SPE2D1-15-R-0001_AMENDMENT_0013.pdf

PDF 1 MB Posted

Attached to
JOINT DEFENSE LOGISTICS AGENCY AND VETERANS ADMINISTRATION RADIOLOGY AND IMAGING SYSTEMS PROGRAM Federal contract opportunity
Solicitation number
SPE2D1-15-R-0001
Issued by
Defense Logistics Agency Troop Support Medical

About this file

This document provides the statement of work for a multiple award indefinite delivery/indefinite quantity contract solicitation for radiology and imaging systems and related services. The Defense Logistics Agency Troop Support Medical Supply Chain and the Department of Veterans Affairs National Acquisition Center jointly manage the Radiology and Imaging Systems Program to support the requirements of both agencies. The objective is to establish the second generation of the program through contracts with a five-year base period and a single five-year option. The estimated value over ten years is $6.5 billion. Products and services include radiology and imaging systems, subsystems, components, maintenance, training, and incidental services. Delivery locations include domestic and overseas sites. Offerors must support all domestic areas. The minimum delivery timeframes range from 30 to 180 days depending on the modality. Clinical use for 30 days or inspection constitutes acceptance.

SPE2D1-15-R-0001 AMENDMENT 0013

View the file

Other files for this federal contract opportunity

Other files attached to JOINT DEFENSE LOGISTICS AGENCY AND VETERANS ADMINISTRATION RADIOLOGY AND IMAGING SYSTEMS PROGRAM, newest first.
File Type Posted
SPE2D1-15-R-0001_AMENDMENT_0015.pdf PDF
SPE2D1-15-R-0001_AMENDMENT_0014.pdf PDF
Attachment__4_-_Both_VA_and_DLA_-_Modality_Matrix_(v.3).xlsx XLSX spreadsheet
Attachment__3_-Both_VA_and_DLA_-Discount_&_Pricing_Information_(DPI)_(v.4).docx DOCX document
Attachment__1_-_Both_VA_and_DLA_-_DICOM_Conformance_Requirements.pdf PDF
Attachment__2_-_VA_Only_-_VA_Form_10091.pdf PDF
Attachment__5_-_Both_VA_and_DLA_-_Contract_Price_Book_Template_(v.2).xlsx XLSX spreadsheet
SPE2D1-15-R-0001_AMENDMENT_0011.pdf PDF
VA_PTAC_general_presentation.pptx PPTX presentation
Preproposal_Conference_Agenda_-_Attendance_Form.docx DOCX document
Attachment__2_-_VA_Only_-_VA_Form_10091.pdf PDF
SPE2D1-15-R-0001_AMENDMENT_0010.pdf PDF
Attachment__5_-_Both_VA_and_DLA_-_Contract_Price_Book_Template.xlsm XLSM spreadsheet
Attachment__1_-_Both_VA_and_DLA_-_DICOM_Conformance_Requirements.pdf PDF
Attachment__3_-Both_VA_and_DLA_-Discount_&_Pricing_Information_Worksheet_(v.3).docx DOCX document
Attachment__4_-_Both_VA_and_DLA_-_Modality_Matrix_(v.3).xlsx XLSX spreadsheet
SPE2D1-15-R-0001_AMENDMENT_0006.pdf PDF
Amendment_0005_-Attachment__3_(v.2_Word).docx DOCX document
SPE2D1-15-R-0001_AMENDMENT_0005.pdf PDF
SPE2D1-15-R-0001_AMENDMENT_0004.pdf PDF
Amendment_0003_-Attachment__3_(v.2)_-_Both_VA_and_DLA_-_Discount_ _Pricing_Worksheet.pdf PDF
SPE2D1-15-R-0001_AMENDMENT_0003.pdf PDF
Amendment_0003_-Attachment__6_(v.2)_-_Both_VA_and_DLA_-_Modality_Matrix.xlsx XLSX spreadsheet
SPE2D1-15-R-0001_AMENDMENT_0002.pdf PDF
SPE2D1-15-R-0001_AMENDMENT_0001.pdf PDF
Attachment__4_-_Both_VA_and_DLA_-_Vendor_Offer_Submission_Form_(for_individual_customer_requirements).xlsx XLSX spreadsheet
Attachment__5_-_Both_VA_and_DLA_-_Contract_Price_Book_Template.xlsm XLSM spreadsheet
Attachment__3_-_Both_VA_and_DLA_-_Discount_ _Pricing_Worksheet.pdf PDF
Attachment__2_-_VA_Only_-_VA_Form_10091.pdf PDF
SOLICITATION_SPE2D1-15-R-0001-_RADIOLOGY_AND_IMAGING_SYSTEMS_PROGRAM.pdf PDF
Attachment__1_-_Both_VA_and_DLA_-_DICOM_Conformance_Requirements.pdf PDF
Attachment__6_-_Both_VA_and_DLA_-_Modality_Matrix.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0013 SPE2D1-15-R-0001 Page 2 of 115

TABLE OF CONTENTS

TITLE PAGE

Continuation of Blocks from the Standard Form 1449 3

FAR 52.212-4 - Contract Terms and Conditions – Commercial Items 5

Addendum to FAR 52.212-4 12

FAR 52.212-5 - Contract Terms and Conditions Required to Implement Statutes or 24 Executive Orders – Commercial Items

Statement of Work 33

FAR 52.212-1 - Instructions to Offerors – Commercial Items 81

Addendum to FAR 52.212-1 85

FAR 52.212-2 - Evaluation – Commercial Items 88

FAR 52.212-3 - Offeror Representations and Certifications – Commercial Items 91

Addendum to FAR 52.212-3 110

CONTRACT DOCUMENTS AND ATTACHMENTS:

Attachment #1 - Both VA and DLA - Modality Interface DICOM Conformance Requirements

Attachment #2 - VA only - VA Form 10091

Attachment #3 - Both VA and DLA - Discount & Pricing Information Worksheet (v.3)

Attachment #4 - Both VA and DLA - Modality Matrix (v.3)

Attachment #5 – Both VA and DLA – Contract Price book template (v.2)

AMENDMENT 0013 SPE2D1-15-R-0001 Page 3 of 115

Continuation of Blocks from SF 1449

Joint Defense Logistics Agency (DLA) Troop Support and the Department of Veterans Affairs National Acquisition Center (VA NAC) Radiology and Imaging Systems Program Solicitation

Block 8

Offer Due Date/Local Time: The solicitation closing date shall be April 17, 2018; 1:00 pm, Local Philadelphia Time. The Government reserves the right to have additional open seasons that would be issued via posting of an amendment on https://www.fbo.gov.

Block 9

› Address and Submit “mailed” offers to:

Defense Logistics Agency Troop Support Post Office Box 56667 Philadelphia, PA 19111-6667 Solicitation Number: SPE2D1-15-R-0001 Opening/Closing Date and Time: See above

› Address and Deliver “hand carried” offers, including delivery by commercial carrier, to:

DLA Troop Support Business Opportunities Office Bldg. 36, 2nd Floor, Room 2035 700 Robbins Avenue Philadelphia, PA 19111-5092 Solicitation Number: SPE2D1-15-R-0001 Opening/Closing Date and Time: See above

Notes: 1. All hand carried offers are to be delivered to the Business Opportunities Office between 8:00 a.m. and 5:00 p.m., Monday through Friday, except for legal federal holidays as set forth in 5 USC 6103. Offerors using a commercial carrier service must ensure that the carrier service “hand carries” the package to the Business Opportunities Office specified above for hand carried offers prior to the scheduled opening/closing time. Package must be plainly marked ON THE OUTSIDE OF THE COMMERCIAL CARRIER’S ENVELOPE with the solicitation number, date, and time set forth for receipt of offers as indicated in Block 8 of the Standard Form 1449.

2. Examples of “hand carried” offers include: In-person delivery by contractor, Fed Ex, Airborne, UPS, DHL, Emery, other commercial carrier, USPS Express Mail, and USPS Certified Mail.

Initial proposal submissions must be mailed or hand carried to the Business Opportunities Office in accordance with the above instructions.

https://www.fbo.gov/

AMENDMENT 0013 SPE2D1-15-R-0001 Page 4 of 115

E-mail or fax transmissions may be authorized in writing by the Contracting Officer for discussions and any proposal revisions. If discussions take place or a request for proposal revision is issued, the method and date/time for receipt of vendor submissions will be provided by the Contracting Officer.

Block 17a › Offeror’s assigned Data Universal Numbering System (DUNS) Number:_______________ (If you do not have a DUNS number, contact the individual identified in Block 7a of the SF 1449 or see 52.212-1, Instructions to Offerors—Commercial Items (paragraph j) for information on contacting Dun and Bradstreet.)

› Offeror’s assigned Contractor and Government Entity (CAGE) Code:__________________

Block 17b Remittance Address: (if different from Contractor/Offeror address in block 17a of the SF 1449.)

CAUTION - CONTRACTOR CODE OF BUSINESS ETHICS (FEB 2012)

FAR Part 3.1002(a) requires all government contractors to conduct themselves with the highest degree of integrity and honesty. Contractors should have a written code of business ethics and conduct within thirty days of award. To promote compliance with such code of business ethics and conduct, contractors should have an employee business ethics and compliance training program that facilitates timely discovery and disclosure of improper conduct in connection with government contracts and ensures corrective measures are promptly instituted and carried out. A contractor may be suspended and/or debarred for knowing failure by a principal to timely disclose to the government, in connection with the award, performance, or closeout of a government contract performed by the contractor or a subcontract awarded there under, credible evidence of a violation of federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in title 18 of the United States Code or a violation of the False Claims Act. (31 U.S.C. 3729-3733)

If this solicitation or contract includes FAR clause 52.203-13 - CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT; the contractor shall comply with the terms of the clause and have a written code of business ethics and conduct; exercise due diligence to prevent and detect criminal conduct; promote ethical conduct and a commitment to compliance with the law within their organization; and timely report any violations of federal criminal law involving fraud, conflict of interest, bribery or gratuity violations found in title 18 of the United States Code or any violations of the False Claims Act. (31 U.S.C. 3729-3733). When FAR 52.203-13 is included in the contract, contractors must provide a copy of its written code of business ethics and conduct to the contracting officer upon request by the contracting officer.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 5 of 115

CONTRACT CLAUSES

52.212-4 - CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS (JAN 2017)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights --

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C.3727). However, when a third party makes payment (e.g., use of the Government wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 6 of 115

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include --

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer— System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 7 of 115

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt Payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and

AMENDMENT 0013 SPE2D1-15-R-0001 Page 8 of 115 then at the rate applicable for each six-month period at fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 9 of 115

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal

AMENDMENT 0013 SPE2D1-15-R-0001 Page 10 of 115 contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause.

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) System for Award Management (SAM).

(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor

AMENDMENT 0013 SPE2D1-15-R-0001 Page 11 of 115 shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the SAM database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End Use License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C.

1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

https://www.acquisition.gov/

AMENDMENT 0013 SPE2D1-15-R-0001 Page 12 of 115

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of Clause)

ADDENDUM TO FAR 52.212-4

The following paragraph of 52.212-4 are amended as indicated below:

Paragraph (t), System for Award Management.

Add the following paragraph:

(a) Definitions.

“System for Award Management (SAM) database” means the primary Government repository for contractor information required for the conduct of business with the Government.

“Commercial and Government Entity (CAGE) Code” means—

(1) A code assigned by the Defense Logistics Information Service (DLIS) to identify a commercial or Government entity; or

(2) A code assigned by a member of the North Atlantic Treaty Organization that DLIS records and maintains in the CAGE master file. This type of code is known as an “NCAGE code”.

“Data Universal Number System (DUNS) Number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System +4 (DUNS+4) Number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern.

(D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11 of the Federal Acquisition Regulation) for the same parent concern.

“Registered in the System for Award Management database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, and Contractor and Government Entity (CAGE) code into the SAM database;

(2) The contractor has completed the Core Data, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service. The Contractor will be required to provide consent for TIN validation to the Government as part of the SAM registration process; and

(4) The Government has marked the record “Active”.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 13 of 115

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following websites:

FAR Clauses: https://www.acquisition.gov/far/index.html DFARS Clauses: http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html DLAD Clauses: http://www.dla.mil/Acquisition/Documents/DLAD%20Rev%205.htm VAAR Clauses: http://www.va.gov/oal/library/vaar/

THE FOLLOWING ADDITIONAL CLAUSES ARE INCORPORATED BY REFERENCE

(NOTE: CLAUSES APPLY TO BOTH DLA AND VA NAC ISSUED CONTRACTS AND DELIVERY

ORDERS UNLESS SPECIFICALLY NOTED OTHERWISE)

52.203-3 Gratuities (APR 1984)

52.203-7 Anti-Kickback Procedures. (MAY 2014)

52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform

Employees of Whistleblower Rights (APR 2014)

52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)

52.216-27 Single or Multiple Awards (OCT 1995)

52.223-7 Notice of Radioactive Materials (JAN 1997)

52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)

52.224-1 Privacy Act Notification (APR 1984)

52.224-2 Privacy Act (APR 1984)

52.227-1 Authorization and Consent (DEC 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)

52.227-19 Commercial Computer Software License. (DEC 2007)

52.232-17 Interest. (MAY 2014)

52.242-13 Bankruptcy (JUL 1995)

52.242-15 Stop-Work Order (AUG 1989) https://www.acquisition.gov/far/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.dla.mil/Acquisition/Documents/DLAD%20Rev%205.htm http://www.va.gov/oal/library/vaar/

AMENDMENT 0013 SPE2D1-15-R-0001 Page 14 of 115

52.243-1 Changes Fixed-Price (AUG 1987)

52.244-6 Subcontracts for Commercial Items (NOV 2017)

52.247-29 F.O.B. Origin. (FEB 2006) (Only applicable for some DLA OCONUS orders)

52.247-34 F.O.B. – Destination (Nov 1991)

252.203-7002 Requirement to Inform Employees of Whistleblower Rights (SEP 2013) DFARS

252.204-7003 Control of Government Personnel Work Product (APR 1992) DFARS

252.204-7004 Alternate A, System for Award Management (Feb 2014) DFARS

252.209-7004 Subcontracting with Firms That Are Owned or Controlled by the Government of a

Country that is a State Sponsor of Terrorism (OCT 2015) DFARS

252.203-7000 Requirements Relating to Compensation of Former DoD Officials (SEP 2011)

DFARS

252.203-7003 Agency Office of the Inspector General (DEC 2012)

252.203-7005 Representation Relating to Compensation of Former DoD Officials (NOV 2011)

DFARS

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting (Oct 2016)

252.204-7012 Provision of Information to Cooperative Agreement Holders (DEC 1991) DFARS

252.211-7003 Item Unique Identification and Valuation (Mar 2016) DFARS

252.215-7008 Only One Offer (OCT 2013) DFARS

252.219-7003 Small Business Subcontracting Plan (DoD Contracts) Basic (Mar 2016) (Only applies to DLA administered contracts) DFARS

252.225-7020 Trade Agreements Certificate (Nov 2014) DFARS

252.225-7021 Trade Agreements (Dec 2017) DFARS (Only applies to DLA issued orders)

252.225-7027 Restriction on Contingent Fees for Foreign Military Sales (APR 2003) DFARS

252.225-7028 Exclusionary Policies and Practices of Foreign Governments (APR 2003) DFARS

252.227-7015 Technical Data -- Commercial Items (FEB 2014) DFARS

252.227-7037 Validation of Restrictive Markings on Technical Data (Sep 2016) DFARS

AMENDMENT 0013 SPE2D1-15-R-0001 Page 15 of 115

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports (JUN 2012)

DFARS

252.232-7010 Levies on Contract Payments (DEC 2006) DFARS

252.243-7002 Requests for Equitable Adjustment (DEC 2012) DFARS

252.244-7000 Subcontracts for Commercial Items (JUN 2013) DFARS

252.246-7003 Notification of Potential Safety Issues (JUN 2013) DFARS

252.247-7022 Representation of Extent of Transportation by Sea (AUG 1992) DFARS

252.247-7023 Transportation of Supplies by Sea (APR 2014). DFARS

852.203-71 Display of Department of Veteran Affairs Hotline Poster (DEC 1992) VAAR

THE FOLLOWING ADDITIONAL CLAUSES ARE INCORPORATED IN FULL TEXT:

(NOTE: CLAUSES APPLY TO BOTH DLA AND VA NAC ISSUED CONTRACTS AND DELIVERY

ORDERS UNLESS SPECIFICALLY NOTED OTHERWISE)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of Fixed-Price with Economic Price Adjustment multiple award Indefinite-Quantity contracts resulting from this solicitation.

52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 1 each, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor—

(1) Any order for a single item in excess of the remaining amount of the contract maximum limitation

(2) Any order for a combination of items in excess of the remaining amount of the contract maximum limitation; or

(3) A series of orders from the same ordering office within any days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 16 of 115

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 2 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.216-22 INDEFINITE QUANTITY (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 365 days after delivery order issuance.

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days of expiration date of the contract but no later than two (2) days prior to the expiration date of the contract; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 17 of 115

(c) The total duration of this contract, including the exercise of any options under this clause, shall not extend beyond ten (10) years.

252.216-7006 ORDERING (MAY 2011) DFARS

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule.

Such orders may be issued from date of contract award through the end of the contract period (or the end of each option period).

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c)(1) If issued electronically, the order is considered “issued” when a copy has been posted to the Electronic Document Access system, and notice has been sent to the Contractor.

(2) If mailed or transmitted by facsimile, a delivery order or task order is considered “issued” when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.

(3) Orders may be issued orally only if authorized in the schedule.

52.233-9001 DISPUTES: AGREEMENT TO USE ALTERNATIVE DISPUTE

RESOLUTION (Dec 2016) DLAD (Only applies to DLA administered contracts and DLA issued orders – For VA administered contracts and VA issued orders VAAR 852.233-71 applies)

(a) The parties agree to negotiate with each other to try to resolve any disputes that may arise. If unassisted negotiations are unsuccessful, the parties will use alternative dispute resolution (ADR) techniques to try to resolve the dispute. Litigation will only be considered as a last resort when ADR is unsuccessful or has been documented by the party rejecting ADR to be inappropriate for resolving the dispute.

(b) Before either party determines ADR inappropriate, that party must discuss the use of ADR with the other party. The documentation rejecting ADR must be signed by an official authorized to bind the contractor (see FAR 52.233-1), or, for the Agency, by the contracting officer, and approved at a level above the contracting officer after consultation with the ADR Specialist and legal counsel.

Contractor personnel are also encouraged to include the ADR Specialist in their discussions with the contracting officer before determining ADR to be inappropriate.

(c) If you wish to opt out of this clause, check here [ ]. Alternate wording may be negotiated with the contracting officer.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 18 of 115

(End of Provision)

ECONOMIC PRICE ADJUSTMENT – ESTABLISHED CATALOG PRICE - ONE

UPWARD ADJUSTMENT AUTHORIZED EACH YEAR TERM - NON-ECAT (JUL 2014)

DLATS

(a) All price adjustments authorized or mandated by this clause are based upon changes in the Contractor’s List Prices. The clause also provides for voluntary price reductions (VPR) in the form of “specials” or “discounts”.

(b) Definitions:

(1) Contract Unit Price: The price per unit of issue comprised of the “List Price” and the applicable “Discount”. The Contract Unit Price is determined by reducing the applicable List Price by the appropriate Discount. The list prices and discounts shall be listed in the contract. The resulting net contract unit prices may or may not be listed in the contract at the discretion of the Contracting Officer.

(2) Discount: The percentage reduction off the List Price proposed by the contractor and accepted by the Government. These percentages may vary per item and quantity ordered. They shall be agreed to at time of award and may not be reduced for the life of the contract. These discounts are in addition to any standard trade discounts in the contractor’s established commercial Catalog/Price List. (Contractors may offer larger discounts and/or reduced List Prices at any time.)

(3) List Price: The established Catalog Unit Prices of the items. In order for a “List Price” to meet the criteria as an established Catalog Price, it must meet the definition in (c) below.

(4) Voluntary Price Reduction (VPR): See paragraph (l) below.

(c) The term "established Catalog Unit Price", as used in this clause, means a Unit Price that (i) is a Catalog Price for a commercial item sold in substantial quantities to the general public and (ii) is the net price after applying any standard trade discounts offered by the contractor.

(d) The offeror/contractor warrants that (1) the List Prices and the subsequent revisions thereto are the established Catalog Unit Prices in effect at time of Award or adjustment for like quantities of the same items and (2) any Contract Unit Prices determined using these List Prices do not include allowances for any portion of the contingency covered by this clause.

(e) Prior to award the contractor must furnish:

(1) their current established Catalog/Price List, offered Discounts, proposed Contract Unit Prices.

(f) Upon acceptance by the Government, the Award Unit Prices will be established at the List Prices minus the agreed-to Discounts.

(g) Downward Adjustments.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 19 of 115

(1) Downward adjustments to Contract Unit Prices are mandated whenever there are decreases in List Prices. The contractor shall promptly notify the Contracting Officer in writing of the amount and effective date of each decrease in List Price. The Contractor shall propose a lower Contract Unit Price taking into consideration the benchmark in paragraph (g)(2) below. The contractor must furnish a copy of the revised Catalog/Price List as soon as it is available. Also, the contractor must provide an Excel spreadsheet or ACCESS Database (in both hard copy and disc) that displays for each item with an offered decrease in Contract Unit Price the appropriate information below. The Contractor shall submit this information at least 60 days prior to the date when the reduced List Prices take effect.

(i) The Supplier (Catalog); e.g., ABC Imaging, Inc.

(ii) The Product Name/Nomenclature; e.g., High Speed Hand piece.

(iii) Part Number; e.g., HIH 2000

(iv) The List Price upon which the current Contract Unit Price is based.

(v) The applicable Contract Discount used as a basis for determining the current Contract Unit Price.

(vi) The Contract Unit Price currently in effect.

(vii) The reduced List Price.

(viii) The applicable Contract Discount or larger Contract Discount now offered.

(ix) The reduced Contract Unit Price now offered.

(x) The percentage decrease in List Price from the List Price which determined the current Contract Unit Price to the new, lower List Price.

(xi) The percentage change in Contract Unit Price from the current Contract Unit Price to the new lower Contract Unit Price now offered.

(2) Reductions in List Price(s). For any offered price decrease, the appropriate discount or larger discount now offered will be applied to each reduced List Price to determine the adjusted Contract Unit Price provided the proposed lower Contract Unit Price does not exceed the following benchmark:

The offered reduction in Contract Unit Price on a percentage basis must be at least equal to the percentage reduction from the List Price currently in effect under the contract to the new lower List Price; i.e., the current Contract Unit Price must, as a minimum, be reduced by the percentage decrease in List Price.

(3) If the proposed Contract Unit Price exceeds the List Price benchmark, the Contracting Officer shall determine the proposed price reductions unreasonable and negotiate a price reduction which results in a Contract Unit Price that does not exceed the benchmark. (All negotiated price

AMENDMENT 0013 SPE2D1-15-R-0001 Page 20 of 115 reductions shall be confirmed in writing and will include the agreed-to price(s) and the list price(s) and discount(s) which make up these prices.) If an agreement cannot be reached the Contracting Officer has the option of removing these items from the Contract or taking the action in the last sentence below. If the proposed Contract Unit Price does not exceed the benchmark, it will be determined fair and reasonable. Upon acceptance of any proposed price decreases, the Government shall modify the contract to include the reduced list prices and discounts. The adjusted Contract Unit Prices may or may not be shown in the modification at the discretion of the Contracting Officer. These reduced Contract Unit Prices shall apply to those items ordered on or after the date when the reduced List Price(s) take effect. If the contractor fails to notify the Contracting Officer of any List Price decreases within the timeframe and in the manner stated above or agreement on any reduction cannot be reached, the Contracting Officer may determine the applicable adjustment and authorize a unilateral price adjustment retroactively applied to all items ordered on or after the effective date of the decrease in the Contractor’s established List Prices.

(h) Upward Adjustments.

(1) DURING THE FIRST YEAR OF THE CONTRACT Base TERM (I.E., AWARD DATE 09/24/2014 WOULD EQUATE TO THE PERIOD 9/24/14 THRU 9/23/2015), Contract Unit Prices are not subject to any upward adjustment. However, the Contractor is authorized to submit one upward adjustment request starting from the second year of the base term, and during each year thereafter, to include the years in the OPTION TERMS (IF INVOKED). Therefore in total, no more than 9 annual adjustments may be invoked on this contract.

Request shall be submitted no later than 60 days prior to the effective date of the upcoming CONTRACT Year. Each request for upward price adjustment must be based upon increases in List Prices only. (List Price increases which will take effect beyond this 60 day evaluation period, shall not be included in the upcoming adjustment but may be submitted for the subsequent Annual adjustment.) The Contractor shall propose a Contract Unit Price taking into consideration the benchmarks in paragraph (h)(2). The request shall include a copy of the revised Catalog/Price List and the following for each item with a proposed increase in Contract Unit Price:

(i) A separate Excel spreadsheet or ACCESS database, in both hard copy and disc, that displays for each item with a proposed price increase the following information:

(A) The item number; e.g., 0003.

(B) The Supplier (Catalog); e.g., ABC Dental, Inc.

(C) The Product Name/Nomenclature; e.g., High Speed Hand piece.

(D) The Part Number; e.g., HIH2000.

(E) For the initial ADJUSTMENT PERIOD, the List Price that determined the Award Unit Price, the applicable Contract Discount, and the Award Unit Price. For all subsequent ADJUSTMENT PERIODS, the List Price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year, the applicable discount, and the highest Contract Unit Price that was in effect during the preceding Contract Year.

AMENDMENT 0013 SPE2D1-15-R-0001 Page 21 of 115

(F) The increased List Price and its effective date, the applicable Contract Discount or larger Contract Discount now offered, and the proposed higher Contract Unit Price.

(G) For the initial ADJUSTMENT PERIOD, the percentage change from the List Price that determined the award unit price to the new higher List Price. For all subsequent ADJUSTMENT YEARS, the percentage change from the List Price that determined the highest Contract Unit Price that was in effect at any time during the preceding Contract Year to the new higher List Price.

(H) Any other information required by the Contracting Officer.

(2) Benchmarks. If any List Price increases, and the increase is authorized under this clause, the Contract Unit Prices for any corresponding items ordered after the increase takes effect shall be determined using the increased List Price and either the applicable Discount originally awarded or any larger Discount now offered that applies to the affected item. Proposed increases will be considered fair and reasonable if they do not exceed whichever is the lower of the following two benchmarks:

(i) For the Initial ADJUSTMENT PERIOD of the contract, the proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the List Price that determined the award unit price to the new higher List Price. For all subsequent ANNUAL ADJUSTMENT PERIODS, the proposed increase in Contract Unit Price on a percentage basis cannot exceed the percentage increase from the List Price that determined the highest Contract Unit Price that was in effect at any time during the preceding contract year to the new higher List Price.

(ii) Any proposed higher Contract Unit Prices are subject to the following limitations:

(A) For the initial ANNUAL ADJUSTMENT, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the award unit price for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the award unit price plus the annual ceiling).

ANNUAL CEILING, ALL ITEMS: 4%

There is no percentage limit on downward adjustments under this clause.

(B) For all subsequent Option Years, Contract Unit Price increases shall be limited to the following annual ceiling(s) applied to the highest Contract Unit Price in effect during the preceding Contract Year for the same item (i.e., any proposed higher Contract Unit Price cannot exceed the highest Contract Unit Price in effect during the preceding Contract Year plus the annual ceiling.)

ANNUAL CEILING, ALL ITEMS: 4%

There is no percentage limit on downward adjustments under this clause.

(3) Upon approval of the proposed price increases, the Government shall modify the contract to include the increased list prices and discounts. The adjusted Contract Unit Prices may or may not be included in the modification at the discretion of the Contracting Officer. Upward price adjustments shall be effective on the ANNUAL ANNIVERSARY OR TERM OPTION EFFECTIVE DATE unless either of the following occurs:

(i) If the Contractor's request for price adjustment is not received 60 days prior to the effective date of the upcoming ANNUAL ADJUSTMENT/BASE OR OPTION TERM (if

AMENDMENT 0013 SPE2D1-15-R-0001 Page 22 of 115 exercised), any approved upward price adjustment shall not be effective until 60 days after receipt of the request.

(ii) If during the 60 day period the Government has to evaluate prices and modify the contract, the Contracting Officer is unable to determine during that period that a price increase on any item or items is fair and reasonable (i.e., the proposed Contract Unit Price exceeds the lower of the two benchmarks above). In this case, no price increases will be authorized for those items until the Contracting Officer is able to determine the price increases for those items to be fair and reasonable. If necessary, the Contracting Officer shall conduct discussions with the Contractor to negotiate a price reduction which results in a Contract Unit Price that does not exceed the lower of the two benchmarks. When discussions have concluded and an agreement which results in fair and reasonable prices is reached, the Contractor shall confirm the agreed-to price(s) in writing (The agreement shall also identify the list price and discount which makes up each agreed-to price.)

Once the written agreement is received, the Government shall modify the contract to include the increased list prices and discounts. The adjusted Contract Unit Prices may or may not be included in the modification at the discretion of the Contracting Officer.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .