SPD cut sheets_2019_1120.pdf

PDF 9 MB Posted

Attached to
Building 99 of Misawa Air Base Hospital Initial Outfitting Project
Solicitation number
W9127S22Q6001
Issued by

About this file

This document outlines requirements for an initial outfitting project at Building 99 of Misawa Air Base Hospital in Japan. The solicitation requests quotes by December 6, 2021 for furnishing and installing medical equipment, furniture, and finishes for the new facility. Key requirements include furnishing and installing medical and surgical equipment, casework, flooring, wall finishes, artwork, and telecommunications infrastructure. The project is a total small business set-aside under NAICS code 337127 with a size standard of 500 employees. The statement of work, specifications, drawings, existing inventory lists, and other supporting documents are provided as attachments to inform quote submissions.

View the file

Other files

File Type Posted
U JSN Specs FIO_V2.pdf PDF
W9127S22Q6001 AMENDMENT 0005.pdf PDF
W9127S22Q6001 - ProjNet information.pdf PDF
W9127S22Q6001 AMENDMENT 0004.pdf PDF
W9127S22Q6001 AMENDMENT 0003.pdf PDF
W9127S22Q6001 AMENDMENT 0002.pdf PDF
W9127S22Q6001 AMENDMENT 0001.pdf PDF
GC Schedule.pdf PDF
W9127S22Q6001 Misawa Hospital Modernization IO Bid Schedule.xlsx XLSX spreadsheet
W9127S22Q6001 Solicitation.pdf PDF
FRCS FAT SAT Checklist.pdf PDF
DHA System-Level Continuous Monitoring Plan 23MAY2018.pdf PDF
MABH-FFE-Package.pdf PDF
PN99822_FP_Misawa Hospital Addition and Alteration_V2.0 (22 Feb 21).pdf PDF
MABH-SID-Package-Vol1.pdf PDF
MABH-SID-Package-Vol2.pdf PDF
10 MABH-Electrical.pdf PDF
11 71 01.pdf PDF
Misawa Existing Inventory (G) 2JUN2021.xlsx XLSX spreadsheet
06 MABH-Equipment.pdf PDF
Specifications_Volume 1_Addendum 02.pdf PDF
Past Performance Questionnaire.pdf PDF
DHA FRCS Baseline Categorization Memorandum-1 October 2020 (1).pdf PDF
10 MABH-Telecom Drawings ONLY.pdf PDF
BoDEquipmentCutSheets-LogCAT A FIO.pdf PDF
DHA System-Level Continuous Monitoring Plan 23MAY2018.xlsx XLSX spreadsheet
07 MABH-FireProtection.pdf PDF
05 MABH-Interiors.pdf PDF
Misawa PRCL 21OCT21.pdf PDF
Example Generic ICS Med-COI Boundary Diagram v4.pdf PDF
01 MABH-General.pdf PDF
FRCS-VRA Ver 2.0.docx DOCX document
MABH-SID-Package-Vol3.pdf PDF
Misawa DHA-FE Submittal List_10.27.21.xlsx XLSX spreadsheet
DHA-ACAS Scanning Requirements_Read Only 06.17.21.pdf PDF
Misawa Artwork Best Practices 10.29.21.pdf PDF
Draft DHA PM Standard Isolation Architecture for Cybersecurity of FRCS.DOCX DOCX document
Misawa Furniture and Finishes Best Practices 10.29.21.pdf PDF
SOW - FY21 Misawa Requirements Document_20211029 v14.docx DOCX document
LVS Division 27 - DHA Specification_Standard 06.14.21.pdf PDF
Misawa JSN summary 21OCT21.xlsx XLSX spreadsheet
Specifications_Vol 2_Addm 01.pdf PDF
DHA-FE Weekly Report_Template_20210524.xlsx XLSX spreadsheet
W9127S22Q6001 Solicitation.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responsibility Start

Date End Date

STERIS & Client TBD TBD

STERIS & Client TBD TBD

STERIS & Client TBD TBD

Client TBD TBD

STERIS TBD TBD

Client TBD TBD

STERIS & Client TBD TBD

STERIS & Client TBD TBD

Client TBD TBD

Client/Contractor TBD TBD

Client/Contractor TBD TBD

Client/Contractor TBD TBD

Client/Contractor TBD TBD

Mobile SPD Commission Activities

STERIS Mobile Solutions TBD TBD

STERIS Mobile Solutions TBD TBD

Client/Contractor TBD TBD

STERIS Mobile/STERIS Service TBD TBD

Client/Contractor TBD TBD

STERIS & Client TBD TBD

STERIS & Client TBD TBD

STERIS & Client TBD TBD

STERIS & Client TBD TBD

STERIS Mobile Solutions TBD TBD

STERIS & Client TBD TBD

STERIS Mobile Solutions TBD TBD

Transition and Go live

STERIS/Client TBD TBD

Client TBD TBD

Commission Wrap Up

STERIS Service onsite- Equipment start-up/testing

Connect fire alarm, sprinkler and IT

STERIS onsite presenation and site validation

Professional Services advance data request to be sent to the Client identified SPD contact

Advance data request completed and sent back to Professional Services

Professional Services arrives onsite and performs assessment

Professional Services report out findings and action items. Client to have SPD, surgical and executive sponsors present

Client to act upon Professional Services findings

Pre-deployment Activities

Client to provide SPD contact for Professional Services onsite visit

Contact reviewed & signed and PO issued to secure unit

Review and validation of client site, MEP and Deck plans

Electricity must be ready to energize Mobile SPD at delivery

Customer occupies and functions out of the Mobile SPD

Customer Transition to Mobile SPD with assistance from Professional Services

Project Schedule

All utilities must be stubbed before commissioning activities begin

Mobile unit and equipment in-service to Customer's Facilities and Bio-Med team

Task

Mobile Installation Technician arrives on site- review site mark up, road plate position, delivery path, etc.

Mobile SPD Delivery/ leveling ( delivery at 6 am)- all commissioning activities begin

Plumbing connections must be made to Mobile SPD by close of business

Facilities/Bio-Med Mobile and Equipment In-Services

Place road plates in position ( if applicable)

Mark up location for unit placement

Obtain final Customer sign off on documents

Mobile team departs site

Customer Mobile and Equipment In-Services

Mobile unit and equipment in-service to Customer sdhillier Text Box sdhillier Text Box U9000

STERIS Mobile SPD Site Planning and Utility Connections Guide

800-548-4873 www.STERIS.com

Misa wa A

FB

Con fid en tia l

STERIS MOBILE SPD

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Introduction and Disclaimer

The purpose of this document is to provide the basic information needed for site planning. Please note that some STERIS Mobile SPD units have slight variations in dimensions, equipment layout, product portfolio, ancillary cooling packages and means of egress.

For specific unit information not contained in this document, please contact STERIS Corporation.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Special Notes: 1. Prior to deployment, STERIS will perform a site visit and/or teleconference to review mechanical, electrical and plumbing (MEP) requirements with all parties involved to ensure a successful project.

2. Customer is responsible for all licenses, permits and any government approvals. Time spent to meet these requirements should be built into your master project schedule.

3. Customer is responsible to make all utility connections.

4. Power must be with 50’ of the front/nose of the unit, readily available upon unit arrival and all utilities must be stubbed out to the deployment location.

5. In the event power cannot be provided due to an emergency, STERIS will discuss alternative power options with generator support on a case by case basis.

6. STERIS can provide steps for entrance and exit, however, it is strongly recommended that the facility provides a deck or connecting corridor to transport instruments into and out of the unit. IMPORTANT – any connecting structure must be constructed AFTER the Mobile SPD arrives on site.

7. It is recommended that anchor tie downs are not placed until the Mobile SPD arrives. Although STERIS does not penetrate the ground, STERIS Installation Specialists will be on site and can provide guidance regarding tie down locations.

Misa wa A

FB

Con fid en

Pre-Deployment Activities

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Pre-Deployment Checklist

❑ Coordinate a site walk with STERIS and responsible parties

❑ Execute the STERIS rental agreement and provide a purchase order to reserve the unit

❑ Submit deployment plans/drawings to STERIS for final review

❑ Communicate with applicable state and local agencies regarding approvals and inspections

❑ Review mechanical, electrical and plumbing requirements with state and local agencies

It is important to ensure the following has occurred prior to the delivery of the Mobile SPD:

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Sample Mobile SPD Commission Schedule Provided by STERIS

Misa wa A

FB

Con fid en

Equipment Layout, Operational Flow and Facility Requirements

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Equipment Layout

NOTE: STERIS can provide steps for entrance and exit, however, it is strongly recommended that the facility provides a deck or connecting corridor to transport instruments into and out of the unit. IMPORTANT

– any connecting structure must be constructed AFTER the Mobile SPD arrives on site.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Facility Requirements and Optional Packages

NOTE: See page 63 for information and power requirements pertaining to the

Cold Weather Insulation Package

NOTE: See page 62 for information and power requirements pertaining to the Ancillary Cooling Package

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Mobile SPD Operational Flow

Decontamination

Prep and Pack

Sterile Unload

Sterile load

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Mobile SPD Operational Flow Continued

Surgery case is completed

Place Instruments back in container and spray with transport gel such as PRE-

KLENZ™

Place dirty sets on dirty staging cart

Quick Turn?

Call SPD Manager and place dirty set on priority cart

Yes

No Pull instruments for cases

Transport dirty sets on dedicated dirty cart to SPD following LEAN delivery

Transport dirty sets to dirty holding

Enter vestibule and close outer door. Open inner door and unload dirty sets. Close inner door and wipe down cart per policy and standards.

Return cart to dirty side of surgery

Process instrument sets per Manufacturer IFU’s and policy

Wipe out containers per policy and work instructions and pass through the pass-through window.

Assemble the containers with appropriate sets. Inspect, assemble and wrap according to work instructions and procedures.

Sterilize instruments in either high or low temp sterilizer per manufacturers instructions.

Su rg e ry

Tr an sp o rt

SP

D Soiled Sterile

Transport sterile sets to Sterile Storage

Enter vestibule and close outer door. Open inner door and load cool sterile instrument sets in clean case cart. Close inner door and cover cart per policy and standards.

Misa wa A

FB

Con fid en

Site Preparation

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Operational Envelope

NOTE: The Mobile SPD requires a 70’L x30’W foot print for deployment and service access70’

30’

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Operational Envelope Driver Side View

NOTE: The Mobile SPD requires a 70’L x15’H foot print for deployment and service access

70’

15’

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Operational Envelope Passenger Side View

NOTE: The Mobile SPD requires a 70’L x15’H foot print for deployment and service access

70’

15’

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Operational Envelope Rear View

Measurements are based on expandable at 42" standard height

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

NOTE: 4’ x 8’ by 1” steel road plates are needed to support and distribute weight accordingly. STERIS can advise if these plates are NOT needed once a formal site visit is performed

Mobile SPD Weight Distribution

21,700 LBS TOTAL AT

REAR LEVELING GEAR

21,700 LBS TOTAL AT

FRONT LEVELING

FOOT

18,150 LBS TOTAL AT

REAR SUPPORTING

GEAR

Road Plates

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Touch Points and Weight Distribution PhotosNOTE: Total unit weight is approximately 70,000 lbs.

NOTE: If necessary, and based on individual site conditions, two 4’ x 8’ by 1” steel road plates may be needed. Plates provided by others.

Front Unit Stabilizers Rear Unit Stabilizers Rear Axle Stabilizers

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Unit Tie-Down Images and Requirements

Unit Anchoring / Tie Downs

- (8) at 5,000 lb. tensile capacity (2 each per corner)

- Locations are field specific

- Anchor points to be located on the ground at 30-45 degrees from the unit tiedown points

- STERIS will provide straps needed to secure the unit.

NOTE: STERIS does not penetrate the ground. The STERIS Mobile SPD Installation Specialist can provide guidance regarding the tie down locations once the unit arrives on site.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Mobile SPD Anchor Point Locations

Side Tie Down

Location

Rear Tie Down

Location

Rear Tie Down

Location

Side Tie Down

Location

Side Tie Down

Location

Side Tie Down

Location

Front Tie Down

Location

Front Tie Down

Location

NOTE: It is recommended that anchor tie downs are placed after the Mobile SPD arrives. Although STERIS does not penetrate the ground, Installation Specialists will be on site and can provide guidance regarding tie down locations.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Support Pad Recommendations

1) Minimum Support Pad Requirements:

A minimum support pad measuring 11’W x 47’L is recommended. The cross hatching shown on the following pages depicts the recommended support pad.

2) Support Pad Depth:

Recommendations for the width and length of the pad are given on the following pages. Based upon the weight distribution of the Mobile SPD and existing site conditions, the depth should be determined by a contractor.

3) Support Pad Levelness:

In order to ensure proper operation of the system, the support pad(s) must be level and the deviation shall not exceed ¼” in 10’.

4) Recommended Service Pad:

A full service pad measuring 25’W x 62’L is recommended. This will allow full service access to the Mobile SPD. The recommended service pad is illustrated on the following pages.

5) Vehicle Access:

A firm, level surface is recommended around the Mobile SPD in order to provide access to the site, access to the Mobile SPD and access to service the unit.

NOTE: When applicable, the Customer is responsible for providing a pad. If a pad is needed, the Customer is also responsible for performing calculations based on unit weight to determine the depth of the pad.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Support Pad Recommendations Continued

NOTE: When applicable, the Customer is responsible for providing a pad. If a pad is needed, the Customer is also responsible for performing calculations based on unit weight to determine the depth of the pad.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

NOTE: When applicable, the Customer is responsible for providing a pad. If a pad is needed, the Customer is also responsible for performing calculations based on unit weight to determine the depth of the pad.

Support Pad Recommendations Continued

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Maximum Pitch and Slope for Delivery

NOTE: The Customer is responsible for providing an appropriate delivery path and ramp to accommodate the Mobile SPD.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Mobile SPD Height Thresholds

161 3/4

NOTE: Assuming level ground, minimum ground to trailer floor height is 42”, max ground to trailer floor height is 57”

Any increase in elevation above 51” will require the use of dunnage to raise the unit beyond the maximum height provided by hydraulic power.

STERIS will provide a maximum of 6” of dunnage to support a deployment max height of 57”

Standard ride height 42”

Standard Height with air ride 42” – 46”

Mobile SPD Deployment Accommodations

Standard ride height 42” (ground to interior floor)

Standard unit height with air ride system 42”- 46” (from ground)

Standard unit adjustment with hydraulics 42”- 51” (from ground)

STERIS provided dunnage (6”) 51” - 57” (from ground)

Deployments with a ground to door height greater than 57”

To be determined after initial site visit performed by STERIS

Dunnage + 4”

+ 5”

+ 6”

Misa wa A

FB

Con fid en

I

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Connecting Corridor and Unit Delivery Protocol

Step 1:

STERIS Site Walk

Step 2:

Document Sharing (Customer to provide elevation drawings)

Step 3:

Unit Arrival

Step 4:

Connecting Corridor Construction Begins

Step 5:

Connecting Corridor

Construction Completes

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Sample Deck, Ramp and Connecting Corridor Photos

NOTE: The facility is responsible for engineering and constructing ramps, decks and connecting corridors that will connect to the unit.

Construction of these structures can begin prior to unit arrival, however, these structures are not to be completed until after the unit is on site.

During the design phase, please pay special attention to the door locations to ensure there is enough clearance for the SPD doors to align with the connecting structure.

NOTE: When designing a connecting corridor, the facility is responsible for constructing an extension over the unit and sealing the structure to ensure that water/snow does not penetrate this connecting area.

Misa wa A

FB

Con fid en

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Proper Site Preparation Procedure

NOTE: Deck elevations are required to be sent to STERIS for approval prior to unit arrival. Customer should not build the deck until after the unit arrives on site.

The Mobile SPD has the capability to raise and lower to meet various height challenges, however, the connecting structure must be built after unit arrival as there are limitations to the maximum height of the unit.

The connecting corridor should be constructed AFTER the Mobile SPD arrives on site as there must be enough room to expand the unit and ensure an exact alignment to the connecting structure. The structure must be built to the unit (STERIS will not manipulate the unit to align with a pre-existing structure).

Misa wa A

FB

Con fid en

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Connecting Corridor Bumper Protection

NOTE: Customer is responsible for ensuring the protection of the exterior of the SPD unit. When installing a deck/connecting structure, please incorporate a bumper or protective rail/barrier to prevent the unit from being damaged by transfer carts.

Misa wa A

FB

Con fid en

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Connecting Corridor and Weather Sealing

NOTE: It is the responsibility of the Customer/contractor to ensure that all connecting corridors are installed with a sealer/expansion foam. Installing this material will prevent leaks from enter the transition space between the corridor and the Mobile SPD.

Example of Proper Weather Seal

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Connecting Corridor Roof Extension

NOTE: When designing a connecting corridor, the facility is responsible for constructing an extension over the unit and sealing the structure to ensure that water/snow does not penetrate this connecting area.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Mobile SPD Door Dimensions

NOTE: STERIS will provide information regarding which specific unit will be deployed for scheduled projects.

Misa wa A

FB

Con fid en

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

STERIS Storage Container

NOTE: A STERIS storage container travels with every Mobile SPD. This container is used to help transport the roll-around equipment while the unit is in transit.

This unit also holds various supplies that are used to support the unit throughout the deployment. It is important that this unit resides within close proximity to the Mobile SPD. STERIS will assess location areas for this container during the site visit.

92” Wide

99” Tall

240” Deep

Misa wa A

FB

Con fid en

Utility Connection Drawings and Connection Points

NOTE: Customer/contractor is responsible for all utility connections. STERIS Mobile Installation Specialists will be on site to provide guidance as needed.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Plan View - Utility Connection Points

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Driver Side Utility Connection Points

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Passenger Side Utility Connection Points

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Front and Rear Utility Connection Points

Front Rear

Power Connections Sprinkler Connection

Misa wa A

FB

Con fid en

Utility Connections Detail and Images

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Utility Connection Locations

6 7

Data Connections

HVAC Condensate Locations

Tie-Down Locations

Ground Point Connection

Power

Cold Water Connection

Hot Water Connection

Waste Water Connection

Fire Sprinkler Connection

Fire Alarm Connection

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

NOTE:

Facility/Contractor is responsible for making the final power connection from the Mobile

SPD to the disconnect.

Shoreline Cable: (2) 75’ lengths (provided)

Power Connection Images and Requirements Power 1

480VAC, 3-Phase, (2) 250 AMP

Configuration 4 wire (L1,L2,L3,G)

Frequency: 60hz

Facility end hard wired (Customer Connection Point)

Strain ReliefMale Connection (unit) Female Connection (shoreline)

NOTE: A Neutral is NOT needed in this configuration.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Power Connection Images and Requirements Power 1

NOTE: Disconnect must be within 50’ of the front/nose of the unit.

Main 480V 3PH (2) 250 Amp Connection

- 2 75’ cables provided by STERIS

- Facility to provide disconnect

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Power Load Calculations Power 1

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Power Load Calculations Continued Power 1

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Power Load Calculations Continued Power 1

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Power Connection Images and Requirements Power 1

Product Construction:

• Conductor:

• 8 AWG through 500 kcmil fully annealed stranded bare copper

• Insulation:

• Premium-grade, color-coded 90 C

EPDM

• Color code: see chart

• Jacket:

• Super Vu-Tron 90 C, black

• Temperature range: -40 C to + 90 C

• Jacket Marketing:

• Sizes smaller than 2-1/4” Carol

Super VU-Tron (size) Type W portable power cable (UL) 2000V dry 90 C wet 75 C sun res CSA (-40 C) FT-

5 P-7K-123049 MSHA

• Sizes 2-14” and larger – (size) type W Carol Super Vu-Tron 90 C dry and water resistant 75 C 2000V sun res (UL) P-7k-123049 MSHA LR27161

(Super Vu-Tron Multi-Conductor Type W Round)

90 C (UL) Type W 2000 Volt Portable Power Cable)

NOTE: Specifications may vary by unit. (Units 104-107 are 2/0 and units 108+ are 3/0

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Hot and Cold Water Supply Images and Requirements

Hot Water Supply Requirements

- 1 ¼ inch connection

- 300 GPH minimum at 40-60 psi

- Temperature: 140°F nominal

- Total hardness as CaCO3 120 PPM or less

- External lines must be facility protected.

Hot and Cold Water Supply Images and Requirements Cold Water Supply

Hot Water Supply

Cold Water Supply Requirements

- 1 ¼ inch connection

- 1,000 GPH minimum at 40-60 psi

- Total hardness as CaCO3 120 PPM or less

- Cold Weather Protection: Internal lines are weather protected.

- External lines must be facility protected

MCSSD Belly Boxes (Hot/Cold Water Access Point)

Water Manifolds (Customer Connection Point) 1 ¼ MPT Fresh - Water Fill Port - Hot and Cold

NOTE: The Customer is responsible for installing backflow preventers on the water lines coming into the Mobile SPD as required by local jurisdiction.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Belly Box Waste Water Access Point

Waste Water Supply4

4” Waste Water Connection (Customer Connection Point)

Waste Water Images and Requirements

NOTE: Waste connection can be connected through the side of the belly box door or the bottom of the floor.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Belly Box (Waste Water Exit Point) Waste Water Line to Drain (under unit)

Waste Water Line to Drain Location (External lines must be facility protected)

The maximum waste peak flow (with all equipment running at the same time) is equal to 631 gallons per hour (excluding water from the sinks which vary by rate of use.

Waste Water Supply4

Waste Water Images and Requirements

NOTE: Waste flow will vary depending on the frequency of equipment operation in the unit.

NOTE: It is highly recommended that a P-Trap be installed on the waste line to minimize the potential for foul odors.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Driver Side View - Waste Drain Heights

Waste Water Supply4

(10”) FLOOR TO

CENTER OF DRAIN

(17 ¾”) FLOOR TO

CENTER OF DRAIN

NOTE: Two waste water connections are offered to accommodate for site specific slope and elevation.

NOTE: It is important to review the slope at specific site locations to ensure gravity can drive waste water removal.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Fire Sprinkler Images and Requirements Fire Sprinkler5

Fire Sprinkler Requirements

- External lines must be facility protected

- Supply required:

Static 60 PSI Minimum Residual Pressure 50 PSI

2 inch Victaulic coupling

Misa wa A

FB

Con fid en tia l sdhillier

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Fire Alarm6

Fire Alarm System Drawing

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Fire Evacuation Plan

Misa wa A

FB

Con fid en tia l sdhillier

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Fire Extinguisher Locations

Fire extinguisher location

NOTE: There are three fire extinguishers provide with the Mobile SPD. There is one extinguisher in each vestibule, as well as a third “loose shipped” extinguished which is stored under the eye was sink the decontamination room.

ABC Type Dry Chemical

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Fire Alarm System Drawing Fire Alarm6

Fire Alarm Panel

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Fire Alarm Matrix

Facility Remote

Activation

Manual Pull Stations

Area Smoke/Heat

Detectors

Sprinkler Waterflow

Switch

Sprinkler Shut Off Tamper

Switch

Unit Power

Alarm Battery Back-Up

General Alarm System Errors

Alarm X X X X

Supervisory X

Trouble X X X

Activate Audio/Visual Alarm Signals Throughout Unit

X X X X

Unit Alarm Panel Tone and Signal X X X X

Export To Alarm Contact X X X X

Export To Supervisory Contact X

Export to Trouble Contact X X X

Fire Alarm6

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Fire Alarm Images and Requirements Fire Alarm

Fire Alarm Connection Customer Connection Point

RJ45 Fire Alarm Remote Dry Contacts

- Conventional analog fire alarm system with local audible-visual, horn-strobe alarm devices for occupant warning.

- Unit alarm system configured with:

- 2 zones with detection and pull stations

- 1 zone with supervisory tamper switch on sprinkler water control valve

- 1 zone for water flow switch on sprinkler system

- System exports trouble, supervisory and alarm conditions to three dry contacts available at the rear of the unit.

NOTE: The fire alarm system has no capability to repeat or react to external alarms or external PA systems.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Data Images and Requirements Data Connections7

Data Connection Box Customer Connection Point

(Rear of Unit) Data Connection Box (Interior) Two RJ45 Connection Points

RJ45 Connections Provided Throughout the Unit

NOTE: Customer must extend their IT network to the Mobile SPD for their IT provided equipment.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Data Connections Drawing Data Connections7

NOTE: RJ45 data connections are available at several locations throughout the unit to support network, voice and POTS (phone).

RJ45 Connection Locations

IT Switch Interior Connection

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

HVAC Condensate Images and Connections HVAC Condensate (4)8

Front of Unit

Heating and Cooling Connections/ HVAC Condensate Drain Terminations

- Nominal ¾” drain at front and rear of unit

Rear of Unit

NOTE: If condensate from the HVAC units is not captured, the condensate will drain to ground.

Misa wa A

FB

Con fid en

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Ground Point Images and Requirements Ground Point10

- Earth ground provided; installation per NEC Article 250

- (1) single point ground stud

- (1) 20’ ground cable with (2) clamps provided

Misa wa A

FB

Con fid en

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Cold Weather Package

Power Requirements

- Electrical Service: 240VAC, 2 pole, total of 80 amps, 60 HZ, Single Phase

- STERIS will supply (4) 4,000 watt 240V heaters with NEMA 6-30 plugs

- Customer is responsible to provide one 240V single phase 60 Hz 80 amp feed (hard wired to lugs in panel) to STERIS provided panel.

NOTE: When deploying the Mobile SPD in climates where the ambient temperature routinely drops and stays below 40 degrees Fahrenheit, the cold weather insulation package is a requirement.

NEMA 6-30 plug

STERIS Provided Heaters Customer Provided Power

Utility Connection Inside the Mobile SPD

Misa wa A

FB

Con fid en

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Ancillary Cooling Package

NOTE: The ancillary cooling package is required in locations where the heat index consistently exceeds 100 degrees.

Power Requirements

- Electrical Service: 480 VAC, 3-phase, 60hz

- (2) 30 AMP breakers

Unit Information STERIS will supply HVAC pre-cooling capability

- HVAC Pre-cool unit dimensions and weight:

- Width = 32”

- Length = 48”

- Height = 52”

- Weight = 685 lbs

Misa wa A

FB

Con fid en tia l rhtaylor

NOT REQUIRED AT THIS LOCATION

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Sample Deployment Photos

Misa wa A

FB

Con fid en

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Sample Deployment Photos Continued

Misa wa A

FB

Con fid en

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 3 5-22-2019

Sample Deployment Photos Continued

Misa wa A

FB

Con fid en

File details come from the government source that posted it. Updated .