REV 1-M-404 MECHANICAL ROOM NEW WORK.pdf

PDF 118 KB Posted

Attached to
Project: CSC-20049 Water Heater (Solar) Improvements Bldg 11
Solicitation number
SP4702-22-R-0011
Issued by

About this file

This document contains a federal contract opportunity solicitation for water heater improvements at a Defense Logistics Agency facility. The solicitation seeks proposals for safety improvements including the installation of a solar water tank, heat pump water heater, gas-fired condensing boilers, circulation pumps, a chemical feeder, expansion tank, air separator, and glycol feeder. The work must be completed within 540 calendar days of the notice to proceed. The pre-proposal site visit will take place on August 1, 2022, and proposals are due by August 22, 2022. The award will be a firm fixed-price contract for a 100% small business set-aside requirement with a NAICS code of 238220 and size standard of $16.5 million. The selection will be based on lowest price for technically acceptable proposals meeting the requirements.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CD

ET-11-9-1

H W

RHWS HWS HWS HWS HWS HWS HWS HWS HWS

H W

S H

W S

H W

S H

W S

DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW

D C

W D

C W

D C

W D

C W

D C

W

B-11-9-1

HWP-11-9-1

AS-11-9-1

HWP-11-9-2

CHEMICAL

FEEDER

4"

B-11-9-2

DCWDCWDCW

H W

S H

W S

D H

W D

H W

D H

W D

H W

D H

W D

H W

D H

W D

H W

H W

S H

W S

H W

S H

W S

HWS HWS HWS HWS

H W

S H

W S

H W

S H

W S

H W

S

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

D C

W D

C W

D C

W D

C W

D H

W D

H W

D H

W D

H W

D H

W D

H W

D H

W D

H W

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

H W

R

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

DCW

D C

W D

C W

D C

W D

C W

D C

W D

C W

D C

W D

C W

D C

W D

C W

D C

W

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

D E

F E

N S

E

L O

G I S T

I C

S

A G

E N

C Y

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y

D

EF

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

-A ug -2

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

A

U G

C

H

AN

G

ES

T O

C O

D

ED

N O

TE

S

4-584 M-404

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

SE

C

TI

O N

BO

IL

ER

R

O O

M N

EW

W

O R

K

PL

AN

SCALE: 3/8" = 1'-0"

BUILDING 11 SECTION 9 - BOILER ROOM NEW WORK PLAN

GENERAL NOTES: M-101 THRU M-401

1. HOT WATER SUPPLY/RETURN (HWS/HWR) PIPING SHALL BE ASTM

A53/A53M, GRADE B, SCHEDULE 40, BLACK STEEL, SEAMLESS. WHERE

PIPE NEEDS REDUCED USE ECCENTRIC REDUCERS.

2. INSULATE NEW HWS/HWR PIPE WITH 2" MINERAL FIBER WITH ALL

SERVICE JACKET. INSTALL PIPING AT A MINIMUM 13 FEET AFF.

3. NEW GAS PIPING SHALL BE STEEL PIPE CONFORMING TO ASME B36.10M;

AND MALLEABLE-IRON THREADED FITTINGS CONFORMING TO ASME

B16.1 AND ASME B16.3.

4. PROVIDE NEW MANUFACTURERS STANDARDIZATION SOCIETY OF

VALVES AND FITTINGS (MSS) TYPE 43 HANGERS WITH TYPE 40

PROTECTIVE SHIELD PIPING. SPACE HANGERS PER MSS 58

GUIDELINES.

5. WATER DISTRIBUTION SYSTEM SHALL BE BALANCED IN ACCORDANCE

WITH SECTION 23 05 93.00 06 TESTING, ADJUSTING AND BALANCING FOR

HVAC OF THE PROJECT SPECIFICATIONS.

6. PIPING AND HEATER LOCATIONS ARE SCHEMATIC IN NATURE. PIPING,

UNIT HEATERS AND BOILERS SHOWN ARE PROVIDED TO SHOW

SUFFICIENT DETAIL FOR BIDDING AND EXECUTION. ACTUAL

INSTALLATION IN FIELD MAY BE REVISED (WITH GOVERNMENT

APPROVAL) TO EASE INSTALLATION.

7. PROVIDE PIPE SLEEVES WHERE PIPES PASS THROUGH MASONRY OR

CONCRETE WALLS. SLEEVES SHALL BE OF SUFFICIENT LENGTH TO

PASS THROUGH ENTIRE THICKNESS OF WALLS. SEAL ALL

PENETRATIONS TO 3 HR FIRE RATING.

CODED NOTES:

1. INSTALL SOLAR WATER TANK IN ACCORDANCE WITH MANUFACTURER'S

RECOMMENDATIONS. SEE PIPING SCHEMATIC SHEET M-504. SEE UNIT

SCHEDULE SHEET M-601.

2. INSTALL NEW INLINE CIRCULATING PUMP. INSTALL PUMP PER

MANUFACTURER'S RECOMMENDATIONS. SEE DETAIL SHEET M-501.

SEE SCHEDULE SHEET M-602.

3. INSTALL NEW HEAT PUMP WATER HEATER IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS. SEE PIPING SCHEMATIC

SHEET M-504. SEE SCHEDULE SHEET M-601.

4. INSTALL NEW GAS-FIRED HOT WATER CONDENSING BOILERS. BOILER

INSTALLATION SHALL INCLUDE ALL FITTINGS AND ACCESSORIES

NECESSARY FOR PROPER OPERATION. BOILERS MUST BE INSTALLED

IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

EXHUAST FLUE AND COMBUSTION AIR INTAKE SHALL BE

SIZED/INSTALLED IN ACCORDANCE WITH BOILER MANUFACTURER'S

RECOMMENDATIONS. SEE BOILER EXHAUST DETAIL SHEET M-501. SEE

BOILER SCHEDULE SHEET M-601. SEE HOT WATER PIPING SCHEMATIC

SHEET M-503. SEE HOT WATER SYSTEM CONTROLS SHEET M-701.

5. INSTALL NEW HOT WATER CIRCULATION PUMPS WITH VFD CONTROL.

PROVIDE 6" CONCRETE PAD FOR UNIT. SEE HOT WATER CIRCULATION

PUMP SCHEDULE SHEET M-601. SEE PUMP DETAIL SHEET M-501.

6. INSTALL NEW 12 GALLON CHEMICAL FEEDER (CF-1) FOR HOT WATER

SYSTEM. SEE DETAIL SHEET M-501. PROVIDE 6" CONCRETE PAD FOR

UNIT.

7. INSTALL NEW BLADDER EXPANSION TANK FOR HOT WATER SYSTEM.

PROVIDE 6" CONCRETE PAD FOR UNIT. SEE SCHEDULE SHEET M-602.

8. INSTALL NEW AIR SEPARATOR BELL & GOSSETT MODEL RL-4F OR

APPROVED EQUAL. INSTALL UNIT IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS.

9. INSTALL NEW 55 GALLON GLYCOL FEEDER. INSTALL IN ACCORDANCE

WITH MANUFACTURER'S RECOMMENDATIONS. SEE PIPING SCHEMATIC

SHEET M-504

SWT-11-9-1

SGP-11-9-1

GF-11-9-1

4"

2-1/2" 2-1/2"

1 1

AutoCAD SHX Text

NORTH

File details come from the government source that posted it. Updated .