for the rail tank car; or receiving tank measurements.
All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
Deliveries by tank truck/truck and trailer/tank wagon/intermodal container.
On items requiring delivery on a f.o.b. destination basis by tank truck, truck and trailer, tank wagon or intermodal container, the quantity shall be determined —in the following order of preference:
Calibrated temperature compensating meters on the receiving system (as identified in the schedule).
Calibrated temperature compensating meter onthe delivery conveyance (as identified in the schedule).
Weight, using calibrated scales at the receiving location (as identified in the schedule).
Calibrated meters on the receiving system, requiring manual volume correction (as identified in the schedule).
Loading ticket mechanically imprinted with the volume corrected (net) quantity. The ticket must be generated at the time of loading and be based on a calibrated loading rack meter or calibrated scales.
Calibrated meter on the delivery conveyance, requiring manual volume correction.
Loading ticket, not volume corrected (requiring manual volume correction).
Invoice quantities for all residual fuelsand lubricating oils and invoice quantities for other products that are in excess of 5,000 gallons (or 18,900 liters) shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius). Invoice quantities of nonresidual fuels which are less than 5,000 gallons (or 18,900 liters) do not require correction to net gallons (or liters). For this purpose, residual fuels areany products with a viscosity equal to or greater than a regular (not light) number 4 fuel oil (ASTM D 396).
Water bottoms.
Every delivery must be free of all water bottoms prior to discharge; and The Contractor is responsible for their removal and disposal.
Measurement restrictions. All methods of measurement described in this contract text are subject to government safety and environmentalrestrictions, foreign or domestic. Such restrictions may prohibit, or render ineffective, a particular method in some cases.
Measurement standards. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the U.S., other technically equivalent national or internationalstandards may be used. Certified capacity tables shall mean capacity tables prepared by an independent inspector or any independentsurveyor to the aforementioned measurement and calibrations standards. In addition, the following specific standards will be used as applicable:
API MPMS Chapter 11.1, Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils (this chapter is an adjunct to ASTM D 1250, IP 200 and International Organization for Standardization (ISO) 91-1). Either the 2004 or 1980 version of the standard may be used.
Either the printed tables (an adjunct to the 1980 version) or thecomputer subroutine version of the standard may be used. In case of disputes, the computer subroutine for the 2004 version of the standard will be the referee method.
For crude oils, JP4, and Jet B, use Volume I, Tables 5A and 6A; Volume VII, Tables 53A and 54A; or Volume IV, Tables 23A and 24A.
For lubricating oils, use Tables 5D and 6D, Tables 53D and 54D, or Tables 23D and 24D.
For all other fuels and fuel oils, use Volume II, Tables 5B and 6B; Volume VIII, Tables 53B and 54B; or Volume V, Tables 23B and 24B.
For chemicals/additives use Volume III, Table 6C (or Volume IX, Table 54C), or volume correct in accordance with the product specification.
Volume XII, Table 52, shall be used to convert cubic meters at 15 degrees Celsius to barrels at 60 degrees Fahrenheit. Convert litersat 15 degrees Celsius to cubic meters at 15 degrees Celsius by dividing by 1,000.
Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be used.
As an option to (b) (1) (v), liters may be converted to gallons using Table F1.09A (see below). If this option is used, it must be agreed upon by both parties and shall remain in effect for the duration of the contract. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.
If the original measurement is by weight and quantity is required in U.S. gallons, then— Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.
Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit.
API MPMS, Chapter 4, Proving Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 12 months, whichever is more frequent. A meter calibration log/calibration certificates shall be maintained which as a minimum contains number/name of each meter; calibration frequency; date of the last calibration; due date for next calibration; name and signature of the person performing the calibration; traceability to master meter/prover used for calibration; and calibration report number.
Each meter shall be marked with the date of the last calibration and due date for the next calibration. All calibration meter records and logs/certificates shall be kept on file and made available upon request. All calibration records (including logs or certificates) shall be retained on file for a period of three years.
API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter. Outside the U.S., use of a tank shell correction factor is not required unless its use is a customary practice for custody transfer.
Table F1.09a Conversion Factor Table Density @ 15ºC Gallons at 60ºF to Liters at 15ºC; Multiply by Liters at 15C to Gallons at 60F, Multiply by
0.723 – 0.768 3.78286 0.26435
0.769 – 0.779 3.78309 0.26433
0.780 – 0.798 3.78334 0.26432
0.799 – 0.859 3.78356 0.26430
0.860 – 0.964 3.78381 0.26428
0.965 – 1.074 3.78405 0.26427
Shipping documentation. When the Contractor’s shipping document (such as a truck’s metered ticket) is used to determine, or verify, the payment quantity under this contract, the following information shall be provided on that shipping document: gross and net quantity (gallons or liters, as required), observed and corrected API gravity/density, and the temperature (Fahrenheit or Celsius) at which the product was measured. This information shall be mechanically imprinted on the shipping document. Although this will apply primarily to the use of meters in various applications, it also applies to any other quantity determination method. The following exceptions apply:
Where Government documents are the sole basis for payment, such as Department of Defense (DD) Form 250/250-1s, the information is not required.
Where conveyances with temperature-compensating meters are used, the shipping document shall only be annotated with the corrected API gravity/density, the net quantity, and a statement that a temperature-compensating meter was used to determine net quantity.
Where conveyances with temperature compensating meters are not used, the shipping document shall be only be annotated with the API gravity (or density), gross quantity, and a statement that volume correction was not required.
Right to representative. For f.o.b. origin deliveries, the Government has the right to have a representative present to witness the measurement of quantity. For f.o.b. destination deliveries, the Contractor has theright to have a representative present to witness the delivery and measurement of quantity.
7. All other terms and conditions remain unchanged.
Section B