This solicitation is for a firm fixed price contract to provide safety improvements at the Defense Supply Center Columbus, Ohio. The work includes furnishing labor, equipment, materials and supervision to complete solar water heater improvements in Building 11. A pre-proposal site visit is scheduled for August 1, 2022, with proposals due August 22, 2022. The award will be made to the lowest priced technically acceptable offer from a responsible small business. The contractor must pay prevailing Davis-Bacon wages and complete all work within 540 calendar days of the notice to proceed.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLUMBUS

O W

N

S H

IG

H

ST

IN

D

IA

N

O

LA

A

VE

TH

S

T

N C

AS

SA

D Y

AV

E

HA

RR

IS

BU

RG

P

IK

E

SU

N

BU

R

Y R

D

SU

N

BU

R

Y R

D d

C

LE

VN

HARD RD

E DUBLIN

JOHN GLENN

W 5TH AVE

COLUMBUS

WHITEHALL

COLUMBUS INT'L

AIRPORT

RD

HA

RR

IS

B

EL

AN

D

AV

E

URG

PIKE

E BROAD ST

REFUGEE RD

GRANVILLE RD

- LANCASTER RD

JO

HNST

R

IVER

SID

E D

R

C

LE

VE

LA

N D

A

VE

S H

AM

IL

TO

N

R D

ST

EL

ZE

R

R D

JA

M

ES

R

D

YE

AR

LI

N

G R

D

DSCC

OSU AIRPORT

MAIN STREET

MAIN STREET

Gtypegroupnamepreferencedescription

Gtypegroupnamepreferencedescription

G

G

RV STORAGE

"A"

RV STORAGE

"B"

DRMO

STORAGE

INDEX OF DRAWINGS

SHEET NO. SHEET TITLE

G-001 COVER SHEET

A-101 BUILDING 11 PLAN & ELEVATION

S-101 BUILDING 11 ROOM 927 - FLOOR RESURFACING PLAN

S-101 STRUCTURAL DETAILS

M-001 GENERAL MECHANICAL NOTES AND LEGENDS

MD-101 BUILDING 11 SECTIONS 3 & 4 - MECHANICAL DEMOLITION

MD-102 BUILDING 11 SECTIONS 5 & 6 - MECHANICAL DEMOLITION

MD-103 BUILDING 11 SECTIONS 7 & 8 - MECHANICAL DEMOLITION

MD-104 BUILDING 11 SECTIONS 9 & 10 - MECHANICAL DEMOLITION

MD-105 BUILDING 11 SECTIONS 11 & 12 - MECHANICAL DEMOLITION

MD-106 BUILDING 11 SECTION 13 - MECHANICAL DEMOLITION

MD-501 TYPICAL HEAT EXCHANGER DEMOLITION SCHEMATIC

M-101 BUILDING 11 SECTIONS 3 & 4 - NEW MECHANICAL WORK PLAN

M-102 BUILDING 11 SECTIONS 5 & 6 - NEW MECHANICAL WORK PLAN

M-103 BUILDING 11 SECTIONS 7 & 8 - NEW MECHANICAL WORK PLAN

M-104 BUILDING 11 SECTIONS 9 & 10 - NEW MECHANICAL WORK PLAN

M-105 BUILDING 11 SECTIONS 11 & 12 - NEW MECHANICAL WORK PLAN

M-106 BUILDING 11 SECTION 13 - NEW MECHANICAL WORK PLAN

M-401 BUILDING 11 SECTIONS 3 & 4 - SOLAR COLLECTOR PLAN

M-402 BUILDING 11 SECTIONS 8 & 9 - SOLAR COLLECTOR PLAN

M-403 BUILDING 11 SECTION 11 - SOLAR COLLECTOR PLAN

M-404 BUILDING 11 SECTION 9 - BOILER ROOM NEW WORK PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 BOILER PIPING SCHEMATIC

M-504 SOLAR WATER HEATING PIPING SCHEMATICS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-701 BOILER CONTROLS

M-702 SOLAR WATER HEATING CONTROLS

E-101 BUILDING 11 ROOM 401 - MECHANICAL POWER PLAN

E-102 BUILDING 11 ROOM 927- MECHANICAL POWER PLAN

E-103 BUILDING 11 ROOM 1107 - MECHANICAL POWER PLAN

E-104 BUILDING 11 ROOM 1300 - MECHANICAL POWER PLAN

YEARLING ROAD GATE:

401 N YEARLING RD,

WHITEHALL, OH 43213

JAMES ROAD GATE (TRUCK

ENTRANCE):

200 JAMES ROAD

COLUMBUS, OH 43218

FACILITY ENGINEERING: BUILDING 308

WORK LOCATION: BUILDING 11CENTRAL RECEIVING: BUILDING 17

PASS & ID: BUILDING 61

DEFESE SUPPLY CENTER COLUMBUS

PROJECT NUMBER: CSC-20049

WATER HEATER (SOLAR)

IMPROVEMENTS, BLDG. 11

DSCC SITE LOCATION

COLUMBUS VICINITY

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

D E

F E

N S

E

L O

G I S T

I C

S

A G

E N

C Y

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y D

EF

EN

SE

S

U

PP

LY

C

EN

TE

R C

O

LU

M

BU

S C

O

LU

M

BU

S, O

H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

N O

N E

-J ul -2

"X

N O

N E

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y

EM

ER

G

EN

C Y

SE

R

VI

C

ES

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584 G-001

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

C O

VE

R

S H

EE

T

AutoCAD SHX Text

AutoCAD SHX Text

RIM= 789.94'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text "A"

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text "B"

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text "C"

AutoCAD SHX Text

OHIO ARMY NATIONAL

AutoCAD SHX Text

GUARD CENTER

AutoCAD SHX Text

U.S. ARMY

AutoCAD SHX Text

RESERVE CENTER

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

OHIO ARMY

AutoCAD SHX Text

NATIONAL GUARD

AutoCAD SHX Text

COMBINED

AutoCAD SHX Text

SUPPORT

AutoCAD SHX Text

MAINTENANCE

AutoCAD SHX Text

SHOP

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

ARMY FORCES

AutoCAD SHX Text

RESERVE CENTER

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

OHIO ARMY

AutoCAD SHX Text

NATIONAL GUARD

AutoCAD SHX Text

COMBINED

AutoCAD SHX Text

SUPPORT

AutoCAD SHX Text

MAINTENANCE

AutoCAD SHX Text

SHOP

AutoCAD SHX Text

OHIO ARMY

AutoCAD SHX Text

NATIONAL GUARD

AutoCAD SHX Text

COMBINED

AutoCAD SHX Text

SUPPORT

AutoCAD SHX Text

MAINTENANCE

AutoCAD SHX Text

SHOP

AutoCAD SHX Text

STORAGE AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TENNIS

AutoCAD SHX Text

COURTS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text 21A

AutoCAD SHX Text 20A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CREDIT

AutoCAD SHX Text

UNION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 45A

AutoCAD SHX Text 45C

AutoCAD SHX Text 45B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VPC

AutoCAD SHX Text

ARMY FORCES

AutoCAD SHX Text

RESERVE CENTER

W

ES

T

EN

D

EA

ST

E N

D

RAMP

v

W O

M

EN

'S R

ES

TR

O O

M

VH

M

EN

'S R

ES

TR

O O

M

M

EC

H

AN

IC

AL

R O

O M

LO

AD

IN

G

D O

C K

D F

DOCK AREA

v v v

DOCK AREA

v v

SECTION 2 SECTION 5SECTION 4SECTION 3 SECTION 6

RAMP

SECTION 7

OFFICEOFFICE

s s 3

DIVISION

M/RRW/RR

CC

E

CC

E

42 42

LPF

A C E

C

14'-5"19'-6"8'-3"

6" 6" 10"

*FIRE ALARM,

START PANEL RUN

TO CLEAR THIS,

SHOULD LEAVE A

34" AISLE WAY

614 615 616

TABLE

Credenza & Hutch

D es k

D es k

D es k

D es k

OPEN

C

LO

SE

D

D O

U

BL

E C

LO

SE

D D

O U

BL

E

OFFICE

505506507508

SECTION 8 SECTION 9 SECTION 10 SECTION 11 SECTION 12 SECTION 13

DOCK

UP

v v v

LOADING DOCK AND WALKWAY

CL

v v v

VH

ROOM

EQUIPMENT

1014 1015

EM LT

LP

-1

LP

-2

LP

-3

T

TT

T

T

T

EM LT

EM

LT

FFF

F

VH

1014 1015

EM LT

LP

-1

LP

-2

LP

-3

T

TT

T

T

T

EM LT

EM

LT

FFF

F

EM

L

T

EM

L

T

SW

BD

0-

LP

0-

W

LP

0-

E

EL

P

N L

SW

BD

1-

LP

LP

F

S

F

C F

LP

LP

1036 1035 1034

180 SF

DTC ADMIN

DTC

DTC

BOILER ROOM

DTC

903902

4A

R O

O M

EQ

U

IP

M

EN

T

T

LP122

LP

PP

EM LT

F F

F

F

NAC

EM

L

T

EM

L

T F F

SIR

SIR

PT

D F

F

'-6

1 16

T

PP

13021303

130413051306

TRANSFORMER

ELECTRIC BOXA/C

LP

T

1240 1242

TEL

SIDEWALK

ELECTRIC BOX

SW

BD

0-

LP

0-

W

LP

0-

E

LP

LP

SW

BD

0-

LP

0-

W

LP

0-

E

LP

LP

6'

BU

IL

D

IN

G

AU

D

IT

O R

IU

M

BA

C

KS

TA

G E

132213231324132513261327

OFFICE

S

S

915A

DDWO

PR

IN

TE

R

COAT COAT

NEW

OPENING

POLE POLE

POWER

03820 821807

915A

SECTION 1

BOILER ROOM

MECHANICAL

T T

T

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y

D

EF

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

-J ul -2

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584 A-101

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

PL

AN

E

LE

VA

TI

O N

BUILDING 11 NORTH ELEVATION

SCALE: 1/8" = 1'-0"

SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION 9 SECTION 10 SECTION 11 SECTION 12 SECTION 13

SCALE: 1/64" = 1'-0"

BUILDING 11 SECTIONS 1-13

NORTH

BOILER ROOM

G

LY

GLYGLYGLYGLYGLYGLYGLYGLY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

G

LY

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

3/

'-0

-J ul -2

"X

3/

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584 A-401

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

R

O O

M

F

LO

O

R R

ES

U

R

FA

C

IN

G P

LA

N

SOW NOTES:

1. SURFACE PREPARATION

1.1 CONCRETE SURFACES:

REMOVE PLATES, MACHINED SURFACES, AND SIMILAR ITEMS ALREADY

IN PLACE THAT ARE NOT TO BE COATED. PROVIDE SURFACE-APPLIED

PROTECTION BEFORE SURFACE PREPARATION AND COATING WHERE

REMOVAL IS IMPRACTICAL OR IMPOSSIBLE. AFTER COMPLETING

COATING OPERATIONS, REINSTALL ITEMS THAT WERE REMOVED.

REMOVE CLEAN DIRT, OIL, GREASE, AND INCOMPATIBLE PAINTS FROM

SUBSTRATES TO ENSURE BONDING. COORDINATION OF SHOP-APPLIED

PRIME COATS WITH HIGH-PERFORMANCE COATINGS IS CRITICAL.

REMOVE INCOMPATIBLE PRIMERS. RE-PRIME SUBSTRATE WITH

COMPATIBLE PRIMERS AS REQUIRED TO PRODUCE COATING SYSTEMS

INDICATED.

CONTRACTOR SHALL PREP THE CONCRETE FLOORING, BY PATCHING

AND LEVELING OF THE FLOOR AREA AND REPAIR THE CONCRETE

FLOORS AS REQUIRED TO ACCEPT THE NEW FLOORING. SEAL CRACKS

SIZES 1/4" X 1/2" AND HIGHER USING JOINT FILLER MATERIAL FOR

CONCRETE FLOORS. REMOVE EXPANSION JOINT MATERIALS FROM

FLOOR JOINTS AND REPLACE WITH EPOXY MORTAR WITH SEMI RIGID

EPOXY SEAL.

REMOVE RELEASE AGENTS, CURING COMPOUNDS, EFFLORESCENCE,

AND CHALK MAXIMUM MOISTURE CONTENT OF CONCRETE IS 12

PERCENT. MOISTURE CONTENT MUST BE MEASURED WITH

ELECTRONIC MOISTURE METER.

CLEAN SURFACES WITH DIAMOND GRIND TO REMOVE EXISTING

COATINGS. PREPARE SURFACES USING THE METHODS

RECOMMENDED BY THE MANUFACTURER FOR ACHIEVING THE BEST

RESULT FOR THE SUBSTRATE UNDER THE PROJECT CONDITIONS.

2. COATING MATERIAL PREPARATION

2.1 GENERAL:

MIX AND PREPARE COATING MATERIALS IN ACCORDANCE WITH THE

COATING MANUFACTURER'S PRINTED INSTRUCTIONS FOR THE

PARTICULAR MATERIAL AND COAT TO BE APPLIED. KEEP MATERIALS

WHICH ARE NOT IN ACTUAL USE IN CLOSED CONTAINERS.

COATING MATERIALS THAT HAVE BEEN MIXED WITH AN AUTOMATIC

SHAKER MUST BE ALLOWED TO STAND TO LET AIR BUBBLES ESCAPE,

THEN GIVEN A FINAL HAND MIXING BEFORE APPLICATION. STIR

MATERIALS SO AS TO PRODUCE A MIXTURE OF UNIFORM DENSITY.

STIR AT FREQUENT INTERVALS DURING APPLICATION TO PREVENT

SKINNING. DO NOT STIR FILM WHICH MAY FORM ON THE SURFACE OF

THE MATERIAL. REMOVE FILM AND STRAIN, IF NECESSARY.

2.2 THINNING

THINNING MUST BE DONE IN ACCORDANCE WITH COATING

MANUFACTURER'S PRINTED DIRECTIONS FOR THE PARTICULAR

MATERIAL AND COAT.

2.3 TINTING

PRIME AND INTERMEDIATE COATS OF PAINT MUST BE A SLIGHTLY

DIFFERENT TINT FROM THE FINISH COAT TO FACILITATE

IDENTIFICATION OF EACH COAT. TINTING MUST BE DONE BY THE

COATING MANUFACTURER AND CLEARLY IDENTIFIED AS TO COLOR

AND COAT.

3. APPLICATION OF COATING MATERIALS

3.1 GENERAL

DO NOT PERFORM EXTERIOR PAINTING IN DAMP OR RAINY WEATHER.

INTERIOR PAINTING MUST NOT BE ALLOWED UNTIL THE BUILDING IS

ENCLOSED AND HAS THOROUGHLY DRIED OUT. DO NOT ALLOW

PAINTING BELOW 60 DEGREES F AND ABOVE 95 DEGREES F. COATING

APPLICATION MUST BE IN ACCORDANCE WITH THE COATING

MANUFACTURER'S WRITTEN INSTRUCTIONS & RECOMMENDATIONS,

AND AS SPECIFIED.

APPLICATION OF COATINGS MUST BE DONE BY SKILLED APPLICATORS.

APPLY COATINGS TO CLEAN AND PROPERLY PREPARED SURFACES.

APPLY COATINGS CAREFULLY WITH CLEAN, HIGH-QUALITY

APPLICATION EQUIPMENT. ALLOW SUFFICIENT TIME BETWEEN COATS

TO ENSURE COMPLETE DRYING AND CURING. SURFACES MUST BE

SANDED AND DUSTED BETWEEN COATINGS, AS REQUIRED, TO

PRODUCE A SURFACE FREE OF VISIBLE DEFECTS. HIGH GLOSS

COATINGS AND CLEAR FINISHES MUST BE LIGHTLY SANDED BETWEEN

COATS TO ENSURE BOND OF FOLLOWING COATS.

APPLY COATS TO THE SURFACES IN AN EVEN FILM. DO NOT ACCEPT

CLOUDINESS, SPOTTING, HOLIDAYS, LAPS, APPLICATION MARKS, RUNS,

SAGS, AND OTHER SIMILAR SURFACE IMPERFECTIONS. REMOVE

DEFECTIVE COATING APPLICATIONS AND RECOAT AS DIRECTED.

COATING LINES SUCH AS WAINSCOTS MUST BE SHARP, TRUE, AND

WELL-DEFINED. TAPE MAY BE USED TO ESTABLISH COATING LINES,

PROVIDING TAPE IS REMOVED BEFORE RAGGING OR SAW-TOOTH

EDGES FORM.

SURFACES, INCLUDING EDGES, CORNERS, CREVICES, WELDS, AND

OTHER SIMILAR CHANGES IN SURFACE PLANE, MUST RECEIVE A

DRY-FILM THICKNESS NOT LESS THAN SPECIFIED.

3.2 RATE OF APPLICATIONS:

11 MILS PRIME COAT - MIX COMPONENTS TOGETHER. MIX ONLY

ENOUGH MATERIAL WHICH CAN BE APPLIED WITHIN 25 MINUTES. APPLY

AT THE RATE OF 200 SF PER GALLON. ALLOW COATING TO CURE 24

HOURS AT 75 DEGREES F AND 50% RELATIVE HUMIDITY.

16 MILS BASE COAT - MIX ALL COMPONENTS TOGETHER IN A MORTAR

MIXER. PLACE MIXED MATERIAL WITHIN 15 MINUTES. APPLY AT A RATE

OF 107 SF/GAL. POUR MIX MATERIAL INTO SCREEN BOX AND

SCREENED OVER DESIRED AREA. POWER TROWEL MATERIAL TO

COMPACT AND ACHIEVE FINISHED TEXTURE. ALLOW COATING TO CURE

6 HOURS AT 75 DEGREES F AND 50% RELATIVE HUMIDITY. REMOVE

HIGH SPOTS AND IMPERFECTIONS USING A TERRAZZO GRINDER.

VACUUM UP LOOSE MATERIAL AND DUST.

3 MILS URETHANE TOP COAT- SATIN URETHANE TOPCOAT: OPEN AND

MIX ONLY ENOUGH MATERIAL, WHICH CAN BE APPLIED IN A 2 HOUR

PERIOD. APPLY SATIN URETHANE TOPCOATING AT THE RATE OF 500 SF

PER GALLON. ALLOW COATING TO DRY 24 HOURS AT 75 DEGREES F.

AND 50% RELATIVE HUMIDITY.

3.2.1 BRUSH APPLICATION

BRUSHES MUST BE CLEAN AND THE PROPER SIZE AND TYPE FOR

HIGH-QUALITY APPLICATION OF THE SPECIFIED COATING MATERIALS.

SLOW-DRY COATINGS MUST BE BRUSHED OUT. QUICK-DRY COATINGS

MUST BE BRUSHED ONLY ENOUGH TO SPREAD OUT EVENLY.

3.2.2 ROLLER APPLICATION

ROLLER COVERS MUST BE CLEAN AND OF THE PROPER NAP LENGTH,

NAP TEXTURE, AND MATERIAL FOR HIGH-QUALITY APPLICATION OF THE

SPECIFIED COATING MATERIALS.

ROLLER APPLICATION MUST BE DONE CAREFULLY AND MUST BE

EQUIVALENT IN ALL RESPECTS TO THE SAME COATS APPLIED BY

HIGH-QUALITY BRUSH APPLICATION.

4. ACCEPTANCE PROVISIONS

4.1 REPAIRING

REMOVE DAMAGED AND UNACCEPTABLE PORTIONS OF COMPLETED

WORK AND REPLACE WITH NEW WORK TO MATCH ADJACENT

SURFACES AT NO ADDITIONAL COST TO THE GOVERNMENT.

4.2 CLEANING

AT END OF EACH WORKDAY, REMOVE RUBBISH, EMPTY CANS, RAGS,

AND OTHER DISCARDED MATERIALS FROM PROJECT SITE.

AFTER COMPLETING COATING APPLICATION, CLEAN SPATTERED

SURFACES. REMOVE SPATTERED COATINGS BY WASHING, SCRAPING,

OR OTHER METHODS. DO NOT SCRATCH OR DAMAGE ADJACENT

FINISHED SURFACES.

APPLICATION EQUIPMENT MUST BE CLEANED PROMPTLY AND

THOROUGHLY WITH A SUITABLE SOLVENT AFTER EACH USE AND

STORED IN A CLEAN, COVERED, WELL-VENTILATED CONTAINER.

PROTECT WORK OF OTHER TRADES AGAINST DAMAGE FROM COATING

OPERATION. CORRECT DAMAGE BY CLEANING, REPAIRING,

REPLACING, AND RECOATING, AS APPROVED BY ARCHITECT, AND

LEAVE IN AN UNDAMAGED CONDITION. AT COMPLETION OF

CONSTRUCTION ACTIVITIES OF OTHER TRADES, TOUCH UP AND

RESTORE DAMAGED OR DEFACED COATED SURFACES.

4.3 PROTECTION

CLOSE JOB SITE TO TRAFFIC FOR A PERIOD OF 24 HOURS AFTER

COATING APPLICATION AT 75 DEGREES F AND 50% RELATIVE HUMIDITY.

BUILDING ROOM 927 (BOILER ROOM) CONCRETE FLOOR FINISH SCHEDULE

SECTION

NO. NAME GROSS

AREA

REMOVE/STRIP EXISTING

FLOOR FINISH. CLEAN AND

PREPARE FOR APPLICATION OF

NEW FINISH

APPLY ONE COAT

OF 11 MILS EPOXY

AS A PRIMER

APPLY ONE COAT OF

16 MILS EPOXY AS A

BASE COAT

SCRUB THE BASE COAT,

THEN APPLY CLEAR SATIN

3 MILS URETHANE TOP

COAT

REMARKS

9 BOILER

ROOM

950 SQ. FT. ■ ■ ■ ■

GENERAL NOTES

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AFFECTING THE WORK. FLOOR RESURFACING SHALL NOT START UNTIL BOILER ROOM MECHANICAL ROOM DEMOLITION IS COMPLETE. SEE SHEET MD-104 FOR BOILER ROOM

DEMOLITION PLAN.

2. EXISTING FURNISHINGS, CASEWORK, MATERIALS AND SUPPLIES WILL BE REMOVED AND/OR RELOCATED FROM THE WORK AREAS BY DSCC PERSONNEL, COORDINATE WITH THE CONTRACTING OFFICER REPRESENTATIVE (COR).

3. UNLESS OTHERWISE APPROVED, THE CONTRACTOR SHALL SCHEDULE AND COMPLETE FLOOR STRIPPING, SURFACE PREPARATION AND FINISHING OPERATIONS IN WORK PHASES, AS PER APPROVED WORK SCHEDULE. THIS WILL PERMIT THE REMOVAL & RELOCATION OF SUPPLIES AND MATERIALS FROM THE WORK AREAS BY GOVERNMENT PERSONNEL

CONCRETE FLOOR TO BE

RESURFACED

LEGEND

SCALE: 3/16" = 1'-0"

BUILDING 11 ROOM 927 - FLOOR RESURFACING PLAN

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

-J ul -2

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584 S-501

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

ST

R

U C

TU

R

AL

D

ET

AI

LS

SHEET NOTES: S-101

1. ACTUAL SIZE AND THE DIMENSIONS OF THE SUPPORT STRUCTURE AND

UNISTRUTS USED FOR INSTALLATION OF THE SOLAR PANELS SHALL BE

THE RESPONSIBILITY OF THE CONTRACTOR.

2. CONTRACTOR TO PROVIDE DESIGN CALCULATIONS FOR ALL SOLAR

PANEL MOUNTING HARDWARE TO BE INCLUDED IN THE SHOP DRAWING

SUBMITTAL AND TO BE STAMPED BY A REGISTERED STRUCTURAL

ENGINEER LICENSED IN THE STATE OF OHIO.

3. ALL CONNECTIONS TO BE DESIGNED TO WITHSTAND MAXIMUM

ALLOWABLE LOADING OF THE INTERSECTING MEMBERS/

SOLAR PANELS

6'-2" 5'-0"(typ.)

ROOF PURLINS(5'-0" c/c. TYP.)

SSM ROOF BEAM

MULTI-ARCH CONC.

ROOF(EXTG.)

INSULATION

ROOF SLOPE

SOLAR PANEL

SUPPLY/RETURN

LINES

X X X X X X X X X X X X X X X X X X X

6"

NOTES:

1. 6-INCH MINIMUM CLEAR DISTANCE FROM EDGE OF EQUIPMENT TO

EDGE OF EQUIPMENT PAD (TYPICAL ALL EDGES).

2. PRIOR TO PAD INSTALLATION, SWEEP CONCRETE CLEAN, ROUGHEN

SURFACE, AND APPLY BONDING AGENT.

EQUIPMENT

SEE NOTE 1

EQUIPMENT PAD

REINFORCING

#3 @ 9" OC, EW

6" CONCRETE

EQUIPMENT PAD

CONCRETE FLOOR

3/4" CHAMFER AT

EXPOSED EDGES (TYP)

#4 @ 24" OC (ALT. -DRILL

& EPOXY VERTICAL LEG

DOWEL WITH 3" IMBED)

TYPICAL EQUIPMENT PAD DETAIL

SCALE: NONE

TYPICAL BUILDING ROOF SECTION

SCALE: NONE

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

-J ul -2

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584 M-001

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

M

EC

H

AN

IC

AL

L

EG

EN

D

N

O

TE

S

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE

HOSE CONNECTOR

FLEXIBLE CONNECTION

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

MODULATING CONTROL VALVE

MODULATING CONTROL BUTTERFLY VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

THREE-WAY TWO POSITION CONTROL VALVE

PRESSURE REGULATING VALVE

PRESSURE SAFETY VALVE

AUTOMATIC BALANCING CONTROL VALVE

WATER BALANCE DEVICE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

WATER LEVEL CONTROLLER

FLOW METER

VALVE SYMBOL LEGEND

PIPE TYPE DESCRIPTION

LPS LPS

HWR HWR

HWS HWS

G G

PIPING LEGEND

CONDENSATE

LOW PRESSURE STEAM

HOT WATER SUPPLY

HOT WATER RETURN

GLYCOL

NATURAL GAS

DOMESTIC COLD WATER

DOMESTIC HOT WATER

MECHANICAL SYMBOL LEGEND

DESCRIPTIONPLAN SYMBOLS

GENERAL NOTES:

1. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH MECHANICAL DRAWING

OF THIS SET. NOTES SPECIFIC TO INDIVIDUAL MECHANICAL DRAWINGS WILL BE SHOWN

ON THE RESPECTIVE MECHANICAL DRAWING.

2. THE MECHANICAL SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS, NFPA STANDARDS, AND CONTRACT

SPECIFICATIONS. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND

EQUIPMENT, AND SHALL PROVIDE ALL SERVICES AND INCIDENTALS REQUIRED TO

PRODUCE A COMPLETE AND PROPERLY OPERATING MECHANICAL SYSTEM FOR THE

FACILITY.

3. DUE TO THE SMALL SCALE OF THE DRAWINGS, ALL VALVES, FITTINGS, ACCESSORIES,

ETC. ARE NOT SHOWN OR IDENTIFIED ON THE PLANS. CONTRACTOR SHALL REFER TO

MECHANICAL DETAILS FOR ALL VALVES, FITTINGS, ACCESSORIES, ETC., REQUIRED.

CONTRACTOR SHALL ENSURE ALL REQUIRED ITEMS ARE FURNISHED AND INSTALLED.

4. FOR MECHANICAL DETAILS, SEE SHEETS M-501 THRU M-504. MECHANICAL DETAILS MAY

OR MAY NOT BE REFERENCED ON MECHANICAL PLANS; HOWEVER, CONTRACTOR SHALL

INSTALL ALL EQUIPMENT, PIPING, AND ACCESSORIES IN ACCORDANCE WITH THE

MECHANICAL DETAILS.

5. FOR MECHANICAL EQUIPMENT SCHEDULES, SEE SHEET M-601 & M-602.

6. FOR HVAC CONTROL DRAWINGS, SEE SHEET M-701.

7. THE CONTRACTOR SHALL PERFORM ALL TESTS AS REQUIRED BY SPECIFICATIONS,

APPLICABLE CODES, AND APPLICABLE REGULATORY AGENCIES. REQUIRED TESTS SHALL

BE WITNESSED BY A GOVERNMENT REPRESENTATIVE AS SPECIFIED.

8. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER TRADES TO AVOID

CONFLICTS AND OBSTRUCTIONS.

9. HVAC EQUIPMENT SHALL BE LOCATED AS SHOWN. CONTRACTOR SHALL DETERMINE THE

EXACT LOCATIONS BASED ON ACTUAL SIZES OF EQUIPMENT. CONTRACTOR SHALL

PROVIDE CLEARANCES AROUND EQUIPMENT AS REQUIRED BY MANUFACTURER'S

RECOMMENDATIONS AND CODE REQUIREMENTS. EQUIPMENT SHALL BE INSTALLED TO

FACILITATE SERVICE, MAINTENANCE, REPAIR AND REPLACEMENT OF EQUIPMENT.

CONNECTIONS TO EQUIPMENT SHALL BE MADE FOR EASE OF DISCONNECT AND TO

AVOID INTERFERENCE WITH OTHER INSTALLATIONS. CONTRACTOR SHALL PROVIDE ALL

DUCT AND PIPE TRANSITIONS REQUIRED FOR CONNECTIONS TO EQUIPMENT.

EQUIPMENT LOCATIONS SHALL BE COORDINATED WITH ELECTRICAL REQUIREMENTS.

10. CONTRACTOR SHALL INSTALL PIPING SYSTEMS SO THAT ALL VALVES, STRAINERS,

UNIONS, TRAPS, FLANGES, AND ALL OTHER FITTINGS AND APPURTENANCES ARE EASILY

ACCESSIBLE. CONTRACTOR SHALL PROVIDE AND INSTALL ALL PIPING FITTINGS, RISES,

DROPS, ETC., AS NECESSARY FOR A FULLY FUNCTIONAL PIPING SYSTEM. ALL VALVES

SHALL BE INSTALLED SO THAT THE VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR

PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED. ALL VALVES AND STRAINERS SHALL

BE FULL SIZE OF PIPE. VALVES FOR ISOLATION OF EQUIPMENT SHALL BE FULL SIZE OF

PIPE TO EQUIPMENT BEFORE REDUCTION FOR CONNECTION TO EQUIPMENT.

11. ALL FLOOR MOUNTED EQUIPMENT SHALL BE LOCATED ON NEW HOUSEKEEPING PADS.

12. ALL CONTROL WIRING SHALL BE INSTALLED IN CONDUIT. ALL CONDUIT, IN FINISHED

AREAS AND EXCLUDING MECHANICAL AND ELECTRICAL ROOMS, SHALL BE CONCEALED.

ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL

CODE AND WITH CONTRACT SPECIFICATIONS.

13. CUT OPENINGS, AS REQUIRED, IN THE CONSTRUCTION FOR THE INSTALLATION OF

PIPING, DUCTWORK, AND EQUIPMENT. PATCH AND REPAIR TO MATCH THE EXISTING

ADJACENT CONSTRUCTION AND TO MAINTAIN THE RATING OF CONSTRUCTION. THE

ANNULAR SPACE OF ALL PENETRATIONS SHALL BE FILLED WITH AN APPROVED MATERIAL

IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.

T THERMOSTAT

HOT WATER CIRCULATION PUMP

CONDENSING BOILER

A

PIPE ANCHOR

VERTICAL UNIT HEATER

PIPE/EQUIPMENT TO BE DEMOLISHED

PIPE/EQUIPMENT WITH ASBESTOS

TO BE DEMOLISHED

EXPANSION TANK

AIR SEPARATOR

CONNECTION/DISCONNECTION POINT

VALVE SYMBOL DESCRIPTION

DCWDCW

DHW DHW

GLY

HEAT PUMP WATER HEATER

SOLAR WATER TANK

SOLAR COLLECTOR

INLINE CIRCULATION PUMP

AutoCAD SHX Text

LC

M v

F

HROC

v v

HROC

v

14'-5"19'-6"8'-3"

6" 6" 10"

*FIRE ALARM,

START PANEL RUN

TO CLEAR THIS,

SHOULD LEAVE A

34" AISLE WAY

D es k

D es k

LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS

CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LP

S

LPS

LPS

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

CD CD CD CD CD CD CD CDCDCDCDCDCDCD

C D

C D

CD

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

LPS

C D

1"

1"

1-1/4"

1-1/4"

HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS

H

PS

H

PS

H

PS

HPSHPSHPSHPSHPSHPSHPS

D H

W D

H W

DHWDHWDHWDHWDHWDHWDHW

DHWDHWDHW

MPS

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

M P S

LPS

M

BOILER

BOILER1 1/2" CONDENSATE RETURN

LINE @ 12'-6" AFF

2" CONDENSATE

RETURN LINE

MPSMPSMPSMPSMPS

MPSMPSMPSMPSMPS

CONDENSATE

RETURN TANK

MPS

M

P S

M P S

M

P S

M P S

DCW

D C

W

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584

MD-101

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

SE

C

TI

O N

S

- M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

SCALE: 3/32" = 1'-0"

BUILDING 11 SECTIONS 3 & 4 - MECHANICAL DEMOLITION PLAN

CODED NOTES:

1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL

ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING

ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)

FOR WATER HEATER BACK TO ELECTRICAL PANEL.

2. REMOVE EXISTING SOLAR COLLECTOR ARRAY LOCATED ON ROOF.

PATCH ANY HOLES IN ROOF AS RESULT OF DEMOLITION TO MATCH

EXISTING.

3. REMOVE EXISTING SOLAR WATER HEAT EXCHANGER TANK AND

ALL ASSOCIATE PIPING. REMOVE ALL PIPING BETWEEN TANK AND

SOLAR COLLECTOR ARRAY ALONG WITH CIRCULATING PUMP.

REMOVE STEAM PIPING BACK TO MAIN. REMOVE CONDENSATE

CIRCULATING PUMP.

SHEET NOTES: SHEETS MD-101 THRU MD-401

1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.

2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF

DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.

3. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE

PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND

DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST

BE NOTIFIED 14 DAYS BEFORE ABATEMENT.

4. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS

SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED

ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IMMEDIATELY.

5. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,

PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT

DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND

LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.

6. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING

SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY

OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN

OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY

TO KEEP THE BUILDING TEMPERED.

AutoCAD SHX Text T

AutoCAD SHX Text T v v s s 3

CC

E

CC

E

LPF

A C E

C

10"

*FIRE ALARM,

START PANEL RUN

TO CLEAR THIS,

SHOULD LEAVE A

34" AISLE WAY

614 615 616

TABLE

OPEN

C

LO

SE

D

D O

U

BL

E C

LO

SE

D D

O U

BL

E

505506507508

LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS

CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD

5" 5"

CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CDCDCDCDCDCDCD

C D

C D

CD

CD CD CD CD CD CD CD CD CD CD CD CD CDCDCDCDCDCDCD

C D

C D

CD

CD CD CD CD CD CD CD CD CD CD CD

HWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWSHWS

HWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWR

AI

R

S

EP

AR

AT

O R

EX

PA

N

SI

O N

T

AN

K

C D

H W

R H

W R

H W

R

HWR

LP

S

LP

S

LPS

H W

S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

R H

W R

H W

R H

W R

C D

1- 1/

2"

1- 1/

2"

H X-

P-

P-

C O

N D

EN

SA

TE

R

EC

EI

VE

R

2"

2" 2"

2" 3/

4"

H

PS

H

PS

HPS

H

PS

H

PS

HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS

D H

W D

H W

D H

W D

H W

DHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHW

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584

MD-102

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

SE

C

TI

O N

S

- M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

SCALE: 3/32" = 1'-0"

BUILDING 11 SECTIONS 5 & 6 - MECHANICAL DEMOLITION PLAN

CODED NOTES:

1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL

ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING

ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)

FOR WATER HEATER BACK TO ELECTRICAL PANEL.

2. REMOVE EXISTING STEAM TO HOT WATER SHELL AND TUBE HEAT

EXCHANGER AND ALL ASSOCIATED APPURTENANCES. REMOVE

STEAM AND CONDENSATE PIPING BACK TO MAINS AND CAP.

REMOVE EXISTING STEAM CONDENSATE RECEIVER PUMP.

REMOVE ALL EXISTING ELECTRICAL CONNECTIONS (CONDUIT,

WIRE, SWITCHES, ETC.) BACK TO ELECTRICAL PANEL.

SHEET NOTES: SHEETS MD-101 THRU MD-401

1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.

2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF

DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.

3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK

TO MAIN AND CAPPED.

4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE

PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND

DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST

BE NOTIFIED 14 DAYS BEFORE ABATEMENT.

5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS

SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED

ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IMMEDIATELY.

6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,

PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT

DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND

LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.

7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING

SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY

OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN

OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY

TO KEEP THE BUILDING TEMPERED.

CAFETERIA

DDWO

820 821807

DTC

DDWO

CD

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

LPS

LPS

LPS

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LPS

LPS

LPS

LPS LPS LPS LPS LPS

CD CD

CDCDCD

LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS

CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD

LPS LPS LPS LPS

CD CD CD

C D

CD

C D

C D

C D

C

D 1" CONDENSATE RETURN @

12'-0" AFF

CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CDCDCDCDCDCDCD

C D

C D

CD

CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CDCDCDCDCDCDCD

C D

C D

CD

LPS

AI

R

S

EP

AR

AT

O R

EX

PA

N

SI

O N

T

AN

K H

W R

H W

R H

W R

HWR

LP

S

LP

S

LPS

H W

S H

W S

C D

H X-

C O

N D

EN

SA

TE

R

EC

EI

VE

R

HPS

H

PS

H

PS

H

PS

H

PS

HPS

HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS

H

PS

H

PS

H

PS

H

PS

H

PS

H

PS

H

PS

H

PS

HPSHPSHPSHPSHPSHPS

HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS HPS

H

PS

H

PS

C D

C D

LP

S

LPSLPS

LP

S

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584

MD-103

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

SE

C

TI

O N

S

- M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

SCALE: 3/32" = 1'-0"

BUILDING 11 SECTIONS 7 & 8 - MECHANICAL DEMOLITION PLAN

CODED NOTES:

1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL

ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING

ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)

FOR WATER HEATER BACK TO ELECTRICAL PANEL.

2. REMOVE STEAM HEATING COIL FROM EXISTING HEATING COIL.

REMOVE ALL ASSOCIATED STEAM AND CONDENSATE PIPING TO

COIL.

3. REMOVE EXISTING GAS METER AND ASSOCIATED GAS PIPING.

SHEET NOTES: SHEETS MD-101 THRU MD-401

1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.

2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF

DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.

3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK

TO MAIN AND CAPPED.

4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE

PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND

DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST

BE NOTIFIED 14 DAYS BEFORE ABATEMENT.

5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS

SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED

ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IMMEDIATELY.

6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,

PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT

DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND

LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.

7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING

SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY

OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN

OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY

TO KEEP THE BUILDING TEMPERED.

AutoCAD SHX Text

AH11-8-1

AutoCAD SHX Text

AH11-8-2

VH

ROOM

EQUIPMENT

1014 1015

EM LT

LP

-1

LP

-2

LP

-3

T

TT

T

T

T

EM LT

EM

LT

FFF

F

VH

1014 1015

EM LT

LP

-1

LP

-2

LP

-3

T

TT

T

T

T

EM LT

EM

LT

FFF

F

SW

BD

0-

LP

0-

W

LP

0-

E

SW

BD

1-

LP

LP

1036 1035 1034

180 SF

DTC

MAINTANCE

903902

4A

W R/R

SW

BD

0-

LP

0-

W

LP

0-

E

LP

LP

SW

BD

0-

LP

0-

W

LP

0-

E

LP

LP

915A

PR

IN

TE

R

COAT COAT

NEW

OPENING

POLE POLE

POWER

DTC

DTC

W R/R

915A

H W

R H

W R

H W

R

H W

S H

W S

CD CD CD CD CD CD CD CD CD CD CD CD CD

C D

LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS

LPS

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

LP

S

LPSLPS

LP

S

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

LPS

C D

C D

LP

S

LPSLPS

LP

S

LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS

CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD

C D

C D

LPS

LPS

LPS LPS LPS LPS LPS

LPS

CD CD CD

LPS

LPS

LP

S

LP

S

LP

S

CD

CD

H

PS

H

PS

C D

CD

C D

CD

CONDENSATE TRANSFER

LINE @ 10' AFF

C D

C D

C D

CONDENSATE TANK

1 1/2" STEAM SUPPLY

@17'-8" AFF

1" CONDENSATE RETURN @

12'-0" AFF

4" CONDENSATE LINE @

13'-6"

CD

HPSHPSHPSHPS

H

PS

HEAT

EXCHANGER

H

PS

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584

MD-104

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

SE

C

TI

O N

S

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O N

P

LA

N

SCALE: 3/32" = 1'-0"

BUILDING 11 SECTIONS 9 & 10 - MECHANICAL DEMOLITION PLAN

CODED NOTES:

1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL

ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING

ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)

FOR WATER HEATER BACK TO ELECTRICAL PANEL.

2. REMOVE EXISTING STEAM TO HOT WATER SHELL AND TUBE HEAT

EXCHANGER AND ALL ASSOCIATED APPURTENANCES. REMOVE

STEAM AND CONDENSATE PIPING BACK TO MAINS AND CAP.

REMOVE EXISTING STEAM CONDENSATE RECEIVER PUMP.

REMOVE ALL EXISTING ELECTRICAL CONNECTIONS (CONDUIT,

WIRE, SWITCHES, ETC.) BACK TO ELECTRICAL PANEL.

3. REMOVE EXISTING BOILER, STEAM SUPPLY PIPING, PIPE

HANGERS, FEEDWATER PIPING, BLOWDOWN PIPING, NATURAL

GAS PIPING, VENT PIPING, EXHAUST STACK, BOILER

CONTROLLERS AND ALL ASSOCIATED APPURTENANCES. PATCH

OPENINGS IN BUILDING ROOF AND BOILER ROOM CEILING AS

RESULT OF VENT PIPING REMOVAL. REMOVE CONCRETE PAD FOR

BOILER. CONTRACTOR TO COMPLETELY REMOVE ALL EXISTING

ELECTRICAL CONNECTS BACK TO PANEL (CONDUIT, WIRE,

SWITCHES, ETC.).

4. REMOVE EXISTING CONDENSATE RECEIVER TANK, ASSOCIATED

FEEDWATER PUMPS, COLD WATER PIPING, CONDENSATE RETURN

PIPING, PIPE HANGERS AND ALL ASSOCIATED APPURTENANCES.

REMOVE CONCRETE PAD FOR CONDENSATE RECEIVER.

CONTRACTOR TO COMPLETELY REMOVE ALL EXISTING

ELECTRICAL CONNECTS BACK TO PANEL (CONDUIT, WIRE,

SWITCHES, ETC.).

5. CONTRACTOR TO REMOVE EXISTING COMBUSTION MAKE UP AIR

HANDLING UNITS AND ALL ASSOCIATED APPURTENANCES.

CONTRACTOR TO PROVIDE SHEET METAL TO BLOCK OPENING IN

WALL LEFT BY UNIT. CONTRACTOR TO COMPLETELY REMOVE ALL

EXISTING ELECTRICAL CONNECTS BACK TO PANEL (CONDUIT,

WIRE, SWITCHES, ETC.).

6. REMOVE EXISTING CONDENSATE CIRCULATION PUMP AND ALL

ASSOCIATED PIPING. CONTRACTOR TO COMPLETELY REMOVE

ALL EXISTING ELECTRICAL CONNECTS BACK TO PANEL (CONDUIT,

WIRE, SWITCHES, ETC.).

7. REMOVE EXISTING WATER SOFTENER, COLD WATER PIPING AND

HANGERS. REMOVE CONCRETE PAD FOR UNIT.

8. REMOVE EXISTING BLOWDOWN TANK.

SHEET NOTES: SHEETS MD-101 THRU MD-401

1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.

2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF

DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.

3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK

TO MAIN AND CAPPED.

4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE

PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND

DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST

BE NOTIFIED 14 DAYS BEFORE ABATEMENT.

5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS

SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED

ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IMMEDIATELY.

6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,

PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT

DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND

LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.

7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING

SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY

OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN

OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY

TO KEEP THE BUILDING TEMPERED.

AutoCAD SHX Text 2"

CL CL

v

JAN

v

ROOM

EQUIPMENT

EM

L

T

EM

L

T

SW

BD

0-

LP

0-

W

LP

0-

E

EL

P

N L

SW

BD

1-

LP

LP

F

S

F

C F

LP

LP

FD

-F

C E

ST

O

R

AG

E

W O

M

EN

'S R

ES

TR

O O

M

R O

O M

EQ

U

IP

M

EN

T

T

LP122

LP

M

EC

H

AN

IC

AL

PP

C O

N

FE

R

EN

C E

EL

EC

TR

IC

AL

V

AU

LT

BR

EA

K

AR

EA

PA

SS

AG

EW

AY

W O

M

EN

'S L

O U

N G

E

M

EC

H

AN

IC

AL

R O

O M

JA

N

IT

O

R

JA

N

IT

O

R

EM LT

F F

F

F

NAC

EM

L

T

EM

L

T F F

PA

SS

AG

EW

AY

SIR

SIR

PT

D

O

FF

IC

E

O

FF

IC

E

O

FF

IC

E

O

FF

IC

E

O

FF

IC

E

O

FF

IC

E

C O

R R

ID

O

R

VE

ST

IB

U

LE

VE

ST

IB

U

LE

SO

U

TH

SO

U

TH

EA

ST

W

ES

T

F

F

5'-11"

'-6

1 16

T

PP

TELECOMMUNICATIONS

ROOM

SPRINKLER RISER

BREAK AREA

A/C

T

WOMEN'S

1240 1242

TEL

SW

BD

0-

LP

0-

W

LP

0-

E

LP

LP

SW

BD

0-

LP

0-

W

LP

0-

E

LP

LP

BU

IL

D

IN

G

AU

D

IT

O R

IU

M

BA

C

KS

TA

G E

VE

ST

IB

U

LE

VE

ST

IB

U

LE

N O

R

TH

SO

U

TH

EA

ST

EA

ST

FI

LE

ST

O

R

AG

E R

O O

M

SI

PR

R O

O M

D R

Y

PA

N

TR

Y

VT

C

R O

O M

TE

AM

R O

O M

M

EE

TI

N

G R

O O

M

TE

AM

R O

O M

TE

AM

R O

O M

PM

O

FF

IC

E

ST

O

R

AG

E R

O O

M

PM

O

FF

IC

E

PM

O

FF

IC

E

PD

O

FF

IC

E

PD

O

FF

IC

E

PM

O

FF

IC

E

PM

O

FF

IC

E

PM

O

FF

IC

E TE

AM

R

O O

M

TE

AM

R

O O

M

O

PE

N O

FF

IC

E

AR

EA

PM

O

FF

IC

E

011-I-1215

1-

E-

LA

N

/W

AN

R O

O M

LP

S

LPSLPS

LPS

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

LP

S

LPSLPS

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

LPS

H W

R H

W R

H W

S

HWS

LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS

CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD CD CD CD CD CD CD CD CD CD CD CD CD CD CD

C D

C D

C D

C D

HEAT

EXCHANGER

HOT WATER

PUMP

HWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWRHWR

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R

HWR

HWSHWSHWSHWSHWSHWSHWSHWSHWSHWS

HWS

HWSHWSHWS

HWS

H W

S

HWSHWSHWS

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584

MD-105

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

SE

C

TI

O N

S

- M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O N

P

LA

N

SCALE: 3/32" = 1'-0"

BUILDING 11 SECTIONS 11 & 12 - MECHANICAL DEMOLITION PLAN

CODED NOTES:

1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL

ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING

ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)

FOR WATER HEATER BACK TO ELECTRICAL PANEL.

2. REMOVE STEAM HEATING COIL FROM EXISTING HEATING COIL.

REMOVE ALL ASSOCIATED STEAM AND CONDENSATE PIPING TO

COIL.

SHEET NOTES: SHEETS MD-101 THRU MD-401

1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.

2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF

DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.

3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK

TO MAIN AND CAPPED.

4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE

PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND

DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST

BE NOTIFIED 14 DAYS BEFORE ABATEMENT.

5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS

SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED

ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IMMEDIATELY.

6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,

PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT

DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND

LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.

7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING

SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY

OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN

OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY

TO KEEP THE BUILDING TEMPERED.

AutoCAD SHX Text 5" Extg Steam Line

AutoCAD SHX Text 2" Extg Condensate Line

AutoCAD SHX Text B

JAN

JA

N

IT

O

R

O

FF

IC

E

O

FF

IC

E

F

TELECOMMUNICATIONS

SPRINKLER RISER

CONFERENCE

OFFICE OFFICEOFFICE

CUBICLES

FILES/STORAGE

BREAK AREA

MECHANICAL ROOM DIRECTOR'S

13021303

130413051306

TRANSFORMER

ELECTRIC BOXA/C

LP

TEL

ELECTRIC BOX

132213231324132513261327

SUPPLYEVIDENCE

OFFICE

S

S

INTERVIEW RM

SOLID DOOR

H W

R H

W R

H W

R

H W

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

LP

S

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

LPS

C D

HWR

AIR

SEPARATOR

D C

W

STEAM

CONDENSATE

PUMP

AHU

D C

W

DCW DCW

CD

HEAT

EXCHANGER

EXPANSION TANK HOT WATER

PUMP

LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS

CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD

C

DC

D

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584

MD-106

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

SE

C

TI

O N

- M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

SCALE: 3/32" = 1'-0"

BUILDING 11 SECTION 13 - MECHANICAL DEMOLITION PLAN

CODED NOTES:

1. REMOVE EXISTING ELECTRIC DOMESTIC WATER HEATER AND ALL

ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING

ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)

FOR WATER HEATER BACK TO ELECTRICAL PANEL.

2. REMOVE STEAM HEATING COIL FROM EXISTING HEATING COIL.

REMOVE ALL ASSOCIATED STEAM AND CONDENSATE PIPING TO

COIL.

3. REMOVE EXISTING UNIT HEATER, STEAM SUPPLY PIPING,

CONDENSATE RETURN PIPING, PIPE HANGERS, THERMOSTAT AND

ALL ASSOCIATED APPURTENANCES. REMOVE ALL EXISTING

ELECTRICAL CONNECTIONS (CONDUIT, WIRE, SWITCHES, ETC..)

FOR HEATER.

SHEET NOTES: SHEETS MD-101 THRU MD-401

1. HASHED EQUIPMENT/PIPING ARE TO BE REMOVED.

2. ANY HOLES IN WALLS, CEILINGS AND ROOFS FROM THE RESULT OF

DEMOLITION SHALL BE PATCHED TO MATCH EXISTING.

3. PIPING BRANCH LINES TO BE REMOVED MUST BE REMOVED BACK

TO MAIN AND CAPPED.

4. REMOVE ASBESTOS INSULATION IN ACCORDANCE WITH THE

PROJECT GUIDE SPECIFICATIONS SECTION 02 82 00 REMOVAL AND

DISPOSAL OF ASBESTOS CONTAINING MATERIALS. OHIO EPA MUST

BE NOTIFIED 14 DAYS BEFORE ABATEMENT.

5. IF DURING DEMOLITION, INSULATION IS FOUND WHICH IS

SUSPECTED OF CONTAINING ASBESTOS THAT IS NOT IDENTIFIED

ON DRAWINGS, CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IMMEDIATELY.

6. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,

PIPE LOCATIONS, AND EQUIPMENT ARE TAKEN FROM AS-BUILT

DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES AND

LOCATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.

7. CONTRACTOR MUST COORDINATE WORK TO KEEP HEATING

SYSTEM IN OPERATION DURING THE HEATING SEASON, TYPICALLY

OCTOBER 1ST THRU APRIL 1ST. IF SYSTEM MUST BE TAKEN

OFFLINE THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY

TO KEEP THE BUILDING TEMPERED.

AutoCAD SHX Text 5" Extg Steam Line

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584

MD-501

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

TY

PI

C

AL

H

EA

T

EX

C H

AN

G

ER

D

EM

O

LI

TI

O N

S C

H

EM

AT

IC

TYPICAL HEAT EXCHANGER DEMOLITION SCHEMATIC

SCALE: NO SCALE

H W

S

H W

S H

W S

H W

S

CDCD

LP

S

LP

S

LP

S

STEAM

CONTROL

VALVE

C O

N D

EN

SA

TE

ST

EA

M

H W

S H

W S

H W

S

HWSHWSHWSHWSHWSHWS

HWSHWSHWSHWSHWSHWSHWSHWSHWSHWS

CV

H W

R H

W R

H W

R H

W R

H W

R

HWRHWRHWRHWR

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR

C D

C D

C D

C D

H W

S

3-WAY DIVERTING VALVE, SET TO

MAINTAIN 180 DEGREE PUMP

DISCHARGE TEMPERATURE

BALL

VALVE

DRAIN LINE

C D

C D

C D

RETURN FROM BUILDING

SUPPLY TO BUILDING

HWS HWS

BALL

VALVE

(TYP.)

TRIPLE

DUTY

VALVE

FLEX

CONNECTOR

PRESSURE

GAUGE

THERMOMETER (TYP)

COMBINATION BACKFLOW PREVENTER

AND REDUCING VALVE

DOMESTIC WATER

GATE VALVE (TYP.)

INVERTED

BUCKET

TRAP

CONDENSATE

RETURN

HEAT

EXHANGER

CONDENSATE

PUMP

GATE

VALVE

EXPANSION

TANK

AIR SEPARATOR

PRESSURE GAUGE

STRAINER

CIRCULATION

PUMP

CHEMICAL

SHOT

FEEDER

BALL

VALVE

W O

M

EN

'S R

ES

TR

O O

M

M

EN

'S R

ES

TR

O O

M

M

EC

H

AN

IC

AL

R O

O M

D F v v v

14'-5"19'-6"8'-3"

6" 6" 10"

*FIRE ALARM,

START PANEL RUN

TO CLEAR THIS,

SHOULD LEAVE A

34" AISLE WAY

D es k

D es k

LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPS

CDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCDCD

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LPS

LP

S

LPS

LPSLPS

LP

S

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

C D

CD CD CD CD CD CD CD CD CDCDCDCDCDCDCDCDCD

C D

C D

C D

C D

CD

LPS

CD

LPS

LPS

C D

C D

1"

1"

1-1/4"

1-1/4"

HPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHPS

H

PS

H

PS

H

PS

H

PS

HPSHPSHPSHPSHPSHPSHPSHPSHPS

D H

W

D H

W D

H W

D H

W D

H W

D H

W

DHW

D H

W

DHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHWDHW

DHWDHWDHWDHWDHW

DHW DHW DHW DHW DHW DHW DHW DHW DHW DHW DHW

BOILER ROOM

DCWDCWDCWDCW

D C

W D

C W

D C

W D

C W

DHW

D

H W

D H

W

DHWDHWDHWDHWDHWDHW

DHW DHW DHW DHW DHW DHW DHW

D H

W D

H W

D H

W D

H W

DHW

D H

W

DHWDHWDHWDHWDHWDHWDHWDHW

DHW DHW DHW

D H

W

G

LY

G

LY

G

LY

G

LY

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

C O

LU

M

BU

S, O H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

-J ul -2

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y)

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

4-584 M-102

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

W

AT

ER

H

EA

TE

R (S

O

LA

R ) I

M

PR

O

VE

M

EN

TS

, B

LD

G

. 1

BU

IL

D

IN

G

SE

C

TI

O N

S

- N

EW

H

VA

C W

O R

K

PL

AN

SCALE: 3/32" = 1'-0"

BUILDING 11 SECTION 3 & 4 - NEW MECHANICAL WORK PLAN

CODED NOTES:

1. INSTALL NEW THERMOSTATIC MIXING VALVE. PROVIDE PIPING AS

SHOWN ON TYPICAL MIXING VALVE TO FIXTURES SCHEMATIC SHEET

M-504.

2. INSTALL SOLAR WATER TANK IN ACCORDANCE WITH MANUFACTURER'S

RECOMMENDATIONS. SEE PIPING SCHEMATIC SHEET M-504. SEE UNIT

SCHEDULE SHEET M-601.

3. INSTALL NEW HEAT PUMP WATER HEATER IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS. SEE PIPING SCHEMATIC

SHEET M-504. SEE SCHEDULE SHEET M-601.

4. INSTALL NEW INLINE CIRCULATING PUMP. INSTALL PUMP IN

ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SEE

DETAIL SHEET M-501. SEE SCHEDULE SHEET M-602.

5. INSTALL NEW 55 GALLON GLYCOL FEEDER. INSTALL IN ACCORDANCE

WITH MANUFACTURER'S RECOMMENDATIONS. SEE PIPING SCHEMATIC

SHEET M-504.

GENERAL NOTES: M-101 THRU M-106

1. SOLAR COLLECTOR ARRAY AND PIPING ON ROOF NOT SHOWN ON

DRAWING FOR CLARITY. SEE LAYOUT ON SHEETS M-401 THRU M-403.

2. HOT WATER SUPPLY/RETURN (HWS/HWR) PIPING SHALL BE ASTM

A53/A53M, GRADE B, SCHEDULE 40, BLACK STEEL, SEAMLESS. WHERE

PIPE NEEDS REDUCED USE ECCENTRIC REDUCERS INSULATE NEW

HWS/HWR PIPE WITH 2" MINERAL FIBER WITH ALL SERVICE JACKET.

INSTALL PIPING AT A MINIMUM 13 FEET AFF.

3. ALL NEW DOMESTIC HOT WATER AND COLD WATER SHALL BE ASTM

B88M, COPPER TUBE, TYPE L. INSULATE NEW DOMESTIC HOT WATER

AND COLD WATER PIPING WITH 1" FLEXIBLE ELASTOMERIC INSULATION.

4. ALL EXTERIOR WATER/GLYCOL PIPING INSULATION SHALL HAVE AN

ALUMINUM WEATHER PROOF JACKET.

5. NEW GAS PIPING SHALL BE STEEL PIPE CONFORMING TO ASME B36.10M;

AND MALLEABLE-IRON THREADED FITTINGS CONFORMING TO ASME

B16.1 AND ASME B16.3.

6. PROVIDE NEW MANUFACTURERS STANDARDIZATION SOCIETY OF

VALVES AND FITTINGS (MSS) TYPE 43 HANGERS WITH TYPE 40

PROTECTIVE SHIELD PIPING. SPACE HANGERS PER MSS 58

GUIDELINES.

7. WATER DISTRIBUTION SYSTEM SHALL BE BALANCED IN ACCORDANCE

WITH SECTION 23 05 93.00 06 TESTING, ADJUSTING AND BALANCING FOR

HVAC OF THE PROJECT SPECIFICATIONS.

8. PIPING AND HEATER LOCATIONS ARE SCHEMATIC IN NATURE. PIPING,

UNIT HEATERS AND BOILERS SHOWN ARE PROVIDED TO SHOW

SUFFICIENT DETAIL FOR BIDDING AND EXECUTION. ACTUAL

INSTALLATION IN FIELD MAY BE REVISED (WITH GOVERNMENT

APPROVAL) TO EASE INSTALLATION.

9. PROVIDE PIPE SLEEVES WHERE PIPES PASS THROUGH MASONRY OR

CONCRETE WALLS. SLEEVES SHALL BE OF SUFFICIENT LENGTH TO

PASS THROUGH ENTIRE THICKNESS OF WALLS. SEAL ALL

PENETRATIONS TO 3 HR FIRE RATING.

PIPE DOWN FROM SOLAR COLLECTOR ARRAY

EXISTING 1"Ø DOMESTIC HOT

WATER PIPING TO BE REUSED

SWT-11-4-1 SGP-11-4-1

WH-11-4-1

DHWP-11-4-1

GF-11-4-1

AutoCAD SHX Text T

AutoCAD SHX Text T s s 3

DIVISION

M/RRW/RR

CC

E

CC

E

42 42

LPF

A C E

C

10"

*FIRE ALARM,

START PANEL RUN

TO CLEAR THIS,

SHOULD LEAVE A

34" AISLE WAY

614 615 616

TABLE

Credenza &

Hutch

D es k

D es k

OPEN

C

LO

SE

D

D O

U

BL

E C

LO

SE

D D

O U

BL

E

OFFICE

505506507508

LPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSLPSL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .