Misawa DHA-FE Submittal List_10.27.21.xlsx
XLSX spreadsheet 70 KB Posted
- Solicitation number
- W9127S22Q6001
About this file
This is a solicitation for initial outfitting services at Building 99 of the Misawa Air Base Hospital in Japan. The Army Corps of Engineers seeks quotes for furniture, fixtures, and equipment; communications systems; and information technology services. Quotes are due by December 6, 2021.
The requirement includes furnishing a 200-bed hospital building along with supporting departmental spaces. Offerors must provide medical equipment, furniture, communications infrastructure, and integrated systems. The project involves outfitting an existing building with all necessary movable and built-in components. The solicitation incorporates specifications for divisions of work including furnishings, equipment, communications, and cybersecurity. The acquisition is set aside for small businesses with a NAICS code of 337127 and 500-employee size standard. Compliance with the U.S.-Japan Status of Forces Agreement is required for all work performed.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQUIPMENT (DIV 11)
| DIV 11 EQUIPMENT (RPIE) = lab equipment, fumehoods, dock levelers, sterilzers, cleaning & disposal equip, dental columns/workstations, incinerators | ||||||||||||
| DIV 11 EQUIPMENT (PP) = bio safety cabinets, commercial equipment, dental, food, lab, mortuary, therapy, etc. | ||||||||||||
| DIV 13 EQUIPMENT (RPIE) = prefab audio booths, hyperbaric, hydrotherapy | ||||||||||||
| DISCIPLINE | REFERENCE | |||||||||||
| CSI DIVISION | DISCIPLINE | TYPE | SUBMITTAL | UPON IOT AWARD | INITIAL OUTFITTING S1 | INITIAL OUTFITTING S2 | ACTIVATION | WARRANTY | CORE UFC | UFC CHAPTER/ SECTION | UFC SECTION | NOTES |
| QUALIFICATIONS - PROJECT TEAM | ||||||||||||
| Div 11: Equipment | Equipment ( PP) | Qualifications | C-Qualifications: Biomendical Equipment Technician (BMET) | X | Requirements Document | |||||||
| Div 11: Equipment | Equipment (PP) | Qualifications | C-Qualifications: Equipment Planner | X | Requirements Document | |||||||
| Div 11: Equipment | Equipment (PP) | Qualifications | Qualification of installers and inspectors | X | DHA-FE FFE-LVS Performance Specifications | |||||||
| DOCUMENTS | ||||||||||||
| Div 11: Equipment | Equipment (PP) | Color Board | PP- FFE Package: Color Boards: Furniture Material Boards (8-1/2x11) | X | X | UFC 3-120-10 Interior Design | ||||||
| Div 11: Equipment | Equipment (PP) | Color Board | PP- FFE Package: Color Boards: Large Scale Presentations | X | X | UFC 3-120-10 Interior Design | ||||||
| Div 11: Equipment | Equipment (PP) | Cost | Itemized Cost Estimates (FFE) | X | X | X | CH 5, 5-4.5 | UFC 3-120-10 Interior Design; UFC 4-510-01 Design: Military Medical Facilities (Appendix C) | ||||
| Div 11: Equipment | Equipment (PP) | Data | Data: BIM Schedule: Medical Equipment & Furniture Data | X | X | DoD MHS Minimum BIM Requirements (as referenced in UFC 4-510-01) | ||||||
| Div 11: Equipment | Equipment (PP) | Drawings | Drawings (Furniture & Equipment Plans: Composite to mirror Architectural Plans) | X | X | CH 5, 5-4.10 | UFC 3-120-10 Interior Design | |||||
| Div 11: Equipment | Equipment (PP) | Drawings | Drawings (Furniture & Equipment Plans: Room-by-Room) | X | X | CH 5, 5-4.10 | UFC 3-120-10 Interior Design | |||||
| Div 11: Equipment | Equipment (PP) | Drawings | Drawings (Furnishings, Fixtures, Equipment (FFE) & Associated JSNs) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 11: Equipment | Equipment (PP) | Drawings | World-Class Checklist (WCC) Drawing | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 11: Equipment | Equipment (PP) | Drawings | PP- FFE Package: Drawings: Typicals (FFE) | X | X | UFC 3-120-10 Interior Design | ||||||
| Div 11: Equipment | Equipment (PP) | Drawings | PP- FFE Package: Drawings: Systems Furniture (large scale w/ electrical, comm, panels) | X | X | UFC 3-120-10 Interior Design; UFGS 12 59 00 Systems Furniture | ||||||
| Div 11: Equipment | Equipment (PP) | Forms | PP- FFE Package: Forms: Property Transfer Documentation (i.e., DD Form 250s) | X | X | X | DD Form 250 Material Inspection & Receiving Report | |||||
| Div 11: Equipment | Equipment (PP) | Forms | PP- FFE Package: Documents: Best Value Determination | X | X | UFC 3-120-10 Interior Design | ||||||
| Div 11: Equipment | Equipment (PP) | List | Item Installation list (JSN, Qty, Model No, Manufacturer) | X | X | CH 5, 5-4.7 | UFC 3-120-10 Interior Design | |||||
| Div 11: Equipment | Equipment (PP) | List | Manufacturer Source List (Soures, Contact Info, Contract Nos) | X | X | CH 5, 5-4.3 | UFC 3-120-10 Interior Design | |||||
| Div 11: Equipment | Equipment (PP) | List | Point of Contact List (Project Team) | X | X | UFC 3-120-10 Interior Design & Requirement Document | ||||||
| Div 11: Equipment | Equipment (PP) | List | Equipment List (Project Room Contents (PRC)) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 11: Equipment | Equipment (PP) | List | Table of JSNs - Equipment & Furniture (aka JSN Summary) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities; UFC 3-120-10 Interior Design | |||||
