This solicitation is for a firm fixed price contract to provide safety improvements at the Defense Supply Center Columbus, Ohio. The work includes furnishing labor, equipment, materials and supervision to complete solar water heater improvements in Building 11. A pre-proposal site visit is scheduled for August 1, 2022, with proposals due August 22, 2022. The award will be made to the lowest priced technically acceptable offer from a responsible small business. The contractor must pay prevailing Davis-Bacon wages and complete all work within 540 calendar days of the notice to proceed.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLUMBUS
O W
N
S H
IG
H
ST
IN
D
IA
N
O
LA
A
VE
TH
S
T
N C
AS
SA
D Y
AV
E
HA
RR
IS
BU
RG
P
IK
E
SU
N
BU
R
Y R
D
SU
N
BU
R
Y R
D d
C
LE
VN
HARD RD
E DUBLIN
JOHN GLENN
W 5TH AVE
COLUMBUS
WHITEHALL
COLUMBUS INT'L
AIRPORT
RD
HA
RR
IS
B
EL
AN
D
AV
E
URG
PIKE
E BROAD ST
REFUGEE RD
GRANVILLE RD
- LANCASTER RD
JO
HNST
R
IVER
SID
E D
R
C
LE
VE
LA
N D
A
VE
S H
AM
IL
TO
N
R D
ST
EL
ZE
R
R D
JA
M
ES
R
D
YE
AR
LI
N
G R
D
DSCC
OSU AIRPORT
MAIN STREET
MAIN STREET
Gtypegroupnamepreferencedescription
Gtypegroupnamepreferencedescription
G
G
RV STORAGE
"A"
RV STORAGE
"B"
DRMO
STORAGE
INDEX OF DRAWINGS
SHEET NO. SHEET TITLE
G-001 COVER SHEET
A-101 BUILDING 11 PLAN & ELEVATION
S-101 BUILDING 11 ROOM 927 - FLOOR RESURFACING PLAN
S-101 STRUCTURAL DETAILS
M-001 GENERAL MECHANICAL NOTES AND LEGENDS
MD-101 BUILDING 11 SECTIONS 3 & 4 - MECHANICAL DEMOLITION
MD-102 BUILDING 11 SECTIONS 5 & 6 - MECHANICAL DEMOLITION
MD-103 BUILDING 11 SECTIONS 7 & 8 - MECHANICAL DEMOLITION
MD-104 BUILDING 11 SECTIONS 9 & 10 - MECHANICAL DEMOLITION
MD-105 BUILDING 11 SECTIONS 11 & 12 - MECHANICAL DEMOLITION
MD-106 BUILDING 11 SECTION 13 - MECHANICAL DEMOLITION
MD-501 TYPICAL HEAT EXCHANGER DEMOLITION SCHEMATIC
M-101 BUILDING 11 SECTIONS 3 & 4 - NEW MECHANICAL WORK PLAN
M-102 BUILDING 11 SECTIONS 5 & 6 - NEW MECHANICAL WORK PLAN
M-103 BUILDING 11 SECTIONS 7 & 8 - NEW MECHANICAL WORK PLAN
M-104 BUILDING 11 SECTIONS 9 & 10 - NEW MECHANICAL WORK PLAN
M-105 BUILDING 11 SECTIONS 11 & 12 - NEW MECHANICAL WORK PLAN
M-106 BUILDING 11 SECTION 13 - NEW MECHANICAL WORK PLAN
M-401 BUILDING 11 SECTIONS 3 & 4 - SOLAR COLLECTOR PLAN
M-402 BUILDING 11 SECTIONS 8 & 9 - SOLAR COLLECTOR PLAN
M-403 BUILDING 11 SECTION 11 - SOLAR COLLECTOR PLAN
M-404 BUILDING 11 SECTION 9 - BOILER ROOM NEW WORK PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 BOILER PIPING SCHEMATIC
M-504 SOLAR WATER HEATING PIPING SCHEMATICS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-701 BOILER CONTROLS
M-702 SOLAR WATER HEATING CONTROLS
E-101 BUILDING 11 ROOM 401 - MECHANICAL POWER PLAN
E-102 BUILDING 11 ROOM 927- MECHANICAL POWER PLAN
E-103 BUILDING 11 ROOM 1107 - MECHANICAL POWER PLAN
E-104 BUILDING 11 ROOM 1300 - MECHANICAL POWER PLAN
YEARLING ROAD GATE:
401 N YEARLING RD,
WHITEHALL, OH 43213
JAMES ROAD GATE (TRUCK
ENTRANCE):
200 JAMES ROAD
COLUMBUS, OH 43218
FACILITY ENGINEERING: BUILDING 308
WORK LOCATION: BUILDING 11CENTRAL RECEIVING: BUILDING 17
PASS & ID: BUILDING 61
DEFESE SUPPLY CENTER COLUMBUS
PROJECT NUMBER: CSC-20049
WATER HEATER (SOLAR)
IMPROVEMENTS, BLDG. 11
DSCC SITE LOCATION
COLUMBUS VICINITY
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
D E
F E
N S
E
L O
G I S T
I C
S
A G
E N
C Y
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
C
Y D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R C
O
LU
M
BU
S C
O
LU
M
BU
S, O
H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
N O
N E
-J ul -2
"X
N O
N E
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y
EM
ER
G
EN
C Y
SE
R
VI
C
ES
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584 G-001
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
C O
VE
R
S H
EE
T
AutoCAD SHX Text
AutoCAD SHX Text
RIM= 789.94'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text "A"
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text "B"
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text "C"
AutoCAD SHX Text
OHIO ARMY NATIONAL
AutoCAD SHX Text
GUARD CENTER
AutoCAD SHX Text
U.S. ARMY
AutoCAD SHX Text
RESERVE CENTER
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
AutoCAD SHX Text
OHIO ARMY
AutoCAD SHX Text
NATIONAL GUARD
AutoCAD SHX Text
COMBINED
AutoCAD SHX Text
SUPPORT
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
AutoCAD SHX Text
ARMY FORCES
AutoCAD SHX Text
RESERVE CENTER
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
AutoCAD SHX Text
OHIO ARMY
AutoCAD SHX Text
NATIONAL GUARD
AutoCAD SHX Text
COMBINED
AutoCAD SHX Text
SUPPORT
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
OHIO ARMY
AutoCAD SHX Text
NATIONAL GUARD
AutoCAD SHX Text
COMBINED
AutoCAD SHX Text
SUPPORT
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
STORAGE AREA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TENNIS
AutoCAD SHX Text
COURTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RETENTION
AutoCAD SHX Text
POND
AutoCAD SHX Text
RETENTION
AutoCAD SHX Text
POND
AutoCAD SHX Text
RETENTION
AutoCAD SHX Text
POND
AutoCAD SHX Text
RETENTION
AutoCAD SHX Text
POND
AutoCAD SHX Text
RETENTION
AutoCAD SHX Text
POND
AutoCAD SHX Text 21A
AutoCAD SHX Text 20A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CREDIT
AutoCAD SHX Text
UNION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 45A
AutoCAD SHX Text 45C
AutoCAD SHX Text 45B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VPC
AutoCAD SHX Text
ARMY FORCES
AutoCAD SHX Text
RESERVE CENTER
W
ES
T
EN
D
EA
ST
E N
D
RAMP
v
W O
M
EN
'S R
ES
TR
O O
M
VH
M
EN
'S R
ES
TR
O O
M
M
EC
H
AN
IC
AL
R O
O M
LO
AD
IN
G
D O
C K
D F
DOCK AREA
v v v
DOCK AREA
v v
SECTION 2 SECTION 5SECTION 4SECTION 3 SECTION 6
RAMP
SECTION 7
OFFICEOFFICE
s s 3
DIVISION
M/RRW/RR
CC
E
CC
E
42 42
LPF
A C E
C
14'-5"19'-6"8'-3"
6" 6" 10"
*FIRE ALARM,
START PANEL RUN
TO CLEAR THIS,
SHOULD LEAVE A
34" AISLE WAY
614 615 616
TABLE
Credenza & Hutch
D es k
D es k
D es k
D es k
OPEN
C
LO
SE
D
D O
U
BL
E C
LO
SE
D D
O U
BL
E
OFFICE
505506507508
SECTION 8 SECTION 9 SECTION 10 SECTION 11 SECTION 12 SECTION 13
DOCK
UP
v v v
LOADING DOCK AND WALKWAY
CL
v v v
VH
ROOM
EQUIPMENT
1014 1015
EM LT
LP
-1
LP
-2
LP
-3
T
TT
T
T
T
EM LT
EM
LT
FFF
F
VH
1014 1015
EM LT
LP
-1
LP
-2
LP
-3
T
TT
T
T
T
EM LT
EM
LT
FFF
F
EM
L
T
EM
L
T
SW
BD
0-
LP
0-
W
LP
0-
E
EL
P
N L
SW
BD
1-
LP
LP
F
S
F
C F
LP
LP
1036 1035 1034
180 SF
DTC ADMIN
DTC
DTC
BOILER ROOM
DTC
903902
4A
R O
O M
EQ
U
IP
M
EN
T
T
LP122
LP
PP
EM LT
F F
F
F
NAC
EM
L
T
EM
L
T F F
SIR
SIR
PT
D F
F
'-6
1 16
T
PP
13021303
130413051306
TRANSFORMER
ELECTRIC BOXA/C
LP
T
1240 1242
TEL
SIDEWALK
ELECTRIC BOX
SW
BD
0-
LP
0-
W
LP
0-
E
LP
LP
SW
BD
0-
LP
0-
W
LP
0-
E
LP
LP
6'
BU
IL
D
IN
G
AU
D
IT
O R
IU
M
BA
C
KS
TA
G E
132213231324132513261327
OFFICE
S
S
915A
DDWO
PR
IN
TE
R
COAT COAT
NEW
OPENING
POLE POLE
POWER
03820 821807
915A
SECTION 1
BOILER ROOM
MECHANICAL
T T
T
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
C
Y
D
EF
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
-J ul -2
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584 A-101
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
BU
IL
D
IN
G
PL
AN
E
LE
VA
TI
O N
BUILDING 11 NORTH ELEVATION
SCALE: 1/8" = 1'-0"
SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION 9 SECTION 10 SECTION 11 SECTION 12 SECTION 13
SCALE: 1/64" = 1'-0"
BUILDING 11 SECTIONS 1-13
NORTH
BOILER ROOM
G
LY
GLYGLYGLYGLYGLYGLYGLYGLY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
G
LY
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
3/
'-0
-J ul -2
"X
3/
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584 A-401
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
BU
IL
D
IN
G
R
O O
M
F
LO
O
R R
ES
U
R
FA
C
IN
G P
LA
N
SOW NOTES:
1. SURFACE PREPARATION
1.1 CONCRETE SURFACES:
REMOVE PLATES, MACHINED SURFACES, AND SIMILAR ITEMS ALREADY
IN PLACE THAT ARE NOT TO BE COATED. PROVIDE SURFACE-APPLIED
PROTECTION BEFORE SURFACE PREPARATION AND COATING WHERE
REMOVAL IS IMPRACTICAL OR IMPOSSIBLE. AFTER COMPLETING
COATING OPERATIONS, REINSTALL ITEMS THAT WERE REMOVED.
REMOVE CLEAN DIRT, OIL, GREASE, AND INCOMPATIBLE PAINTS FROM
SUBSTRATES TO ENSURE BONDING. COORDINATION OF SHOP-APPLIED
PRIME COATS WITH HIGH-PERFORMANCE COATINGS IS CRITICAL.
REMOVE INCOMPATIBLE PRIMERS. RE-PRIME SUBSTRATE WITH
COMPATIBLE PRIMERS AS REQUIRED TO PRODUCE COATING SYSTEMS
INDICATED.
CONTRACTOR SHALL PREP THE CONCRETE FLOORING, BY PATCHING
AND LEVELING OF THE FLOOR AREA AND REPAIR THE CONCRETE
FLOORS AS REQUIRED TO ACCEPT THE NEW FLOORING. SEAL CRACKS
SIZES 1/4" X 1/2" AND HIGHER USING JOINT FILLER MATERIAL FOR
CONCRETE FLOORS. REMOVE EXPANSION JOINT MATERIALS FROM
FLOOR JOINTS AND REPLACE WITH EPOXY MORTAR WITH SEMI RIGID
EPOXY SEAL.
REMOVE RELEASE AGENTS, CURING COMPOUNDS, EFFLORESCENCE,
AND CHALK MAXIMUM MOISTURE CONTENT OF CONCRETE IS 12
PERCENT. MOISTURE CONTENT MUST BE MEASURED WITH
ELECTRONIC MOISTURE METER.
CLEAN SURFACES WITH DIAMOND GRIND TO REMOVE EXISTING
COATINGS. PREPARE SURFACES USING THE METHODS
RECOMMENDED BY THE MANUFACTURER FOR ACHIEVING THE BEST
RESULT FOR THE SUBSTRATE UNDER THE PROJECT CONDITIONS.
2. COATING MATERIAL PREPARATION
2.1 GENERAL:
MIX AND PREPARE COATING MATERIALS IN ACCORDANCE WITH THE
COATING MANUFACTURER'S PRINTED INSTRUCTIONS FOR THE
PARTICULAR MATERIAL AND COAT TO BE APPLIED. KEEP MATERIALS
WHICH ARE NOT IN ACTUAL USE IN CLOSED CONTAINERS.
COATING MATERIALS THAT HAVE BEEN MIXED WITH AN AUTOMATIC
SHAKER MUST BE ALLOWED TO STAND TO LET AIR BUBBLES ESCAPE,
THEN GIVEN A FINAL HAND MIXING BEFORE APPLICATION. STIR
MATERIALS SO AS TO PRODUCE A MIXTURE OF UNIFORM DENSITY.
STIR AT FREQUENT INTERVALS DURING APPLICATION TO PREVENT
SKINNING. DO NOT STIR FILM WHICH MAY FORM ON THE SURFACE OF
THE MATERIAL. REMOVE FILM AND STRAIN, IF NECESSARY.
2.2 THINNING
THINNING MUST BE DONE IN ACCORDANCE WITH COATING
MANUFACTURER'S PRINTED DIRECTIONS FOR THE PARTICULAR
MATERIAL AND COAT.
2.3 TINTING
PRIME AND INTERMEDIATE COATS OF PAINT MUST BE A SLIGHTLY
DIFFERENT TINT FROM THE FINISH COAT TO FACILITATE
IDENTIFICATION OF EACH COAT. TINTING MUST BE DONE BY THE
COATING MANUFACTURER AND CLEARLY IDENTIFIED AS TO COLOR
AND COAT.
3. APPLICATION OF COATING MATERIALS
3.1 GENERAL
DO NOT PERFORM EXTERIOR PAINTING IN DAMP OR RAINY WEATHER.
INTERIOR PAINTING MUST NOT BE ALLOWED UNTIL THE BUILDING IS
ENCLOSED AND HAS THOROUGHLY DRIED OUT. DO NOT ALLOW
PAINTING BELOW 60 DEGREES F AND ABOVE 95 DEGREES F. COATING
APPLICATION MUST BE IN ACCORDANCE WITH THE COATING
MANUFACTURER'S WRITTEN INSTRUCTIONS & RECOMMENDATIONS,
AND AS SPECIFIED.
