This document is a Source Selection Plan for a Defense Logistics Agency (DLA) Request for Proposal (RFP) seeking support services for the Ozone Depleting Substances (ODS) and Hydrofluorocarbon (HFC) Reserve Program Office. The solicitation (SP4703-26-R-0001) will evaluate proposals based on three primary factors: Technical/Risk, Past Performance, and Price, with non-price factors significantly more important than price. Technical/Risk will be assessed through sub-factors including Management Approach and Capabilities, Technical Approach, and Personnel Qualifications, while Past Performance will be evaluated on the relevancy and quality of prior contracts.
The evaluation will use color-coded ratings ranging from Blue (Outstanding) to Red (Unacceptable) for Technical/Risk, and will assign performance confidence assessments from Substantial Confidence to No Confidence based on the contractor's historical project performance. Contractors must demonstrate understanding of the Performance Work Statement requirements, provide evidence of corporate capabilities, propose qualified personnel with appropriate security clearances, and submit pricing within commercial ranges. The ultimate award will be made to the contractor offering the best value to the government, considering the established evaluation criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SP470326D0001 QA Matrix ODS GFC (AMD1) .xlsx | XLSX spreadsheet | |
| SP470326R0001 ODS HFC RFP Evaluation Factors (AMD1) .docx | DOCX document | |
| SP470326R0001 ODS HFC RFP SF1449 (AMD1) .pdf | ||
| SP470326R0001 ODS HFC RFP Past Performance Questionnaire.pdf | ||
| SP470326R0001 ODS HFC RFP PWS.docx | DOCX document | |
| SP470326R0001 ODS HFC RFP Instructions to Offerors.docx | DOCX document | |
| SP470326R0001 ODS HFC RFP SF1449.pdf | ||
| SP470326R0001 ODS HFC RFP Key Personnel Template.doc | DOC document | |
| SP470326R0001 ODS HFC RFP Synopis-Solicitation.docx | DOCX document | |
| SP470326R0001 ODS HFC RFP Schedule B Price Breakdown.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCE SELECTION PLAN
Defense Logistics Agency Support for ODS Reserve Program Office
RFP SP4703-12-R-0003
Request for Proposal SP4703-26-R-0001 Ozone Depleting Substances (ODS) And Hydrofluorocarbon (HFC) Support Services Defense Logistics Agency (DLA) Richmond and Forward Sites
Evaluation factors and subfactors are critical, solicitation-linked characteristics that:
| • | Significantly impact the source selection decision. |
| • | Serve as discriminators or are statutorily/regulatorily mandated. |
| • | Provide a consistent standard for evaluating proposals, enabling best value determination. |
The solicitation must clearly detail these factors and subfactors, their relative importance, and the importance of non-price factors compared to price, to inform potential offerors of the evaluation criteria. Evaluation factors and subfactors shall drive the solicitation's instructions for proposal content. Price and the quality of proposed products/services must be evaluated in all source selections.
Relative Importance of Factors:
Non-price factors (Technical/Risk and Past Performance) are significantly more important than price. Within non-price factors, Technical/Risk is more important than Past Performance. The Technical/Risk sub-factors are ranked in descending order of importance as follows: Management Approach and Capabilities, Technical Approach, and Personnel Qualifications.
Basis for Award and Summary Evaluation of Non-Price Factors and Sub-Factors.
1) Proposals will first be evaluated on the basis of the Non-Price Evaluation Factors (Technical / Risk and Past Performance ) and then Price. The evaluation process is further defined in Paragraph 6.
2) The Technical/Risk sub-factors are Management Approach and Capabilities; Technical Approach; and Personnel Qualifications. These sub-factors address the contractor’s capability and provide evidence that they can perform the requirements described in the PWS.
3) Past Performance information will be provided by the contractors to show their relevancy of successfully accomplishing PWS tasks and to determine the quality of their relevant past performance in order to assign a performance confidence assessment rating. Assessment for this area will be subjective based on consideration of all relevant facts and circumstances. Evaluation will investigate information furnished by the contractor to ensure they have consistently demonstrated a commitment to administration, customer satisfaction, timely delivery, and quality goods and services in prior contracts of similar scope and complexity. This is a matter of judgment and will be a subjective assessment based on investigative findings.
4) Price will be evaluated for reasonableness and completeness.
5) Award will be made to the contractor whose proposal offers the best value to the government based on the requirement and the established evaluation factors.
A. Factors and Subfactors for Acquisition
Factor 1: Technical/Risk Evaluation Sub-Factor A: Management Approach and Capabilities Sub-Factor B: Technical Approach Sub-Factor C: Personnel Qualification
Factor 2: Past Performance Evaluation / Performance Confidence Assessment Aspect One: Relevancy of Prior Contracts Aspect Two: Quality of Historical Projects
Factor 3: Price Evaluation
B. Tables and Specific Instructions
Factor 1: Technical/Risk Evaluation. Table 1, Combined Technical/Risk Ratings, includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies in determining technical ratings. The three sub-factors affecting a contractor’s ability to meet the solicitation requirements are Management Approach and Capabilities (sub-factor A), Technical Approach (sub-factor B), and Personnel Qualifications (sub-factor C). The Evaluation Team must evaluate the contractor’s proposal against the minimum performance or capability requirements established by the solicitation assessing the strengths, weaknesses, deficiencies, and risks and assigned a Combined Technical/Risk rating pursuant to Table 2 included herein.
a. Sub-factor A: Management Approach and Capabilities. In the evaluation of this sub-factor, the understanding of the work, as evidenced by proposed plan for overall implementation and execution of project, will be assessed. Proposals will be evaluated to ensure:
(i) Contractor’s understanding of the work as evidenced by proposed plan for overall implementation and execution of project.
(ii) Current corporate capability to perform contract, including relevant corporate experience.
(iii) Evidence of a process for ensuring quality and timeliness of deliverables.
(iv) Evidence of reach-back capability, including subcontractors, consultants, and business partners.
(v) Evidence of turn-over rate and ability to rapidly hire and train personnel in a dynamic environment with changing workloads.
b. Sub-factor B: Technical Approach. In the evaluation of this sub-factor, the approach to research, analyze, and develop deliverables and performance of each specific tasking will be assessed. Proposals will be evaluated to ensure Contractor’s technical approach demonstrates an understanding of the PWS requirements by addressing each specific task. Contractors are to include a discussion of methods and techniques for completing each discrete task and addressing potential problem areas to include solutions, new processes, or, if applicable, new technologies.
c. Sub-factor C: Personnel Qualifications. Proposals will be evaluated to ensure:
(i) Contractor proposes personnel who demonstrate the overall years of required knowledge, experience, and education that is directly related to the requirement stated in the Performance Work Statement (PWS). Contractor must meet required IT access level and security clearance as stated in the PWS for all Key Personnel. All proposed personnel must identify security clearance status within resumes.
(ii) Quality and depth of education and experience on other projects that may not be similar enough to include in response to paragraph above but may be relevant.
Table 2. Combined Technical/Risk Ratings
| Color |
| Rating |
| Description |
| Blue |
| Outstanding |
| Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. |
| Purple |
| Good |
| Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. |
| Green |
| Acceptable |
| Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate. |
| Yellow |
| Marginal |
| Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high. |
| Red |
| Unacceptable |
| Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable. |
Factor 2: Past Performance Evaluation / Performance Confidence Assessment. The past performance evaluation results in a performance confidence assessment rating of the contractor’s probability of meeting the solicitation requirements (see Paragraph C. Table 4), derived at by considering each contractor’s demonstrated relevant record of performance (see Paragraph a. Table 3) and how well the contractor performed on the contracts (see Paragraph b. Table 4).
The Past Performance assessment is based on two aspects: Relevancy and Quality. In rating past performance and deriving a performance confidence assessment rating, the following will be considered:
a. Aspect One: Relevancy of Prior Contracts. This source of Past Performance information will be provided in the contractor’s written proposal. The first aspect is to evaluate the contractor’s past performance to determine how relevant a recent effort accomplished by the contractor is to the effort to be acquired. In establishing what is relevant for the acquisition, consideration should be given to those aspects of a contractor’s contract history that would give the greatest ability to measure whether the contractor will satisfy the current procurement. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming. A Relevancy rating will be assigned per the four levels of relevancy as shown in Table 3. The more relevant past performance will be a stronger predictor of future success and have more influence on the performance confidence assessment than past performance of lesser relevance.
Table 3. Past Performance Relevancy Ratings
| Rating |
| Definition |
| Very Relevant |
| Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. |
| Relevant |
| Present/past performance effort involved similar magnitude of effort and complexities this solicitation requires. |
| Somewhat Relevant |
| Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires. |
| Not Relevant |
| Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. |
b. Aspect Two: Quality of Historical Projects: The second aspect is to determine how well the contractor performed on the contracts. The past performance evaluation process gathers information from customers on how well the contractor performed those past contracts and includes history of successful completion of projects; history of producing high-quality reports and deliverables; commitment to customer satisfaction; history of staying on schedule and within budget; and history of conformance to Subcontracting Plans. Past Performance information may be obtained from Past Performance Questionnaires, SPRS, CPARs, or other sources available to the government. The Quality rating of Outstanding, Good, Acceptable, Marginal, Unacceptable, or Neutral will be assigned for the levels as shown in Table 4.
Table 4. Past Performance Quality Ratings
| Rating |
| Definition |
| Outstanding |
| Response demonstrates historical projects with outstanding experience directly related to the requirement and history of producing high quality reports, deliverables, staying on schedule and within budget. Generally, has an outstanding overall past performance based on Past Performance Questionnaires. |
| Good |
| Response demonstrates historical projects with good experience directly related to the requirement and history of producing high quality reports, deliverables, staying on schedule and within budget. Generally, has a good overall past performance based on Past Performance Questionnaires. |
| Acceptable |
| Response demonstrates historical projects with generally satisfactory experience directly related to the requirement and history of producing high quality reports, deliverables, staying on schedule and within budget. Generally, has an acceptable overall past performance based on Past Performance Questionnaires. |
| Marginal |
| Response demonstrates generally poor overall experience performing historical projects and does not exhibit experience directly related to the requirement and history of producing high quality reports, deliverables, staying on schedule and within budget. Generally marginal overall performance based on Past Performance Questionnaires. |
| Unacceptable |
| Response demonstrates generally an unsatisfactory overall experience performing historical projects and does not exhibit experience directly related to the requirement and history of producing high quality reports, deliverables, staying on schedule and within budget. Generally, has an unacceptable overall past performance based on Past Performance Questionnaires. |
| Neutral |
| The Neutral rating is to be assigned if the contractor has no relevant record of past performance. The contractor will not be rated favorably or unfavorably. |
C. Performance Confidence Assessment: Past performance information will be reviewed and assessed to determine its relevancy and quality to assign a performance confidence assessment rating. Each contractor shall be assigned one rating from Table 5.
Table 5. Performance Confidence Assessments
| Rating |
| Description |
| Substantial Confidence |
| Based on the contractor’s recent / relevant performance record, the government has a high expectation that the contractor will successfully perform the required effort. |
| Satisfactory Confidence |
| Based on the contractor’s recent / relevant performance record, the government has a reasonable expectation that the contractor will successfully perform the required effort. |
| Limited Confidence |
| Based on the contractor’s recent / relevant performance record, the government has a low expectation that the contractor will successfully perform the required effort. |
| No Confidence |
| Based on the contractor’s recent / relevant performance record, the government has no expectation that the contractor will be able to successfully perform the required effort. |
| Unknown Confidence (Neutral) |
| No recent / relevant performance record is available or the contractor’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. |
Factor 3: Price Evaluation. All pricing must be established within the commercial pricing. The contractor’s proposed labor categories and labor rates, along with requested applicable proposed discounts, will be evaluated. The submission of information other than cost or pricing data (SF 1448) to support a determination of price reasonableness with initial offers will not be requested.