SP8000-16-R-0010_Attachment_3_(COR_Inspect_Rept)_for_Turbine_Engine_Component_Recycling.pdf
PDF 15 KB Posted
- Attached to
- Turbine Engine Component Recycling
- Solicitation number
- SP8000-16-R-0010
About this file
Attachment 3 (COR Inspection Report) to the PWS for Turbine Engine Component Recycling (SP8000-16-R-0010)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS Paragraph B.1.2.2 Task 1:
Receiving Material GFM moved to a secure area As Required Contractor unload 100% of material
PWS Paragraph B.2.2.1 Task 2:
Unpacking and Sorting Unpack and sort GFM
Within 30 days of arrival at
Contractor facility
100% of the total weight must be sorted and accountable during audits
PWS Paragraph B.3.1.3 Task 3:
Precious Metal Recovery
Provide precious metals offtake assay and Toxic Characteristic Leachate
Procedure (TCLP) documentation
Prior to Government Acceptance
100% metal offtakes be appropriately packaged, labeled, manifested, shipped & in a form where it can be domestically recovered
PWS Paragraph B.4.2.3
PWS Paragraph B.5.2.3
PWS Paragraph B.6.2.2
Task 4:
DEMIL-Nickel Based Alloys
Task 5:
DEMIL- Titanium Based Alloys
Task 6:
DEMIL-Non Aerospace
Grade Material
Produce certificate for each DD Form 1348
As Required & Within 30 days of arrival at Contractor facility
100% of components shall undergo DEMIL
PWS Paragraph B.4.2.2
PWS Paragraph B.5.2.2
Task 4:
DEMIL-Nickel Based Alloys
Task 5:
DEMIL- Titanium Based
Alloys
Provide vacuum induction melt (VIM) material documentation showing shipment(s) meet requirements
Prior to Government Acceptance; As Required and/or Within 30 days of arrival at Contractor facility
100% of components shall undergo DEMIL
ATTACHMENT #3 to PWS:
Contractor Remarks
The COR will observe the selected requirement/task at any time they determine a need to inspect a requirement/task or notices a deficiency. Results of each inspection will be documented on ATTACHMENT C: COR Inspection Report. A “pass”, “fail” or “N/A” rating will be assigned to requirement/task inspected. A "pass" rating will be assigned when the Contractor performs a rated requirement/task at or above the listed "Acceptable Quality Level (AQL)." A “fail” rating will be assigned when the Contractor performs a rated requirement/task below the listed "AQL." A brief description of the inspection and observed defects will be recorded. The COR will ascertain whether documented deficiencies were corrected and processes implemented to ensure re-occurrence of the deficiency is prevented. A “N/A” rating will be assigned when no work was required to be performed on a specific task. The COR will retain copies of each completed ATTACHMENT C: COR Inspection Report in the on site "COR File" and forwarded to the Contracting Officer upon request.
COR:
COR Inspection Report Contract Number: Dates of Inspection:
Strategic Material Turbine Engine Components Recycling
Contractor:
Contractor Sign/Date: COR Sign/Date:
COR Remarks/Notes
Rating See Note in RemarksPerformance Standard Requirements/Tasks Action Minimum
Frequency AQL Required Quality Level Performed