| Div 11: Equipment | Equipment (PP) | List | World-Class Checklist (WCC) List | X | X | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||
| Div 11: Equipment | Equipment (PP) | Literature | Product Literature (FFE) | X | X | DHA-FE FFE-LVS Performance Specifications | ||||||
| Div 11: Equipment | Equipment (PP) | Narrative | Narrative: Equipment | X | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | ||||
| Div 11: Equipment | Equipment (PP) | Narrative | PP- FFE Package: Narrative: Design Analysis (Furniture & Fixtures) | X | X | UFC 3-120-10 Interior Design | ||||||
| Div 11: Equipment | Equipment (PP) | Plan | PP Execution Plan: Delivery & Instalation Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 11: Equipment | Equipment (PP) | Plan | PP Execution Plan: Inspections & Acceptance Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 11: Equipment | Equipment (PP) | Plan | PP Execution Plan: Operations & Maintenance Data | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 11: Equipment | Equipment (PP) | Plan | PP Execution Plan: Security Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 11: Equipment | Equipment (PP) | Plan | PP Execution Plan: Storage & Staging Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 11: Equipment | Equipment (PP) | Plan | PP Execution Plan: Testing & Certification Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 11: Equipment | Equipment (PP) | Plan | PP Execution Plan: Training Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 11: Equipment | Equipment (PP) | Plan | PP Execution Plan: Warrany Documents | X | 1.5.3.5 | Requirements Document; DHA-FE FFE-LVS Performance Specifications | ||||||
| Div 11: Equipment | Equipment (PP) | Report | PP- FFE Package: Documentation: Cybersecurity (Equipment Related) | X | X | Refer to Division 25: Integrated Automation (Cybersecurity) | ||||||
| Div 11: Equipment | Equipment (PP) | Report | PP-Performance Verification & Acceptance Testing Documentation | X | DHA-FE FFE-LVS Performance Specifications | |||||||
| Div 11: Equipment | Equipment (PP) | Specifications | Specifications & Cut Sheets: Equipment Data/Catalog Cut Sheets | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 11: Equipment | Equipment (PP) | Specifications | PP- FFE Package: Specifications: Operations & Maintenance Data | X | DHA-FE FFE-LVS Performance Specifications | |||||||
| Div 11: Equipment | Equipment (PP) | Specifications | PP- FFE Package: Specifications: Performance Verification & Acceptance Testing Docs | X | X | DHA-FE FFE-LVS Performance Specifications | ||||||
| Div 11: Equipment | Equipment (PP) | Specifications | PP- FFE Package: Specifications: Qualification of installers and inspectors | X | X | DHA-FE FFE-LVS Performance Specifications | ||||||
| Div 11: Equipment | Equipment (PP) | Specifications | PP- FFE Package: Specifications: Contact information for repairs | X | X | DHA-FE FFE-LVS Specifications | ||||||
| Div 11: Equipment | Equipment (PP) | Specifications | PP- FFE Package: Specifications: Equipment Data and Catalog Cut Sheets | X | X | UFC 4-510-01 Design: Military Medical Facilities | ||||||
| Div 11: Equipment | Equipment (PP) | Specifications | PP- FFE Package: Specifications: Installation Instructions (FFE) | X | X | UFGS 12 50 00.13 10 Furniture Installation and other applicable UFGS |
https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.dla.mil/TroopSupport/Subsistence/Operationalrations/qapubs/dd250.aspxhttps://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-01-33-00https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10
ID-FURNISHINGS (DIV 12)
| DIVISION 12 FURNISHINGS (RPIE) = window coverings, manufactured/kitchen/bathroom/healthcare/systems casework, floor mats, audience seating, exterior site furnishings | ||||||||||||
| DIVISION 12 FURNISHINGS (PP) = specialty casework (lab/pharm/RN), accessories, cabinets, officer furniture, seating, institution furnitures, patient room, exam systems furniture, cubicle curtains, artwork | ||||||||||||
| DISCIPLINE | REFERENCE | |||||||||||
| CSI DIVISION | DISCIPLINE | TYPE | SUBMITTAL | UPON IOT AWARD | INITIAL OUTFITTING S1 | INITIAL OUTFITTING S2 | ACTIVATION | WARRANTY | CORE UFC | UFC CHAPTER/ SECTION | UFC SECTION | NOTES |
| QUALIFICATIONS - PROJECT TEAM | ||||||||||||
| Div 12: Furnishings | Interior Design (PP) | Qualifications | Qualifications: Artwork Consultant | X | Requirements Document | |||||||
| Div 12: Furnishings | Interior Design (PP) | Qualifications | Qualifications: Interior Designer | X | Requirements Document | |||||||
| Div 12: Furnishings | Interior Design (PP) | Certificates | C-Certificates (Authorized Dealer) | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | ||||||
| Div 12: Furnishings | Interior Design (PP) | Certificates | C-Certificates (Certified Furniture Installer) | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | ||||||
| Div 12: Furnishings | Interior Design (PP) | Certificates | C-Certificates (Certified Telecomm Installer) | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | ||||||
| Div 12: Furnishings | Interior Design (PP) | Certificates | C-Certificates (Licensed Electricians) | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | ||||||
| Div 12: Furnishings | Interior Design (PP) | Certificates | C-Certificates (Manufacturer Certification) | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | ||||||
| Div 12: Furnishings | Interior Design (PP) | Certificates | C-Certificates (Warranty) | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | ||||||
| DOCUMENTS | ||||||||||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Color Board | CID: Color Boards (Furniture Material Boards) | X | X | Y | CH 5, 5-4.8 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Color Board | CID: Color Boards (Large Scale Presentation Boards - Furniture) | X | X | Y | CH 5, 5-4.8.2 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Cost Estimate | CID: Itemized Furniture Cost Estimate | X | X | X | Y | CH 5, 5-4.3 | UFC 3-120-10 Interior Design | |||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Cost Estimate | CID: Cost Estimates: Interior Design (PP) | X | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | ||||
| Div 12: Furnishings | Interior Design (PP) | Data | BIM Schedule: Medical Equipment & Furniture Data | X | X | DoD MHS Minimum BIM Requirements & UFGS 01 33 16.00 Design Data (Design After Award) | ||||||
| Div 12: Furnishings | Interior Design (PP) | Data | PP-Operations & Maintenance Data | X | DHA-FE FFE-LVS Performance Specifications | |||||||
| Div 12: Furnishings | Interior Design-Artwork (PP) | Drawings | CID: Drawings (Artwork Placement Plans) | X | X | Y | CH 5, 5-4.10.2 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Drawings | CID: Drawings (Furniture Plans: Composite to mirror Architectural Plans w/FFE) | X | X | Y | CH 5, 5-4.10 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Drawings | CID: Drawings (Furniture Plans: Room-by-Room) | X | X | Y | CH 5, 5-4.10 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Drawings | CID: Drawings (Food Service) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Drawings | CID: Drawings (Furnishings, Fixtures, Equipment (FFE) & Associated JSNs) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Drawings | CID: Drawings (Seating - Food Service) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 12: Furnishings | Interior Design-Furniture-Systems (PP) | Drawings | CID: Drawings (Systems Furniture Plans: Large Scale Plans to include Power, Voice, Data, Panel Height) | X | X | Y | CH 5, 5-4.10.1 | UFC 3-120-10 Interior Design; UFGS 12 59 00 Systems Furniture | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Drawings | World-Class Checklist (WCC)-Drawing | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 12: Furnishings | Interior Design (PP) | Drawings | PP- FFE Package: Drawings: Room-by-Room Plans (FFE) | X | X | UFC 3-120-10 Interior Design | ||||||
| Div 12: Furnishings | Interior Design (PP) | Drawings | PP- FFE Package: Drawings: Typicals (FFE) | X | X | UFC 3-120-10 Interior Design | ||||||
| Div 12: Furnishings | Interior Design (PP) | Drawings | C-O&M Data (Furniture Data Package-Furniture Drawings) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design-Furnishings (PP | Form | CID: Best Value Determination (BVD) Documentation | X | X | Y | CH 5, 5-4.6 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design (PP) | Form | C-O&M Data (Furniture Data Package-Order Form Documentation) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Forms | PP-Property Transfer Documentation (PP Acceptance-DD Form 250s - Material Inspection & Receiving Report) | X | X | 1.5.4.3 | Requirements Document | |||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | List | CID: Item Code Legend (aka JSN List) | X | X | Y | CH 5, 5-4.4 | UFC 3-120-10 Interior Design; UFC 4-510-01 Design - Appendix C | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP | List | CID: Manufacturer Source List (Soures, Contact Info, Contract Nos) | X | X | Y | CH 5, 5-4.9 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | List | CID: Item Installation list (JSN, Qty, Model No, Manufacturer) | X | X | Y | CH 5, 5-4.5 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | List | CID: Point of Contact List (Project Team) | X | X | Y | CH 5, 5-4.2 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | List | CID: Project Room Contents (PRC) List | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | List | World-Class Checklist (WCC) List - Interior Design | X | X | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||
| Div 12: Furnishings | Interior Design (PP) | List | PP- FFE Package: List: Cost Data (FFE) | X | X | UFC 3-120-10 Interior Design; UFC 4-510-01 Design: Military Medical Facilities | ||||||
| Div 12: Furnishings | Interior Design (PP) | List | C-O&M Data (Furniture Data Package-Furniture Listing) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Literature | PP-Product Literature | X | X | DHA-FE FFE-LVS Performance Specifications | ||||||
| Div 12: Furnishings | Interior Design (PP) | Manual | C-O&M Data (Furniture Data Package-Assembly Manuals) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Manual | C-O&M Data (Furniture Data Package-Electrical System Manuals) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Manual | C-O&M Data (Furniture Data Package-Installation Instructions) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Manual | C-O&M Data (Furniture Data Package-Key Control System) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Manual | C-O&M Data (Furniture Data Package-Maintenance Manuals) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Manual | C-O&M Data (Furniture Data Package-Special Tools) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design-CID Concept (PP) | Narrative | CID: Design Narrative: Interior Design | X | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Narrative | CID: Design Analysis: Interior Design | X | X | X | Y | CH 5, 5-4.1 | UFC 3-120-10 Interior Design | |||
| Div 12: Furnishings | Interior Design (PP) | Narrative | PP- FFE Package: Narrative: Design Analysis (Furniture & Fixtures) | X | X | UFC 3-120-10 Interior Design | ||||||
| Div 12: Furnishings | Interior Design (PP) | Plan | PP Execution Plan: Delivery & Instalation Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 12: Furnishings | Interior Design (PP) | Plan | PP Execution Plan: Inspections & Acceptance Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 12: Furnishings | Interior Design (PP) | Plan | PP Execution Plan: Operations & Maintenance Data | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 12: Furnishings | Interior Design (PP) | Plan | PP Execution Plan: Security Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 12: Furnishings | Interior Design (PP) | Plan | PP Execution Plan: Storage & Staging Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 12: Furnishings | Interior Design (PP) | Plan | PP Execution Plan: Testing & Certification Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 12: Furnishings | Interior Design (PP) | Plan | PP Execution Plan: Training Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 12: Furnishings | Interior Design (PP) | Plan | PP Execution Plan: Warrany Documents | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 12: Furnishings | Interior Design (PP) | Report | PP- FFE Package: Documentation: Cybersecurity (Equipment Related) | X | X | Refer to Division 25: Integrated Automation (Cybersecurity) | ||||||
| Div 12: Furnishings | Interior Design (PP) | Report | PP-Performance Verification & Acceptance Testing Documentation | X | X | DHA-FE FFE-LVS Performance Specifications | ||||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Sample | CID: Binders with Samples | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Specifications | CID: Data Sheets (Each Item-JSN, Name, Qty, Cost/Qoutes, Manufacturer, Product Spec, Finish/Fabric) |
tc={C4F3AAA6-79E4-934B-BA26-F7A387D67AD6}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| These are sometimes referred to as “Room Illustration Sheets” Calling submittals by the same name as the UFC | X | X | Y | CH 5, 5-4.7 | UFC 3-120-10 Interior Design | |||||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Specifications | CID: Cut Sheets: Equipment Data/Catalog Cut Sheets - Furnishings (Furniture, Casework, Artwork) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Specifications | CID: Specifications - Furnishings (Furniture, Casework, Artwork) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 12: Furnishings | Interior Design (PP) | Specifications | PP- FFE Package: Specifications: Operations & Maintenance Data | X | X | DHA-FE FFE-LVS Performance Specifications | ||||||
| Div 12: Furnishings | Interior Design (PP) | Specifications | PP- FFE Package: Specifications: Qualification of installers and inspectors | X | X | DHA-FE FFE-LVS Performance Specifications | ||||||
| Div 12: Furnishings | Interior Design (PP) | Specifications | PP- FFE Package: Specifications: Warranty information | X | X | X | DHA-FE FFE-LVS Performance Specifications | |||||
| Div 12: Furnishings | Interior Design (PP) | Specifications | PP- FFE Package: Specifications: Contact information for repairs | X | X | DHA-FE FFE-LVS Specifications | ||||||
| Div 12: Furnishings | Interior Design (PP) | Specifications | PP- FFE Package: Specifications: Data Sheets (per Item JSN, Contract & Manufacturer/Make/Model Info, Qty, Cost) | X | X | UFC 3-120-10 Interior Design | ||||||
| Div 12: Furnishings | Interior Design (PP) | Specifications | PP- FFE Package: Specifications: Installation Instructions (FFE) | X | X | UFGS 12 50 00.13 10 Furniture Installation and other applicable UFGS | ||||||
| Div 12: Furnishings | Interior Design (PP) | Sustainability | C-Closeout Submittals (Bio-Based Content of Furniture)-S | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Sustainability | C-Closeout Submittals (Energy Efficient Equipment)-S | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Sustainability | C-Closeout Submittals (Reduced Recycled Content of Furniture)-S | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Sustainability | C-Closeout Submittals (Reduced VOCs for Furniture)-S | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Binders | CID: Binders | X | X | Y | CH 5, 5-3 | UFC 3-120-10 Interior Design | ||||
| Div 12: Furnishings | Interior Design-Furnishings (PP) | Binders | CID: Binder: Artwork Selections | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 12: Furnishings | Interior Design (PP) | Data | C-Preconstruction Submittals (Storage Location) | X | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | ||||
| Div 12: Furnishings | Interior Design (PP) | Data | C-Product Data (to include style options) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Samples | C-Samples (Fabric and Finishes) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Drawings | C-Shop Drawings (aka Installation Drawings) | X | X | 1.2 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Furniture | CID-Alternate Design Submittal (Desking/Systems Furniture) | X | X | 1.5 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation | |||||
| Div 12: Furnishings | Interior Design (PP) | Package | CID-FF&E Package plus Drawings & Specifications | X | X | 1.4 | UFGS 12 50 00.13 10 Furniture & Furnishing Installation |
https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-201-02https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-01-33-00https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-01-33-00https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-12%2050%2000.13%2010 CYBERSECURITY (DIV 25)-TA v.1
| DIVISION 25 INTEGRATED AUTOMATION = FRCS Cybersecurity, Utility Monitoring & Control System Testing, RMF for FRCS, and UMCS Front-end & Integration | ||||||||||||
| DISCIPLINE | REFERENCE | |||||||||||
| CSI DIVISION | DISCIPLINE | TYPE | SUBMITTAL | Upon IOT Award | INITIAL OUTFITTING S1 | INITIAL OUTFITTING S2 | ACTIVATION | WARRANTY | CORE UFC | UFC CHAPTER/ SECTION | UFC SECTION | NOTES |
| QUALIFIICATIONS - PROJECT TEAM | ||||||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Certificates | C-SD-07 Certificates (Info Assurance Technical Level II/Security Plus) | X | 1.6 | UFGS 25 08 11.00 20 RMF for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Certificates | C-SD-07 Software Licenses (all FRCS licensing including software licenses and update licensing) | X | UFGS 25 05 11 Cybersecurity For Facility-Related Control Systems | |||||||
| Div 25: Integrated Automation | Communications-Cybersecurity (PP) | Qualifications | Qualifications: Cybersecurity Consultant | X | Requirements Document | |||||||
| DOCUMENTS | ||||||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity (PP) | Drawings | Drawings: Floor Plans & Existing Conditions | X | UFC 4-510-01 Design: Military Medical Facilities | |||||||
| Div 25: Integrated Automation | Communications-Cybersecurity (PP) | Drawings | Drawings: Site & Block Plans | X | UFC 4-510-01 Design: Military Medical Facilities | |||||||
| Div 25: Integrated Automation | Communications-Cybersecurity (PP) | Narrative | FRCS: Privacy Impact Assessment | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: Basis of Design: C-I-A Impact Level for the Control System (& Listing of Security Controls) | X | 5-2.1 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: Concept Design Submittal (1-15%): CCIs result from approved tailored security control list | X | 5-2.2.1 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | initial classification for each CCI | |||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | FRCS: Data, documentation, and software Submittals | X | G-3.5 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: Design Development Submittal (35-50%): CCI Changes to Standard Requirements | X | 5-2.2.2 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: Design Development Submittal (35-50%): CCI Control System Design | X | 5-2.2.2 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: Design Development Submittal (35-50%): CCI Final Classification | X | 5-2.2.2 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: Developer Configuration Management and Developer Security Testing And Evaluation | X | G-3.15 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: Final Design Submittal (100%): Updated Prefinal Design Submital | X | 5-2.2.4 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: Information System Documenation | X | G-3.15 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: Pre-Final Design Submittal (90%): Updated Design Development Submittal | X | 5-2.2.3 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | FRCS: System Architecture Submittals | X | G-3.11 | UFC 4-010-06 Cybersecurity of Facility-Related Control Systems | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-01 Product Data (Authorization to Operate (if current ATO available)) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-01 Wireless Communication Request | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-01 Device Account Lock Exception Request | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-01 Multiple IP/OT Connection Device Request | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-01 Cybersecurity Interconnection Schedule | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | C-SD-01 Contractor Computer Cybersecurity Compliance Statements | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | C-SD-01 Contractor Temporary Network Cybersecurity Compliance Statements | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Drawings | C-SD-02 Shop Drawings (Draft As-Builts) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Drawings | C-SD-02 Shop Drawings (Final As-Builts) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-02 User Interface Banner Schedule | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-02 Network Communication Report | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Diagram | C-SD-02 Cybersecurity Riser Diagram | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-03 Control System Cybersecurity Documentation | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-03 Product Data (All Software) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-03 Product Data (Enclosure Keys) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-03 Product Data (Product Data Sheets) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 Design Data (Control System Security Controls) | X | 1.6 | UFGS 25 08 11.00 20 RMF for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | C-SD-05 Detailed Architecture Diagram | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | C-SD-05 IP Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 Detailed Inventory Report (Hardware, Software, Firmware) | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 Design Data (Ports, Protocols, And Services Management Registration Form ) | X | 1.6 | UFGS 25 08 11.00 20 RMF for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | C-SD-05 Data Flow Diagram | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 STIG and SRG selection report (for each FRCS) | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 Design Data (Security Plan) | X | 1.6 | UFGS 25 08 11.00 20 RMF for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Access Control (AC) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Audit and Accountaility (AU) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Awaremess and Training (AT) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Configuration Management (CM) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | C-SD-05 System Level Configuration Management Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Contingency Planning (CP) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | C-SD-05 System Level Contingency Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Identification and Authentication (IA) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Incident Response (IR) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Narrative | C-SD-05 System Level Incident Response Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Maintenance (MA) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Media Protection (MP) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Personnel Security (PS) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Physical and Environmental Security (PE) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Planning (PL) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Program Management (PM) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Risk Assessment (RA) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Security Assessment and Authorization (CA) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level System and Communictions Protection (SC) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level PKI Authentication Security Plan (if requested/applicable) | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level System and Information Integrity (SI) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level System and Services Acquisition (SA) Controls Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-05 System Level Continuous Monitoring Plan | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Wireless Communication Test Report | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (Preconstruction Factory Test Procedures) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (Preconstruction QC Checklist) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (Existing Conditions Report) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (Post-construction Factory Test Report) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (Post-construction QC Checklist) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (PVT Phase I Procedures) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (PVT Phase I Report) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (PVT Phase II Procedures) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (PVT Phase II Report) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (Security Technical Implementation Guide Benchmark Report) | X | 1.6 | UFGS 25 08 11.00 20 RMF for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (SRG Compliance Checklist) | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (ACAS Vulnerability Reports) | X | 1.6 | UFGS 25 08 11.00 20 RMF for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (SCAP Report) | X | 1.6 | UFGS 25 08 11.00 20 RMF for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (ISSE Checklist (Step 3)) | X | 1.6 | UFGS 25 08 11.00 20 RMF for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-06 Test Reports (ISSE Checklist (Step 4)) | X | 1.6 | UFGS 25 08 11.00 20 RMF for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-10 O&M Data ( Advanced Training Documentation) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-10 O&M Data ( Refresher Training Documentation) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-10 O&M Data (Basic Training Documentation) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-10 O&M Data (Operation and Maintenance (O&M) Instructions) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-10 O&M Data (Preventive Maintenance Work Plan) | X | 1.4 | UFGS 25 05 11 Cybersecurity for FRCS | ||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-11 Commissioning Report (when commissioning is required) | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-11 Final Test Report (when commissioning is not required) | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Report | C-SD-11 Password Summary Report | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-11 Software Recovery and Reconstitution Images (Control System Applications, Operating Systems, Databases, Firmware, and configurations for all IP and OT components) | X | ||||||||
| Div 25: Integrated Automation | Communications-Cybersecurity-FRCS Only | Data | C-SD-11 FRCS Hardware and Software Maintenance Tools (Functional and Cybersecurity) | X | ||||||||
| Div 25: Integrated Automation | Communications-Utility Monitoring & Integration | Data | C-SD-05 Design Data (UMCS IP Network Bandwidth Usage Estimate) (25 10 10) | X | 1.4 | UFGS 25 10 10 Utility Monitoring & Control System UMCS Front-End & Integration | ||||||
| Div 25: Integrated Automation | Communications-Utility Monitoring & Integration | Report | C-SD-06 Test Reports (Start-Up Testing Report) (25 10 10) | X | 1.4 | UFGS 25 10 10 Utility Monitoring & Control System UMCS Front-End & Integration | ||||||
| Div 25: Integrated Automation | Communications-Utility Monitoring & Integration | Data | C-SD-06 UMCS and Building Level DDC Testing Sequence (25 08 10) | X | ||||||||
| Div 25: Integrated Automation | Communications-Utility Monitoring & Integration | List | C-SD-11 Closeout Submittal (Closeout QC Checklist) (25 10 10) | X | 1.4 | UFGS 25 10 10 Utility Monitoring & Control System UMCS Front-End & Integration; | UFGS 25 05 11 Cybersecurity for FRCS |
https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-010-06https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-08-11-00-20https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-10-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-10-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-10-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-10-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-10-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-08-11-00-20https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-08-11-00-20https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-10-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-05-11https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-010-06https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-10-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-05-11https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-05-11https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-120-10https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-05-11https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-08-11-00-20https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-08-11-00-20https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-08-11-00-20https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-25-08-11-00-20
COMMUNICATIONS (DIV 27-28)
| DIVISION 27 COMMUNICATIONS (RPIE) = nurse call, network time sync, radio & public address, community antenna TV, etc. | ||||||||||||
| DIVISION 27 COMMUNICATIONS (PP) = patient monitoring, patient queuing, integrated audio-video systems and equipment, data/comm network equipment, LAN/WLAN, etc. | ||||||||||||
| DIVISION 28 ELECTRONIC SAFETY & SECURITY (PP) = electronic security systems | ||||||||||||
| DIVISION 28 ELECTRONIC SAFETY & SECURITY (RPIE) = fire detection/suppression systems | ||||||||||||
| DISCIPLINE | REFERENCE | |||||||||||
| CSI DIVISION | DISCIPLINE | TYPE | SUBMITTAL | UPON IOT AWARD | INITIAL OUTFITTING S1 | INITIAL OUTFITTING S2 | ACTIVATION | WARRANTY | CORE UFC | CHAPTER/ SECTION | REFERENCE NAME/LINK | NOTES |
| QUALIFIICATIONS - PROJECT TEAM | ||||||||||||
| Div 27: Comm/Div 28: ESS | Communications-Qualifications | Qualifications | Qualifications: Communications Systems Engineer (CES) | X | Requirements Document | |||||||
| DOCUMENTS | ||||||||||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Cost Estimate | Cost Estimates (10%-100%) | X | X | X | C-4.3.1 | UFC 4-510-01 Design: Military Medical Facilities | ||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Specifications | Cut Sheets-Communications (35%) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Narrative | Design Narrative: Communications (10%-65%) | X | X | C-5.3 | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Drawings | Drawings-Communications (35%) | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | List | World-Class Checklist (WCC) List - Comm (10%) | X | X | C-5.3.2 | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Drawings | World-Class Checklist (WCC)-Drawing - Comm | X | X | Appendix C | UFC 4-510-01 Design: Military Medical Facilities | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Data | PP-Operations & Maintenance Data | X | DHA-FE FFE-LVS Performance Specifications | |||||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Report | PP-Performance Verification & Acceptance Testing Documentation | X | DHA-FE FFE-LVS Performance Specifications | |||||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Literature | PP-Product Literature | X | DHA-FE FFE-LVS Performance Specifications | |||||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Data | PP-Warranty Information | X | DHA-FE FFE-LVS Performance Specifications | |||||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Narrative | PP Execution Plan: Delivery & Instalation Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Narrative | PP Execution Plan: Inspections & Acceptance Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Narrative | PP Execution Plan: Operations & Maintenance Data | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Narrative | PP Execution Plan: Security Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Narrative | PP Execution Plan: Storage & Staging Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Narrative | PP Execution Plan: Testing & Certification Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Narrative | PP Execution Plan: Training Plan | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Narrative | PP Execution Plan: Warrany Documents | X | X | 1.5.3.5 | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Data | PP- Itemized Cost Estimates | X | X | X | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Data | PP-Best Value Determination (BVD) Documentation/APL | X | X | X | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Plan | PP-Communications (LVS) Package | X | X | 1.5.3.4 | Requirements Document | |||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | Cut Sheets | PP-Data Sheets (Each Item, Name, Qty, Cost/Qoutes, Manufacturer, Product Spec) |
tc={21BA5E9C-FDEF-C34B-BA6F-87937962D62B}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| These are sometimes referred to as “Room Illustration Sheets” Calling submittals by the same name as the UFC | X | X | Requirements Document | ||||||
| Div 27: Comm/Div 28: ESS | Communications (PP) | List | PP-Item Code Legend | X | X | Requirements Document | |||
| Div 27: Comm/Div 28: ESS | Communications (PP) | List | PP-Item Installation list (Qty, Model No, Manufacturer) | X | X | Requirements Document | |||
| Div 27: Comm/Div 28: ESS | Communications (PP) | List | PP-Manufacturer Source List (Soures, Contact Info, Contract Nos) | X | X | Requirements Document | |||
| Div 27: Comm/Div 28: ESS | Communications (PP) | List | PP-Point of Contact List (Vendors/Manufacturers/Suppliers) | X | X | Requirements Document | |||
| Div 27: Comm/Div 28: ESS | Communications (PP) | DD Forms | PP-Property Transfer Documentation (PP Acceptance-DD Form 250s) | X | 1.5.4.3 | Requirements Document: Property Accountability Issuances | |||
| Div 27: Comm/Div 28: ESS | Communications-BIM (RPIE & PP) | Drawings/Data | BIM Submittal: HIT | X | X | DoD MHS Minimum BIM Requirements (as referenced in UFC 4-510-01) |
https://www.wbdg.org/FFC/DOD/UFC/ufc_4_510_01_2019_c2.pdf
TRANSITION
| S1 - Draft Transition submittal (package) | |||||||||||
| S2 - Final Transition submittal (package) | |||||||||||
| S3 - Updated Transition submittals (documents) to be distributed 90 days prior to moves | |||||||||||
| S4 - Updated Transition submittals (documents) to be distributed 14 days prior to moves | |||||||||||
| S5 - Transition submittals (documents) due at time of excessing | |||||||||||
| S6 - Transition submittals (documents) distribute NLT 14 days following moves | |||||||||||
| S7 - Transition submittals (documents) to be distributed to PDT NLT 45 days following survey distribution | |||||||||||
| DISCIPLINE | SUBMITTALS | REFERENCE | |||||||||
| CSI DIVISION | DISCIPLINE | TYPE | SUBMITTAL | UPON IOT AWARD | TRANSITION S1 | TRANSITION S3 | ADDITIONAL SUBMITTALS | CORE UFC | UFC CHAPTER/ SECTION | UFC SECTION | NOTES |
| QUALIFICATIONS - PROJECT TEAM | |||||||||||
| 1 | Transition | Qualifications | Qualifications: Transition Planner | X | Requirements Document | ||||||
| 1 | Transition | Qualifications | Qualifications: Public Relations Specialist | X | Requirements Document | ||||||
| 1 | Transition | Qualifications | Qualifications: Biomedical Equipment Technician | X | Requirements Document | ||||||
| MTF TRANSITION PLAN - Electronic form & one 3-Ring Binder | |||||||||||
| 1 | Transition | Plan & Schedule | Plan: Table of Contents | X | X | Requirements Document | |||||
| 1 | Transition | Narrative & Schedule | Plan: Move Plan & Master Move Schedule (See IO/T Example) | X | X | Requirements Document | |||||
| 1 | Transition | Narrative | Plan: Storage & Staging | X | X | Requirements Document | |||||
| 1 | Transition | Narrative & Schedule | Plan: Installation | X | X | Requirements Document |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .