DHA-FE Weekly Report_Template_20210524.xlsx

XLSX spreadsheet 163 KB Posted

Attached to
Building 99 of Misawa Air Base Hospital Initial Outfitting Project
Solicitation number
W9127S22Q6001
Issued by

About this file

This solicitation is for the initial outfitting project at Building 99 of Misawa Air Base Hospital in Japan. It is a combined synopsis and solicitation issued by the Department of the Army Corps of Engineers Engineering District Little Rock as a total small business set-aside. Quotes are due by December 6, 2021 for outfitting spaces including surgery, inpatient psychiatry, and imaging departments. The solicitation incorporates specifications and drawings providing requirements for furniture, finishes, medical equipment, and other items. It includes a project room contents list, existing inventory, and best practices documents to guide complying with standards for the Defense Health Agency military treatment facility.

View the file

Other files

File Type Posted
U JSN Specs FIO_V2.pdf PDF
W9127S22Q6001 AMENDMENT 0005.pdf PDF
W9127S22Q6001 - ProjNet information.pdf PDF
W9127S22Q6001 AMENDMENT 0004.pdf PDF
W9127S22Q6001 AMENDMENT 0003.pdf PDF
W9127S22Q6001 AMENDMENT 0002.pdf PDF
W9127S22Q6001 AMENDMENT 0001.pdf PDF
GC Schedule.pdf PDF
W9127S22Q6001 Misawa Hospital Modernization IO Bid Schedule.xlsx XLSX spreadsheet
W9127S22Q6001 Solicitation.pdf PDF
FRCS FAT SAT Checklist.pdf PDF
DHA System-Level Continuous Monitoring Plan 23MAY2018.pdf PDF
MABH-FFE-Package.pdf PDF
PN99822_FP_Misawa Hospital Addition and Alteration_V2.0 (22 Feb 21).pdf PDF
MABH-SID-Package-Vol1.pdf PDF
MABH-SID-Package-Vol2.pdf PDF
10 MABH-Electrical.pdf PDF
11 71 01.pdf PDF
Misawa Existing Inventory (G) 2JUN2021.xlsx XLSX spreadsheet
06 MABH-Equipment.pdf PDF
SPD cut sheets_2019_1120.pdf PDF
Specifications_Volume 1_Addendum 02.pdf PDF
Past Performance Questionnaire.pdf PDF
DHA FRCS Baseline Categorization Memorandum-1 October 2020 (1).pdf PDF
10 MABH-Telecom Drawings ONLY.pdf PDF
BoDEquipmentCutSheets-LogCAT A FIO.pdf PDF
DHA System-Level Continuous Monitoring Plan 23MAY2018.xlsx XLSX spreadsheet
07 MABH-FireProtection.pdf PDF
05 MABH-Interiors.pdf PDF
Misawa PRCL 21OCT21.pdf PDF
Example Generic ICS Med-COI Boundary Diagram v4.pdf PDF
01 MABH-General.pdf PDF
FRCS-VRA Ver 2.0.docx DOCX document
MABH-SID-Package-Vol3.pdf PDF
Misawa DHA-FE Submittal List_10.27.21.xlsx XLSX spreadsheet
DHA-ACAS Scanning Requirements_Read Only 06.17.21.pdf PDF
Misawa Artwork Best Practices 10.29.21.pdf PDF
Draft DHA PM Standard Isolation Architecture for Cybersecurity of FRCS.DOCX DOCX document
Misawa Furniture and Finishes Best Practices 10.29.21.pdf PDF
SOW - FY21 Misawa Requirements Document_20211029 v14.docx DOCX document
LVS Division 27 - DHA Specification_Standard 06.14.21.pdf PDF
Misawa JSN summary 21OCT21.xlsx XLSX spreadsheet
Specifications_Vol 2_Addm 01.pdf PDF
W9127S22Q6001 Solicitation.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSR

SCOPE
REPORT DATE25-May-21
PROJECT TITLEHospital Modernization
FISCAL YEARFY24
APPROPRIATIONMILCON
INSTALLATION NAMEEIELSON AFB
PROJECT NUMBERPN12345
PROJECT DESCRIPTIONHospital Repair
PROJECT DELIVERY METHODIDBIO
SCOPECLINAWARD SFGROWTH SF
Surgery, Inpatient Pscyh, Imaging00110,00010,250
Demolish MRI Facility002650650
MRI (EIP-Procurement)003700725
Personal Property (OM-IO)00400
Transition Services (OM-IOT)00500
TOTAL CHANGE275
SCHEDULECOSTS
SCHEDULE ACTIVITYINITIALUPDATEDGROWTHTYPE OF COSTPAAWARDMODSPENDINGGROWTH
AUTHORIZATION TO AWARD30-Aug-2029-Dec-201%DESIGN$0.96$1.50$0.03$0.012.67%
DESIGN AWARD/START30-Aug-2115-Dec-213%CONSTRUCTION$16.00$15.00$0.80$0.307.33%
CONCEPT DESIGN (35%)

Allison Keck: NOTE: This is NOT Preaward 35% Submission provided by an AE1 on a DB/IDBIO Project; This is post DOR award.

[Day-Month-Year][Day-Month-Year]PROCUREMENT EQUIPMENT$1.50$1.50$0.00$0.000.00%
ACCEPTED DESIGN (CORRECTED 100%)1-Oct-221-Oct-222%INITIAL OUTFITTING (OM)$2.72$2.55$0.05$0.001.96%
DESIGN: TOTAL SCHEDULE GROWTH6%TRANSITION (OM)$0.16$0.15$0.00$0.000.00%
CONSTRUCTION AWARD00ERROR:#VALUE!TOTAL$21.34

Allison Keck: PER LTCOL GRUENWALD: MILCON - either the enacted 1391 amount or the 2853 (if change occurs in scope or cost). i.e. PA for MILCON equals the amount we plan to ask for. Once have appropriation that is the amount we get as line appropriations. Authorized versus appropriated. 2853 - MILCON only this would reset the project amount for example if bids come in lower.

O&M-SRM, use 2811 reporting number?

$20.70$0.88$0.3111.96%
CONSTRUCTION START (NTP)30-Dec-2215-Jan-23ERROR:#VALUE!
RP/RPIE CONDITIONAL ACCEPTANCE (PIS)29-Dec-243-Feb-2536
RP/RPIE INTERIM ACCEPTANCE (BOD/PIS)29-Dec-253-Feb-2636CONSTRUCTION: WORK IN PLACECLINAWARDEARNINGSREMAIN% COMPLETE
CONSTRUCTION: TOTAL SCHEDULE GROWTHERROR:#VALUE!Surgery, Inpatient Pscyh, Imaging001$10.0$6.0$4.060.00%
IO/T (PP) AWARD/START4-Feb-244-Feb-240Demolish MRI Facility002$2.0$0.0$2.00.00%
PP ACCEPTANCE18-Feb-2425-Feb-247MRI (EIP-Procurement)003$1.5$0.2$1.313.33%
TRANSITION START25-Feb-243-Mar-247Personal Property (OM-IO)004$2.6$0.5$2.119.61%
TRANSITION COMPLETE (OFB)3-Mar-2410-Mar-240Transition Services (OM-IOT)005$0.2$0.0$0.20.00%
IO/T: TOTAL SCHEDULE GROWTH14TOTAL$16.2$6.7$9.541.36%
NOTES
The PSR is a reporting tool is for all projects that have awarded to a DOR, DB, Builder, or IOT Contractor
SCOPE
High RiskExceeds Authorized Scope/Out of scope change; not on original PFD or PRC; requires justification and will result in time & cost delays (example" adding departments; or FFE-LVS not on original lists)
Moderate RiskIn scope change; will result in cost/time delay (includes SF changes to PFD, or quantity changes to PRC)
Low RiskIn scope change; no impact to schedule/cost
Proposed out-of-scope contract modifications require new OTFAOC Justifications. The estimated value of the proposed out-of- scope contract modification or new task/delivery order J&A shall be based on the value ofthe modification or new task/delivery order requirement, not cumulative contract value, except if justifications were processed within six months ofcontract award.
COSTS
High RiskExceeds 25% of the Award/Imminent change to contract; will result in additional funds
Moderate RiskExceeds 10% of Award (Contingency Amount);Pending change to contract; may result in additional funds
Low RiskUnder 5%; Administrative/no cost change to contract; zero cost impact
Programmed Amount = Contract Price Only (do not include Agent Fees and 3rd Party Costs)
Exposure = Requested/Pending Changes (Discretionary & Non-Discretionary)
Changes do not include Award Options
SCHEDULE
High RiskSchedule updates exceed 30-days past initial schedule date/likely to result in impact to schedule; and will result in cost growth
Moderate RiskSchedule updates exceed 30-days past initial schedule date/may impact schedule and may result in cost growth
Low RiskSchedule updates exceed 30-days past initial schedule date/impact to schedule and cost nomimal
UFGS 01 32 00.10 Progress Schedules
Earnings = Progress Payments: Amount Paid to Date (RMS Guide Part 6; see "Requested CLIN earnings"
Progress payments: based on the value of acceptable work the Contractor has placed from one pay period to the next. That is, a Contractor is paid according to the percentage or quantity of work that has been satisfactorily completed, or partially completed as the case may be.
FAR 46.501Conditional Acceptance = receive "Interim" RP/RPIE/PP IBE DD Form 1354s; known as "Placed in Service"
UFC 1-300-08Final Acceptance = receive "revised" RP/RPIE/PP IBE DD Form 1354s; known as "Construction Complete"
UFC 1-300-08Contract Complete = receive "final" RP/RPIE DD Form 1354s (end of warranty phase)
PP Final Acceptance = "Open for Business"
Progress48 USC 52-.236-15: Schedules for Construction Contracts: progress chart to indicate % of work scheduled for completion by any given date
FAR 52.236-15 Schedules for Construcion Contracts
PreliminaryPreliminary Project Schedule: Due within 5-days after work commences or as determined by the KO
ProgressProgress chart to indicate percentage of work schedule for completion by a given date
USACE MILESTONES (UFGS 01 32 00.10 Project Schedule)
PreliminaryPreliminary Project Schedule: due within 15-days after the NTP (only shows first 90-days of work)
InitialInitial Project Schedule: Shows entire POP; Due within 42 cal days of Contruction NTP; includes Prefinal inspection and final inspections
UdatesPeriodic Schedule Updates: Updated a minimum 1/mo; includes prefinal inspection and final inspections
Design Schedule (DB/IDBIO) = required for each submittal; fragnet extracted from prelim, initial, updated schedule
Earnings = Progress Payments
NAVFAC MILESTONES (UFGS 01 32 17.00 20 Cost Loaded Network Analysis Schedules (NAS))
Baseline NAS: Due with 30-45 dyas after award (to include design)
Initial=Construction Baseline NAS: due prior to the pre-final design submittal
Look Ahead Schedule:
Updates=Monthly Network Analysis Updates
Closeout (As-Built) Schedule
Substantial Completion (1.10.1.6.6) = point in time when government considers project ready for benefical occupancy
DD Form 1354s due 30-days prior to "Substantial Completion"
Projected Completion: the point when all contract requirements are complete and verified.
Contract Completion Date (CCD): follow projected completion
NAVFAC MILESTONES (UFGS 01 32 16.00 20 Small Project Construction Progress Schedules)
Acceptance: A standardized term used extensively throughout contract and construction governance regardless of Agent (FAR, UFCs, UFGS, and DoD Issuances).
UFC 1-300-08: Work-in-Progress (WIP) – In the context of real property construction, this represents the accumulation of costs by the construction agent that will be billed to the sponsoring entity since project inception. The billed costs are recorded in the corresponding CIP account by the sponsoring entity, but only capitalizable costs. See CIP.

&"Calibri (Body)_x0000_,Bold"&14&K04-022PROJECT STATUS REPORT &"Calibri (Body),Bold"&14&K04-022PROJECT TITLE

PROJECT SPONSOR: DEFENSE HEALTH AGENCY-FACILITIES ENTERPRISE TEMPLATE VERSION: v.02 17 Mar 21

TAB 1 OVERVIEW

1PROJECT INFORMATION
AREPORT DATE25-May-21IPROJECT NUMBERPN12345
BPROJECT TITLEHospital ModernizationJBUILDING NUMBERS5431, 123, 321
CFISCAL YEARFY24KJURISDICTIONAir Force
DPROJECT LOCATIONAlaskaLFACILITY TYPEInpatient Hosp/Med Center
EAPPROPRIATIONMILCONMMULTI-PHASEDYes
FFUNDING TYPEMilitary ConstructionNPROJECT DESCRIPTIONHospital Repair
GWORK CLASSIFICATIONRepairOMARKETAlaska
HINSTALLATION NAMEEIELSON AFBPPROJECT DELIVERY METHODIDBIO
2COST OVERVIEW
APROGRAMMED (TOTAL)[DD Form 1391 Amt]FDESIGN MODS[$ Amount]
BDESIGN CONTRACT/SUBCONTRACT[$ Award Amt]GCONSTRUCTION MODS[$ Amount]
CCONSTRUCTION CONTRACT[$ Award Amt]HPERSONAL PROPERTY (IO) MODS[$ Amount]
DIO/PP CONTRACT/SUBCONTRACT[$ Award Amt]ITRANSITION MODS[$ Amount]
ETRANSITION CONTRACT/SUB[$ Award Amt]JTOTAL MODS TO DATE[$ Amount]
3SCHEDULE OVERVIEW
PHASE: [1 OF X]REVISEDPROPERTY ACCEPT/TRANSITION: [PHASE 1 OF X]REVISED
APERIOD OF PERFORMANCE1530IRP/RPIE CONDITIONAL ACCEPT[Day-Month-Year]
BDESIGN AWARD30-Sep-21JRP/RPIE INTERIM ACCEPTANCE[Day-Month-Year]
CACCEPTED DESIGN (CORRECTED 100%)31-Oct-22KRP/RPIE FINAL ACCEPTANCE[Day-Month-Year]
DCONSTRUCTION AWARD[Day-Month-Year]LPP CONDITIONAL ACCEPTANCE[Day-Month-Year]
ECONSTRUCTION START (NTP)[Day-Month-Year]MPP INTERIM ACCEPTANCE[Day-Month-Year]
FPLACED IN SERVICE DATE[Day-Month-Year]NPP FINAL ACCEPTANCE[Day-Month-Year]
GCONSTRUCTION COMPLETE (OFB)[Day-Month-Year]OTRANSITION START[Day-Month-Year]
HIO/T (PP) AWARD[Day-Month-Year]PTRANSITION COMPLETE[Day-Month-Year]
4SCOPE OVERVIEW
AAWARDED GSF11350BREVISED GSF11625
5RISK OVERVIEW
LEADERSHIP ACTION REQUIREDNUMBER OF RISKS/LEVELSCHEDULE EXPOSURECOST EXPOSURE
A[No or Yes-Name & Title][No. High Risk Items]H[Total Impact to POP][$ Total Cost Exposure]
B[No or Yes-Name & Title][No. Mod Risk Items]M[Total Impact to POP][$ Total Cost Exposure]
C[No or Yes-Name & Title][No. Low Risk Items]L[Total Impact to POP][$ Total Cost Exposure]
6REQUEST FOR INFORMATION OVERVIEW
ARFIs TO DATE[Number]BPAST DUE[Number]
7PROJECT MANAGEMENT
A-PROJECT MANAGEMENT: CONTRACTORS
1BUILDER[Company Name]4BUILDER PROJECT MANAGER[Name & Email]
2DESIGNER OF RECORD[Company Name]5DOR PROJECT MANAGER[Name & Email]
3IO/T SUB/CONTRACTOR[Company Name]6IO/T PROJECT MANAGER[Name & Email]
B-PROJECT MANAGEMENT: DESIGN & CONSTRUCTION AGENT
1PROJECT MANAGEMENT OFFICE[Drop-Down Menu]5PROJECT MANAGER (PM)[Name & Email]
2MEDICAL EXPERTISE OFFICE[Drop-Down Menu]6CONTRACTING OFFICER (KO)[Name & Email]
3ACO OFFICE[Drop-Down Menu]7ADMINISTRATIVE KO (ACO)[Name & Email]
4COR OFFICE[Drop-Down Menu]8CONTRACTING OFFICER REP (COR)[Name & Email]
C-PROJECT MANAGEMENT: DEFENSE HEALTH AGENCY-FACILITIES ENTERPRISE
1DHA-FE BRANCH[Drop-Down Menu]4DHA-FE PROJECT OFFICER[Name & Email]
2DHA-FE REGION[Drop-Down Menu]5DHA-FE PROJECT LEAD[Name & Email]
3DHA-FE AOR[Drop-Down Menu]6DHA-FE PLANNING LEAD[Name & Email]
TERMS
ACOAdministrative KO
AORArea of ResponsibilityThe region of the world in which the work is performed
KPContracting Officer
CORContracting Officer Representative
DORDesigner of Record
FEFacilities EnterpriseThe name of the DHA division responsible for all DoD healthcare facilities
FYFiscal YearThe year the project is appropriated
GSFGross Square Feet
HHigh RiskTBD: 30-days until impact to cost/schedule
IOInitial OutfittingThe act of outfitting the new/newly renovated space; funded with OM-IO dollars
LLow RiskTBD:90-days+ until impact to cost/schedule
MModerate RiskTBD:60-days until impact to cost/schedule
POPPeriod of PerformanceThe time it takes the Contractor and Subcontractors to perform the terms of the contract
PPPersonal PropertyNon-fixed property; funded with OM-IO dollars
PMProject ManagementIndividuals responsible for leadeng their respective teams in the execution of the work
RPReal PropertyFixed building and/or infrastructure; funded with MILCON or OM-SRM dollars
RPIEReal Property Installed EquipmentFixed equipment and/or systems funded with MILCON or OM-SRM dollars
RFIRequest for InformationCorrespondence between Government and Contractor
TTransitionThe act of moving occupants and property, cleaning, property disposition; OM-IO funded
CAConditional AcceptanceConditional Acceptance: FAR term. Also referred to as: “Placed in Service” Date (UFC Term), “Partial Acceptance” Date (Phased Projects) (Agent Term), or “Beneficial Occupancy” or “Early Access” Date (Agent Term)
IAInterim Acceptance
FAFinal AcceptanceAcceptance: A standardized term used extensively throughout contract and construction governance regardless of Agent (FAR, UFCs, UFGS, and DoD Issuances).
CCContract Complete
ADAccepted DesignOpen for Business = DHA Term (Patient Care Starts)
NTPNotice to Proceed
OFBOpen for BusinessSee "Construction Complete"
&"Calibri,Bold"&K04-009TAB 1 OVERVIEW&"Calibri,Bold"&K04-007PROJECT WEEKLY REPORT
&"Calibri (Body),Bold"&K04-015PROJECT TITLE

&"Calibri Light (Headings),Regular"&9&K000000PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&9TEMPLATE VERSION: v.03 25 MAY 21

TAB 2 COST

ACOST LINE ITEM NO.CHANGEPOPDESIGNBUILD RP/RPIEEIPPPTTOTALFAC NODESCRIPTIONNOTES
1BASE BID001[Calendar Days][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][Number][CLIN Title]TPFTemporary Phasing FacilityTemporary Facilities (to include planning/design/outfitting/transition) funded with MILCON/OM-SRM)
2OPTION 1002ND-COIBEIntegrated Building EquipmentPersonal Property greater than $250K funded with "Procurement" appropriations
3OPTION 2003ND-CORPReal PropertyThe Design/Construction of fixed building and infrastructure funded with "MILCON or OM" appropriations
4OPTION 3004ND-CORPIEReal Property Installed EquipmentFixed building equipment funded with "MILCON or OM" appropriations
5OPTION 4005ND-COPPPersonal PropertyPersonal property (non-fixed) funded with "OM" appropriations (aka OM-IOT)
6OPTION 5006ND-COIOInitial OutfittingIO = act of procuring and installing personal property (PP)
7AWARD TOTALS[Calendar Days][$ Award Amt][$ Award Amt][$ Award Amt][$ Award Amt][$ Award Amt][$ Award Amt]TTransition ServicesT = act of moving occupants & property, cleaning, public relations support; disposition of property
BMODIFICATIONSTYPEPOPDESIGNBUILD RP/RPIEEIPPPTTOTALTYPEDESCRIPTIONMODModifications
1MOD 1001ND-EC[Calendar Days][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][D/ND][Facility Type/Name/Dept Name]CRChange Request
2MOD 2002DCLINCost Line Item Number
3MOD 3003ND-ACDesignDesign in includes Real Property, RPIE, EIP, and PP
4MOD 4004ND-GFPCHANGE TYPES
5MOD 5005DDDiscretionary(FAR 52.243-4) Changes resulting from conditions differing from the original design, e.g., new federal

regulation, code, criteria, mission changes, or enhancement. These changes must be directed by a government agency, using/programming command/service, or customer and generally, relate to ease of maintainability, operability, or an enhancement of quality of life for the user (soldier). Reference FAR 52.243-4.

6MOD 6006D-VENDNon-Discretionary
7MOD 7007ND-EDND-ECND-Engineering Change(FAR 52.243-4) Changes, accountable to the U.S. Army Corps of Engineers, which are necessary to remedy deficiencies in the contract plans and specifications (refer to "Changes" Clause – FAR 52.243-4). These changes do not necessarily indicate a Design Deficiency.
8MOD 8008ND-TOWND-COND-Contract Options(FAR 52.214-27) Changes resulting from various reasons such as changes in tax as a result of tax law changes, decrease in inspections, decreases because of inaccurate price or description furnished by the contractor, etc.
9MOD 9009ND-ECND-DSCND-Differing Site Conditions(FAR 52.217-7) Exercised with construction funds after award of the basic contract. The option must be specifically identified in the original Bid Documents. Miscellaneous Changes (FAR 52.214-27) changes in tax law, decrease of inspections, decrease because of inaccurate price or description provided by contractor.
10MOD 10010ND-ACND-VECND-Value Engineering Change(FAR 52.236-2) Subsurface or latent physical conditions at the site which differ materially from those indicated in the contract or unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract and not identified through a normal engineering site investigation.
11MOD TOTALS[Calendar Days][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount]ND-ACND-Administrative Change(FAR 43.101). Change that does not affect the substantive rights of the parties (e.g., a change in the paying office, appropriation data, contractor address change, funding change such as continuing authority civil contracts, etc.). The change MUST be for no cost to the contract price and no time extension.
CCHANGE REQUESTSTYPEPOPDESIGNBUILD RP/RPIEEIPPPTTOTALTYPEDESCRIPTIONND-ASCND-Adverse Security Conditions(FAR 52.249-10) Change in contract price or time that is caused by acts of civil disobedience, war, or other turmoil, that affects the completion or continuation of contract performance, or that unreasonably delays the contractor’s workforce.
1CR1001ND-EC[Calendar Days][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][D/ND][Facility Type/Name/Dept Name]ND-EDND-Excusable Delay No Default(FAR 52.249-10) Change in contract period for weather (including floods), strikes, fires, epidemics, freight embargoes, material or supply shortages, delays of subcontractors or suppliers, and other events which are determined to be beyond the control a without fault or negligence of both the contractor and the subcontractors or suppliers. Change involves time only, no contract cost.
2CR2002DND-GFPND-Govt Furnished Property(FAR 52.245-2 and 52.245-4) Corrections in deficiencies in equipment or property supplied by the Government including delays by the Government in providing GFP.
3CR3003ND-ACND-VEQND-Variations in Est Quantities(FAR 52.212-11) Overruns and underruns of quantities included in the contract. The quantities MUST be listed as Contract Line Items
4CR4004ND-GFPND-SOWND-Suspension of Work(FAR 52.249-2) Temporary work stoppage on all or part of a contract with the intent of restarting work at a later date (Suspensions
5CR5005DND-TOWND-Termination of Work(FAR 52.249-2) Permanent work stoppage on all or part of a contract by deleting a portion of the scope from the contract requirements.
6CR6006D-VEND-CCND-Construction Change(FAR 52.242-4) Changes not falling into one of the other reason codes.
7CR7007ND-EDND-RFQND-Revaluation Foreign Currency
8CR8008ND-TOWIBEUFC 1-300-08: Separate lists of installed building equipment (IBE) (real property) and equipment in place (EIP) (personal property) may be attached to the DD Form 1354 in accordance with Service guidance
9CR9009ND-ECEIPUFC 1-300-08: Equipment in Place (EIP) - This is a special category of personal property (not real property). EIP consists of capital equipment and other nonexpendable equipment of a movable nature that has been fixed in place or attached to real property, but not as an integral part of the facility, and therefore may be severed or removed from a facility without severely damaging, destroying or reducing the usefulness of the facility. EIP is personal property and does not include installed building equipment. It is accounted for on property book records (not real property records). EIP costs may be included as a funded construction cost.
10CR10010ND-AC
11COST EXPOSURE[Calendar Days][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount]
DPOTENTIAL CHANGESPOPDESIGNBUILD RP/RPIEEIPPPTTOTALTYPEDESCRIPTION
1PC 1001ND-GFP[Calendar Days][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][D/ND][Facility Type/Name/Dept Name]
2PC 2002D
3PC 3003D-VE
4PC 4004D
5COST EXPOSURE[Calendar Days][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount]

&"Calibri,Bold"&K04-013TAB 2 COST &"Calibri,Bold"&K04-011PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&K04-015PROJECT TITLE

&"Calibri Light (Headings),Regular"&10PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&10TEMPLATE VERSION: v.03 25 MAY 21

TAB 3 SCHEDULE

ORIGINAL STARTORIGINAL CONTRACT COMPLETIONTOTAL DAYSREVISED DAYS
0PH5-9PERIOD OF PERFORMANCE30-Aug-2129-Aug-2514601530
#PHASEACTIVITYINITIAL MILESTONEUPDATED SCHEDULE MILESTONEDAYS CHANGED% CHANGETERMSNOTES
0PREDESIGNAUTHORIZATION TO AWARD30-Aug-2029-Dec-201211%TPFTemporary Phasing FacilityTemporary facilities used to house medical staff and/or patients during the facility/department renovation process
1DESIGNDESIGN AWARD (DBB)/DESIGN-CONSTRUCTION AWARD (DB/IDBIO)30-Aug-2130-Sep-21313%EIPEquipment in PlacePersonal Property greater than $250K funded with "Procurement" appropriations
2DESIGNDESIGN SUBMITTAL 5% (DBB)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!RPReal PropertyFixed building and infrastructure funded with "MILCON or OM" appropriations
3DESIGNDESIGN SUBMITTAL 20% (DBB)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!RPIEReal Property Installed EquipmentFixed building equipment funded with "MILCON or OM" appropriations
4DESIGNDESIGN SUBMITTAL 35%

Allison Keck: MILCON: This is the "post award" DOR-provided 35% Design (it is not the preaward 35% budget quality estimate required by the Comptroller (aka AACEi Class 3/4/5)

[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!PPPersonal PropertyPersonal property (non-fixed) funded with "OM" appropriations (aka OM-IOT)
5DESIGNDESIGN SUBMITTAL 65%[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!PISPlaced In ServiceSee "Conditional Acceptance"
6DESIGNDESIGN SUBMITTAL 100%[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!IO/TInitial Outfitting/TransitionIO = The act of procuring and installing personal property (PP); T = act of moving occupants & property, cleaning, public relations support; disposition of property
7DESIGNDESIGN SUBMITTAL 100% CORRECTED (ACCEPTED DESIGN) (DRAFT DD FORM 1354s & 250s)30-Aug-2231-Oct-22622%CPConstruction Complete
8DESIGNSUBMITTAL 7 ("REFRESH")[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!OFBOpen for Business
9PRECONPRECONSTRUCTION SUBMITTALS[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!FAR 36.515 Schedules for Construction Contracts
10PRECONGOVERNMENT TRAILER IN PLACE[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!Acceptance: A standardized term used extensively throughout contract and construction governance regardless of Agent (FAR, UFCs, UFGS, and DoD Issuances).
11PRECONTEMPORARY PHASING FACILITIES IN PLACE[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!Conditional Acceptance: FAR term. Also referred to as: “Placed in Service” Date (UFC Term), “Partial Acceptance” Date (Phased Projects) (Agent Term), or “Beneficial Occupancy” or “Early Access” Date (Agent Term)
12CONST PH 1CONSTRUCTION AWARD (DBB)/CONSTRUCTION START (NOTICE TO PROCEED)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!Real Property Conditional Acceptance (aka “Beneficial Occupancy” or “Early Access”) is governed by FAR 52.236-11 Use and Possession Prior to Completion
14CONST PH 1IO/T (PP) AWARD/START[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!Red Text = Milestones Required for 2851 Reports
15CONST PH 1RP/RPIE CONDITIONAL ACCEPTANCE (Interim DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!Open for Business = DHA Term (Patient Care Starts)
16CONST PH 1EIP CONDITIONAL ACCEPTANCE (Interim DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!Disposition = To dispose of or excess property via formal channels
17CONST PH 1PP CONDITIONAL ACCEPTANCE (Interim DD Form 250s)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
18CONST PH 1WARRANTY STARTS[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!FARREFERENCES: ACCEPTANCE
19CONST PH 1RP/RPIE INTERIM ACCEPTANCE (Revised DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!46FAR 46.101 Quality Assurance
20CONST PH 1EIP FINAL ACCEPTANCE (PROCUREMENT) (Revised DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!46FAR 46.501 Acceptance, General
21CONST PH 1BENEFICIAL OCCUPANCY DATE/PLACED IN SERVICE DATE (CONDITIONAL ACCEPTANCE)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!52FAR 52.246-21 Warranty of Construction
22CONST PH 1PP INTERIM ACCEPTANCE (Revised DD Form 250s)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!52FAR 52.236-11 Use and Possession Prior to Completion
23CONST PH 1TRANSITION START[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!246DFARS 246.270-2 Policy, Safety & Habitability Inspection
24CONST PH 1TRANSITION COMPLETE (OPEN FOR BUSINESS)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!UFC 1-300-08 Criteria and Transfer and Acceptance of Real Property
25CONST PH 1CONSTRUCTION COMPLETE[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!DODI 5000.64 Accountability and Management of DoD Equipment
26CONST PH 1DISPOSITION OF PROPERTY COMPLETE[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!UFGS 01 45 00 Quality Control, See Acceptance
27CONST PH 2CONSTRUCTION START - PHASE 2[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!EP 415-1-260 Area/Resident Engineer Management Guide
28CONST PH 2RP/RPIE CONDITIONAL ACCEPTANCE (Interim DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
29CONST PH 2EIP CONDITIONAL ACCEPTANCE (Interim DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!FAR 46.101 Definitions, Acceptance = assumes ownership of existing identified supplies tendered or approves specific services rendered as partial or complete performance of the contract.
30CONST PH 2PP CONDITIONAL ACCEPTANCE (Interim DD Form 250s)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!FAR 46.1010 Conditional Acceptance of supplies or services that do not conform to contract quality requirements, or are otherwise incomplete, that the contractor is required to correct or otherwise complete by a specified date
31CONST PH 2WARRANTY STARTS[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!UFC 1-300-08: The interim DD Form 1354 will include actual project costs to be capitalized as reflected in the CIP account by RPUID. It includes costs such as P&D, SIOH, and construction contracts.
32CONST PH 2RP/RPIE INTERIM ACCEPTANCE (Revised DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
33CONST PH 2EIP FINAL ACCEPTANCE (PROCUREMENT) (Revised DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
34CONST PH 2BENEFICIAL OCCUPANCY DATE/PLACED IN SERVICE DATE (CONDITIONAL ACCEPTANCE)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
35CONST PH 2PP INTERIM ACCEPTANCE (Revised DD Form 250s)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
36CONST PH 2TRANSITION START[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
37CONST PH 2TRANSITION COMPLETE (OPEN FOR BUSINESS)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
38CONST PH 2CONSTRUCTION COMPLETE[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
39CONST PH 2DISPOSITION OF PROPERTY COMPLETE[Day-Month-Year][Day-Month-Year]ERROR:#VALUE!ERROR:#VALUE!
40CONST PH3+CONSTRUCTION START[Day-Month-Year][Day-Month-Year]ERROR:#VALUE![% Change]
41CLOSEOUTCLOSEOUT SUBMITTALS[Day-Month-Year][Day-Month-Year]ERROR:#VALUE![% Change]
42CLOSEOUTRP/RPIE CONTRACT COMPLETE (Final DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE![% Change]
43CLOSEOUTEIP CONTRACT COMPLETE (Final DD Form 1354 Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE![% Change]
44CLOSEOUTPP CONTRACT COMPLETE (Final DD Form 250s Received)[Day-Month-Year][Day-Month-Year]ERROR:#VALUE![% Change]
45CLOSEOUTONE-YEAR WARRANTY PERIOD ENDS[Day-Month-Year][Day-Month-Year]ERROR:#VALUE![% Change]

&"Calibri (Body),Bold"&K04-013TAB 3 SCHEDULE &"Calibri (Body),Bold"&K04-012PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&K04-019PROJECT TITLE

&"Calibri Light (Headings),Regular"&9PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&9TEMPLATE VERSION: v.03 25 MAY 21

TAB 4 SCOPE

#CLINBUILDINGDEPARTMENTGROSS SQUARE FEETLEVEL OF ALTERATIONTYPE OF SPACENOTES
AWARDREVISEDPROPOSEDREVISEDPROPOSEDREVISEDTYPE OF SPACELEVELS OF ALTERATION
15431Surgery, Inpatient Pscyh, Imaging10000102503H MCInpatient Hosp/Med Center1
2123Demolish MRI Facility650650NAMC (A)Medical Clinic (attached)2
3321MRI (EIP-Procurement)700725NAMC (F)Medical Clinic (freestanding)3
4MO/AMed Office/AdminNA
5BHMental/Behavioral Health Clinic
6VVeterinary Clinic
7PGParking Garage
8DCDental Clinic
9PharPharmacy (freestanding)
TOTAL1135011625Lab (F)Medical Lab (freestanding)
BEEBEE/EPMU
WMedical Warehouse
ETMed Educ/Training

&"Calibri (Body),Bold"&K04-015TAB 4 SCOPE &"Calibri,Bold"&K04-015PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&K04-022PROJECT TITLE

&"Calibri Light (Headings),Regular"&10PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&9TEMPLATE VERSION: v.03 25 MAY 21

TAB 5 RISK

#LEVEL OF RISKDATE ENTEREDPLANNED RESOLUTIONRESOLVEDEST IMPACT TO CRITICAL PATHEST IMPACT TO COSTRISK TYPERISK & PLAN TO MITGATEACTION POCNOTES
1HIGH[1-Feb-21][1-Feb-21][1-Feb-21][Calendar Days][Dollar Value][Owner/Contractor][Description][Name/Email]HIGH30-days until impact to cost/schedule
2MODERATEMODERATE60-days until impact to cost/schedule
3LOWLOW90-days+ until impact to cost/schedule
4NO IMPACTNo Risk to Cost or Schedule (i.e. Administrative Changes)
5POCPoint of Contact accountable to act on the risk
6OwnerGovernment
7Mitigate = to reduce the impact on cost, schedule, quality, scope
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

&"Calibri (Body),Bold"&K04-019TAB 5 RISK &"Calibri,Bold"&K04-017PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&K04-022PROJECT TITLE

&"Calibri Light (Headings),Regular"&9PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&10TEMPLATE VERSION: v.03 25 MAY 21

TAB 6 RFI LOG

#RFI NOTITLEACTIONSUBMITTEDDATE DUEPAST DUEURGENCYNOTES
1[No][RFI Title][Name, Title, Email][Date][Date][No of Days]HIGHHIGH30-days until impact to cost/schedule
2MODERATEMODERATE60-days until impact to cost/schedule
3LOWLOW90-days+ until impact to cost/schedule
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

&"Calibri (Body),Bold"&K04-016TAB 6 RFI LOG &"Calibri,Bold"&K04-017PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&K04-022PROJECT TITLE

&"Calibri Light (Headings),Regular"&10PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&10TEMPLATE VERSION: v.03 25 MAY 21

TAB 7 PROJECT MGT DISTRO

#POSITIONAGENCYNAMEADDRESSE-MAILELECTRONICHARD COPIES
SUBMITTALSALL BINDERS & COLOR BOARDSIO/T DEPT BINDERSSUBMITTALS
1CONTRACTING OFFICERAGENT[Name][Address][Email]1000
2ADMIN CONTRACTING OFFICERAGENT[Name][Address][Email]1001
3PROJECT MANAGERAGENT[Name][Address][Email]1010
4CONTRACTING OFFICER REPAGENT[Name][Address][Email]1111
5QUALITY ASSURANCE EVALUATORAGENT[Name][Address][Email]1001
6MEDICAL SUPPORT/EXPERTISE CTRAGENT[Name][Address][Email]1100
7PROJECT ADMINISTRATORDHA-FE[Name]Send all hard copy submittals to: DHA-FE Project Administrator [Name, Email, Address, Phone Number][Email]1111
8PROJECT OFFICER (AD/GS)DHA-FE[Name][Email]1000
9PROJECT LEAD (CONTRACTOR)DHA-FE[Name][Email]1000
10FACILITY/CLINICAL PLANNERDHA-FE[Name][Email]1000
11ARCHITECTURAL PLANNERDHA-FE[Name][Email]1000
12IO/TRANSITION COORDINATORDHA-FE[Name][Email]1110
13EQUIPMENT REPDHA-FE[Name][Email]1000
14COMMUNICATIONS/CYBER REPDHA-FE[Name][Email]1000
15INTERIOR DESIGNDHA-FE[Name][Email]1000
16ARCHITECTURAL REPDHA-FE[Name][Email]1000
17MECHANICAL REPDHA-FE[Name][Email]1000
18ELECTRICAL REPDHA-FE[Name][Email]1000
19FIRE PROTECTION REPDHA-FE[Name][Email]1000
20CIVIL/STRUCTURAL REPDHA-FE[Name][Email]1000
21COMMISSIONING REPDHA-FE[Name][Email]1000
22MTF FACILITY MANAGERMTF[Name][Address][Email]1111
23LOGISTICS MANAGERMTF[Name][Address][Email]1010
24INFORMATION SYSTEMSMTF[Name][Address][Email]1010
25AUTHORITY HAVING JURISDICTIONINSTALLATION[Name][Address][Email]1000
26COMMUNICATIONSINSTALLATION[Name][Address][Email]1000
27CIVIL WORKS/ENGINEERSINSTALLATION[Name][Address][Email]1001
28TOTAL27576
29* Electronic Submittals include Submittal Deliverables, Color Boards, and Binders
30
31
32

&"Calibri,Bold"&K04-018TAB 7 PROJECT MANAGEMENT/DISTRIBUTION &"Calibri,Bold"&K04-017PROJECT WEEKLY REPORT &"Calibri,Bold"&K04-020PROJECT TITLE

&"Calibri Light (Headings),Regular"&9PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&9TEMPLATE VERSION: v.03 25 MAY 21

TERMS AND DROP DOWN MENUS

MARKET AREAINSTALLATION NAMESPROJECT LOCATIONRESPONSIBLE BRANCHWORK CLASSIFICATIONAGENT MEDICAL SUPPORT OFFICESAGENTSEXISTING CONDITIONS: DRAWINGS, SURVEYS & REPORTSPROJECT REQUIREMENT DEVELOPMENT
NATIONAL CAPITAL REGIONRICDABERDEEN PG - USAMRICDALAlabamaCSMCapital Strategy ManagementRRepairMXMX-Center of ExcellenceUSACEUSACE-DISTRICTSPrevious Project Documentation: Record Documents
NATIONAL CAPITAL REGIONABERABERDEEN PV GRD-PH CENTERAKAlaskaDCADesign Construction ActivationMMaintenanceMFDOMedical Facility Planning OfficeCE-POAAlaska District-USACERecord SpecificationsFunctional Program/Concept of Operations
THAILANDAFBKAFRIMS BANGKOKAZArizonaFOB OM-PMFOB Project ManagementCConstructionNANot ApplicableCE-SPAAlbuquerque District-USACERecord Drawings (As-Builts)Not Applicable
THAILANDAFPHAFRIMS PHILIPPINESARArkansasFOB-EDFOB Engineering & DesignDDemolitionOOtherCE-NABBaltimore District-USACERecord O&M ManualsProgram for Design (PFD)
CENTRAL OKLAHOMAALTUALTUS AFBCACaliforniaFOB SRM-PMFOB SRM Portfolio ManagementCE-LRBBuffalo District-USACERecord Test & Certification ReportsContingency Mode Operations (CMO)
NATIONAL CAPITAL REGIONADRWANDREWS AIR FORCE BASECOColoradoFOB-OMFOB Ops & MaintenancePROJECT DESCRIPTIONAGENT FEESCE-SACCharleston District-USACEOtherOther
SOUTHWEST GEORGIAANNIANNISTON ARMY DEPOTCTConnecticutFMBFinancial ManagementSingle System Infrastructure2.50%Planning & DesignP&DCE-LRCChicago District-USACEAllAll
NATIONAL CAPITAL REGIONAPGRAPG/EA AREADEDelawareSABStaff & Admin BranchMulti-System Infrastructure5.70%USACE Supervision & AdminstrationS&ACE-LREDetroit District-USACEFunctional: Surveys & Reports
NORTHERN ITALYAANXAVIANO AIR BASEFLFloridaRPMReal Property MgmtSingle Dept Alteration6.50%USACE Supervision & Adminstration-OCOUNSS&ACE-EUEurope District-USACENot ApplicableArchitectural Requirements
NORTHERN ITALYAMAIAVIANO AIR BASEGAGeorgiaMTFMedical Treatment FacilityMulti-Dept Alteration1.50%Design, During ConstructionDDCCE-POFFar East District-USACEMission Essential Assessment (MEA)Not Applicable
CENTRAL EUROPEBGRAB-GRAFENWOEHR TOWER BCKSHIHawaiiOtherOtherSingle Dept AdditionPost Construction Award ServicesPCASCE-SWFFort Worth District-USACESafety Risk Assessment (SRA)Non-Permanent & Temporary Facilities (Div 1)
CENTRAL EUROPEBHOHB-HOHENFELS TR AREAIDIdahoNANot ApplicableMulti-Dept Addition2.00%Commissioning AgentCXACE-SFGGalveston District-USACEEnvironment of Care ReportSustainability & Energy Efficient Design (Div 1)
CENTRAL EUROPEBKATB-KATTERBACH KASERNEILIllinoisGEOGRAPHIC TEAMSingle Facility Replacement0.50%USACE Center of ExpertiseMXCE-POHHonolulu District-USACEMaterial Handling & Transporation StudyDemolition, Remediation & Disposition (Div 2)
CENTRAL EUROPEBSHIB-SHIPTON KASERNEINIndianaEEastMulti-Facility Replacements1.00%Earned Value Management SystemGEVMSCE-LRHHuntington District-USACEFood Service StudyCabinetry (Div 6)
CENTRAL EUROPEBPANB-STUTTGART-PANZER KASERNIAIowaWWestBuild to Lease8%NAVFAC Supervision, Inspection, OverheadeSIOHCE-HNCHuntsville Ctr -USACETemporary Facilities /Swing Space SurveyRoofing & Envelope (Div 7)
CENTRAL EUROPEBPATB-STUTTGART-PATCH BCKSKSKansasMModernizationLease Only1%In-House Staff (Contractors)HISCE-SAJJacksonville District-USACEOtherDoors & Windows (Div 8)
CENTRAL EUROPEBVILB-VILSECK ROSE BARRACKSKYKentuckyPPacificOtherCE-POJJapan Engineer District-USACEAllExterior Finishes (Div 9)
SAN DIEGOBALBBALBOALALouisianaEUEuropeTRANSITION COSTSCE-NWKKansas City District-USACEEnvironmental: Surveys & ReportsExterior Signage, Partitions, Storm Shutters (Div 10)
BARKSDALE AFBBARKBARKSDALE AFBMEMaineAPPLICABLE CRITERIALevel of complexity – use price per sq ft based on occupancy:CE-SWLLittle Rock District-USACENot ApplicablePreFab Systems, Shielding & Bracing (Div 13)
BEALE AFBBEALBEALE AFBMDMarylandFISCAL YEARDHA-FEDHA-FE2%L1 – General Office (RMO, TOPA, Education & Training, Public Health, etc.)CE-LRLLouisville District-USACEHazardous Material: Report (NEPA)Anti-Terrorism & Physical Security (Div 34)
NBHC FORT WORTHFTWRBHC FORT WORTH TEXASMAMassachusettsFY19Fiscal Year 2019AArmy3%L2 – Clinic Space & Heavy Office (Mental Health, Family Health, Women’s Health, TOPA, Medical Records, etc.)CE-MVMMemphis District-USACEOtherAccessibility
CORPUS CHRISTIKINGBHC KINGSVILLE TEXASMIMichiganFY20Fiscal Year 2020NNavy5%L3 – Complex – Heavy Equipment Areas (OR, Radiology, Optometry, Dental, Lab, Emergency Dept, Physical Therapy, etc.)CE-MEMiddle East District-USACEArchitectural: Surveys & ReportsSound Transmission
NATIONAL CAPITAL REGIONANNABLDG 695 NHC ANNAPOLISMNMinnesotaFY21Fiscal Year 2021AFAir ForceFactors to consider that increase cost:CE--SAMMobile District-USACENot ApplicableDetention Rooms
CENTRAL KENTUCKYBGADBLUE GRASS ARMY DEPOTMSMississippiFY22Fiscal Year 2022VAVeteran Affairs· # of phasesCE-LRNNashville District-USACEWorld-Class Features (Checklist)Security Sensitive Spaces
NATIONAL CAPITAL REGIONPHILBMC PHILADELPHIA PNBCMOMissouriFY23Fiscal Year 2023LLease· # of moves per departmentCE-NAENew England District-USACESustainability: Design FeaturesOther
NATIONAL CAPITAL REGIONNSAWBMC WASHINGTON NAVY YARDMTMontanaFY24Fiscal Year 2024OOther· # of trips to site for TPCE-MVNNew Orleans District-USACEForce Protection: Situation ReportAll
NATIONAL CAPITAL REGIONBOLLBOLLING AFBNENebraskaFY25Fiscal Year 2025· % of reuse vs. new FFE/LVSCE-NANNew York District-USACEPhysical Security Assessment
COLORADOBUCKBUCKLEY AFBNVNevadaFY26Fiscal Year 2026· Contingency %CE-NAONorfolk District-USACEDrawings: Construction & Demo BoundariesInterior Design Requirements
JACKSONVILLENASJBUMED HQNHNew HampshireFY27Fiscal Year 2027PROCUREMENT TEMPLATE· Weekend moves vs. weekdayCE-NOWOmaha District-USACEOtherNot Applicable
NATIONAL CAPITAL REGIONBUMDBUMED HQNJNew JerseyFY28Fiscal Year 2028DOR+IOTDOR ONLY + IOT· Move within facility vs. load on truckCE-NAPPhiladelphia District-USACEAllProject Room Contents List (PRCL) (FF)
GREAT LAKESMOFFCAMMOFNMNew MexicoFY29Fiscal Year 2029DB+IOTDB + IOT· Specialty 3rd party equipment moves (not de-install/re-install done by vendor)CE-LRPPittsburgh District-USACEInterior Design: Surveys & ReportsInterior Finishes (Div 9)
CENTRAL KENTUCKYATTECAMP ATTERBURYNYNew YorkFY30Fiscal Year 2030IDBIOIDBIO· DRMO – how far away is the facility?CE-NWPPortland District-USACENot ApplicableSignage, Fixtures, Storage (Div 10)
CENTRAL KENTUCKYATTECAMP ATTERBURYNCNorth CarolinaNANot Applicable· Does Facility have upper floors without elevators or limited to a small passenger elevatorCE-MVRRock Island District-USACEPersonal Property Inventory ReportFurnishings & Furniture (Div 12)
SAN ANTONIOBULLCAMP BULLISNDNorth DakotaAPPROPRIATION ($)CE-SPKSacramento District-USACEReal Property Inventory ReportArtwork (Div 12)
SAN ANTONIOCBTACAMP BULLISOHOhioO&MOperations & MaintenanceREQUIRED/MISCPROJECT DESCRIPTION% OF EST CONTRACT COSTCE-SPNSan Francisco District-USACEMTF Furniture/Casework/Signage Standards ListComprehensive Interior Design (CID)
SAN ANTONIOCBTACAMP BULLIS -AMEDD C&SOKOklahomaMILCONMilitary ConstructionYYesIOTPROCURMNTCE-SASSavannah District-USACEOtherStructural Interior Design (SID)
KOREACARRCAMP CARROLLOROregonPProcurementNNoACC-RPAmbulatory Care Center Replacement17.0%6.0%CE-NWSSeattle District-USACEAllOther
KOREACARRCAMP CARROLL - MRMCPAPennsylvaniaHNHost NationNANot ApplicableACC-RAmbulatory Care Center Repair20.0%5.0%CE-MVSSt. Louis District-USACEMedical Devices & Equipment: Surveys & ReportsAll
KOREACASECAMP CASEYRIRhode IslandRDT&EResearch & DevelopmentMcL-RClinic Repair10.0%1.5%CE-MVPSt. Paul District-USACENot Applicable
OKINAWA ISLANDSCOURCAMP COURTNEY-6029SCSouth CarolinaOtherOtherAGENCYDC-RDental Clinic Repair20.0%5.0%CE-TACTransatlantic Afghanistan District-USACEPersonal Property Inventory ReportMedical Devices and Equipment Requirements
OKINAWA ISLANDSFOSTCAMP FOSTER-6044SDSouth DakotaDHA-FEFacilities EnterpriseDC-RPDental Clinic Replacement17.0%4.0%CE-SWTTulsa District-USACEReal Property Inventory ReportNot Applicable
SOUTHWEST GEORGIAFKMRCAMP FRANK MERRILLTNTennesseeFUNDING TYPE ($)USACEArmy Corps of EngineersH-RPHospital Replacement15.0%1.5%SC-MVKVicksburg District-USACEMTF Medical Device/Equipment Standards ListProject Room Contents List (PRCL)
NORTH CAROLINA COASTGEIGCAMP GEIGERTXTexasSSustainmentNAVFACNavy Facilities CommandH-RHospital Repair15.0%5.0%CE-NWWWalla Walla District-USACEOtherMedical Devices & Equipmen t(Div 11)
OKINAWA ISLANDSHNSNCAMP HANSEN-6011UTUtahRRestorationAFCECAF Civil EngineersMD-RMedical /Dental Clinic Repair15.0%2.0%CE-SAWWilmington District-USACEAllPrefabricated Equipment (Div 13)
KOREAHUMPCAMP HUMPHREYSVTVermontMModernizationVAVeteran AffairsMD-RPMedical /Dental Clinic Replacement15.0%2.0%NAVFACNAVAC: REGIONAL COMMANDCommunications: Surveys & ReportsProcurement Equipment (Div 11)
NORTH CAROLINA COASTCPJOCAMP JOHNSONVAVirginiaMILCONMilitary ConstructionHHSHealth & Human ServicesMA-RMedical Admin Repair20.0%1.5%NAV-EUNAVFAC Atlantic (EU)Not ApplicableOther
OKINAWA ISLANDSKINSCAMP KINSER-6056WAWashingtonOtherOtherGSAGeneral Services AgencyMA-RPMedical Admin Replacement20.0%1.5%NAV-MANAVFAC Atlantic (Mid-Atlantic)Personal Property Inventory ReportAll
OKINAWA ISLANDSLESTCAMP LESTER - 6043WVWest VirginiaPHSPublic Health ServiceMC-RMedical Center Repair15.0%1.5%NAV-NWNAVFAC Atlantic (NW)Real Property Inventory Report
SAN DIEGOCPENCAMP PENDLETONWIWisconsinWORK CLASSIFICATIONOtherOtherMC-RPMedical Center Replacement15.0%0.0%NAV-SENAVFAC Atlantic (SE)MTF Comm/Automation Standards ListCommunication Requirements (IM/IT)
OKINAWA ISLANDSSCHWCAMP SCHWAB-6009WYWyomingRRepairNANot ApplicableMcL-RPMedical Clinic Replacement7.5%0.0%NAV-SWNAVFAC Atlantic (SW)Communications Security AssessmentNot Applicable
KOREAWALKCAMP WALKERBABahrainMMaintenanceOOther (i,e Vet Clinc)10.0%1.0%NAV-WANAVFAC Atlantic (WA)OtherCommunications (IM/IT) Checklist
JAPANZAMACAMP ZAMA _ JAPANBEBelgiumCConstructionPERFORMANCE FORMSRLResearch Labs10.0%0.0%NAV-FENAVFAC Pacific (Far East)AllMonitoring & Cybersecurity (Div 25)
GREAT LAKESCMPRCAMPORCUCubaDDemolitionCCASSConstruction Contractor Appraisals Support SystemNAV-HINAVFAC Pacific (HI)Mechanical: Surveys & ReportsElectronic Security Systems (Div 28)
HAWAIICPSICAMSMIGEGermanyCPARSContractor Performance Assessment Reporting SystemNAV-MNAVFAC Pacific (Marianas)Not ApplicableFire Detection Systems (Div 28)
CANNON AFBCANNCANNON AFBGRGreeceREAL PROPERTY JURISDICTIONACASSA-E Contract Admin Support SystemNAV-WFSpecialty Centers (Warfare)Existing Mechanical/HVAC/ReportOther
GREAT LAKESLOVECAPT JAMES A. LOVELL FHCCGUGuamAArmyIDBIO-PFDHA-FE IDBIO Performance FormNAV-MiscSpecialty Centers (Crane)Drawings: Existing HVACAll
CARLISLE BARRACKSCBRKCARLISLE BARRACKSITItalyNNavyIOT-PFDHA-FE IOT Performance FormAFCECAFCEC: REGIONHVAC/Med Gas/Plumbing Commissioning Reports
LOW COUNTRYCHARCHARLESTON AFBJAJapanAFAir ForceAPFDHA-FE Agent Performance FormAF-CFMAFCEC-Mobility/Support ForcesOtherMechanical Requirements
LOW COUNTRYCHARCHARLESTON AFBKRKoreaVAVeteran AffairsCPFDHA-FE Contracting Activity Performance FormAF-CFSAFCEC-Strategic Design & Construction (CFS)AllNot Applicable
TIDEWATERCHENCHEANNPRPuerto RicoLLeaseNANot ApplicableAF-CFPAFCEC-Pacific (CFP)Fire Protection: Surveys & ReportsElevators & P-Tubes (Div 14)
COLUMBUS AFBCLMBCOLUMBUS AFBSGSingaporeOOtherAF-CFEAFCEC-Europe (CFE)Not ApplicablePlumbing & Med Gas (Div 22)
JAPANCHINCOMFLEACT CHINHAE KSESSpainPROJECT DELIVERY METHODAF-CFTAFCEC-Technical Services (CFT)Life Safety SurveyAutomatic Guided Vehicle Systems (Div 41)
OKINAWA ISLANDSWHBHCOMFLEACT OKINAWA JATUTurkeyFACILITY TYPEDBB + IOTD-B-B+IOT: Design Contract + Construction Contract + IOT ContractVAREGIONStatement of Conditions (SOC)Process Gas & Liquid Handling Equipment (Div 43)
JAPANSASECOMFLEACT SASEBO JAUKUnited KingdomH MCInpatient Hosp/Med CenterDB + IOTDB+IOT: Design-Build Contract + IOT ContractVA-EVA CFM-East (MD)Water Flow Test (Fire Pump)Pollution & Waste Control Systems (Div 44)
JAPANHAIOCOMFLEACT SASEBO JA-HHOOtherMC (A)Medical Clinic (attached)IDBIOIDBIO: Single Design-Build Contract incl IOTNON-PERSONAL SERVICE CONRACTSVA-WVA CFM-West (CA)Fire Protection Commissioning ReportsWater & Wastewater (Div 46)
JAPANYOKOCOMFLEACT YOKOSUKA JAMC (F)Medical Clinic (freestanding)DBB OnlyDBB no IO&TNot ApplicableVA-CVA CFM-Central (IL)OtherOther
LAS VEGASCRCHCREECH AFBPROJECT PHASESMO/AMed Office/AdminDB OnlyDB no IO&TOn-Site Project Lead (Contractor)VA-DCVA CFM - Central (DC)AllAll
NATIONAL CAPITAL REGIONDLGRDAHLGRNANot ApplicableBHMental/Behavioral Health ClinicOTHEROtherOn-Site IO/T Coordinator (Contractor)GSAREGIONElectrical: Surveys & Reports
DAVIS-MONTHAN AFBDVMNDAVIS-MONTHAN AFBPH0Work InductionVVeterinary ClinicHealthcare PlannerGSA-1GSA-Region 1 | New EnglandNot ApplicableFire Protection Requirements
FILLMORE-NEW CUMBERLANDDDDSDEFENSE DISTRIB DEPOT SUSPH1Project ValidationPGParking GarageACQUISITION TYPEArchitectGSA-2GSA-Region 2 | Northeast & CaribbeanElectrical: Surveys & ReportsNot Applicable
CENTRAL KENTUCKYDTAWDETROIT ARSENAL-WARRENPH2Project PrioritizationDCDental ClinicCONTRACT NEGOTIATION TYPEInterior DesignerGSA-3GSA-Region 3 | Mid-AtlanticElectrical Commissioning ReportsFire Suppression Systems (Dvi 21)
TIDEWATERDNEKDNECKPH3Project management & Acquisition PlanningPharPharmacy (freestanding)BV-LPTABest Value Low Price Technically AcceptableEquipmentGSA-4GSA-Region 4 | Southeast SunbeltOtherFire Detection Systems (Div 28)
NATIONAL CAPITAL REGIONBETHDOSIMETRY CT-BETHESDA, MDPH4ARequirements PlanningLab (F)Medical Lab (freestanding)BV-TOBest Value Trade OffTransitionGSA-5GSA-Region 5 | Great LakesAllOther