Round3_RFP_Questions_09162015.docx

DOCX document 32 KB Posted

Attached to
Chemicals, Packaged Petroleum, Oil, Lubricants
Solicitation number
SPE4A2-15-R-0002
Issued by

About this file

This document contains questions and answers regarding a solicitation for Chemicals, Packaged Petroleum, Oil, and Lubricants. The solicitation seeks pricing and delivery for fuel, oil, and chemical products to be distributed to overseas military bases. Offerors must propose a fixed throughput fee percentage to cover transportation and warehousing costs, which will be applied to the adjusted unit price on each delivery order. Questions addressed performance requirements for inactive items, definitions of direct shipment orders, and confirm whether tables responding to hazardous material clauses must be included with proposals. Clarification was also provided on economic price adjustment limitations and calculation of the throughput fee.

RESPONSES TO SOLICITATION QUESTIONS

View the file

Other files

File Type Posted
SPE4AX16D9008_REDACTED_for_J&A_NSNs_2.pdf PDF
SPE4AX16D9008_REDACTED_for_J&A_NSNs.pdf PDF
SPE4AX16D9008.pdf PDF
SPE4A215R0002Amend010.pdf PDF
SPE4A215R0002Amend0009.pdf PDF
SPE4A215R0002Amend08.pdf PDF
SPE4A215R0002Amend07.pdf PDF
Scenarios.docx DOCX document
Scenarios.docx DOCX document
Rnd6_RFP_Questions_10132015.docx DOCX document
SPE4A215R002Amend06.pdf PDF
Rnd5_RFP_Questions_09252015.docx DOCX document
SPE4A215R0002Amend05.pdf PDF
RFP_Att02_ChemPol_Supply_Schedule.xlsx XLSX spreadsheet
Round_4_RFP_Questions_09252015.docx DOCX document
Chem_POL_PPC_Company_Attendance.xlsx XLSX spreadsheet
spe4a2-15-r-0002_0004_(3).pdf PDF
SPE4A2-15-R-0002.pdf PDF
Rnd2_RFP_Questions_09162015_(3).docx DOCX document
Vendor_Instructions_for_VSM_Shipments.docx DOCX document
SPE4A215R0002Amend03.pdf PDF
Chem_POL_-_RFP__PPC_Questions_-_17_August_V4_2015.docx DOCX document
SPE4A215R0002Amend02.pdf PDF
RFP_Att02_ChemPol_Supply_Schedule.xlsx XLSX spreadsheet
SPE4A215R0002Amend01.pdf PDF
RFP_Att02_ChemPol_Supply_Schedule.xlsx XLSX spreadsheet
TAB_14_ChemPOL_RFP_Instructions_to_Offerors_8_July_2015.pdf PDF
5YR_REQSummary.xlsx XLSX spreadsheet
5YR_REQCOMBINED.xlsx XLSX spreadsheet
6840_5YR_Req MrktShare.xlsx XLSX spreadsheet
5YR_MrktShareSummary.xlsx XLSX spreadsheet
6850_5YR_Req MrktShare.xlsx XLSX spreadsheet
6810_5YR_Req MrktShare.xlsx XLSX spreadsheet
6820_5YR_Req MrktShare.xlsx XLSX spreadsheet
9150_5YR_Req MrktShare.xlsx XLSX spreadsheet
TAB 15 ChemPOL Evaluation of Offers 8 July 2015.pdf PDF
SF1449_SPE4A215R0002.pdf PDF
TAB 14 ChemPOL RFP Instructions to Offerors 8 July 2015.pdf PDF
RFP Att09 PP Subcontractor_Teaming Partner Consent Form.pdf PDF
RFP Att02 ChemPol_Supply_Schedule.xlsx XLSX spreadsheet
RFP Att10 ChemPOL PP Questionaire.pdf PDF
RFP Att06 Disaster Relief Item List Chem POL May2015.xlsx XLSX spreadsheet
RFP Att11 Client Authorization Letter.pdf PDF
RFP Att05 PIDdataChem_POLrecompete.txt TXT text file
RFP Att04 DRU 8932 Privatization CHEM QM Report.xlsx XLSX spreadsheet
RFP Att07 VMI Report July2015.xlsx XLSX spreadsheet
RFP Att12 Chem POL - SOW - 8 July 2015.pdf PDF
RFP Att03 Inactive NIINs.xlsx XLSX spreadsheet
RFP Att01Cross Reference Matrix.xlsx XLSX spreadsheet
ChemPOL_Supplier_Info.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation SPE4A2-15-R-0002 Packaged Petroleum, Oil, and Lubricants (Chem/POL)

No.
Reference
Question
Answers
1
RFP Doc: SF1449_SPE4A215R0002; Att. 13 - Special Contract Requirements

Page(s): 12; 1 Section: 52.216-9030 Economic Price Adjustment - Department Of Labor Price Index (Jun 2014) DLAD; H-900 Pricing and Payment

As a result of Amendment 0002, paragraph (d) to the clause limits cumulative index increases to 10% for BLS indexes whose identifier exceeds six digits. Please confirm that wpu06140197 and pcu324191324191are the only two EPA indexes in the solicitation that are subject to the 10% cumulative increase limitation.
Yes. WPU0614019 and PCU324191324191 are the only two EPA indices in the solicitation subject to the 101% cumulative increase limitation.
2
RFP Doc: SF1449_SPE4A215R0002; Att. 13 - Special Contract Requirements

Page(s): 12; 1 Section: 52.216-9030 Economic Price Adjustment - Department Of Labor Price Index (Jun 2014) DLAD; H-900 Pricing and Payment

As a result of Amendment 0002, paragraph (d) to the clause limits cumulative index increases to 10% for BLS indexes whose identifier exceeds six digits, which presumably applies to wpu06140197 and pcu324191324191 (the only BLS indexes having more than 6 numerals in their identifiers). Together these comprise 60% of the weighting for the POL indexes. Since 2005 wpu06140197 has fluctuated between 161.5 and 490.9, and pcu324191324191 has fluctuated between 210.2 and 454.3. Since these indexes are intended to measure 60% of the market price fluctuation of POLs, placing an artificial aggregate limitation of 10% over the 10-year term of the contract with no limitation on the decreases is not reasonable for sustainable contract performance and renders this contract infeasible and therefore unbiddable. Due to the unpredictable nature of EPA index changes it is impossible to pad prices sufficiently to cover the risk of this drastic limitation. Therefore would DLA remove the limit on EPA index increases or increase the limit to the current contract limit of 150% per contract year for the POL items?
Where WPU0614019 and PCU324191324191 are used in a blended index, the ceiling will apply when the weighted average of those indices will produce a price increase that exceeds 10% over the original base unit price.
3
RFP Doc: Att14 - Instructions

Page(s): 1 Section: 1.A. Preparation and Submittal Citation: "Charts, graphs or spreadsheets may be on fold-out pages, but must fold within the page size specified and will count as one page."

May graphics, diagrams, tables, and illustrations also be on fold-out pages (that fold within the page size specified) and count as one page?
Yes, this would also to apply to graphics, diagrams, tables, and illustrations.
4
RFP Doc: Att. 13 - Special Contract Requirements; Att. 14 - Instructions to Offerors

Page(s): 1; 14 Section: H-900 Pricing and Payment; F. Factor 5, Volume 7: Price Proposal Citation: “Throughput Fee: A fixed percentage is established to cover expenses that vary with the volume of business such as the costs of transportation and warehousing. The fee is applied to each NSN unit price and is paid on each delivery order issued. This fee is applicable throughout the entire contract.”

Original Question #2: “Will the offeror’s proposed throughput fee percentage 1) be multiplied by the offeror’s proposed NSN unit price and converted into a fixed unit price per NSN item that remains fixed for the duration of the contract or, 2) be a fixed percentage that will be multiplied by the NSN unit price on each delivery order to derive the throughput fee payable for the individual order? If the answer is #2 above the throughput price per NSN will increase and decrease in step with the EPA adjustments for the POL and chemical items. The costs covered by the throughput fee, however, do not bear any relationship with the material prices so the EPA adjustments will cause throughput fee to vary above and below contract costs. If the answer is #1 above can offerors propose an annual escalation, like management fee is priced?”

Original Government Answer #2: “The Government's intent was to tie the Throughput Fee to a measure that would vary with volume on the contract. As the pricing indices will vary throughout the contract (going both up & down) and the Government can't predict which way indices will travel at any given time, the Government will not be adjusting its Throughput Fee equation.”

The Original Question #2 did not ask whether the Government would change the Throughput Fee equation, but asked which of two possible interpretations of the Throughput Fee calculation was correct. Depending on the answer, there was either a follow-up concern or question. The Government did not respond to either interpretation, so it is possible that neither was correct. Can the Government confirm which interpretation is correct, if either, and provide an example of how Throughput Fee is calculated on an individual contract delivery order based on the percentage proposed for the initial contract? Also please clarify how Throughput Fee will be calculated on the basis of an ‘adjusted NSN unit price at the time of each shipment’ as described in the Government’s response to Q44. By ‘adjusted NSN unit price’ does the Government mean current material NSN unit price as adjusted by the terms of the EPA clause of the contract?

The Throughput fee will be a fixed percentage applied to the EPA adjusted NSN price on each delivery order. See Amendment 04.

5
RFP Doc: Att. 13 – Special Contract Requirements;

Page(s): 4 Section: H-906 PRICING OF ITEMS ADDED TO THE CONTRACT

There is no clear direction as to how/where to price the non-recurring labor costs to research and select sources, establish vendor purchase agreements, obtain SDS/HWLs, etc. for new items added to the contract. Would the contractor be permitted to build these non-recurring costs into its proposed NSN prices when submitted or is there another acceptable pricing approach?
The Contractor will not be allowed to include non-recurring costs in the price of items to be added after contract award.
6
RFP Doc: Att. 12 - Statement of Work; Att. 14 - Instructions to Offers; Att. 3 – Inactive NIINs

Page(s): 17; 14 Section: 6.4 Inactive Material; F. Factor 5, Vol 7, Price Proposal

The only requirement from the Statement of Work relating to Inactive Items is that Inactive Items are exempt from the Fill Rate metric (6.9.4 Inactive Material). Attachment 3 provides a list of over 2,300 NSNs designated as Inactive Items. Various performance requirements from the Statement of Work including FAT/PLT, Forecasting & Inventory Management refer to the Active Items listed in Attachment 2, ChemPOL Supply Schedule, however none to Inactive Items. Can the Government detail what are the performance requirements, if any, with respect to Inactive Items? In addition, since there is no pricing requirement for Inactive Items and Instructions to Offers states that Throughput Fee applies only to Active Items, how will the Contractor be compensated for delivering Inactive Items under the contract?
Inactive items are products that have either never had demand or have not experienced a demand in over five years. However, these products are consumable NSNs used in support of maintenance, overhaul or repair operations. These NSNs will be exempt from the Fill Rate metrics and a full production lead time will be allowed. The Throughput Fee applies to all delivery orders. See Amendment 04
7
RFP Doc: Amendment 3

Page(s): 3 Section: I. RF Equipment and Equipment Support Citation: “The contractor will furnish all aRFID equipment. The Contractor shall contact and coordinate with the Government POCs for the delivery of the initial software and for any other assistance or advice required.”

What are the minimum specifications for the computer the Contractor must furnish to install and operate the Government-furnished application software? Will the Contractor be required to purchase aRFID tags and data cables at no additional cost to the Government? If so, can the Government provide approved sources for the aRFID tags and estimate how many tags will be required on a monthly basis?
This information can be found in Amendment 03, additional shipping and transportation language to the SOW. A phone number is also included for technical questions regarding aRFID requirements. The Gov’t does not have an estimated number of tags required on a monthly basis.
8
RFP Doc: Att. 12 - Statement of Work

Page(s): 16 Section: 6.9.1.1. Fill Rate Exceptions – Direct Shipments Citation: Note: there is no definition for Direct Shipments in the Statement of Work or description for how Direct Shipments are processed.

Could the Government confirm that a “Direct Shipment” order is a delivery order issued to the Contractor that specifies an OCONUS f.o.b. destination ship-to address, which must be corrected via a manual iterative process (e.g. via telephone or email) between the Contactor, DLA, and DDC to change the delivery order to f.o.b. origin for pickup and transport by DDC’s designated carrier? Further, could the Government confirm as part of this process the Contractor must: a) screen for and hold Direct Shipment orders; b) validate with DDC that the orders are indeed Direct Shipment orders because sometimes these orders should instead be corrected to f.o.b. destination orders for Contractor shipment to a CONUS destination, c) request a delivery order modification from DLA (changing the order to f.o.b. origin), d) notify DDC when the contract modification is complete, e) monitor and download the revised shipping instructions and related documentation from VSM, f) attach these documents to the package, and f) schedule the pickup with the DDC directed freight carrier? Also, could the Government confirm that approximately 200 Direct Shipment orders are processed per month, each of which must be worked / reworked through the manual/email processes described above?

The term “Direct Shipment” will been removed from section 6.9.1.1 of the SOW via amendment. Items that require FOB-Origin shipment will require the process cited, as DLA has no automated means to capture these.

9
RFP Doc: SF1449_SPE4A215R0002

Page(s): 48 Section: Clauses Added to Part 12 by Addendum; 52.247-51 Evaluation of Export Offers (JAN 2001) FAR Citation: “Offers shall be evaluated and awards made on the basis of the lowest laid down cost to the Government at the overseas port of discharge; Offers shall be evaluated on the basis of shipment through one of the ports set forth in paragraph (d) of this clause to the overseas port of discharge.”

There are no ports identified in paragraph (d) of the clause. Notwithstanding, how is this clause applicable since VSM will specify all delivery addresses for orders shipped to overseas ports of discharge?
This clause will be removed via Amendment 04.
10
RFP Doc: SF1449_SPE4A215R0002; Q&A Response #4, 17 Aug 2015

Page(s): 28 Section: Clauses Added to Part 12 by Addendum; 52.223-03 Hazardous Material Identification And Material Safety Data (JAN 1997) FAR, 252.223-7001 Hazard Warning Labels (DEC 1991) DFARS

Amendment 0002 does not clarify how offerors should address FAR 52.223-03 or DFARS 252.223-7001 in preparing their proposals. In consideration of the requirement to submit safety data sheets and hazard warning labels as Volume 3 of the proposal, are offerors required to complete the tables to RFP clauses FAR 52.223-03 and DFARS 252.223-7001 and submit these completed tables with Volume 1?
Offerors must provide the required tables with their Volume 1 of their proposal as per the instruction in these clauses. As per Amendment 02, SDS & HWL are not required for all items on Attachment 2. They are only required for the items on the SDS & HWL Tab.

File details come from the government source that posted it. Updated .