APPLICATION OF COATINGS MUST BE DONE BY SKILLED APPLICATORS.
APPLY COATINGS TO CLEAN AND PROPERLY PREPARED SURFACES.
APPLY COATINGS CAREFULLY WITH CLEAN, HIGH-QUALITY
APPLICATION EQUIPMENT. ALLOW SUFFICIENT TIME BETWEEN COATS
TO ENSURE COMPLETE DRYING AND CURING. SURFACES MUST BE
SANDED AND DUSTED BETWEEN COATINGS, AS REQUIRED, TO
PRODUCE A SURFACE FREE OF VISIBLE DEFECTS. HIGH GLOSS
COATINGS AND CLEAR FINISHES MUST BE LIGHTLY SANDED BETWEEN
COATS TO ENSURE BOND OF FOLLOWING COATS.
APPLY COATS TO THE SURFACES IN AN EVEN FILM. DO NOT ACCEPT
CLOUDINESS, SPOTTING, HOLIDAYS, LAPS, APPLICATION MARKS, RUNS,
SAGS, AND OTHER SIMILAR SURFACE IMPERFECTIONS. REMOVE
DEFECTIVE COATING APPLICATIONS AND RECOAT AS DIRECTED.
COATING LINES SUCH AS WAINSCOTS MUST BE SHARP, TRUE, AND
WELL-DEFINED. TAPE MAY BE USED TO ESTABLISH COATING LINES,
PROVIDING TAPE IS REMOVED BEFORE RAGGING OR SAW-TOOTH
EDGES FORM.
SURFACES, INCLUDING EDGES, CORNERS, CREVICES, WELDS, AND
OTHER SIMILAR CHANGES IN SURFACE PLANE, MUST RECEIVE A
DRY-FILM THICKNESS NOT LESS THAN SPECIFIED.
3.2 RATE OF APPLICATIONS:
11 MILS PRIME COAT - MIX COMPONENTS TOGETHER. MIX ONLY
ENOUGH MATERIAL WHICH CAN BE APPLIED WITHIN 25 MINUTES. APPLY
AT THE RATE OF 200 SF PER GALLON. ALLOW COATING TO CURE 24
HOURS AT 75 DEGREES F AND 50% RELATIVE HUMIDITY.
16 MILS BASE COAT - MIX ALL COMPONENTS TOGETHER IN A MORTAR
MIXER. PLACE MIXED MATERIAL WITHIN 15 MINUTES. APPLY AT A RATE
OF 107 SF/GAL. POUR MIX MATERIAL INTO SCREEN BOX AND
SCREENED OVER DESIRED AREA. POWER TROWEL MATERIAL TO
COMPACT AND ACHIEVE FINISHED TEXTURE. ALLOW COATING TO CURE
6 HOURS AT 75 DEGREES F AND 50% RELATIVE HUMIDITY. REMOVE
HIGH SPOTS AND IMPERFECTIONS USING A TERRAZZO GRINDER.
VACUUM UP LOOSE MATERIAL AND DUST.
3 MILS URETHANE TOP COAT- SATIN URETHANE TOPCOAT: OPEN AND
MIX ONLY ENOUGH MATERIAL, WHICH CAN BE APPLIED IN A 2 HOUR
PERIOD. APPLY SATIN URETHANE TOPCOATING AT THE RATE OF 500 SF
PER GALLON. ALLOW COATING TO DRY 24 HOURS AT 75 DEGREES F.
AND 50% RELATIVE HUMIDITY.
3.2.1 BRUSH APPLICATION
BRUSHES MUST BE CLEAN AND THE PROPER SIZE AND TYPE FOR
HIGH-QUALITY APPLICATION OF THE SPECIFIED COATING MATERIALS.
SLOW-DRY COATINGS MUST BE BRUSHED OUT. QUICK-DRY COATINGS
MUST BE BRUSHED ONLY ENOUGH TO SPREAD OUT EVENLY.
3.2.2 ROLLER APPLICATION
ROLLER COVERS MUST BE CLEAN AND OF THE PROPER NAP LENGTH,
NAP TEXTURE, AND MATERIAL FOR HIGH-QUALITY APPLICATION OF THE
SPECIFIED COATING MATERIALS.
ROLLER APPLICATION MUST BE DONE CAREFULLY AND MUST BE
EQUIVALENT IN ALL RESPECTS TO THE SAME COATS APPLIED BY
HIGH-QUALITY BRUSH APPLICATION.
4. ACCEPTANCE PROVISIONS
4.1 REPAIRING
REMOVE DAMAGED AND UNACCEPTABLE PORTIONS OF COMPLETED
WORK AND REPLACE WITH NEW WORK TO MATCH ADJACENT
SURFACES AT NO ADDITIONAL COST TO THE GOVERNMENT.
4.2 CLEANING
AT END OF EACH WORKDAY, REMOVE RUBBISH, EMPTY CANS, RAGS,
AND OTHER DISCARDED MATERIALS FROM PROJECT SITE.
AFTER COMPLETING COATING APPLICATION, CLEAN SPATTERED
SURFACES. REMOVE SPATTERED COATINGS BY WASHING, SCRAPING,
OR OTHER METHODS. DO NOT SCRATCH OR DAMAGE ADJACENT
FINISHED SURFACES.
APPLICATION EQUIPMENT MUST BE CLEANED PROMPTLY AND
THOROUGHLY WITH A SUITABLE SOLVENT AFTER EACH USE AND
STORED IN A CLEAN, COVERED, WELL-VENTILATED CONTAINER.
PROTECT WORK OF OTHER TRADES AGAINST DAMAGE FROM COATING
OPERATION. CORRECT DAMAGE BY CLEANING, REPAIRING,
REPLACING, AND RECOATING, AS APPROVED BY ARCHITECT, AND
LEAVE IN AN UNDAMAGED CONDITION. AT COMPLETION OF
CONSTRUCTION ACTIVITIES OF OTHER TRADES, TOUCH UP AND
RESTORE DAMAGED OR DEFACED COATED SURFACES.
4.3 PROTECTION
CLOSE JOB SITE TO TRAFFIC FOR A PERIOD OF 24 HOURS AFTER
COATING APPLICATION AT 75 DEGREES F AND 50% RELATIVE HUMIDITY.
BUILDING ROOM 927 (BOILER ROOM) CONCRETE FLOOR FINISH SCHEDULE
SECTION
NO. NAME GROSS
AREA
REMOVE/STRIP EXISTING
FLOOR FINISH. CLEAN AND
PREPARE FOR APPLICATION OF
NEW FINISH
APPLY ONE COAT
OF 11 MILS EPOXY
AS A PRIMER
APPLY ONE COAT OF
16 MILS EPOXY AS A
BASE COAT
SCRUB THE BASE COAT,
THEN APPLY CLEAR SATIN
3 MILS URETHANE TOP
COAT
REMARKS
9 BOILER
ROOM
950 SQ. FT. ■ ■ ■ ■
GENERAL NOTES
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AFFECTING THE WORK. FLOOR RESURFACING SHALL NOT START UNTIL BOILER ROOM MECHANICAL ROOM DEMOLITION IS COMPLETE. SEE SHEET MD-104 FOR BOILER ROOM
DEMOLITION PLAN.
2. EXISTING FURNISHINGS, CASEWORK, MATERIALS AND SUPPLIES WILL BE REMOVED AND/OR RELOCATED FROM THE WORK AREAS BY DSCC PERSONNEL, COORDINATE WITH THE CONTRACTING OFFICER REPRESENTATIVE (COR).
3. UNLESS OTHERWISE APPROVED, THE CONTRACTOR SHALL SCHEDULE AND COMPLETE FLOOR STRIPPING, SURFACE PREPARATION AND FINISHING OPERATIONS IN WORK PHASES, AS PER APPROVED WORK SCHEDULE. THIS WILL PERMIT THE REMOVAL & RELOCATION OF SUPPLIES AND MATERIALS FROM THE WORK AREAS BY GOVERNMENT PERSONNEL
CONCRETE FLOOR TO BE
RESURFACED
LEGEND
SCALE: 3/16" = 1'-0"
BUILDING 11 ROOM 927 - FLOOR RESURFACING PLAN
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
-J ul -2
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584 S-501
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
ST
R
U C
TU
R
AL
D
ET
AI
LS
SHEET NOTES: S-101
1. ACTUAL SIZE AND THE DIMENSIONS OF THE SUPPORT STRUCTURE AND
UNISTRUTS USED FOR INSTALLATION OF THE SOLAR PANELS SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR.
2. CONTRACTOR TO PROVIDE DESIGN CALCULATIONS FOR ALL SOLAR
PANEL MOUNTING HARDWARE TO BE INCLUDED IN THE SHOP DRAWING
SUBMITTAL AND TO BE STAMPED BY A REGISTERED STRUCTURAL
ENGINEER LICENSED IN THE STATE OF OHIO.
3. ALL CONNECTIONS TO BE DESIGNED TO WITHSTAND MAXIMUM
ALLOWABLE LOADING OF THE INTERSECTING MEMBERS/
SOLAR PANELS
6'-2" 5'-0"(typ.)
ROOF PURLINS(5'-0" c/c. TYP.)
SSM ROOF BEAM
MULTI-ARCH CONC.
ROOF(EXTG.)
INSULATION
ROOF SLOPE
SOLAR PANEL
SUPPLY/RETURN
LINES
X X X X X X X X X X X X X X X X X X X
6"
NOTES:
1. 6-INCH MINIMUM CLEAR DISTANCE FROM EDGE OF EQUIPMENT TO
EDGE OF EQUIPMENT PAD (TYPICAL ALL EDGES).
2. PRIOR TO PAD INSTALLATION, SWEEP CONCRETE CLEAN, ROUGHEN
SURFACE, AND APPLY BONDING AGENT.
EQUIPMENT
SEE NOTE 1
EQUIPMENT PAD
REINFORCING
#3 @ 9" OC, EW
6" CONCRETE
EQUIPMENT PAD
CONCRETE FLOOR
3/4" CHAMFER AT
EXPOSED EDGES (TYP)
#4 @ 24" OC (ALT. -DRILL
& EPOXY VERTICAL LEG
DOWEL WITH 3" IMBED)
TYPICAL EQUIPMENT PAD DETAIL
SCALE: NONE
TYPICAL BUILDING ROOF SECTION
SCALE: NONE
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
-J ul -2
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584 M-001
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
M
EC
H
AN
IC
AL
L
EG
EN
D
N
O
TE
S
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
HOSE CONNECTOR
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
VALVE SYMBOL LEGEND
PIPE TYPE DESCRIPTION
LPS LPS
HWR HWR
HWS HWS
G G
PIPING LEGEND
CONDENSATE
LOW PRESSURE STEAM
HOT WATER SUPPLY
HOT WATER RETURN
GLYCOL
NATURAL GAS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
MECHANICAL SYMBOL LEGEND
DESCRIPTIONPLAN SYMBOLS
GENERAL NOTES:
1. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH MECHANICAL DRAWING
OF THIS SET. NOTES SPECIFIC TO INDIVIDUAL MECHANICAL DRAWINGS WILL BE SHOWN
ON THE RESPECTIVE MECHANICAL DRAWING.
2. THE MECHANICAL SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, NFPA STANDARDS, AND CONTRACT
SPECIFICATIONS. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND
EQUIPMENT, AND SHALL PROVIDE ALL SERVICES AND INCIDENTALS REQUIRED TO
PRODUCE A COMPLETE AND PROPERLY OPERATING MECHANICAL SYSTEM FOR THE
FACILITY.
3. DUE TO THE SMALL SCALE OF THE DRAWINGS, ALL VALVES, FITTINGS, ACCESSORIES,
ETC. ARE NOT SHOWN OR IDENTIFIED ON THE PLANS. CONTRACTOR SHALL REFER TO
MECHANICAL DETAILS FOR ALL VALVES, FITTINGS, ACCESSORIES, ETC., REQUIRED.
CONTRACTOR SHALL ENSURE ALL REQUIRED ITEMS ARE FURNISHED AND INSTALLED.
4. FOR MECHANICAL DETAILS, SEE SHEETS M-501 THRU M-504. MECHANICAL DETAILS MAY
OR MAY NOT BE REFERENCED ON MECHANICAL PLANS; HOWEVER, CONTRACTOR SHALL
INSTALL ALL EQUIPMENT, PIPING, AND ACCESSORIES IN ACCORDANCE WITH THE
MECHANICAL DETAILS.
5. FOR MECHANICAL EQUIPMENT SCHEDULES, SEE SHEET M-601 & M-602.
6. FOR HVAC CONTROL DRAWINGS, SEE SHEET M-701.
7. THE CONTRACTOR SHALL PERFORM ALL TESTS AS REQUIRED BY SPECIFICATIONS,
APPLICABLE CODES, AND APPLICABLE REGULATORY AGENCIES. REQUIRED TESTS SHALL
BE WITNESSED BY A GOVERNMENT REPRESENTATIVE AS SPECIFIED.
8. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER TRADES TO AVOID
CONFLICTS AND OBSTRUCTIONS.
9. HVAC EQUIPMENT SHALL BE LOCATED AS SHOWN. CONTRACTOR SHALL DETERMINE THE
EXACT LOCATIONS BASED ON ACTUAL SIZES OF EQUIPMENT. CONTRACTOR SHALL
PROVIDE CLEARANCES AROUND EQUIPMENT AS REQUIRED BY MANUFACTURER'S
RECOMMENDATIONS AND CODE REQUIREMENTS. EQUIPMENT SHALL BE INSTALLED TO
FACILITATE SERVICE, MAINTENANCE, REPAIR AND REPLACEMENT OF EQUIPMENT.
CONNECTIONS TO EQUIPMENT SHALL BE MADE FOR EASE OF DISCONNECT AND TO
AVOID INTERFERENCE WITH OTHER INSTALLATIONS. CONTRACTOR SHALL PROVIDE ALL
DUCT AND PIPE TRANSITIONS REQUIRED FOR CONNECTIONS TO EQUIPMENT.
EQUIPMENT LOCATIONS SHALL BE COORDINATED WITH ELECTRICAL REQUIREMENTS.
10. CONTRACTOR SHALL INSTALL PIPING SYSTEMS SO THAT ALL VALVES, STRAINERS,
UNIONS, TRAPS, FLANGES, AND ALL OTHER FITTINGS AND APPURTENANCES ARE EASILY
ACCESSIBLE. CONTRACTOR SHALL PROVIDE AND INSTALL ALL PIPING FITTINGS, RISES,
DROPS, ETC., AS NECESSARY FOR A FULLY FUNCTIONAL PIPING SYSTEM. ALL VALVES
SHALL BE INSTALLED SO THAT THE VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR
PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED. ALL VALVES AND STRAINERS SHALL
BE FULL SIZE OF PIPE. VALVES FOR ISOLATION OF EQUIPMENT SHALL BE FULL SIZE OF
PIPE TO EQUIPMENT BEFORE REDUCTION FOR CONNECTION TO EQUIPMENT.
