SP8000-16-R-0010_Attachment_1_(PRST)_for_Turbine_Engine_Component_Recycling.pdf
PDF 28 KB Posted
- Attached to
- Turbine Engine Component Recycling Federal contract opportunity
- Solicitation number
- SP8000-16-R-0010
About this file
Attachment 1 (PRST) to the PWS for Turbine Engine Component Recycling (SP8000-16-R-0010)
View the file
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT #1 to PWS: Performance Requirements Summary Table (PRST) Turbine Engine Components Recycling
SP8000-16-R-0010
Performance Standard
Paragraph in
PWS
Requirements/Tasks Action (See Note 3)
Minimum Frequency
(See Note 4)
Acceptable Quality Levels
(See Note 5)
Deductions/Penal ties for “Fail” ratings on Inspection
Reports (See Note 5)
Methods of Surveillance (See Note 2)
Primary Designated
Government Inspector
(See Note 6)
B.1.2.2 Task 1:
Receiving Material
Move GFM to a secure area As Required
Contractor unload 100% of material
$250
Scheduled or Unannounced
Inspections
COR
B.2.2.1 Task 2:
Unpacking and Sorting
Unpack and Sort GFM
Within 30 days of arrival at Contractor facility
100% of the total weight must be sorted and accountable during audits
$250 per day over 30 day limit Scheduled or Unannounced
Inspections
COR
B.3.1.3 Task 3:
Precious Metal Recovery
Provide precious metals offtake assay and Toxic
Characteristic Leachate
Procedure
(TCLP)
documentation
Prior to Government Acceptance
100% metal offtakes be appropriately packaged, labeled, manifested, shipped & in a form where it can be domestically recovered
$250 Scheduled or Unannounced
Inspections
COR
ATTACHMENT #1 to PWS: Performance Requirements Summary Table (PRST)
Performance Standard
Paragraph in
PWS
Requirements/Tasks Action (See Note 3)
Minimum Frequency
(See Note 4)
Acceptable Quality Levels
(See Note 5)
Deductions/Penalties for “Fail” ratings on Inspection Reports
(See Note 5)
Methods of Surveillance (See Note 2)
Primary Designated
Government Inspector
(See Note 6)
B.4.2.3
B.5.2.3
B.6.2.2
Task 4:
DEMIL-Nickel Based Alloys
Task 5:
DEMIL- Titanium Based Alloys
Task 6:
DEMIL-Non Aerospace Grade
Material
Produce certificate for each DD Form
1348-1
As Required & Within 30 days of arrival at Contractor facility
100% of components shall undergo
DEMIL
$100 for each missing form Scheduled or
Unannounced Inspections
B.4.2.2
B.5.2.2
Task 4:
DEMIL-Nickel Based Alloys
Task 5:
DEMIL- Titanium Based Alloys
Provide vacuum induction melt (VIM) material documentation showing shipment(s) meet requirements
Prior to Government Acceptance;
As Required and/or Within 30 days of arrival at
Contractor facility
100% of components shall undergo
DEMIL
Rejection of Invoices For Batch
Scheduled or Unannounced
Inspections
ATTACHMENT #1 to PWS: Performance Requirements Summary Table (PRST)
Note 1) The Government will evaluate the Contractor’s performance by appointing a Contracting Officer’s Representative (COR) to monitor the
Contractor’s performance and ensure tasks/services are received and acceptable in accordance with (IAW) the Performance Work Statement
(PWS).
Note 2) The methods of surveillance used by the Government can be either scheduled or unannounced inspection for this contract
Note 3) The Contractor shall provide all labor, administrative support, transportation, supervision, coordination and control of all Sub-Contractors, equipment, materials, parts, supplies and services associated with the performance of this PWS at the Acceptable Performance Levels (APL) established in the Performance Requirements Summary Table (PRST) of this PWS.
Note 4) The COR will utilize the Attachment B-Quality Assurance Surveillance Plan (QASP) developed (by the Government) for the PWS to document Contractor performance of the requirement/tasks. (See Attachment B to the PWS for a copy of the QASP.)
The COR will, at a minimum:
1) Execute scheduled or unannounced inspections of the Contractor’s performance to ensure that the Contractor is achieving the required level of performance.
2) Prepare a “COR Inspection Report” upon completion of the scheduled or unannounced inspection that identifies areas inspected and/or any deficiencies noted. (See Attachment C to the PWS for a copy of the “COR Inspection Report).
Note 5) DLA Strategic Materials (DLA-SM) will not levy any monetary deductions against the Contractor for “pass” and “N/A” ratings documented in the COR Inspection Reports. A “fail” rating however, will be assigned to each task/service inspected that fell below the established Acceptable Quality Level (AQL) for each “Performance Standard” requirement evaluated. When a “fail” rating is assigned, all observed deficiencies must be documented on a COR Inspection Report. DLA-SM may (at the Government’s discretion) levy monetary deductions against the Contractor for “fail” ratings documented in the COR Inspection Reports as listed in the PRST of the PWS for each “Performance Standard” requirement evaluated.
Note 6) The designated Government inspector mentioned in this PRST is a minimum requirement. The COR may perform inspections and complete a COR inspection report even if not assigned as the primary designated Government inspector in the PRST.
File details come from the government source that posted it. Updated .