Past Performance Questionnaire.pdf

PDF 118 KB Posted

Attached to
Building 99 of Misawa Air Base Hospital Initial Outfitting Project
Solicitation number
W9127S22Q6001
Issued by

About this file

This document includes a past performance questionnaire for evaluation of contractor performance on federal projects, as well as details of a solicitation for an initial outfitting project at Building 99 of Misawa Air Base Hospital in Japan.

The solicitation seeks quotes for the initial outfitting of Building 99 of Misawa Air Base Hospital, with a response deadline of December 6, 2021. The requirement is set aside for small businesses with a NAICS code of 337127 and size standard of 500 employees. The project involves furnishing, installing, and commissioning medical equipment and architectural, mechanical, electrical, and telecommunications systems. Relevant documents include the statement of work, drawings, specifications, furniture cut sheets, and a past performance questionnaire for evaluation of offerors' experience. The federal agency issuing this opportunity is the Department of the Army Corps of Engineers Engineering District Little Rock.

View the file

Other files

File Type Posted
U JSN Specs FIO_V2.pdf PDF
W9127S22Q6001 AMENDMENT 0005.pdf PDF
W9127S22Q6001 - ProjNet information.pdf PDF
W9127S22Q6001 AMENDMENT 0004.pdf PDF
W9127S22Q6001 AMENDMENT 0003.pdf PDF
W9127S22Q6001 AMENDMENT 0002.pdf PDF
W9127S22Q6001 AMENDMENT 0001.pdf PDF
GC Schedule.pdf PDF
W9127S22Q6001 Misawa Hospital Modernization IO Bid Schedule.xlsx XLSX spreadsheet
W9127S22Q6001 Solicitation.pdf PDF
FRCS FAT SAT Checklist.pdf PDF
DHA System-Level Continuous Monitoring Plan 23MAY2018.pdf PDF
MABH-FFE-Package.pdf PDF
PN99822_FP_Misawa Hospital Addition and Alteration_V2.0 (22 Feb 21).pdf PDF
MABH-SID-Package-Vol1.pdf PDF
MABH-SID-Package-Vol2.pdf PDF
10 MABH-Electrical.pdf PDF
11 71 01.pdf PDF
Misawa Existing Inventory (G) 2JUN2021.xlsx XLSX spreadsheet
06 MABH-Equipment.pdf PDF
SPD cut sheets_2019_1120.pdf PDF
Specifications_Volume 1_Addendum 02.pdf PDF
DHA FRCS Baseline Categorization Memorandum-1 October 2020 (1).pdf PDF
10 MABH-Telecom Drawings ONLY.pdf PDF
BoDEquipmentCutSheets-LogCAT A FIO.pdf PDF
DHA System-Level Continuous Monitoring Plan 23MAY2018.xlsx XLSX spreadsheet
07 MABH-FireProtection.pdf PDF
05 MABH-Interiors.pdf PDF
Misawa PRCL 21OCT21.pdf PDF
Example Generic ICS Med-COI Boundary Diagram v4.pdf PDF
01 MABH-General.pdf PDF
FRCS-VRA Ver 2.0.docx DOCX document
MABH-SID-Package-Vol3.pdf PDF
Misawa DHA-FE Submittal List_10.27.21.xlsx XLSX spreadsheet
DHA-ACAS Scanning Requirements_Read Only 06.17.21.pdf PDF
Misawa Artwork Best Practices 10.29.21.pdf PDF
Draft DHA PM Standard Isolation Architecture for Cybersecurity of FRCS.DOCX DOCX document
Misawa Furniture and Finishes Best Practices 10.29.21.pdf PDF
SOW - FY21 Misawa Requirements Document_20211029 v14.docx DOCX document
LVS Division 27 - DHA Specification_Standard 06.14.21.pdf PDF
Misawa JSN summary 21OCT21.xlsx XLSX spreadsheet
Specifications_Vol 2_Addm 01.pdf PDF
DHA-FE Weekly Report_Template_20210524.xlsx XLSX spreadsheet
W9127S22Q6001 Solicitation.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC / USACE Past Performance Questionnaire (PPQ) Form PPQ -0 (9/30/11)

APPENDIX 15-1, Page 4 of 7 01 November 2014

UAI VERSION 3

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE requests that the client completes this questionnaire and submits directly back to the offeror.

The offeror will submit the completed questionnaire to USACE with their proposal, and may duplicate this questionnaire for future submission on USACE solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to USACE. Please contact the offeror for USACE POC information. The Government reserves the right to verify any and all information on this form.

APPENDIX 15-1, Page 5 of 7 01 November 2014

UAI VERSION 3

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Ra Rating will be neither positive nor negative.

APPENDIX 15-1, Page 6 of 7 01 November 2014

UAI VERSION 3

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N

APPENDIX 15-1, Page 7 of 7 01 November 2014

UAI VERSION 3

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .