CONTINUATION SHEET REFERENCE NO. DOCUMENT BEING CONTINUED:
SP4520-14-R-0003 (Amendment 0002) contractor may use attachments to the form if necessary. The Contractor’s Contract Manager or Alternate Contract Manager shall sign the form certifying its accuracy and completeness.
(4) Trailer and Security:
i. All Contractor trailers utilized for hazardous waste pickup shall be padlocked upon arrival at the pickup location. Failure to meet this requirement may result in the Government’s halting of the pickup. All trailers capable of being padlocked shall also be padlocked again prior to departure of the pickup location(s). The driver shall provide the padlock and lock the trailer without assistance from the COR or other Government representative(s).
ii. The COR or other Government representative has the right to request any identification and/or occupational endorsements from the driver and, refuse commencement and/or completion of pickups if any unusual or suspicious actions occur. The contractor shall assert no claim against the Government for any costs or demurrage associated with the driver verification process and/or the unexpected halt or commencement of pickups Government for reasons specified in this section.
iii. The Government reserves the right to take appropriate action, such as the pursuit of monetary consideration and/or annotation of negative past performance, if Contractor trailers capable of being padlocked arrives and/or departs from the pickup location(s) without meeting the padlock requirements mentioned above and/or contractor personnel refuse to cooperate with any requests for additional identification and/or professional endorsements.
(5) Hours of Operation:
i. The Government anticipates, unless different hours/days are specified for a particular service, that all services performed under this contract shall be performed, on a daily basis, during regular working hours (0730 through 1630 hours) Monday through Friday, and on local national and American holidays (only with prior COR approval/contractor concurrence). The specific date and time for off-site removal services, shall be established by the COR and the contractor via email or a facsimile pickup request which shall constitute a call against a Task Order (refer also to section B.2.(a)(3), NOTIFICATIONS). The COR shall forward the pickup request information to the generator. The COR shall meet the contractor at the scheduled pickup site at time agreed upon by the contractor and COR. This date/time shall be at least two work days prior to the date scheduled.
The US holidays are:
1st of January* 1st Monday in September 3rd Monday in January 2nd Monday in October 3rd Monday in February 11th of November* Last Monday in May 4th Thursday in November 4th of July* 25th of December*
*If this date falls on a Saturday, the preceding day (Friday) is the US holiday. If this date falls on a Sunday, the following day (Monday) is the US holiday.
(6) Drums and Removals:
i. The contractor shall provide, supply, place and remove hazardous waste containers, when and as required for the performance of work under this contract, for the collection and/or transportation of waste. Contractor provided containers shall be UN approved, clean, free of residue and graffiti, and only labeled with markings that identify the current waste. The containers shall have a current inspection/certification and be capable of being operated as intended (i.e. lids shall close tightly and prevent the intrusion of rainwater, safety hooks to hold lids open shall be in place and operational, containers shall be able to be locked, etc.). Containers greater than 1.1 cubic meter (CBM) shall be weighed each time before they are placed into service. The container shall be labeled with the date weighed as well as the actual weight. Containers shall be unmarked, structurally sound and containing no free standing residue(s). The contractor’s provision of containers shall be evaluated and documented under Section 3.3 of the Acceptable Performance Levels (APLs) of this contract.
Note:* The words container and drum are used interchangeably throughout the contract. CLINs N67000 to N68200 Government pertain to the Government purchase/order of containers for use
CONTINUED ON NEXT PAGE
| (7) Transportation: |
| (4) Storage Restrictions: |
| i. The contractor shall properly store hazardous wastes and materials in accordance with, but not limited to, European host nation, IMDG and ADR laws and regulations in a manner that effectively mitigates hazards to human health and the environment. I... |
| ii. Storage of waste shall not exceed the TSDRFs permit restrictions, but in all cases shall not exceed one year. |
| 1. PASSES FOR ENTRY INTO MILITARY PREMISES |
| 2. CONTRACTOR REPRESENTATIVE |
| 3. CONTAINER PLACEMENT |
| 4. CONTAINERS |
| 5. MARKING AND IDENTIFICATION |
| 6. FEES |
| 7. PERIOD OF PERFORMANCE |
| 8. INDEMNIFICATION |
| 9. USE OF FACILITIES AND TRANSPORTERS |
| 10. ADDITIONAL TSDFS AND TRANSPORTERS |
| 11. USE OF TRANSPORTERS AND TREATMENT, STORAGE, DISPOSAL & RECYCLING (TSDR) FACILITIES |
| 12. TREATMENT, STORAGE, DISPOSAL & RECYCLING (TSDR) FACILITIES |
| 13. CONTRACT MINIMUM/MAXIMUM |
| 14. PARTIAL PAYMENTS UPON FINAL DISPOSAL |
| 15. DOCUMENTATION REQUIREMENTS, ACCEPTANCE, INVOICING, AND TRACKING |