11. ALL FLOOR MOUNTED EQUIPMENT SHALL BE LOCATED ON NEW HOUSEKEEPING PADS.
12. ALL CONTROL WIRING SHALL BE INSTALLED IN CONDUIT. ALL CONDUIT, IN FINISHED
AREAS AND EXCLUDING MECHANICAL AND ELECTRICAL ROOMS, SHALL BE CONCEALED.
ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL
CODE AND WITH CONTRACT SPECIFICATIONS.
13. CUT OPENINGS, AS REQUIRED, IN THE CONSTRUCTION FOR THE INSTALLATION OF
PIPING, DUCTWORK, AND EQUIPMENT. PATCH AND REPAIR TO MATCH THE EXISTING
ADJACENT CONSTRUCTION AND TO MAINTAIN THE RATING OF CONSTRUCTION. THE
ANNULAR SPACE OF ALL PENETRATIONS SHALL BE FILLED WITH AN APPROVED MATERIAL
IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.
T THERMOSTAT
HOT WATER CIRCULATION PUMP
CONDENSING BOILER
A
PIPE ANCHOR
VERTICAL UNIT HEATER
PIPE/EQUIPMENT TO BE DEMOLISHED
PIPE/EQUIPMENT WITH ASBESTOS
TO BE DEMOLISHED
EXPANSION TANK
AIR SEPARATOR
CONNECTION/DISCONNECTION POINT
VALVE SYMBOL DESCRIPTION
DCWDCW
DHW DHW
GLY
HEAT PUMP WATER HEATER
SOLAR WATER TANK
SOLAR COLLECTOR
INLINE CIRCULATION PUMP
AutoCAD SHX Text
LC
M v
F
HROC
v v
HROC
v
14'-5"19'-6"8'-3"
6" 6" 10"
*FIRE ALARM,
START PANEL RUN
TO CLEAR THIS,
SHOULD LEAVE A
34" AISLE WAY
D es k
D es k
LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS
CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LP
S
LPS
LPS
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
CD CD CD CD CD CD CD CDCDCDCDCDCDCD
C D
C D
CD
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
LPS
C D
1"
1"
1-1/4"
1-1/4"
HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS
H
PS
H
PS
H
PS
HPSHPSHPSHPSHPSHPSHPS
D H
W D
H W
DHWDHWDHWDHWDHWDHWDHW
DHWDHWDHW
MPS
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
M P S
LPS
M
BOILER
BOILER1 1/2" CONDENSATE RETURN
LINE @ 12'-6" AFF
2" CONDENSATE
RETURN LINE
MPSMPSMPSMPSMPS
MPSMPSMPSMPSMPS
CONDENSATE
RETURN TANK
MPS
M
P S
M P S
M
P S
M P S
DCW
D C
W
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584
MD-101
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
BU
IL
D
IN
G
SE
C
TI
O N
S
- M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
SCALE: 3/32" = 1'-0"
BUILDING 11 SECTIONS 3 & 4 - MECHANICAL DEMOLITION PLAN
CODED NOTES:
1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL
ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING
ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)
FOR WATER HEATER BACK TO ELECTRICAL PANEL.
2. REMOVE EXISTING SOLAR COLLECTOR ARRAY LOCATED ON ROOF.
PATCH ANY HOLES IN ROOF AS RESULT OF DEMOLITION TO MATCH
EXISTING.
3. REMOVE EXISTING SOLAR WATER HEAT EXCHANGER TANK AND
ALL ASSOCIATE PIPING. REMOVE ALL PIPING BETWEEN TANK AND
SOLAR COLLECTOR ARRAY ALONG WITH CIRCULATING PUMP.
REMOVE STEAM PIPING BACK TO MAIN. REMOVE CONDENSATE
CIRCULATING PUMP.
SHEET NOTES: SHEETS MD-101 THRU MD-401
1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.
2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF
DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.
3. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE
PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND
DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST
BE NOTIFIED 14 DAYS BEFORE ABATEMENT.
4. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS
SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED
ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
5. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT
DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND
LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.
6. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING
SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY
OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN
OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO KEEP THE BUILDING TEMPERED.
AutoCAD SHX Text T
AutoCAD SHX Text T v v s s 3
CC
E
CC
E
LPF
A C E
C
10"
*FIRE ALARM,
START PANEL RUN
TO CLEAR THIS,
SHOULD LEAVE A
34" AISLE WAY
614 615 616
TABLE
OPEN
C
LO
SE
D
D O
U
BL
E C
LO
SE
D D
O U
BL
E
505506507508
LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS
CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD
5" 5"
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CDCDCDCDCDCDCD
C D
C D
CD
CD CD CD CD CD CD CD CD CD CD CD CD CDCDCDCDCDCDCD
C D
C D
CD
CD CD CD CD CD CD CD CD CD CD CD
HWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWS
HWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWR
AI
R
S
EP
AR
AT
O R
EX
PA
N
SI
O N
T
AN
K
C D
H W
R H
W R
H W
R
HWR
LP
S
LP
S
LPS
H W
S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
R H
W R
H W
R H
W R
C D
1- 1/
2"
1- 1/
2"
H X-
P-
P-
C O
N D
EN
SA
TE
R
EC
EI
VE
R
2"
2" 2"
2" 3/
4"
H
PS
H
PS
HPS
H
PS
H
PS
HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS
D H
W D
H W
D H
W D
H W
DHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHW
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584
MD-102
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
BU
IL
D
IN
G
SE
C
TI
O N
S
- M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
SCALE: 3/32" = 1'-0"
BUILDING 11 SECTIONS 5 & 6 - MECHANICAL DEMOLITION PLAN
CODED NOTES:
1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL
ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING
ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)
FOR WATER HEATER BACK TO ELECTRICAL PANEL.
2. REMOVE EXISTING STEAM TO HOT WATER SHELL AND TUBE HEAT
EXCHANGER AND ALL ASSOCIATED APPURTENANCES. REMOVE
STEAM AND CONDENSATE PIPING BACK TO MAINS AND CAP.
REMOVE EXISTING STEAM CONDENSATE RECEIVER PUMP.
REMOVE ALL EXISTING ELECTRICAL CONNECTIONS (CONDUIT,
WIRE, SWITCHES, ETC.) BACK TO ELECTRICAL PANEL.
SHEET NOTES: SHEETS MD-101 THRU MD-401
1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.
2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF
DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.
3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK
TO MAIN AND CAPPED.
4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE
PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND
DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST
BE NOTIFIED 14 DAYS BEFORE ABATEMENT.
5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS
SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED
ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT
DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND
LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.
7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING
SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY
OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN
OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO KEEP THE BUILDING TEMPERED.
CAFETERIA
DDWO
820 821807
DTC
DDWO
CD
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
LPS
LPS
LPS
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LPS
LPS
LPS
LPS LPS LPS LPS LPS
CD CD
CDCDCD
LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS
CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD
LPS LPS LPS LPS
CD CD CD
C D
CD
C D
C D
C D
C
D 1" CONDENSATE RETURN @
12'-0" AFF
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CDCDCDCDCDCDCD
C D
C D
CD
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CDCDCDCDCDCDCD
C D
C D
CD
LPS
AI
R
S
EP
AR
AT
O R
EX
PA
N
SI
O N
T
AN
K H
W R
H W
R H
W R
HWR
LP
S
LP
S
LPS
H W
S H
W S
C D
H X-
C O
N D
EN
SA
TE
R
EC
EI
VE
R
HPS
H
PS
H
PS
H
PS
H
PS
HPS
HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS
H
PS
H
PS
H
PS
H
PS
H
PS
H
PS
H
PS
H
PS
HPSHPSHPSHPSHPSHPS
HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS
H
PS
H
PS
C D
C D
LP
S
LPSLPS
LP
S
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584
MD-103
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
BU
IL
D
IN
G
SE
C
TI
O N
S
- M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
SCALE: 3/32" = 1'-0"
BUILDING 11 SECTIONS 7 & 8 - MECHANICAL DEMOLITION PLAN
CODED NOTES:
1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL
ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING
ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)
FOR WATER HEATER BACK TO ELECTRICAL PANEL.
2. REMOVE STEAM HEATING COIL FROM EXISTING HEATING COIL.
REMOVE ALL ASSOCIATED STEAM AND CONDENSATE PIPING TO
COIL.
3. REMOVE EXISTING GAS METER AND ASSOCIATED GAS PIPING.
SHEET NOTES: SHEETS MD-101 THRU MD-401
1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.
2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF
DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.
3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK
TO MAIN AND CAPPED.
4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE
PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND
DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST
BE NOTIFIED 14 DAYS BEFORE ABATEMENT.
5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS
SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED
ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT
DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND
LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.
7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING
SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY
OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN
OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO KEEP THE BUILDING TEMPERED.
AutoCAD SHX Text
AH11-8-1
AutoCAD SHX Text
AH11-8-2
VH
ROOM
EQUIPMENT
1014 1015
EM LT
LP
-1
LP
-2
LP
-3
T
TT
T
T
T
EM LT
EM
LT
FFF
F
VH
1014 1015
EM LT
LP
-1
LP
-2
LP
-3
T
TT
T
T
T
EM LT
EM
LT
FFF
F
SW
BD
0-
LP
0-
W
LP
0-
E
SW
BD
1-
LP
LP
1036 1035 1034
180 SF
DTC
MAINTANCE
903902
4A
W R/R
SW
BD
0-
LP
0-
W
LP
0-
E
LP
LP
SW
BD
0-
LP
0-
W
LP
0-
E
LP
LP
915A
PR
IN
TE
R
COAT COAT
NEW
OPENING
POLE POLE
POWER
DTC
DTC
W R/R
915A
H W
R H
W R
H W
R
H W
S H
W S
CD CD CD CD CD CD CD CD CD CD CD CD CD
C D
LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS
LPS
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
LP
S
LPSLPS
LP
S
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
LPS
C D
C D
LP
S
LPSLPS
LP
S
LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS
CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD
C D
C D
LPS
LPS
LPS LPS LPS LPS LPS
LPS
CD CD CD
LPS
LPS
LP
S
LP
S
LP
S
CD
CD
H
PS
H
PS
C D
CD
C D
CD
CONDENSATE TRANSFER
LINE @ 10' AFF
C D
C D
C D
CONDENSATE TANK
1 1/2" STEAM SUPPLY
@17'-8" AFF
1" CONDENSATE RETURN @
12'-0" AFF
4" CONDENSATE LINE @
13'-6"
CD
HPSHPSHPSHPS
H
PS
HEAT
EXCHANGER
H
PS
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584
MD-104
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
BU
IL
D
IN
G
SE
C
TI
O N
S
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O N
P
LA
N
SCALE: 3/32" = 1'-0"
BUILDING 11 SECTIONS 9 & 10 - MECHANICAL DEMOLITION PLAN
CODED NOTES:
1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL
ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING
ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)
FOR WATER HEATER BACK TO ELECTRICAL PANEL.
2. REMOVE EXISTING STEAM TO HOT WATER SHELL AND TUBE HEAT
EXCHANGER AND ALL ASSOCIATED APPURTENANCES. REMOVE
STEAM AND CONDENSATE PIPING BACK TO MAINS AND CAP.
REMOVE EXISTING STEAM CONDENSATE RECEIVER PUMP.
REMOVE ALL EXISTING ELECTRICAL CONNECTIONS (CONDUIT,
WIRE, SWITCHES, ETC.) BACK TO ELECTRICAL PANEL.
3. REMOVE EXISTING BOILER, STEAM SUPPLY PIPING, PIPE
HANGERS, FEEDWATER PIPING, BLOWDOWN PIPING, NATURAL
GAS PIPING, VENT PIPING, EXHAUST STACK, BOILER
CONTROLLERS AND ALL ASSOCIATED APPURTENANCES. PATCH
OPENINGS IN BUILDING ROOF AND BOILER ROOM CEILING AS
RESULT OF VENT PIPING REMOVAL. REMOVE CONCRETE PAD FOR
BOILER. CONTRACTOR TO COMPLETELY REMOVE ALL EXISTING
ELECTRICAL CONNECTS BACK TO PANEL (CONDUIT, WIRE,
SWITCHES, ETC.).
4. REMOVE EXISTING CONDENSATE RECEIVER TANK, ASSOCIATED
FEEDWATER PUMPS, COLD WATER PIPING, CONDENSATE RETURN
PIPING, PIPE HANGERS AND ALL ASSOCIATED APPURTENANCES.
REMOVE CONCRETE PAD FOR CONDENSATE RECEIVER.
CONTRACTOR TO COMPLETELY REMOVE ALL EXISTING
ELECTRICAL CONNECTS BACK TO PANEL (CONDUIT, WIRE,
SWITCHES, ETC.).
5. CONTRACTOR TO REMOVE EXISTING COMBUSTION MAKE UP AIR
HANDLING UNITS AND ALL ASSOCIATED APPURTENANCES.
CONTRACTOR TO PROVIDE SHEET METAL TO BLOCK OPENING IN
WALL LEFT BY UNIT. CONTRACTOR TO COMPLETELY REMOVE ALL
EXISTING ELECTRICAL CONNECTS BACK TO PANEL (CONDUIT,
WIRE, SWITCHES, ETC.).
6. REMOVE EXISTING CONDENSATE CIRCULATION PUMP AND ALL
ASSOCIATED PIPING. CONTRACTOR TO COMPLETELY REMOVE
ALL EXISTING ELECTRICAL CONNECTS BACK TO PANEL (CONDUIT,
WIRE, SWITCHES, ETC.).
7. REMOVE EXISTING WATER SOFTENER, COLD WATER PIPING AND
HANGERS. REMOVE CONCRETE PAD FOR UNIT.
8. REMOVE EXISTING BLOWDOWN TANK.
SHEET NOTES: SHEETS MD-101 THRU MD-401
1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.
2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF
DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.
3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK
TO MAIN AND CAPPED.
4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE
PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND
DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST
BE NOTIFIED 14 DAYS BEFORE ABATEMENT.
5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS
SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED
ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT
DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND
LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.
7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING
SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY
OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN
OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO KEEP THE BUILDING TEMPERED.
AutoCAD SHX Text 2"
CL CL
v
JAN
v
ROOM
EQUIPMENT
EM
L
T
EM
L
T
SW
BD
0-
LP
0-
W
LP
0-
E
EL
P
N L
SW
BD
1-
LP
LP
F
S
F
C F
LP
LP
FD
-F
C E
ST
O
R
AG
E
W O
M
EN
'S R
ES
TR
O O
M
R O
O M
EQ
U
IP
M
EN
T
T
LP122
LP
M
EC
H
AN
IC
AL
PP
C O
N
FE
R
EN
C E
EL
EC
TR
IC
AL
V
AU
LT
BR
EA
K
AR
EA
PA
SS
AG
EW
AY
W O
M
EN
'S L
O U
N G
E
M
EC
H
AN
IC
AL
R O
O M
JA
N
IT
O
R
JA
N
IT
O
R
EM LT
F F
F
F
NAC
EM
L
T
EM
L
T F F
PA
SS
AG
EW
AY
SIR
SIR
PT
D
O
FF
IC
E
O
FF
IC
E
O
FF
IC
E
O
FF
IC
E
O
FF
IC
E
O
FF
IC
E
C O
R R
ID
O
R
VE
ST
IB
U
LE
VE
ST
IB
U
LE
SO
U
TH
SO
U
TH
EA
ST
W
ES
T
F
F
5'-11"
'-6
1 16
T
PP
TELECOMMUNICATIONS
ROOM
SPRINKLER RISER
BREAK AREA
A/C
T
WOMEN'S
1240 1242
TEL
SW
BD
0-
LP
0-
W
LP
0-
E
LP
LP
SW
BD
0-
LP
0-
W
LP
0-
E
LP
LP
BU
IL
D
IN
G
AU
D
IT
O R
IU
M
BA
C
KS
TA
G E
VE
ST
IB
U
LE
VE
ST
IB
U
LE
N O
R
TH
SO
U
TH
EA
ST
EA
ST
FI
LE
ST
O
R
AG
E R
O O
M
SI
PR
R O
O M
D R
Y
PA
N
TR
Y
VT
C
R O
O M
TE
AM
R O
O M
M
EE
TI
N
G R
O O
M
TE
AM
R O
O M
TE
AM
R O
O M
PM
O
FF
IC
E
ST
O
R
AG
E R
O O
M
PM
O
FF
IC
E
PM
O
FF
IC
E
PD
O
FF
IC
E
PD
O
FF
IC
E
PM
O
FF
IC
E
PM
O
FF
IC
E
PM
O
FF
IC
E TE
AM
R
O O
M
TE
AM
R
O O
M
O
PE
N O
FF
IC
E
AR
EA
PM
O
FF
IC
E
011-I-1215
1-
E-
LA
N
/W
AN
R O
O M
LP
S
LPSLPS
LPS
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
LP
S
LPSLPS
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
LPS
H W
R H
W R
H W
S
HWS
LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS
CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
C D
C D
C D
C D
HEAT
EXCHANGER
HOT WATER
PUMP
HWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWR
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R
HWR
HWSHWSHWSHWSHWSHWSHWSHWSHWSHWS
HWS
HWSHWSHWS
HWS
H W
S
HWSHWSHWS
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584
MD-105
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
BU
IL
D
IN
G
SE
C
TI
O N
S
- M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O N
P
LA
N
SCALE: 3/32" = 1'-0"
BUILDING 11 SECTIONS 11 & 12 - MECHANICAL DEMOLITION PLAN
CODED NOTES:
1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL
ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING
ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)
FOR WATER HEATER BACK TO ELECTRICAL PANEL.
2. REMOVE STEAM HEATING COIL FROM EXISTING HEATING COIL.
REMOVE ALL ASSOCIATED STEAM AND CONDENSATE PIPING TO
COIL.
SHEET NOTES: SHEETS MD-101 THRU MD-401
1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.
2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF
DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.
3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK
TO MAIN AND CAPPED.
4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE
PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND
DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST
BE NOTIFIED 14 DAYS BEFORE ABATEMENT.
5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS
SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED
ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT
DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND
LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.
7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING
SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY
OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN
OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO KEEP THE BUILDING TEMPERED.
AutoCAD SHX Text 5" Extg Steam Line
AutoCAD SHX Text 2" Extg Condensate Line
AutoCAD SHX Text B
JAN
JA
N
IT
O
R
O
FF
IC
E
O
FF
IC
E
F
TELECOMMUNICATIONS
SPRINKLER RISER
CONFERENCE
OFFICE OFFICEOFFICE
CUBICLES
FILES/STORAGE
BREAK AREA
MECHANICAL ROOM DIRECTOR'S
13021303
130413051306
TRANSFORMER
ELECTRIC BOXA/C
LP
TEL
ELECTRIC BOX
132213231324132513261327
SUPPLYEVIDENCE
OFFICE
S
S
INTERVIEW RM
SOLID DOOR
H W
R H
W R
H W
R
H W
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
LP
S
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
LPS
C D
HWR
AIR
SEPARATOR
D C
W
STEAM
CONDENSATE
PUMP
AHU
D C
W
DCW DCW
CD
HEAT
EXCHANGER
EXPANSION TANK HOT WATER
PUMP
LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
C
DC
D
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584
MD-106
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
BU
IL
D
IN
G
SE
C
TI
O N
- M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
SCALE: 3/32" = 1'-0"
BUILDING 11 SECTION 13 - MECHANICAL DEMOLITION PLAN
CODED NOTES:
1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL
ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING
ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)
FOR WATER HEATER BACK TO ELECTRICAL PANEL.
2. REMOVE STEAM HEATING COIL FROM EXISTING HEATING COIL.
REMOVE ALL ASSOCIATED STEAM AND CONDENSATE PIPING TO
COIL.
3. REMOVE EXISTING UNIT HEATER, STEAM SUPPLY PIPING,
CONDENSATE RETURN PIPING, PIPE HANGERS, THERMOSTAT AND
ALL ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING
ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)
FOR HEATER.
SHEET NOTES: SHEETS MD-101 THRU MD-401
1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.
2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF
DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.
3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK
TO MAIN AND CAPPED.
4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE
PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND
DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST
BE NOTIFIED 14 DAYS BEFORE ABATEMENT.
5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS
SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED
ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT
DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND
LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.
7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING
SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY
OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN
OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO KEEP THE BUILDING TEMPERED.
AutoCAD SHX Text 5" Extg Steam Line
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584
MD-501
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
TY
PI
C
AL
H
EA
T
EX
C H
AN
G
ER
D
EM
O
LI
TI
O N
S C
H
EM
AT
IC
TYPICAL HEAT EXCHANGER DEMOLITION SCHEMATIC
SCALE: NO SCALE
H W
S
H W
S H
W S
H W
S
CDCD
LP
S
LP
S
LP
S
STEAM
CONTROL
VALVE
C O
N D
EN
SA
TE
ST
EA
M
H W
S H
W S
H W
S
HWSHWSHWSHWSHWSHWS
HWSHWSHWSHWSHWSHWSHWSHWSHWSHWS
CV
H W
R H
W R
H W
R H
W R
H W
R
HWRHWRHWRHWR
HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR
C D
C D
C D
C D
H W
S
3-WAY DIVERTING VALVE, SET TO
MAINTAIN 180 DEGREE PUMP
DISCHARGE TEMPERATURE
BALL
VALVE
DRAIN LINE
C D
C D
C D
RETURN FROM BUILDING
SUPPLY TO BUILDING
HWS HWS
BALL
VALVE
(TYP.)
TRIPLE
DUTY
VALVE
FLEX
CONNECTOR
PRESSURE
GAUGE
THERMOMETER (TYP)
COMBINATION BACKFLOW PREVENTER
AND REDUCING VALVE
DOMESTIC WATER
GATE VALVE (TYP.)
INVERTED
BUCKET
TRAP
CONDENSATE
RETURN
HEAT
EXHANGER
CONDENSATE
PUMP
GATE
VALVE
EXPANSION
TANK
AIR SEPARATOR
PRESSURE GAUGE
STRAINER
CIRCULATION
PUMP
CHEMICAL
SHOT
FEEDER
BALL
VALVE
W O
M
EN
'S R
ES
TR
O O
M
M
EN
'S R
ES
TR
O O
M
M
EC
H
AN
IC
AL
R O
O M
D F v v v
14'-5"19'-6"8'-3"
6" 6" 10"
*FIRE ALARM,
START PANEL RUN
TO CLEAR THIS,
SHOULD LEAVE A
34" AISLE WAY
D es k
D es k
LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS
CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LP
S
LPS
LPSLPS
LP
S
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
C D
CD CD CD CD CD CD CD CD CDCDCDCDCDCDCDCDCD
C D
C D
C D
C D
CD
LPS
CD
LPS
LPS
C D
C D
1"
1"
1-1/4"
1-1/4"
HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS
H
PS
H
PS
H
PS
H
PS
HPSHPSHPSHPSHPSHPSHPSHPSHPS
D H
W
D H
W D
H W
D H
W D
H W
D H
W
DHW
D H
W
DHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHW
DHWDHWDHWDHWDHW
DHW DHW DHW DHW DHW DHW DHW DHW DHW DHW DHW
BOILER ROOM
DCWDCWDCWDCW
D C
W D
C W
D C
W D
C W
DHW
D
H W
D H
W
DHWDHWDHWDHWDHWDHW
DHW DHW DHW DHW DHW DHW DHW
D H
W D
H W
D H
W D
H W
DHW
D H
W
DHWDHWDHWDHWDHWDHWDHWDHW
DHW DHW DHW
D H
W
G
LY
G
LY
G
LY
G
LY
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
DLA INSTALLATION MANAGEMENT
PR
O
JE
C
T N
O
D
EF
EN
SE
L O
G
IS
TI
C
S
AG
EN
EN
SE
S U
PP
LY
C
EN
TE
R
C O
LU
M
BU
S
C O
LU
M
BU
S, O H
IO
-3
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T D
IV
IS
IO
N
D
LA
IN
ST
AL
LA
TI
O
N M
AN
AG
EM
EN
T
BU
IL
D
IN
G
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
FU
LL
S C
AL
E:
D
AT
E:
C H
EC
KE
D B
Y:
C H
EC
KE
D B
Y:
AP
PR
O
VE
D B
Y:
H
AL
F
SC
AL
E:
"X
1'
'-0
-J ul -2
"X
1'
'-0
FA
C
IL
IT
Y
EN
G
IN
EE
R
D
EP
U
TY
F
AC
IL
IT
Y
EN
G
IN
EE
R
C U
ST
O
M
ER
D
LA
L &M
(S
AF
ET
Y)
D M
-F C
S(
SE
C U
R
IT
Y)
D M
-F C
E(
EN
VI
R
O N
M
EN
TA
L)
4-584 M-102
KE
N
T
KL
IN
G
LE
R
KE
N
T
KL
IN
G
LE
R
C
SC
-2
W
AT
ER
H
EA
TE
R (S
O
LA
R ) I
M
PR
O
VE
M
EN
TS
, B
LD
G
. 1
BU
IL
D
IN
G
SE
C
TI
O N
S
- N
EW
H
VA
C W
O R
K
PL
AN
SCALE: 3/32" = 1'-0"
BUILDING 11 SECTION 3 & 4 - NEW MECHANICAL WORK PLAN
CODED NOTES:
1. INSTALL NEW THERMOSTATIC MIXING VALVE. PROVIDE PIPING AS
SHOWN ON TYPICAL MIXING VALVE TO FIXTURES SCHEMATIC SHEET
M-504.
2. INSTALL SOLAR WATER TANK IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS. SEE PIPING SCHEMATIC SHEET M-504. SEE UNIT
SCHEDULE SHEET M-601.
3. INSTALL NEW HEAT PUMP WATER HEATER IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS. SEE PIPING SCHEMATIC
SHEET M-504. SEE SCHEDULE SHEET M-601.
4. INSTALL NEW INLINE CIRCULATING PUMP. INSTALL PUMP IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SEE
DETAIL SHEET M-501. SEE SCHEDULE SHEET M-602.
5. INSTALL NEW 55 GALLON GLYCOL FEEDER. INSTALL IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS. SEE PIPING SCHEMATIC
SHEET M-504.
GENERAL NOTES: M-101 THRU M-106
1. SOLAR COLLECTOR ARRAY AND PIPING ON ROOF NOT SHOWN ON
DRAWING FOR CLARITY. SEE LAYOUT ON SHEETS M-401 THRU M-403.
2. HOT WATER SUPPLY/RETURN (HWS/HWR) PIPING SHALL BE ASTM
A53/A53M, GRADE B, SCHEDULE 40, BLACK STEEL, SEAMLESS. WHERE
PIPE NEEDS REDUCED USE ECCENTRIC REDUCERS INSULATE NEW
HWS/HWR PIPE WITH 2" MINERAL FIBER WITH ALL SERVICE JACKET.
INSTALL PIPING AT A MINIMUM 13 FEET AFF.
3. ALL NEW DOMESTIC HOT WATER AND COLD WATER SHALL BE ASTM
B88M, COPPER TUBE, TYPE L. INSULATE NEW DOMESTIC HOT WATER
AND COLD WATER PIPING WITH 1" FLEXIBLE ELASTOMERIC INSULATION.
4. ALL EXTERIOR WATER/GLYCOL PIPING INSULATION SHALL HAVE AN
ALUMINUM WEATHER PROOF JACKET.
5. NEW GAS PIPING SHALL BE STEEL PIPE CONFORMING TO ASME B36.10M;
AND MALLEABLE-IRON THREADED FITTINGS CONFORMING TO ASME
B16.1 AND ASME B16.3.
6. PROVIDE NEW MANUFACTURERS STANDARDIZATION SOCIETY OF
VALVES AND FITTINGS (MSS) TYPE 43 HANGERS WITH TYPE 40
PROTECTIVE SHIELD PIPING. SPACE HANGERS PER MSS 58
GUIDELINES.
7. WATER DISTRIBUTION SYSTEM SHALL BE BALANCED IN ACCORDANCE
WITH SECTION 23 05 93.00 06 TESTING, ADJUSTING AND BALANCING FOR
HVAC OF THE PROJECT SPECIFICATIONS.
8. PIPING AND HEATER LOCATIONS ARE SCHEMATIC IN NATURE. PIPING,
UNIT HEATERS AND BOILERS SHOWN ARE PROVIDED TO SHOW
SUFFICIENT DETAIL FOR BIDDING AND EXECUTION. ACTUAL
INSTALLATION IN FIELD MAY BE REVISED (WITH GOVERNMENT
APPROVAL) TO EASE INSTALLATION.
9. PROVIDE PIPE SLEEVES WHERE PIPES PASS THROUGH MASONRY OR
CONCRETE WALLS. SLEEVES SHALL BE OF SUFFICIENT LENGTH TO
PASS THROUGH ENTIRE THICKNESS OF WALLS. SEAL ALL
PENETRATIONS TO 3 HR FIRE RATING.
PIPE DOWN FROM SOLAR COLLECTOR ARRAY
EXISTING 1"Ø DOMESTIC HOT
WATER PIPING TO BE REUSED
SWT-11-4-1 SGP-11-4-1
WH-11-4-1
DHWP-11-4-1
GF-11-4-1
AutoCAD SHX Text T
AutoCAD SHX Text T s s 3
DIVISION
M/RRW/RR
CC
E
CC
E
42 42
LPF
A C E
C
10"
*FIRE ALARM,
START PANEL RUN
TO CLEAR THIS,
SHOULD LEAVE A
34" AISLE WAY
614 615 616
TABLE
Credenza &
Hutch
D es k
D es k
OPEN
C
LO
SE
D
D O
U
BL
E C
LO
SE
D D
O U
BL
E
OFFICE
505506507508
LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .