Q A_List_16-R-0003_Am._0003_5.24.pdf

PDF 55 KB Posted

Attached to
One-Time Scrap Removal/Recycling, US Army Garrison Kwajalein Atoll
Solicitation number
SP453016R0003
Issued by

About this file

Questions and Answers List

View the file

Other files

File Type Posted
SF30_SP453016R00030004.pdf PDF
BSR.docx DOCX document
SF30_SP453016R00030003.pdf PDF
FINAL_Kwajalein_Scrap_Removal_Rev_PWS_20160518.doc DOC document
Questions_ _Answers.pdf PDF
Att_22-USAG-KA_Boneyard_Condensed_Estimate.xlsx XLSX spreadsheet
PP_Conference_Sign_in_Sheet.pdf PDF
55r_(v10).pdf PDF
Attachment_19_-_Revised_Kwajalein_Bid_Schedule.docx DOCX document
Kwajalein_Scrap_Locations_20160511.docx DOCX document
SF30_SP453016R00030002.pdf PDF
Page_42_Am._No._0001.pdf PDF
SF30_SP453016R00030001.PDF PDF
FW_Kwajalein_photos_II_(image_size_adjusted).msg MSG file
ADDENDUM_to_Solicitation_Kwaj_Am._No._0001.pdf PDF
Final_Kwajalein_SLIDES_5.2.16.ppt PPT presentation
Final_SCRIPT_for_Pre-Proposal_Conference_5.3.16.doc DOC document
Page_32_Am._No._0001.pdf PDF
Attachment_19_-_Kwajalein_Bid_Schedule.docx DOCX document
Attachment_15_-_PPI_Part_2.pdf PDF
Attachment_02_-_APLS.pdf PDF
Attachment_08_-_End_Use_Certificate_(EUC) _DLA_Form_1822.pdf PDF
Attachment_18_-_PPI_Part_5.pdf PDF
Attachment_14_-_PPI_Part_1.pdf PDF
Attachment_09_-_Example_Quality_Control_Plan.doc DOC document
Attachment_04_-_Definitions.pdf PDF
Attachment_05_-_Acronyms.pdf PDF
Attachment_03_-_QASP.pdf PDF
Attachment_17_-_PPI_Part_4C.pdf PDF
Attachment_10_-_GFE-Seirra_RB6000_Baler.pdf PDF
Attachment_06_-_Compact_of_Free_Association.pdf PDF
ADDENDUM_to_Solicitation_Kwaj_SP4530-16-R-0003.pdf PDF
Attachment_12_-_U.S._Holidays.pdf PDF
SP4530-16-R-0003.pdf PDF
Attachment_08_(cont)_-_1822_EUC_Instructions.pdf PDF
Attachment_07_-_Subsidiary_Agreements.pdf PDF
Attachment_16_-_PPI_Part_3.pdf PDF
Attachment_11_-_Government_Furnished_Services_and_Facilities_to_Contractor.pdf PDF
Attachment_01_-_Locations.pdf PDF
Attachment_13_-_Representative_Photos_of_Scrap.zip ZIP file
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

SP4530‐16‐R‐0003 KWAJALEIN SCRAP REMOVAL

Amendment No. 0003

Page Question ANSWER:

64. Kind of funny after I have been following this solicitation for almost 2.5 years, I finally see there is something about giving preference to local /native Marshallese contractor's?

I understand, but that was the same thing that happened at Thule AFB, preference was given to Icelandic contractors over anyone else.

It would really seem futile to waste anymore time, if a preference is going to be granted to Marshallese contractors!

Please reread clauses 3.1.1 and 3.1.2. Award of the contract will be made based upon the terms of this solicitation, the amendments, and US law (including but not limited to the Compact of Free Association and Subsidiary documents (Solicitation Attachments 6 and 7)). Whether a potential offeror submits an offer to the proposed solicitation is exclusively within the offeror's discretion.

65. The working period should be within 180days excluding inclement weather delay.

If we could not finish the work during the assigned timetable, should we take something like penalty?

How much we pay the charge per day if we have to do in that case?

With regard to question nos. 42 and 43, extensions are not anticipated for the contract at this time. The successful contractor will not be allowed to continue working after the 180 days after post award conference. If work is not completed within this time frame, per the APL, a disincentive for not meeting this standard is a 0‐25% deduction of the contract value.

Please be aware that the requirement has been reduced from a total estimated weight from 12.1 MIL lbs. to 8 MIL lbs. In accordance with question no. 45, USAG‐KA is allowing an additional ten (10) rooms, from five

(5) to fifteen (15) at double occupancy to allow additional manpower to complete the work within 180 calendar days.

QUESTIONS AND ANSWERS

SP4530‐16‐R‐0003 KWAJALEIN SCRAP REMOVAL

Amendment No. 0003

66. Where is Echo pier? Is it different from a main pier which liner vessels make port?

We understand the Echo pier is not available due to its renovation during the period of the contract and you recommend to use Barge Ship Ramp because it is near the scrap accumulation and easier to bring scrap to the ramp. However, the depth of water of BSR is not enough for container vessel to port nor do big bulker.

Only available small ship can make port the ramp. But small ship cannot carry volume of scrap to appropriate site to deal with. This means that we can accept this project only to use the main pier. Please clarify this situation.

In accordance with question no. 20, Echo Pier will not be available because it will be under renovation during the performance period of this contract.

The BSR is available. The largest vessel USAG‐KA has ever brought into the BSR is 85 feet wide, 280 feet long and had a 14 foot draft. It is actually the one in the picture. According to our charts, there is a 20 foot depth but our Marine department says that there are few spots where sand has accumulated and reduce the depth to less than that. They typically try to keep the draft to 15 feet or less. Additionally, if the vessel were to be a front loading vessel it would require a raked front end since the depth near the loading ramp drops to 10 feet. A side loading barge is more effective there so they can stand back from the shallow portion and still load effectively.

Refer to the attached photo.