AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60015R0406

X

2014 DEC 31

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

8725 JOHN J KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

USA

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

1. The solicitation is hereby reopened for the following line items ONLY:

Tied Group 2 Line Item 0010 - Hill AFB Line Item 0011 - Hill AFB

Please note the following changes and additions that are highlighted in yellow on the attached revised Schedule Pages for Line Items 0010 and 0011:

SIP Publication - Gas Daily Price Guide Overage & Shortage Volume Pricing/Methodology - Simple Average 16-

EOM

Note #5 -The Supply Index Price (SIP) is the monthly simple average of Platts Gas Daily, Daily Midpoint NW Pipeline Rky Mtn.

Note #6 - Please refer to the attached Special Notice, Questar’s (LDC) Pending Proposed Transportation Imbalance Charge.

The closing date for the line items identified above is extended to Thursday, February 12, 2015 at 3:00 p.m., local Fort Belvoir time. Offers shall be submitted to the email address found in provision L705 INSTRUCTIONS TO OFFERORS (NATURAL GAS) (DLA ENERGY JUL 2014) (REV) of the solicitation.

a. Instructions to offerors who initially submitted an offer under SPE600-15-R-0406 but did not include an offer for the line items in paragraph 1 of this amendment:

1. Acknowledge receipt and acceptance of Amendment 0001.

2. Submit a completed Attachment I Area of Supply Interest and Technical Compliance indicating intent to offer on the respective line item(s) in paragraph 1 of this amendment to include all relevant responses on the form.

3. Submit an Attachment IV Solicitation Schedule page Line Item Summary sheet to include the offered price.

SPE600-15-R-0406

Amendment 0001

b. Instructions to any offeror who did not initially submit an offer under SPE600-15-R- 0406:

1. New offerors may submit an offer for the line items listed in paragraph 1 of this amendment.

2. Offers must include all offer elements indicated in the request for proposals.

3. Acknowledge receipt and acceptance of Amendment 0001.

2. All other terms and conditions of the solicitation remain unchanged.

SPE600-15-R-0406

Amendment 0001

Line Item Installation

Address

City State

Zip

Questar Corporation

2,314,000 500,000 1,814,000

Location

388,000 50,000 338,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

50,000 132,000 206,000

1,153,000 246,000 907,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

233,000 186,000 150,000 98,000 49,000 12,000 17,000 8,000 12,000 50,000 132,000 206,000

773,000 204,000 569,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

233,000 186,000 150,000 98,000 49,000 12,000 17,000 8,000 20,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2 Note #3 Note #4 Note #5 Note #6 Please refer to the attached Special Notice, Questar’s (LDC) Pending Proposed Transportation Imbalance Charge.

The Supply Index Price (SIP) is the monthly simple average of Platts Gas Daily, Daily Midpoint NW Pipeline Rky Mtn.

Bldg 5935 Hill AFB

UT

84056-5223

Schedule Page By Line Item Detail

Hill AFB Installation Address

Hill AFB 5713 Lahm Lane

City Gate Yes TS

Alternate Fuel Type Percent Load Di l bl

Notes

Utility Account Information LDC or Pipeline

Total Contract Est. Volume (Dths) Total Summer (Dths) Total Winter (Dths)

Delivery Point Telemetered Rate Class

Estimated Usage Information (All volumes expressed in Dths)

Burner Tip

Year 2015 Annual Totals Summer Totals Winter Totals

Yes #2 Oil 30.00% 3 of 10 distributed steam boiler facilities have DF#2 back-up capabilities. These facilities operated 24/7 only during the winter months.

Firm

Solicitation Parameters Period Beginning Period Ending SIP Publication SIP Location Delivery Option Delivery Type

Year 2016 Annual Totals Summer Totals Winter Totals

Year 2017 Annual Totals Summer Totals Winter Totals

INSIDE FERC'S NW Pipeline Rky Mtn Simple Average 16-EOM INSIDE FERC'S NW Pipeline Rky Mtn Simple Average 16-EOM

10/01/15 09/30/17 GAS DAILY PRICE GUIDE NW Pipeline Rky Mtn (3) Monthly Order Quantities.

Hill AFB does not hold capacity on Questar Pipeline.

Customer holds "Firm" transportation agreement for this specific Line Item.

3 of 10 distributed steam boiler facilities have DF#2 back-up capabilities. These facilities operate 24/7 only during the winter months.

One of the facilities, that operates 24/7, is augmented by a local municipal solid waste incineration facility.

INSIDE FERC'S NW Pipeline Rky Mtn Simple Average 16-EOM INSIDE FERC'S NW Pipeline Rky Mtn Simple Average 16-EOM

Line Item Installation

Address

City State

Zip

Questar Corporation

250,000 30,000 220,000

Location

54,000 6,000 48,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

6,000 16,000 32,000

125,000 15,000 110,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

46,000 11,000 5,000 0 0 0 0 0 9,000 6,000 16,000 32,000

71,000 9,000 62,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

46,000 11,000 5,000 0 0 0 0 0 9,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1 Note #2 Note #3 Note #4 Note #5 Note #6 Please refer to the attached Special Notice, Questar’s (LDC) Pending Proposed Transportation Imbalance Charge.

The Supply Index Price (SIP) is the monthly simple average of Platts Gas Daily, Daily Midpoint NW Pipeline Rky Mtn.

Hill AFB does not hold capacity on Questar Pipeline.

Customer holds "Interruptible" transportation agreement for this specific Line Item.

3 of 10 distributed steam boiler facilities have DF#2 back-up capabilities. These facilities operate 24/7 only during the winter months.

One of the facilities, that operates 24/7, is augmented by a local municipal solid waste incineration facility.

INSIDE FERC'S NW Pipeline Rky Mtn Simple Average 16-EOM INSIDE FERC'S NW Pipeline Rky Mtn Simple Average 16-EOM

INSIDE FERC'S NW Pipeline Rky Mtn Simple Average 16-EOM INSIDE FERC'S NW Pipeline Rky Mtn Simple Average 16-EOM

10/01/15 09/30/17 GAS DAILY PRICE GUIDE NW Pipeline Rky Mtn (3) Monthly Order Quantities. Firm

Solicitation Parameters Period Beginning Period Ending SIP Publication SIP Location Delivery Option Delivery Type

Year 2016 Annual Totals Summer Totals Winter Totals

Year 2017 Annual Totals Summer Totals Winter Totals

(All volumes expressed in Dths) Burner Tip

Year 2015 Annual Totals Summer Totals Winter Totals

Yes #2 Oil 30.00% 3 of 10 distributed steam boiler facilities have DF#2 back-up capabilities. These facilities operated 24/7 only during the winter months.

Estimated Usage Information

City Gate Yes IS

Alternate Fuel Type Percent Load Di l bl

Notes

Utility Account Information LDC or Pipeline

Total Contract Est. Volume (Dths) Total Summer (Dths) Total Winter (Dths)

Delivery Point Telemetered Rate Class

Bldg 5935 Hill AFB

UT

84056-5223

Schedule Page By Line Item Detail

Hill AFB Installation Address

Hill AFB 5713 Lahm Lane

Special Notice - Questar’s (LDC) Pending Proposed Transportation Imbalance Charge

Questar Gas Company recently requested the Utah Public Service Commission’s approval to charge transportation customers for those upstream transportation and storage services that they use. As described in greater detail below, when a customer’s actual usage does not match its nominations on a daily basis, the customer utilizes Questar Gas’ upstream transportation and storage services. Currently, Questar Gas’ sales customers pay all of the costs associated with these services. Questar Gas proposes to charge transportation customers who utilize those services. The Company would calculate and adjust the charge twice per year. The proposed tariff language reads:

TRANSPORTATION IMBALANCE CHARGE

Customers taking service on rate schedules FT-1, MT and TS will be assessed a charge for daily imbalances that are outside of a 5% imbalance tolerance. “Daily imbalance” is defined as the difference between the customer’s nominated volumes, less fuel, and the actual usage on any given day. When the Daily Imbalance exceeds 5% of the actual usage, the charge will be assessed. This charge will include upstream transportation, storage, no notice and other related costs incurred during imbalances. The charge is set forth on the transportation rate schedules and will be recalculated in each pass through filing and updated at least annually.

How much is the charge?

Questar Gas is proposing to charge customers $0.19 for each DTH that is outside of a 5% tolerance on a daily basis. For example:

Assume a customer nominates 100 DTH (net of fuel) and uses 90 DTH. Questar Gas will use its no-notice transportation, storage and transportation services to move the 10 extra DTH off of Questar Gas’ system. In this example, the customer will be given a 5% tolerance based on its usage (90 DTH X 5% =

4.5 DTH). The imbalance in excess of 4.5 DTH is 5.5 DTH. The customer would pay $0.19 per DTH or $1.05 for that day.

Why is Questar Gas proposing this charge?

When there are differences between what a customer nominates and what it uses, Questar Gas must manage that surplus/deficit of gas. The Company manages the surplus or deficit through the use of services that are currently being paid for by other sales customers.

Has the Commission approved this charge?

No. The Commission is currently reviewing the charge. Interested parties are reviewing the proposal and the Commission will hold hearings in August, 2015.

What can I do to minimize these charges?

Questar Gas is proposing to allow a 5% daily tolerance imbalance. The best way to minimize these charges is to monitor your usage and communicate with your agent when you expect changes in usage.

Monitoring equipment is available through outside vendors to help you monitor your gas usage on a real-time basis.

continuation page.pdf
Attachment IV Schedule Pages.pdf
0010 Hill AFB
0011 Hill AFB

File details come from the government source that posted it. Updated .