SP4702-21-R-0027 Section M.pdf
PDF 232 KB Posted
- Solicitation number
- SP470221R0027
- Issued by
-
Defense Logistics Agency
About this file
This request for proposal solicits solutions for an inventory management and monitoring system to replace an existing fuels management IT infrastructure. The Defense Logistics Agency seeks a commercial application that will provide visibility of aviation, ground, and missile propellants owned by DLA Energy and stored at Department of Defense and commercial facilities worldwide. The selected contractor will receive a 10-year firm-fixed price indefinite delivery/indefinite quantity contract consisting of baseline application modification, testing, delivery and sustainment project management; application configuration and testing; and application maintenance and technical support. Interested offerors must contact the contracting officer by November 30th to request additional documentation and attend an optional pre-proposal conference on December 1st. Proposals are due by February 11th, 2022 and award is expected in May 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SP470221R0027 0005.pdf | ||
| SP470221R0027 0004 Attachment 1 - Questions and Answers.xlsx | XLSX spreadsheet | |
| SP4702-21-R-0027 Amendment 0004.pdf | ||
| SP4702-21-R-0027 Amendment 0003.pdf | ||
| SP470221R0027 0003 Attachment 1 - Questions and Answers.xlsx | XLSX spreadsheet | |
| SP4702-21-R-0027 Amendment 0002.pdf | ||
| SP4702-21-R-0027 Amendment 0001.pdf | ||
| SP4702-21-R-0027.pdf | ||
| SP4702-21-R-0027 Section L.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUEL DEPOT SYSTEM (FDS) – INVENTORY MONITORING (IM)
SECTION M SP4702-21-R-0027
EVALUATION FACTORS FOR AWARD
BASIS FOR AWARD
The award shall be made to the responsible firm, whose proposal is determined to be the best value to the Government, technical factors, past performance, and price considered. The Government’s objective is to obtain the highest quality services considered necessary to achieve the stated objectives of this acquisition, with fair and reasonable prices. Award will be made on the basis of trade-off source selection process. Offerors are advised that a proposal meeting the Government’s objectives and requirements with the lowest price may not necessarily be selected if award to a higher priced proposal is determined to be most advantageous to the Government. However, between proposals evaluated as essentially technically equal, price will become the major consideration in selecting the best value.
A proposal must demonstrate to the Government's satisfaction that the Offeror will provide a solution and approach that will ensure the successful accomplishment of each stated objective in the Performance Work Statement (PWS). The Government will evaluate the submissions based on the material presented in the written proposals.
Evaluation Method
The contract resulting from this solicitation will be awarded to the Offeror whose proposal conforms to the solicitation requirements and is determined to provide the best value to the Government. The best value determination will be based on the merits of the offer and the Offeror’s capability. The best value may not necessarily be the proposal offering the lowest price or receiving the highest technical rating.
An offer must be acceptable for the Offeror to be eligible for award.
OFFERS THAT DO NOT CONFORM TO THE REQUIREMENTS STATED HEREIN MAY BE
DETERMINED UNACCEPTABLE AND MAY BE REJECTED WITHOUT FURTHER
EVALUATION.
Proposals will be rated in accordance with the evaluation factors listed below. Evaluation factors (other than price) are significantly more important than price. However, price is an important factor and shall be considered when preparing proposals. While evaluation factors (other than price) are significantly more important than price, the importance of price as an evaluation factor increases with the degree of technical equality of the proposals. Accordingly, when Offerors are considered essentially equal in terms of technical capability, price may become the determining factor for award. The Government reserves the right to award to a lower cost Offeror when the offers are considered essentially equal in terms of technical capability, or when specific strengths and/or benefits associated with a technically superior offer do not support the payment of any associated cost or price premium. In summary, cost/technical capability, tradeoffs will be made.
Award without Discussion:
The Government intends to hold discussions but reserves the right to make awards without discussion.
