REV 1-M-104 NEW WORK SECT 9-10.pdf

PDF 314 KB Posted

Attached to
Project: CSC-20049 Water Heater (Solar) Improvements Bldg 11
Solicitation number
SP4702-22-R-0011
Issued by

About this file

This solicitation package describes a federal contract opportunity for water heater improvements at a Defense Logistics Agency facility in Columbus, Ohio. The scope of work involves installing a solar water tank, heat pump water heater, gas-fired condensing boilers, hot water circulation pumps, a chemical feeder, expansion tank, air separator, glycol feeder, and associated piping. The solicitation will be a 100% small business set-aside with a NAICS code of 238220 and size standard of $16.5 million. The fixed-price award will be made to the lowest-priced technically acceptable offer. Proposals are due by 1:00 PM Eastern on August 22nd and the period of performance is 540 calendar days from notice to proceed. A pre-proposal site visit is scheduled for August 1st with security registration required in advance.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

v

VH

EQUIPMENT

1014 1015

EM LT

LP

-1

LP

-2

LP

-3

T

TT

T

T

T

EM LT

EM

LT

FFF

F

VH

1014 1015

EM LT

LP

-1

LP

-2

LP

-3

T

TT

T

T

T

EM LT

EM

LT

FFF

F

SW

BD

0-

LP

0-

W

LP

0-

E

SW

BD

1-

LP

LP

1036 1035 1034

180 SF

DTC ADMIN

DTC

DTC

BOILER ROOM

DTC

903902

4A

SW

BD

0-

LP

0-

W

LP

0-

E

LP

LP

SW

BD

0-

LP

0-

W

LP

0-

E

LP

LP

6'

915A

PR

IN

TE

R

COAT COAT

NEW

OPENING

POLE POLE

POWER

915A

H W

S

LP

S

LPSLPS

LP

S

LPS

LPS

LP

S

LPSLPS

LP

S

LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS

ET-11-9-1

H W

S H

W S

HWS HWS

H W

S

HWRHWRHWRHWRHWRHWRHWR

DHW

3"

4"

DCW DCW DCW DCW DCW DCW

D C

W

B-11-9-1

HWP-11-9-1

AS-11-9-1

HWP-11-9-2

CHEMICAL

FEEDER

4"

4"

4" 3" 3"

B-11-9-2

PNL-11-9-BR-1

D H

W D

H W

D H

W D

H W

D H

W D

H W

DHW

DHW DHW DHW

DHW

DHW

HWS HWS HWS HWS HWS HWS HWS

3"

H W

S

HWS

H W

S H

W S

H W

S

HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS

DHWDHWDHW

G

LY

G

LY

D C

W

D H

W D

H W

G

LY

G

LY

HWR HWR HWR

H W

R H

W R

H W

R H

W R

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR

4"

4" A

A

A

A

A

A

A

HWRHWRHWRHWRHWRHWRHWRHWRHWRHWR

HWS HWS HWS HWS HWS HWS HWS HWS HWS

A

A

1"

D C

W D

C W

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

D E

F E

N S

E

L O

G I S T

I C

S

A G

E N

C Y

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y

D

EF

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

-A ug -2

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

A

U G

C H

AN

G

ES

T

O C

O D

ED

N

O

TE

S

4-584 M-104

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

SE

C

TI

O N

S

N

EW

M

EC

H

AN

IC

AL

W

O R

K

PL

AN

SCALE: 3/32" = 1'-0"

BUILDING 11 SECTION 9 & 10 - NEW MECHANICAL WORK PLAN

CODED NOTES:

1. INSTALL SOLAR WATER TANK IN ACCORDANCE WITH MANUFACTURER'S

RECOMMENDATIONS. SEE PIPING SCHEMATIC SHEET M-504. SEE UNIT

SCHEDULE SHEET M-601.

2. INSTALL NEW THERMOSTATIC MIXING VALVE AND CONNECT NEW

DOMESTIC HOT WATER SUPPLY TO EXISTING SYSTEM.

3. CONNECT NEW HOT WATER SUPPLY/RETURN PIPING TO EXISTING HOT

WATER SUPPLY/RETURN. SEE PIPING SCHEMATIC DETAIL M-502.

4. INSTALL NEW HEAT PUMP WATER HEATER IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS. SEE PIPING SCHEMATIC

SHEET M-504. SEE SCHEDULE SHEET M-601.

5. INSTALL NEW GAS-FIRED HOT WATER CONDENSING BOILERS. BOILER

INSTALLATION SHALL INCLUDE ALL FITTINGS AND ACCESSORIES

NECESSARY FOR PROPER OPERATION. BOILERS MUST BE INSTALLED

IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

EXHUAST FLUE AND COMBUSTION AIR INTAKE SHALL BE

SIZED/INSTALLED IN ACCORDANCE WITH BOILER MANUFACTURER'S

RECOMMENDATIONS. SEE BOILER EXHAUST DETAIL SHEET M-501. SEE

BOILER SCHEDULE SHEET M-601. SEE HOT WATER PIPING SCHEMATIC

SHEET M-503. SEE HOT WATER SYSTEM CONTROLS SHEET M-701.

6. INSTALL NEW HOT WATER CIRCULATION PUMPS WITH VFD CONTROL.

PROVIDE 6" CONCRETE PAD FOR UNIT. SEE HOT WATER CIRCULATION

PUMP SCHEDULE SHEET M-601. SEE PUMP DETAIL SHEET M-501.

7. INSTALL NEW 12 GALLON CHEMICAL FEEDER (CF-1) FOR HOT WATER

SYSTEM. SEE DETAIL SHEET M-501. PROVIDE 6" CONCRETE PAD FOR

UNIT.

8. INSTALL NEW BLADDER EXPANSION TANK FOR HOT WATER SYSTEM.

PROVIDE 6" CONCRETE PAD FOR UNIT. SEE SCHEDULE SHEET M-602.

9. INSTALL NEW AIR SEPARATOR BELL & GOSSETT MODEL RL-4F OR

APPROVED EQUAL. INSTALL UNIT IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS.

10. INSTALL NEW 55 GALLON GLYCOL FEEDER. INSTALL IN ACCORDANCE

WITH MANUFACTURER'S RECOMMENDATIONS. SEE PIPING SCHEMATIC

SHEET M-504.

11. INSTALL NEW INLINE CIRCULATING PUMP. INSTALL PUMP IN

ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SEE

DETAIL SHEET M-501. SEE SCHEDULE SHEET M-602.

SWT-11-9-1

GENERAL NOTES: M-101 THRU M-106

1. SOLAR COLLECTOR ARRAY AND PIPING ON ROOF NOT SHOWN ON

DRAWING FOR CLARITY. SEE LAYOUT ON SHEETS M-401 THRU M-403.

2. HOT WATER SUPPLY/RETURN (HWS/HWR) PIPING SHALL BE ASTM

A53/A53M, GRADE B, SCHEDULE 40, BLACK STEEL, SEAMLESS. WHERE

PIPE NEEDS REDUCED USE ECCENTRIC REDUCERS INSULATE NEW

HWS/HWR PIPE WITH 2" MINERAL FIBER WITH ALL SERVICE JACKET.

INSTALL PIPING AT A MINIMUM 13 FEET AFF.

3. ALL NEW DOMESTIC HOT WATER AND COLD WATER SHALL BE ASTM

B88M, COPPER TUBE, TYPE L. INSULATE NEW DOMESTIC HOT WATER

AND COLD WATER PIPING WITH 1" FLEXIBLE ELASTOMERIC INSULATION.

4. ALL EXTERIOR WATER/GLYCOL PIPING INSULATION SHALL HAVE AN

ALUMINUM WEATHER PROOF JACKET.

5. NEW GAS PIPING SHALL BE STEEL PIPE CONFORMING TO ASME B36.10M;

AND MALLEABLE-IRON THREADED FITTINGS CONFORMING TO ASME

B16.1 AND ASME B16.3.

6. PROVIDE NEW MANUFACTURERS STANDARDIZATION SOCIETY OF

VALVES AND FITTINGS (MSS) TYPE 43 HANGERS WITH TYPE 40

PROTECTIVE SHIELD PIPING. SPACE HANGERS PER MSS 58

GUIDELINES.

7. WATER DISTRIBUTION SYSTEM SHALL BE BALANCED IN ACCORDANCE

WITH SECTION 23 05 93.00 06 TESTING, ADJUSTING AND BALANCING FOR

HVAC OF THE PROJECT SPECIFICATIONS.

8. PIPING AND HEATER LOCATIONS ARE SCHEMATIC IN NATURE. PIPING,

UNIT HEATERS AND BOILERS SHOWN ARE PROVIDED TO SHOW

SUFFICIENT DETAIL FOR BIDDING AND EXECUTION. ACTUAL

INSTALLATION IN FIELD MAY BE REVISED (WITH GOVERNMENT

APPROVAL) TO EASE INSTALLATION.

9. PROVIDE PIPE SLEEVES WHERE PIPES PASS THROUGH MASONRY OR

CONCRETE WALLS. SLEEVES SHALL BE OF SUFFICIENT LENGTH TO

PASS THROUGH ENTIRE THICKNESS OF WALLS. SEAL ALL

PENETRATIONS TO 3 HR FIRE RATING.

WH-11-9-1

PIPE DOWN FROM SOLAR COLLECTOR ARRAY

SGP-11-9-1

DHWP-11-9-1

EXPANSION LOOP

5'-0" x 2'-6" x 5'-0"

EXPANSION LOOP

5'-0" x 2'-6" x 5'-0"

GF-11-9-1 10

AutoCAD SHX Text 2"

AutoCAD SHX Text

NORTH

File details come from the government source that posted it. Updated .