Proposals should contain the firm’s best terms within the proposed technical and business approach and should address all evaluation factors. Additionally, the Government reserves the right to conduct discussions and request proposal revisions if it is determined to be necessary. If a competitive range is established, the Government may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals (refer to Federal Acquisition Regulation (FAR) 15.306(c)).
No Award:
The Government reserves the right not to make an award because of this solicitation if such award is determined contrary to the best interest of the Government.
Single Award
The Government anticipates the award of a single Firm Fixed Price (FFP), Indefinite- Delivery/Indefinite-Quantity (IDIQ) contract to the Offeror whose proposal meets the requirements of the solicitation and is the most advantageous to the Government.
PROPOSAL AND EVALUATION FACTORS AND SUBFACTORS
Evaluation Factors and Subfactors:
Factor 1: Technical Evaluation
Subfactor A: Technical Approach of the Solution Subfactor B: Management Approach Subfactor C: Key Personnel Qualification
Factor 2: Solutions Demonstration Factor 3: Past Performance Factor 4: Cyber Security Factor 5: Price
Relative Importance of Evaluation Factors and Subfactors
The Government will evaluate proposals using the factors and subfactors listed above:
Factor 1 is significantly more important than Factors 2 and 3. Under Factor 1, Subfactors A, B, and C are of equal importance and are used to develop the overall rating for Factor 1. Factors 1, 2, and 3 are more important than Factor 4. All non-price evaluation factors (Factors 1, 2, 3, and 4), when combined, are significantly more important than Factor 5, price. As the non-price factor ratings become more equal among proposals, the evaluated price becomes more important.
Proposal information provided for one factor may be used to assess other factors if the Government deems if appropriate.
Note: If a proposal receives a rating of “Unacceptable” in any of the Non-price Factors or Subfactors, the entire proposal will be determined "Unacceptable" and will be ineligible for award.
The awardee will be the Offeror who presents the best value approach to the Government’s requirement.
The Government’s objective is to obtain the highest quality supplies and services considered necessary to achieve the required level of maintenance and sustainment Task Order. If needed the Government may enter discussions with all Offeror(s) to determine if an Offeror fully understands the requirement.
DESCRIPTION OF EVALUATION FACTORS AND SUBFACTORS
The Offeror shall use the requirements outlined in the PWS to respond to Factor 1 (including the three subfactors), Factors 2, 3, and 4.
Factor 1: Technical Evaluation
• Subfactor A: Technical Approach of the Solution
The Offeror’s proposed approach shall address how the Offeror will successfully fulfill all requirements and shall demonstrate a clear understanding of the FDS IM as described in the solicitation; specifically, the PWS. The evaluation of the technical approach will ensure that the proposal identifies how risks to schedule and/or performance will be mitigated.
The success and operational capability for the FDS IM solution will depend on the Offeror’s technical capability to establish a system engineering approach that will ensure compliance with the PWS and all other technical and functional requirements proposed for the effort.
• Quality Control Plan (para 6.11.10 of PWS): Describes methods and procedures for adhering to a Quality Assurance Surveillance Plan (QASP); plans and procedures to meet and comply with the quality standards established in Part 8 of the PWS; the Offeror’s self-inspection plan; internal staffing plan; procedures to maintain quality, timeliness, and responsiveness of deliverables and customer satisfaction for the entire effort
• Software Development/Configuration Approach: Identifies a clear and effective process for properly documenting, configuring, and managing all development/configuration
• Software Sustainment Approach: The Government will review and evaluate the Offeror's proposed management approach, including plans for program; quality; security; risk; and personnel management that will be used to ensure the successful sustainment of the resultant contract.
• Sustainment Plan: Address periodic maintenance, repair, replacement, and overhaul of existing systems, hardware, and software inclusive of Information Assurance Vulnerability Alerts (IAVA)Patching. Identify position qualified personnel (as described in the PWS para. 1.5.5), test equipment, etc. needed to quickly diagnose and effect repairs
• Subfactor B: Management Approach
The Government will review and evaluate the Offeror’s Program Management Approach and Capabilities to assess the Offeror’s plans for strategy and management organization structure for the effective and efficient management of contract activities to successfully fulfill the requirements of the PWS Section 1.5. The Offeror’s approach shall address all aspects of Program Management found within the PWS. The Government will review and evaluate how well the Offeror’s proposed Program Management Approach, including plans for program, quality, security, risk, and personnel management should ensure successful execution for the resultant contract.
The Government will review and evaluate the Offeror’s approach to determine how well it provides:
• Plan for managing the FDS IM effort from a program perspective, including both information technology management and program support activities to include communication and interaction with the FDS Program Management Office (PMO), relevant stakeholders, the DLA Contracting Services Office-Columbus (DCSO-C) Contracting Officer, contract administration and staffs.
• Risk Management Plan that identifies how the Offeror will proactively track, identify, and mitigate risks throughout the life of the proposed effort and how risks will be communicated to appropriate FDS IM program personnel
• Proposed Integrated Master Schedule (IMS) to determine:
o Inclusion of significant milestones, design, development, testing, deployment, and installation related activities o Inclusion of activities related to cybersecurity compliance for certification and accreditation in the production environment o Provision of a comprehensive, implementable timeline that aligns with the approach in the technical proposal
• Plan for personnel management including program specific training; continuity and succession management of proposed personnel labor mix; the organizational structure and the use of proposed team members and subcontractors in support of this effort
• Work Breakdown Structure (WBS) for assigning resources to the proposed effort. The WBS shall describe how the labor categories and hours proposed for each task are sufficient to meet the PWS requirements
• Plan to support and manage Department of Defense (DoD) cyber security requirements on an ongoing basis; physical security and personnel security including a clear description of the Offeror’s security program and structure; how information assurance system security fits into the overall management plan and structure; responsibilities of personnel; and how the security plan and key personnel will operate/interact with the Government security team
• Communication plan that outlines the method of providing communication to DLA program staff, management, customers, and users; addresses the Offeror’s understanding of the importance of communications; and how changes will be communicated
• Subfactor C: Key Personnel Qualifications
The Government will review and evaluate the Offeror’s Key Personnel resumes proposed for those resources listed as Key Personnel in the PWS: Program Manager, Senior Software Engineer, Software Engineer, Cloud Architect 2, Operations Manager, and Cyber Security Specialist. The resumes of Key Personnel proposed will be evaluated for a clear demonstration that the proposed resources meet or exceed the education and experience requirements outlined in 1.5.5 of the PWS.
The information presented in the Offeror’s proposal together with information from any other available sources will provide the primary input for evaluation of this factor. The Government reserves the right to verify Key Personnel performance on other contracts identified by the Offeror in the proposal. The Government reserves the right to use other available information to evaluate Key Personnel. The Government may query contract references and other end user representatives regarding Key Personnel experience and quality of experience and performance. The Offeror must provide, along with resume’s, Letters of Intent (LOI)/Letters of Commitment (LOC) confirming Key Personnel selection and availability immediately on contract award. The Offeror must ensure that all Key Personnel are eligible to obtain a Common Access Card (CAC). This includes those individuals currently holding dual citizenship.
Factor 1 will be used to evaluate the degree to which the Offeror’s proposed approach meets all requirements and demonstrates a clear understanding of the FDS IM requirements as described in the PWS. The figure below provides the ratings descriptions.
Technical and Risk Ratings Adjectival
Rating Description
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is ineligible for award.
Figure 1: Factor 1 Capability Rating Method
3.2 Factor 2: Solutions Demonstration
The Solution Demonstration will be evaluated in two steps and the Offeror will assigned with an adjectival rating based on result of the demonstration.
Step 1: The Government will assess whether an Offeror’s Solution Demonstration is compliant with the instructions and presents a demonstration that is “materially the same” as their proposed Technical Approach. The Offeror shall be assigned one rating from the following.
The Government defines “materially the same” as using the same “approach” and technologies to address Solution Demonstration scenarios as the approach and technologies provided in the corresponding areas in the submitted Technical Approach.
Further, the Government defines “approach” as the Offeror’s solution architecture and the technologies that consist of demonstrated commercial and developed software.
Solution Demonstration Step 1 Ratings
Adjectival
Rating
Description
Acceptable
The Offeror’s Solution Demonstration uses concepts or technologies that are “materially the same” as its proposed Technical Approach.
Move to Step 2 Scenarios
Unacceptable
The Offeror’s Solution Demonstration introduces concepts or technologies that are not “materially the same” as its proposed Technical Approach. Proposal does not meet requirements and contains one or more deficiencies (fails).
Figure 2: Solution Demonstration Step 1 Ratings
Step 2: If the Offeror’s Solution Demonstration is evaluated materially the same, the Government will evaluate the Offeror’s demonstration of the following capabilities outlined in Section 3 of the PWS:
• Successful wireless transmission of Inventory Management Data from an Automatic Tank Gauge (ATG) to an Enterprise hosted User Interface (UI).
• Successful wireless transmission of Inventory Management Data from a Remote Terminal Unit (RTU) to an Enterprise hosted User Interface (UI).
• Successful wireless transmission of Inventory Management Data from a locally-installed version of the FDS IM Solution to the Enterprise hosted FDS IM Solution.
Inventory Management Data includes but is not limited to:
• Grade
• Tank Level
• Water Level
• On-hand Quantity (Gross/Net)
• Temperature
• Standard Density
• Conversion Factor
• Ullage
• Current Tank Status
The Offeror’s demonstration must be performed utilizing a Production Representative system that accurately represents the production configuration for application hardware and software. This includes all applicable Operating System and Application Security Technical Implementation Guides (STIGs) applied. The Offeror must present during the demonstration, evidence of system configuration verifying the security posture of the representative environment. This may be accomplished in the form of system scan results or STIG checklist. In addition to system verification documentation, the Offeror must also provide a High-Level Operational Concept Graphic (OV-1) detailing the architecture for the solution being proposed. The OV-1 must indicate a clear understanding of Government Cloud requirements.
The Offeror shall be assigned one rating from the following for each capability demonstrated:
Solution Demonstration Step 2 Ratings
Adjectival Rating Description
Pass
The Offeror’s Solution Demonstration successfully demonstrated required capabilities and the environment was suitable to a Production representative system.
Fail
The Offeror’s Solution Demonstration failed to successfully demonstrate required capabilities, or the environment failed to meet security posturing requirements.
Figure 3: Solution Demonstration Step 2 Ratings
3.3 Factor 3: Past Performance
The past performance evaluation results in a performance confidence assessment rating of the Offeror’s probability of meeting the solicitation requirements derived by considering each Offeror’s demonstrated recent and relevant record of performance and how well the Offeror performed on the contracts. The Past Performance assessment is based on three aspects: Recency, Relevancy, Quality and Confidence. In rating past performance and deriving a performance confidence assessment rating, the following will be considered.
3.3.1 Recency of Prior Contracts
The first aspect is to evaluate the recency of the Offeror’s past performance. Recency is expressed as a time during which past performance references are considered relevant. Past performance that is or was completed in the last three (3) years prior to the solicitation issue date considered to be recent.
Experience that is less recent will not be evaluated as highly as recent experience.
Figure 4: Past Performance Recency Rating Method
3.3.2 Relevancy of Prior Contracts
The second aspect is to determine how relevant a recent effort accomplished by the Offeror is to the effort to be acquired. The Government will evaluate relevancy of the Offeror’s prior projects to the current PWS requirements as provided in the Offeror’s written proposal. In establishing what is relevant for the acquisition, consideration will be given to those aspects of a Offeror’s contract history that will give the greatest ability to measure whether the Offeror will satisfy the current procurement. More relevant past performance will be a stronger predictor of future success and have more influence on the performance confidence assessment than less relevant past performance. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, use of key personnel (for
Past Performance Recency Ratings Adjectival Rating Definition Very Recent Presently performing work.
Recent Past performance within the past 3 years of this solicitation.
Somewhat Recent Past performance within the past 3 to 10 years of this solicitation.
Not Recent Past performance beyond the past 10 years of this solicitation.
services) and extent of subcontracting/teaming. Highly relevant past performance requires that most of the prior contracts provided are essentially the same scope, magnitude of effort and complexities this solicitation requires.
Figure 5: Past Performance Relevancy Rating Method
3.3.3 Quality of Products or Services
The third aspect is to establish the overall quality of the Offeror’s past performance. The past performance evaluation is to determine how well the Offeror performed on prior contracts by such indicators as the organization’s history of successful completion of projects; history of producing high-quality reports and deliverables; commitment to customer satisfaction; and history of staying on schedule and within budget. Evaluation of this aspect will be based on information provided in Past Performance Questionnaires and the Offeror’s proposal and may include the Government’s independent verification with Offeror’s prior customers or through past performance databases such as the Supplier Performance Risk System (SPRS). If the Government’s information conflicts with assertions made in the Offeror’s proposal, the Offeror will be asked to clarify this information.
Past Performance Relevancy Ratings
Adjectival Rating Definition
Very Relevant
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Past Performance Quality Ratings Adjectival Rating Definition Outstanding Response demonstrates historical projects with outstanding experience and history of producing high quality reports, deliverables, and staying on schedule and within budget. An outstanding overall past performance based on past performance information.
Good Response demonstrates historical projects with good experience and history of producing high quality reports, deliverables, and staying on schedule and within budget. A good overall past performance based on past performance information.
Acceptable Response demonstrates historical projects with satisfactory experience and history of producing high quality reports, deliverables, and staying on schedule and within budget. An acceptable overall past performance based on past performance information.
Marginal Response demonstrates poor overall experience performing historical projects and does not exhibit experience and history of either producing high quality reports, deliverables, or staying on schedule and within budget. Marginal overall performance based on past performance information.
Unacceptable Response demonstrates an unsatisfactory overall experience performing historical projects and does not exhibit experience and history of producing high quality reports, deliverables, or staying on schedule and within budget. An unacceptable overall past performance based on past performance information.
Neutral The Neutral rating is to be assigned if the Offeror has no relevant record of past performance. The Offeror will not be rated favorably or unfavorably.
Figure 6: Past Performance Quality Rating Method
3.3.4 Neutral Rating
Offerors that have no record of past performance (i.e., new businesses) must submit a signed and dated statement to that effect. If an Offeror submits a certification statement and the Government has no information available regarding the Offeror’s past performance, that Offeror will receive a neutral rating (i.e., the Offeror is evaluated neither favorably nor unfavorably) for past performance. A prime or significant subcontractor that does not provide any contract reference information will receive a neutral rating for past performance. Furthermore, if Offerors (prime and significant subcontractors) provide contract reference information that is not relevant and current as defined in Section L, Instructions, Conditions, and Notices to Offerors, the Offeror will receive a neutral past performance rating for those contracts.
3.3.5 Other Information Sources
The Government may solicit information from an Offeror’s customers and business associates; Federal, state, and local Government agencies; and from other persons and organizations. The Government reserves the right to limit the number of references it decides to contact as well as the right to contact references other than those provided by the Offeror.
3.3.6 Performance Confidence Assessment
The Government will review and assess past performance information to determine its recency, relevancy, and quality to assign a Performance Confidence Assessment rating. Each Offeror will be assigned one rating from the table below.
Performance Confidence Assessments
Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available, or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Figure 7: Past Performance Confidence Assessments Rating Method
3.4 Factor 4: Cyber Security
Cyber Security Specialist (CSS) Key Personnel: The Cyber Security Specialist shall manage all day-to-day cybersecurity operations including administrative functions, assessing risks, and identifying unstated assumptions. The Cyber Security Specialist shall possess minimum of Bachelor’s Degree from an accredited college or university in computer science, computer engineering, advanced analytics, applied mathematics, physics, or related field. The Governments preference would be a degree in computer science, computer engineering, advanced analytics, applied mathematics, or physics. Requires minimum of 8 years of relevant experience. Minimum certification required is Certified Information System Security Professional (CISSP).
The Government will review and evaluate the Offeror’s proposed personnel for the proposed CSS. The Offeror’s proposed personnel must:
• Demonstrate the ability to meet the PWS Personnel Security Requirements and Citizenship for all personnel proposed for the contract
• Demonstrating the knowledge and experience with performing the cyber security functions described in the PWS para 2.7.10
• Demonstrate security planning for the applicable system by providing information for Cyber Security requirements listed in the PWS para 2.7.10. The explanation should include experience and knowledge of the supporting documentation such as Defense Information Systems Agency (DISA) Secure Technical Implementation Guides, National Institute of Standards and Technology (NIST) Special Publication 800-30, NIST Special Publication 800-37, NIST Special Publication 800-39, NIST Special Publication 800-53, NIST Special Publication 800-82 Revision 2, DoD Instruction 8500.01 and 8510.01.
Acceptable/Unacceptable Rating Method will be used to determine qualified Offerors
Cyber Security Rating
Acceptable Proposal meets the requirements of the solicitation Unacceptable Proposal does not meet the requirements of the solicitation
Figure 8: Cyber Security Rating Method
3.5 Factor 5: Price
A Fixed Price Proposal shall be submitted in accordance with instructions set forth in this solicitation.
Evaluation of an Offeror’s proposal shall be based on the information presented in the proposal and information available to the Contracting Office from sources deemed appropriate. Sources typically considered include Defense Contract Audit Agency (DCAA) office, Defense Contract Management Agency (DCMA), other contracts with the same firms for similar items or services, known commercial sources such as Global Insight Inc. (formally Data Resources, Inc.), Standard and Poor Index, other sources. The quality of organization and attention to detail reflected in the business proposal will be an indication of the quality of organization and level of capability during contract performance.
3.5.1 Price Reasonableness
Proposals will be evaluated for price reasonableness. If price reasonableness cannot be determined, additional pricing information will be requested by the Government in accordance with Defense FAR Supplement (DFARS) 215.403-5. Price evaluation will be based on the total cost offered for all Contract Line Item Numbers (CLINs). If necessary, an informal breakdown will be required at the CLIN level to include by not limited to; material, labor, overhead, general and administrative expenses, miscellaneous subcontracting, travel/per diem, contract data and any miscellaneous cost items.
| 1.0 Basis for award |
| 1.1 Evaluation Method |
| 1.2 Award without Discussion: |
| 1.3 No Award: |
| 1.4 Single Award |
| 2.0 PROPOSAL AND evaluation factors AND SUBFACTORS |
| 2.1 Evaluation Factors and Subfactors: |
| 2.2 Relative Importance of Evaluation Factors and Subfactors |
| 3.0 Description of Evaluation factors AND SUBFACTORS |
| 3.1 Factor 1: Technical Evaluation |
| Subfactor A: Technical Approach of the Solution |
| Subfactor B: Management Approach |
| Subfactor C: Key Personnel Qualifications |
| 3.3 Factor 3: Past Performance |
| The past performance evaluation results in a performance confidence assessment rating of the Offeror’s probability of meeting the solicitation requirements derived by considering each Offeror’s demonstrated recent and relevant record of performance an... |
| 3.3.1 Recency of Prior Contracts |
| The first aspect is to evaluate the recency of the Offeror’s past performance. Recency is expressed as a time during which past performance references are considered relevant. Past performance that is or was completed in the last three (3) years pri... |
| 3.3.2 Relevancy of Prior Contracts |
| 3.3.3 Quality of Products or Services |
| 3.3.4 Neutral Rating |
| 3.3.5 Other Information Sources |
| 3.3.6 Performance Confidence Assessment |
| Figure 8: Cyber Security Rating Method |
File details come from the government source that posted it. Updated .