FINAL
SPILL PREVENTION, CONTROL AND COUNTERMEASURES PLAN
FOR
RAF MENWITH HILL, UNITED KINGDOM
Defence Estates Contract No: DE USF/11041
Environmental Support Services for DE USF &
US Visiting Forces
For
DE USF Waterbeach Defence Estates, Stirling House
Denny End Road Waterbeach
Cambridgeshire, CB5 9QB
DE USF Menwith Hill RAF Menwith Hill, Building 33A
Harrogate HG3 2RF
Parsons
4 GROSVENOR PLACE,
LONDON, SWIX 7PG
UNITED KINGDOM
December 2004 sq90455 Typewritten Text Solicitation SP4520-14-R-0003 Attachment 10b
This page has been intentionally left blank
Spill Prevention, Control and Countermeasures Plan Final Plan, RAF Menwith Hill, UK Contract No: DE USF/11041
SUBMITTED BY
Parsons
4 GROSVENOR PLACE,
LONDON SW1X 7PG, UK
Name Signature
Author Ms. Una Shaw
Technical Director Ms. Elvira Gaddi
Quality Controller Ms. Alison Taylor
Project Manager Ms. Una Shaw
Approved for release Ms. Una Shaw
RECORD OF ANNUAL REVIEW
Each key member of the Facility Response Team is responsible for conducting an annual review and forwarding suggested changes/comments or negative reply to the Chief, Environmental Flight, the responsible Flight for completing this log for each annual review.
Annual Review Conducted By:
Position Signature Date
RAF Menwith Hill Fire Chief
Defence Estates
Chief, Environmental Flight
Chief, Health and Safety Department
Fire Department
Base Civil Engineer
Security
Signed: Chief, Environmental Flight: ________________________
Date: ___________________
Acceptance By:
Postion Signature Date
RAF Menwith Hill Commander
U.S. Menwith Hill Station Commander i
TABLE OF CONTENTS
Table of Contents i Appendices ii List of Figures iii List of Tables iii Acronyms v Glossary vii
SECTION 1 INTRODUCTION 1-1
1.1 Overview and Purpose 1-1
1.2 Instruction on Plan Use 1-1
1.3 Plan Distribution 1-2
1.4 Record of Amendments 1-3
1.5 Base Overview 1-3
1.5.1 Mission Statement 1-3
1.5.2 Environmental Setting 1-3
1.5.3 Geology, Hydrogeology and Hydrology 1-3
1.5.4 Drainage 1-4
1.6 Concept of Operations and Responsibilities for Response 1-4
1.6.1 Governing Principles 1-4
1.6.2 Organization, Roles and Responsibilities 1-5
1.6.3 Relationship to Other Plans 1-5
SECTION 2 SPILL RESPONSE ACTION PLAN 2-1
2.1 Spill Response Procedures 2-1
2.2 Roles and Responsibilities 2-5
2.2.1 Initial Responder (Station Personnel or Unit/Activity) 2-5
2.2.2 Facility Response Team 2-5
SECTION 3 HAZARD ANALYSIS 3-1
3.1 Introduction 3-1
3.2 Hazard Identification 3-1
3.2.1 Hazardous Wastes 3-1
3.2.2 Hazardous Materials 3-2
3.3 Vulnerability Analysis 3-7
3.4 Risk Assessment 3-9
SECTION 4 SPILL PREVENTION 4-1
4.1 Introduction 4-1
4.2 General Operating Procedures for Spill Prevention 4-1
4.2.1 Storage 4-1
4.2.2 Handling 4-2
4.2.3 Transportation 4-2
4.3 Spill Prevention Structures and Equipment 4-2
4.4 Inspection and Surveillance 4-3
4.5 Security Measures 4-3
4.6 Training and Awareness 4-3
4.7 Roles and Responsibilities for Spill Prevention 4-3
ii
SECTION 5 CAPABILITY ASSESSMENT 5-1
5.1 Resources 5-1
5.1.1 Equipment Required 5-1
5.2 Off-base Resources 5-2
SECTION 6 RESPONSE FUNCTIONS 6-1
6.1 Initial Notification of Response Agencies 6-1
6.2 Direction and Control 6-1
6.3 Communication 6-1
6.3.1 Spill Level 1 6-1
6.3.2 Spill Level 2 6-1
6.3.3 Spill Level 3 6-2
6.3.4 Spill Level 4 6-2
6.4 Warning Systems 6-3
6.5 Public Information/Community Relations 6-3
6.6 Resource Management (including training) 6-3
6.7 Medical Support 6-3
6.8 Environmental Management and Decontamination Procedures 6-3
SECTION 7 CONTAINMENT AND CLEAN-UP 7-1
7.1 General Guidelines 7-1
SECTION 8 DOCUMENTATION AND INVESTIGATIVE FOLLOW-UP 8-1
8.1 Documentation 8-1
8.2 Investigative Followup 8-1
8.3 Defence Estates Reporting Requirements 8-2
SECTION 9 PROCEDURES FOR TESTING THE PLAN AND TRAINING
REQUIREMENTS 9-1
9.1 Procedures for Testing 9-1
9.2 Training 9-1
9.2.1 SPCC Awareness - Facility Response Team 9-1
9.2.2 Training of Unit/Generating Activity 9-2
SECTION 10 RECORD KEEPING AND UPDATING THE PLAN 10-1
10.1 Record Keeping 10-1
10.2 Updating the Plan 10-1
Appendix A Organization Spill Response Flowcharts Appendix B Example Spill Incident Report Appendix C Point of Contact Details Appendix D Tank Inventory as of January 2004 Appendix E Interceptor Inventory iii
LIST OF FIGURES
Figure 1.1 Storm Water Drainage System, Interceptors and Outfalls 1-7 Figure 2.1 Spill Categories and Reporting Requirements 2-3 Figure 3.1 Location of Hazardous Materials, Hazardous Waste, Tanks and Vulnerability Zones 3-5 Figure 3.2 Determining the Vulnerability of an Area to Spills 3-8 Figure A-1 Spill Response Action Flowchart for Unit/Activity A-2 Figure A-2 Spill Response Action Flowchart for Fire Department/Chief A-3 Figure A-3 Spill Response Action Flowchart for Defence Estates A-4
LIST OF TABLES
Table 2.1 Point of Contact Details for Spill Response Procedures 2-2 Table 3.1 HWAP and HWSA 3-2 Table 3.2 Hazardous Material (Fuel and Oil) Locations 3-3 Table 3.3 Hazardous Material Storage Locations 3-4 Table 7.1 Minor Spill – Response, Control and Cleanup 7-1 Table 7.2 Major Spill – Response, Control and Cleanup 7-2 Table 8.1 Spill Incident Report Requirements 8-1 Table 8.2 Cause of Spill and Mitigation Measures 8-1 iv v
ACRONYMS
AAFES Army and Air Force Exchange Service
AONB Area of Outstanding Natural Beauty
AST Aboveground Storage Tank
CEV Environmental Flight
DE Defence Estates
DoD Department of Defense
EA Environment Agency
HS Health and Safety
FC Fire Chief
FD Fire Department
FGS-UK Final Governing Standards – United Kingdom
GIS Geographical Information System
HAZMAT Hazardous Material and Hazardous Wastes
HM Hazardous Materials
HW Hazardous Waste
HWAP Hazardous Waste Accumulation Point
HWPS Hazardous Waste Profile Sheet
HWSA Hazardous Waste Storage Area
MDP Ministry of Defence Police
MHS Menwith Hill Station
MoD Ministry of Defence
MSDS Material Safety Data Sheet
MWR Morale, Welfare and Recreation
RAF Royal Air Force
RAFMH Royal Air Force Menwith Hill
PAO Public Affairs Office vi
POC Point of Contact
POL Petroleum, Oils and Lubricants
SPCC Spill Prevention, Control and Countermeasures
US United States
USAF United States Air Force
USF United States Forces
UST Underground Storage Tank vii
GLOSSARY
Bund: Secondary containment for an aboveground storage tank consisting of a base and surrounding walls constructed or lined with a material impermeable to stored Petroleum, Oils or Lubricants (POL).
Facility Response Team: The primary organisation responsible for overall spill prevention, control and countermeasures at RAF Menwith Hill. This team is headed by the RAF Menwith Hill Fire Chief and includes the key members, Defence Estates and the Chief, Environmental Flight.
Environment Agency: The leading public body for protecting and improving the environment in England and Wales.
Geographical Information System (GIS): A GIS is a system of hardware, software, and data that facilitates the development, enhancement, modelling, and display of multivariate (e.g. multilayered) spatially referenced data. It performs some analytical functions itself, and by its analysis, selective retrieval and display capabilities, helps the user to further analyze and interpret the data. Properly configured, the GIS can model (e.g. synthetically recreate) a feature or phenomenon as a function of other features or phenomena which may be related -where all features or phenomena are represented (characterized) by spatial and related tabular data.
Hazardous Material: Any material that is capable of posing an unreasonable risk to health, safety, or environment if improperly handled, stored, issued, transported, labelled, or disposed because it displays a characteristic as listed in Table 5-1 of the FGS-UK or the material is listed in Appendix A, Table A.3 of the FGS-UK.
Hazardous Waste (Special Waste): A discarded material that may be solid, semi-solid, liquid, or contained gas and either exhibits a characteristic of a hazardous waste as listed in Appendix A, Section A-1 of the FGS-UK, or listed as a hazardous waste in Table A.3 Chapter 6 of the FGS-UK.
Hazardous Waste Accumulation Point (HWAP): A shop, site, or other work centre where hazardous waste is accumulated until removed to a HWSA or shipped for treatment or disposal. A HWAP may be used to accumulate an aggregate of no more than 55 gallons of hazardous waste, or 1 litre (or quart) of acute hazardous waste.
Hazardous Waste Profile Sheet: A document which identifies and characterizes the waste by providing generating activity’s knowledge of the waste, and/or laboratory analysis, and details the physical, chemical and other descriptive properties or processes which created the hazardous waste.
Hazardous Waste Storage Area (HWSA): One or more locations on an installation where hazardous wastes are collected prior to shipment for treatment or disposal. The HWSA may store more than 55 gallons of a hazardous waste. The HWSA may consist of a lockable unit (cabinet, room) or a combination of lockable units that are next to each other as long as the lockable unit or combination of lockable units is located within a restricted access area.
Hazardous wastes may be stored in a HWSA for no longer than one year.
viii
Generating Activity: The organization responsible for generating the hazardous waste.
Initial Responder: The unit/activity or person who discovers the spill. The generating activity may also be the initial responder upon discovery of the spill.
Spill Levels: Categories of spill dependent on the substance and the quantity. The spill response procedures are dependent on the spill level.
- Spill Level 1: POL< 1 Gallon (3.8 litres) or HAZMAT < 1 Gallon (3.8 litres).
- Spill Level 2: POL > 1 Gallon (3.8 litres) but < 5 Gallon (19 litres) or HAZMAT < 1
Gallon (3.8 litres).
- Spill Level 3: POL >/= 5 Gallon (19 litres) or HAZMAT >/= 1 Gallon (3.8 litres).
- Spill Level 4: POL >/= 5 Gallon (19 litres) or HAZMAT >/= 1 Gallon (3.8 litres).
1-1
SECTION 1
INTRODUCTION
1.1 OVERVIEW AND PURPOSE
It is the policy of the United States (U.S.) Department of Defense (DoD) to prevent spills of hazardous materials (HM) and hazardous wastes (HW) that result from DoD activities, and to provide for a prompt, coordinated response to contain and clean up any spills (FGS-UK 18-2).
This Spill Prevention, Control and Countermeasures (SPCC) Plan for Royal Air Force (RAF) Menwith Hill describes procedures to prevent, control and, if necessary, clean up spills of all hazardous substances, which include both HM and HW. Within this plan hazardous substances will be described as HAZMAT, which includes both HM and HW.
UK Ministry of Defence (MoD) environmental policy, as described in the Joint Services Publication (JSP) 418, is the host nation driver for this SPCC plan. These environmental requirements are incorporated into the FGS-UK (2002). It should be noted that it is Defence Estates role to advise on MoD requirements in relation to contaminated land and general MoD estate issues. Defence Estates also has responsibility in relation to United States Visiting Forces compliance with environmental requirements.
The procedures contained in this SPCC Plan are based on numerous U.S. DoD, and U.S. Air Force laws, regulations, policies, and other guidance. The key regulatory requirements are noted below, in descending order of their relative hierarchy of application for spill prevention and response.
- FGS-UK (2002), Chapter 5, 6, 18 and 19;
- MoD Joint Services Publication (JSP) 418, Environment Manual (1999);
- Air Force Instruction 32-4002, Hazardous Material Emergency Planning and Response
Program (1997); and
- Air Force Manual 32-4013, Hazardous Material Emergency Planning and Response
Guide (1997).
The laws and regulations governing the management of HAZMAT are continually changing and evolving. Therefore, the procedures contained in this SPCC Plan must be revised periodically to remain current.
1.2 INSTRUCTION ON PLAN USE
The main objective of this plan is to prevent spills and to limit the potential impact that spills may have on the Base and the surrounding environment through prevention, control and countermeasures procedures.
In order to achieve this objective, this SPCC Plan incorporates site-specific details for RAF Menwith Hill and its associated operations, and provides procedures to prevent, control and countermeasure spills at the Base. Specific information included in this Plan is as follows:
• Base Overview including general information on the military mission of RAF Menwith Hill and the environmental setting (Section 1);
1-2
• Spill Response Action Plan including a diagrammatic emergency response and reporting procedure (Figure 2.1, Section 2);
• Responsibilities and points of contact (POC) for spill prevention and response, including details on the Facility Response Team (Section 2);
• Hazard Identification – identifying spill hazards (location of HAZMATs), areas of vulnerability and associated risks (Section 3);
• A Spill Response Geographical Information System (GIS) accompanies the Spill Response Action Plan, this system identifies the main HAZMAT locations (including tanks, hazardous material and hazardous waste storage areas), drainage patterns including the location of interceptors and the final outfalls. This system highlights the areas which are vulnerable to spills and allows for the identification of probable spill pathways;
• Spill Prevention procedures, roles and responsibilities (Section 4);
• Current capabilities of RAF Menwith Hill to control a spill and recommendations for improvements (Section 5);
• Spill Response Functions – roles and responsibilities (Section 6);
• Spill control, containment and cleanup information (Section 7);
• Procedures for documentation and investigation of spills (Section 8);
• Procedures for testing the plan and training requirements (Section 9);
• Record-keeping and updating requirements (Section 10);
• Department and unit/activity specific spill response action flowcharts (Appendix A);
and
• An inventory of tanks and oil interceptors (Appendix D & E).
1.3 PLAN DISTRIBUTION
A copy of this SPCC Plan must be maintained at each facility or unit at RAF Menwith Hill where HM or HW is used, generated, transported, stored, handled, or disposed. For example, a copy of the SPCC Plan, and any revisions, must be maintained at the new HW and HM storage area outside Gate D (located near Building 48). Each person/department responsible for spill prevention and response should also maintain a copy of the plan including:
• RAF Menwith Hill Fire Chief and Fire Department;
• Defence Estates;
• Chief, Environmental Flight;
• Chief, Health and Safety (HS) Department;
• Unit and building supervisors, for example the supervisor of the motorpool, and
HAZMAT storage areas;
• RAF Menwith Hill Commander; and
• U.S. Menwith Hill Station Commander.
A GIS Spill Response (see Section 3) has been developed in coordination with this SPCC Plan. This is an important part of the spill response and control procedures, it will enable the location of spills to be identified and the most likely spill pathway to be determined. It can be used as an early warning system so that receiving interceptors can be closed thereby containing the spill. Defence Estates will also be able to determine the risk of the spill migrating off-base. The original GIS Spill Response, which accompanies this Plan, should be located on the local network of the Drawing Office at RAF Menwith Hill. The Fire Department, Defence Estates and the Environmental Flight should have access to view this system.
1-3
1.4 RECORD OF AMENDMENTS
This SPCC Plan is a dynamic document that must be reviewed and updated regularly to maintain its accuracy and to ensure compliance with applicable requirements. The Chief, Environmental Flight is responsible for the overall content and effectiveness of this plan and will be responsible for updating this Plan in coordination with the Fire Department and Defence Estates. The Environmental Flight will also be responsible for ensuring that the GIS Spill Response is updated to reflect the current status of the Base. The date box on the GIS Spill Response should coordinate with the date on the hard copy of the SPCC Plan.
The signature sheet at the beginning of this plan should reflect the current status of this plan and detail the most recent date of this plan, along with the signature of the Chief, Environmental Flight.
1.5 BASE OVERVIEW
1.5.1 Mission Statement
RAF Menwith Hill is a Communications Research and Rapid Relay Facility, which was originally established in the 1950’s.
1.5.2 Environmental Setting
RAF Menwith Hill is located in rural North Yorkshire approximately 8 miles (13 kilometres (km)) west of the city of Harrogate, 20 miles (32 km) north of Bradford, and 222 miles (357
km) north of London.
1.5.3 Geology, Hydrogeology and Hydrology
Geology
RAF Menwith Hill lies at approximately 210 to 230 metres above sea level. The underlying geology is Carboniferous Millstone Grit which is overlain by a thin cover of glacial boulder clay. The glacial cover across the site varies from 1.5 to 3 metres thick.
The Millstone Grit originated as deltaic sediments about 310 to 320 million years ago. The deltas formed sheets of sand (Namurian sandstone) which subsided periodically and were covered with thick beds of silt and mudstone. The resulting underlying geology consists of Namurian sandstone with layers of silt and mudstone.
Hydrogeology
The sandstone layers of the underlying Millstone Grit allow for the formation of aquifers within this area. The groundwater potential is variable and depends upon the thickness, lithology, the extent of fissuring of the sandstone unit and also the local topography.
There are no groundwater boreholes within the boundary of RAF Menwith Hill, however there are a few small groundwater abstraction boreholes in the surrounding area, the water from which is used for domestic or agricultural purposes. The level of the permanent water table is unknown.
1-4
Hydrology
There are a number of small streams to the north and east of the base which drain to the River Nidd in the north. It is likely that these streams are sourced from the underlying aquifers within the sandstone layers. The nearest natural surface water feature to the Base is a small stream (Little Slack), which flows from the southwestern corner of the Base into the Swinsty Reservoir which is 1.2 miles (2 km) southwest of the site perimeter.
A small lake/wetland Lake Spiri which was excavated in the mid 1970’s is situated just to the south of the Base. Runoff from the base flows via an interceptor (no. 19) to this lake, the outlet from this lake eventually discharges into the Swinsty Reservoir.
1.5.4 Drainage
Storm water drainage within the developed portion of the Base flows via a piped drainage system, which connects to a number of interceptors, before discharging at several points off-base to local ditches. There are a total of twenty interceptors, details of which are provided in Appendix E.
Storm water outfalls are checked weekly and after periods of heavy rainfall. Defence Estates holds a discharge permit for storm water discharges from the Base as issued by the Environment Agency (EA). This permit stipulates the quality parameters of the discharge, which include: no more than 30mg/l of suspended solids and no visible traces of oil/grease.
The storm water is monitored quarterly and the results are maintained by Defence Estates.
Figure 1.1 illustrates the drainage system of the Base and highlights the location of the interceptors and the respective outfall. Existing baseline information on the drainage system and the location of manholes, interceptors and outfalls was utilised to develop the GIS Spill Response. Potential spill pathways, based on the concept of the spill flowing to the nearest manhole, have been identified in the GIS Spill Response. Due to incomplete/inaccurate data on the drainage system some of the drainage data had to be manipulated, as identified in the GIS Spill Response.
1.6 CONCEPT OF OPERATIONS AND RESPONSIBILITIES FOR
RESPONSE
1.6.1 Governing Principles
All operations within the Base are mission support operations. The Operations Compound comprises of secure buildings with associated operating and maintenance facilities. Large quantities of HAZMATs primarily in the form of fuel are stored in this area. The Base Operations Support Site has supporting services including administrative facilities, petrol station, motor pool, vehicle washrack and various workshops. HAZMATs are generally stored in smaller quantities in this area with the exception of the fuel tanks.
This SPCC Plan is applicable to any base activities involving HAZMAT, therefore this plan applies to all facilities, units, activities, and organizations within RAF Menwith Hill that use, generate, transport, store, handle, or dispose of HAZMATs.
1-5
1.6.2 Organization, roles and responsibilities
All individuals at RAF Menwith Hill will be responsible for localized spill prevention under the guidance of the unit/building supervisor. However, there will be one organization, a Facility Response Team, headed by RAF Menwith Hill Fire Department, which has overall responsibility for the spill response.
The Facility Response Team will be established at RAF Menwith Hill and will consist of the following key members: the RAF Menwith Hill Fire Chief (and Fire Department), Defence Estates, Chief, Environmental Flight and the Chief, HS Department. Additional members who are primarily involved in spill response procedures include the RAF Menwith Hill Commander and the local host nation fire service North Yorkshire Fire and Rescue Service at Selby.
The main responsibilities of the Facility Response Team will include:
• Implementation of the Spill Prevention Procedures;
• Response to a spill incident;
• Spill clean-up and countermeasures;
• Training of spill prevention and control/cleanup of minor spills;
• Biannual meetings;
• Participation in annual drill; and
• Review and updating the SPCC plan.
Further details on the individual roles and responsibilities of the members of the Facility Response Team are available in Section 2.
1.6.3 Relationship to other plans
A Hazardous Waste Management Plan (RAF Menwith Hill Environmental Health and Safety Procedure 103 (EHSP-103) Revision A) has been completed for RAF Menwith Hill.
Information from that plan is incorporated into this SPCC Plan. The Hazardous Waste Management Plan should be used in conjunction with this SPCC, to optimize the effectiveness of spill prevention and control procedures.
1-6
1-7
FIGURE 1.1
STORM WATER DRAINAGE SYSTEM, INTERCEPTORS AND OUTFALLS
1-8
2-1
SECTION 2
SPILL RESPONSE ACTION PLAN
This section of the SPCC Plan describes the specific actions, which are to be taken following a spill within RAF Menwith Hill (Section 2.1). The actions to be taken by the initial responder and the Facility Response Team are described in Section 2.2.
2.1 SPILL RESPONSE PROCEDURES
This section describes the immediate and prioritized response actions to be taken when a spill is discovered. The response procedure for spills is dependent on the spill material and the quantity of the spill.
At RAF Menwith Hill, spills are categorized into four spill level categories. Spill Levels 1 and 2 represent minor spills, which can be contained by the generating unit/activity while Spill Levels 3 & 4 are major spills, which require emergency action. The spill levels are defined below along with the required action. Figure 2.1 summarizes the spill response procedure.
• Level 1 Spill – Negligible. If Petroleum, Oils or Lubricants (POL) or HAZMAT < 1 gallon (3.8 litres).
1. Unit/activity will contain/clean up a Level 1 spill.
2. Unit/activity will report the spill to the unit supervisor only.
3. Unit/activity will coordinate the disposal of absorbent, soil and other cleanup material with the Environmental Flight.
• Level 2 Spills – Small. If POL > 1 gallon (3.8 litres) but < 5 gallon (19 litres) or if
HAZMAT < 1 gallon (3.8 litres).
1. Unit/activity will contain/clean up a Level 2 spill.
2. Unit/activity will report the spill to the unit supervisor.
3. Unit/activity will report the spill by phone, fax, or e-mail within 24 hours to Defence
Estates.
4. Defence Estates will notify the U.S. Menwith Hill Station Commander, RAF Menwith
Hill Commander and Chief, Environmental Flight.
5. Unit/activity will coordinate the disposal of absorbent, soil and other cleanup material with the Environmental Flight.
• Level 3 Spills – Medium. If POL >/= 5 gallon (19 litres) or if HAZMAT >/=1 gallon
(3.8 litres) and exceeds unit’s capability to contain/cleanup.
1. Unit/activity will determine that the spill is a Level 3 spill.
2. Unit/activity will immediately contact RAF Menwith Hill Ministry of Defence Police
(MDP) at (999/911 or 777999 (housing phone) or 01423 777 999 (mobile number) who in turn will contact RAF Menwith Hill Fire Department and Defence Estates.
3. The Fire Department will respond and contain the spill.
4. RAF Menwith Hill Fire Chief will obtain additional materials, personnel, and equipment from Civil Engineering to contain spill if needed.
5. Defence Estates will immediately notify U.S. Menwith Hill Station Commander, RAF
Menwith Hill Commander and the Chief, Environmental Flight.
2-2
6. Once containment has been completed, Defence Estates will coordinate/handle final cleanup and disposal actions with the Environmental Flight.
• Level 4 Spills – Large. If POL >/= 5 gallon (19 litres) or if HAZMAT >/=1 gallon (3.8 litres) and exceeds RAF Menwith Hill capabilities to contain and cleanup; outside assistance is required.
1. Unit/activity will determine that the spill is a Level 4 spill.
2. Unit/activity will immediately contact MDP at (999/911 or 777999) who in turn contact the RAF Menwith Hill Fire Department and Defence Estates.
3. The Fire Department will respond and contain the spill.
4. RAF Menwith Hill Fire Chief will obtain additional materials, personnel, and equipment from Civil Engineering to contain the spill if needed.
5. Defence Estates will immediately notify U.S. Menwith Hill Station Commander, RAF
Menwith Hill Commander and Chief, Environmental Flight.
6. If the Fire Chief determines that the spill incident has exceeded the capabilities of RAF
Menwith Hill assets, he will request assistance from host nation emergency response (fire, ambulance, police).
7. Defence Estates will communicate with host nation regulators such as the Environment Agency, English Nature and the Local Authorities and negotiate cleanup requirements with the host nation authorities. Defence Estates will advise the Environmental Flight of requirements, and upon agreement with the Environmental Flight, Defence Estates will contract the cleanup and disposal actions with UK contractors.
TABLE 2.1
POINT OF CONTACT DETAILS FOR SPILL RESPONSE PROCEDURES
Duty Position Duty Telephone RAF Menwith Hill
Ministry of Defence Police Emergency No’s
999/911 – Work Phones 777999 – Housing Phones
01423 777 999 – Mobile Phone RAF Menwith Hill
Ministry of Defence Police
- Direct Line
Defence Estates 7773 RAF Menwith Hill Fire Chief
- Direct Line 7861
Chief, Environmental Flight 7169 Chief, HS Department 7722
U.S. Menwith Hill Station Commander 7880
RAF Menwith Hill Commander 7949
Host Nation Fire Service Emergency: 999 (from outside line) 01609 780150
Local Environment Agency (Dales Area)
0113 2440191
2-3
FIGURE 2.1
SPILL CATEGORIES AND REPORTING REQUIREMENTS
DE: Defence Estates
CEV: Environmental Flight
FD: Fire Department
FC: Fire Chief
RAFMH: Royal Air Force Menwith Hill
US MHS: United States Menwith Hill Station
Hazmat = Hazardous Materials and Hazardous Waste.
Spill Level 1
- POL < 1 gal (3.8 l)
- Hazmat < 1 gal (3.8 l)
Spill Level 2
- POL > 1 gal (3.8 l) but < 5 gal (19 l)
- Hazmat < 1 gal (3.8 l)
Spill Level 3
- POL >/= 5 gal (19 l)
- Hazmat >/= 1 gal (3.8 l)
MAJOR
SPILL
MINOR
SPILL
Within unit's capability to contain/ cleanup
Report to Unit/ Activity
Supervisor
Report to DE within 24 hours
Exceeds unit's capacity to contain/cleanup
Contact RAFMH MDP immediately
999 or 911 or 7999
Spill Level 4
- POL >/= 5 gal (19 li
- Hazmat >/= 1 gal (3.8 l)
Contact local Host Nation Emergency
Services
DE Inform C/CEV, US MHS
Commander & RAFMH Commander
MDP to contact FD and DE
Spill is contained
FC obtains additional materials, personnel, and equipment from Civil Engineering to contain spill if needed
Contact C/CEV, US MHS Commander & RAFMH
Commander
Identify and close receiving interceptor
Defence EstatesFire Department
RESPONDS
& CONTAIN
Cannot contain spill
DE and FC communicate and coordinate with host nation environment agency/cleaning contractors
Spill is Contained
DE coordinates/handles final cleanup and disposal with CEV
Within unit's capability to contain/ cleanup
Exceeds unit's capacity to contain/cleanup
Contact RAFMH MDP immediately
999 or 911 or 7999
MDP to contact FD and DE
Fire Department Defence Estates
RESPONDS Contact C/CEV, US MHS Commander & RAFMH
Commander
Identify and close receiving interceptor
DE communicate with host nation environment agencies if spill may impact on host nation
DE coordinates/handles final cleanup and disposal with CEV
Unit/activity coordinate disposal of cleanup material with CEV
Unit/activity coordinate disposal of cleanup material with CEV
Unit/Activity Report Spill
Report to Unit/ Activity
Supervisor
Report to Unit/ Activity
Supervisor
2-4
2-5
2.2 ROLES AND RESPONSIBILITIES
This section provides the responsibilities and points of contact for the personnel involved with the Spill Response Programme at RAF Menwith Hill as detailed in Section 2.1. Point of contact details are provided in Table 2.1.
2.2.1 Initial Responder (Station Personnel or Unit/Activity)
The Initial Responder is the person who discovers the spill, or first arrives at the scene of a spill. This may be the person in control of the material before it is spilt, the person inspecting facilities and operations, or the person who discovers or is summoned to a nearby spill. This person may or may not have knowledge of hazardous material and spill response actions.
Figure A-1 in Appendix A illustrates the role of the initial responder.
The Initial Responder will:
• Categorize spill level as detailed in Figure 2.1.
• Minor Spill: Spill 1 or 2 – POL< 5 gallon (19 litre) or HAZMAT < 1 gallon (3.8 litre)
1. No emergency actions are needed.
2. Notify unit supervisor.
3. Clean up the spill immediately using spill equipment (absorbent material, mop and gloves).
4. Coordinate disposal of absorbent, soil and other cleanup material with the
Environmental Flight.
5. Report spill to Defence Estates within 24 hours if Spill Level 2 (POL > 1 gallon (3.8 litre) but < 5 gallon (19 litre) or HAZMAT < 1 gallon (3.8 litre)).
6. Take corrective action to prevent future spills.
• Major Spill: Spill Level 3 or 4 - POL >/= 5 gallon (19 litre) or HAZMAT >/= 1 gallon (3.8 litre)
1. Contact Ministry of Defence Police on 999/911 or 777999 (housing phone) or 01423 777 999 (mobile number).
2. Report the following information:
− Name and location of person reporting the spill;
− Time, location, type of material, and estimated quantity of spill;
− Any need for medical assistance; and − Potential risks for safety and environment such as discharge to waters, soil, drainage system, and fire or explosion hazards.
2.2.2 Facility Response Team
The Facility Response Team consists of a group of individuals that are available to respond to a spill incident and are responsible for control of the spill and its cleanup. The specific actions to be taken following a spill are discussed in detail in Section 2.1 and illustrated in Figure 2.1. The Facility Response Team will consist of the following:
• RAF Menwith Hill Fire Chief (The specific role of the Fire Chief and the Fire Department is illustrated in Figure A-2, Appendix A).
• Act as on-scene coordinator.
• Consult GIS Spill Response to identify location of spill and potential spill pathway.
• Determine action to be taken to control the spill.
2-6
• Obtain additional spill control, materials, personnel and equipment from Civil Engineering to contain spill if needed.
• Request assistance of host nation emergency services (North Yorkshire Fire and Rescue Service) if deemed necessary.
• Liaise with host nation environment agencies and cleanup contractors in coordination with Defence Estates.
• Liaise with the Facility Response Team.
• Fill out Spill Incident Report (Appendix B).
• RAF Menwith Hill Fire Department
• Respond and control spill.
• Defence Estates (The specific role of Defence Estates is illustrated in Figure A-3, Appendix A)
• Notify U.S. Menwith Hill Station Commander, RAF Menwith Hill Commander and
Chief, Environmental Flight.
• Consult GIS Spill Response to identify location of spill, potential spill pathway and potential receiving interceptor.
• Close potential receiving interceptor.
• Liaise with the local Environment Agency if the spill may impact the host nation.
• Act as host nation adviser on the requirements for RAF Menwith Hill, that is, negotiate and agree cleanup standards with host nation authorities and advise the Environmental Flight.
• Coordinate with the Environmental Flight on preferred method of cleanup or disposal.
• Obtain the resources of a HAZMAT cleanup contractor and execute requirements as agreed with the Environmental Flight.
• Environmental Flight (CEV)
• Assist the RAF Menwith Hill Commander and Defence Estates in communicating with the local Environment Agency and other host nation agencies.
• Coordinate with Defence Estates on spill cleanup process and disposal of cleanup material (hazardous waste).
• Maintain Spill Incident Form.
• Follow-up investigation of spills in particular reoccurring spills.
• RAF Menwith Hill Commander
• Advise in conjunction with Defence Estates, on MoD and host nation requirements.
• Assist in communications between Defence Estates and the local Environment Agency and other host nation agencies.
• North Yorkshire Fire and Rescue Service
• Assist RAF Menwith Hill Fire Department to control a spill at RAF Menwith Hill, if requested by RAF Menwith Fire Chief.
3-1
SECTION 3
HAZARD ANALYSIS
3.1 INTRODUCTION
It is important that potential spill hazards are identified, and the most vulnerable areas highlighted, to minimize potential impacts on sensitive groundwater and surface water receptors in the surrounding area.
The information within this section should be utilized to improve spill prevention measures, and to aid spill response control by identifying potential spill pathways (through the GIS Spill Response) and highlighting areas where spills impacts would be most severe.
Figure 3.1 highlights the areas where there is a greater potential for spills by identifying the location of HAZMAT storage areas, large car parks and tanks. This map also highlights the Vulnerability Zones as defined in Section 3.3.
The GIS Spill Response is a vital part of the Spill Response procedure. Access to view the GIS Spill Response will be controlled by the Chief, Environmental Flight, who will also be responsible for ensuring that the system is updated when necessary. In responding to a spill, Defence Estates should consult this system to identify the potential pathway of a spill, the receiving interceptor and the final outfall. Utilizing this system will enable the spill to be contained by closing the receiving interceptor, and thereby reducing the risk of impact of pollution.
3.2 HAZARD IDENTIFICATION
Spill hazards are primarily considered to be HAZMATs (hazardous materials and hazardous wastes) which are either located at specific locations or throughout the installation.
3.2.1 Hazardous Wastes
Once a waste is designated as a hazardous waste (see RAF Menwith Hill Hazardous Waste Management Plan, (EHSP-103, Revision A), the generating activity is responsible for informing the Environmental Flight and submitting a Hazardous Waste Profile Sheet (HWPS). The Environmental Flight arranges for the wastes to be collected and transported to on-site Hazardous Waste Accumulation Points (HWAP) or Hazardous Waste Storage Areas (HWSAs). The majority of hazardous waste at RAF Menwith Hill is located at a HWAP or the HWSA, with the exception of newly generated hazardous wastes. Table 3.1 lists the HWAPs and HWSA and their location.
3-2
TABLE 3.1
HWAP AND HWSA
Location Hazardous Waste and Hazardous Material Storage Area outside Gate “D” Jetsam Tank Farm, Swaledale Rd.
Motorpool, Building 30, First Ave.West AAFES Car Care, Second St. West Outside Bldg 36E, Operations compound Autoshop, Bldg 33, Second St. West Container outside building 36A DRMO Appliance compound, rear bldg. 31, First Ave West Hazardous Waste Storage Area adjacent Building 45 Hazardous Waste and Hazardous Material Storage Area adjacent to Jetsam Tank Farm (Operations Compound).
Source: RAF Menwith Hill Hazardous Waste Management Plan (EHSP-103, Revision A) and B. Jamieson, Defence Estates.
The location of HWAP and HWSA are illustrated in Figure 3.1.
3.2.2 Hazardous Materials
Hazardous materials include: petrol, diesel, paints, acids, solvents and water treatment chemicals. The majority of hazardous materials stored on base are in the form of oil and fuel, which are either stored in underground storage tanks (UST) or aboveground storage tanks (AST). Table 3.2 provides details of all of the AST/UST at RAF Menwith Hill.
Other hazardous materials include substances such as: paints, degreasers, cleaning products, which are stored indoors at most facilities/buildings in smaller quantities usually in sealed containers. This plan only identifies the locations of larger quantities of these substances.
Table 3.3 lists the locations/buildings were such materials are stored.
Leaks from vehicles are another potential source of spills from hazardous materials. In particular, car parks with over fifty parking spaces pose a risk of pollution to surface water drains. The potential quantity of hazardous material arising from a leak/spill is likely to be minimal (< 1 gallon (3.8 litre)), however it is possible that oil residues could migrate during heavy rainfall to surface water drains. The location of large car parks is also included in Table 3.3.
3-3
TABLE 3.2
HAZARDOUS MATERIAL TANK INVENTORY
Tanks Location No. of
Tanks Capacity Type Material
1 2,700 L AST Waste Oil Petrol Station 2 72,000 gal UST Unleaded Petrol
Building 42A 1 9,400L AST Diesel Building 33 1 9,400L AST Waste Oil
2 30,000L UST Unleaded Petrol 1 12, 000L AST Diesel 1 16,000L AST Diesel 2 2,800L AST Waste Oil 1 180L AST Anti-Freeze 1 180L AST Engine Oil
*Building 30 Motor Pool
1 180L AST Gear Oil Steeplebush
II 1 3,000L AST Diesel
Satcom 2 50,000L AST Diesel 7 61,000L AST Diesel
Jetsam B 1 8,100L AST Lube Oil 7 61,000L UST Diesel 1 5,000L UST Lube Oil #Jetsam A 1 10,000L UST Waste Oil
Building 36E 1 4,500L AST Waste Anti- Freeze
Boiler House 36M 1 3,400L AST Diesel
* Building 30 also has a decreasing unit with 5 gallons of washer # UST to be replaced with AST with bunding (late 2004).
The location of these tanks is illustrated in Figure 3.1
3-4
TABLE 3.3
HAZARDOUS MATERIAL STORAGE LOCATIONS
Location Building No.
Hazardous Waste and Hazardous Materials Storage Area, outside Gate “D” operations compound (newly constructed in 2003, will become operational in 2004)
Rear of Building 48
MEAR Team 31A Runway Antenna Maintenance 45 SBII Cafeteria 45 Lock Shop 45 Ministry of Defence Police Control Room – Operations Compound 45
Youth Services (Cleaning Closet) 34 FCC Operations (Chemical Lockers and Cooling Towers)
36E
Boiler House – Various Water Treatment Chemicals 36M Engineering Lab (Tech 1) /Hardware Development Lab
36T
Runway Warehouse 36X Child Development Centre Laundry Room, Kitchen, Cleaners Cupboards
Club (Kitchen & Bar) 18 Strike Zone (Bowling & Food) 17 Housing Warehouse 42B Dog Kennels 49 Morale, Welfare and Recreation (MWR) Warehouse
Motorpool (e.g. degreasers, cleaners, paint) 30, 30A and 30B
Medical Centre 26 Recreation Centre 15 Compaq Support and Engineering Office 36 Hazardous Waste and Hazardous Materials Storage Area adjacent to Jetsam Tank Farm, Operations Compound
Operations Compound
Car Park at Buildings 16 & 23 16/23 Car Park at Buildings 20 & 200 20/200 Car Park at Building 44 44 Car Park at Building 47 47 Car Park at Shoppette 48 Car Park at Operations Compound adjacent to Building 45 45
*HM that had been previously been stored in the Supply Warehouse (Bldg. 32) and the Installation Storage Area (Bldg.
39) have been transferred to the new HAZMAT Storage Area outside Gate D).
Hazardous Material Storage Locations are illustrated in Figure 3.1.
3-5
FIGURE 3.1
LOCATION OF HAZARDOUS MATERIALS, HAZARDOUS WASTE, TANKS AND
VULNERABILITY ZONES
3-6
The rest of this page has been intentionally left blank
3-7
3.3 VULNERABILITY ANALYSIS
This section identifies areas, which are vulnerable to spills, and also assesses the level of vulnerability. For the sole purpose of this SPCC Plan the installation is divided into areas of varying vulnerability, which are categorized as Vulnerability Zones I, II and III. The primary influencing factor in establishing whether an area is vulnerable to spills is the presence or absence of HAZMAT storage areas. Other factors, which can affect the level of vulnerability, include:
- Storage of HAZMATs.
- Location – internal/external.
- Proximity to drains.
- Spill pathway (whether it may migrate to an interceptor).
- Capacity of interceptors.
- Vulnerability of catchment area.
Figure 3.2 illustrates the main factors upon which the Vulnerability Zones at RAF Menwith Hill were devised. The Vulnerability Zones are as follows:
• Vulnerability Zone I: Areas which are not vulnerable to spills, e.g. housing areas.
• Vulnerability Zone II: Areas where there are spill hazards i.e. where HAZMATs are located. However the impact of a spill would be minimum, as the spill flow would most likely flow via an interceptor.
• Vulnerability Zone III: Areas where there are major spill hazards i.e. fuel tanks and where the receiving drain has no interceptor.
The majority of the installation has been zoned as Vulnerability Zone II. Hazardous materials and hazardous wastes are stored throughout the base, however the majority of storm water drains within the installation have interceptors, therefore any spills should be contained within the base. Figure 3.1 highlights Vulnerability Zone II, the remaining area is considered Vulnerability Zone I.
3-8
FIGURE 3.2
DETERMINING THE VULNERABILITY OF AN AREA TO SPILLS
Is there a potential Spill Hazard in the area - see
Section 3.2
No Yes
Vulnerability Zone I
Is the most likely spill pathway via an inteceptor
Internal External
Location of Hazard
Vulnerability Zone II Vulnerability Zone III
Yes No
3-9
3.4 RISK ASSESSMENT
This section assesses the risk of damage both on-base and off-base due to a HAZMAT release at RAF Menwith Hill. Spills could impact sensitive off-site receptors through the following routes:
- Surface runoff with potential contaminants discharging to the drains and entering the Little Slack stream (which flows from the southwest corner of the Base) and subsequently flowing into the Swinsty Reservoir which is used for public supply.
- Vertical seepages impacting the underlying Namurian aquifer. If this impact is sufficient it may impact adjacent surface springs or local abstractions.
Spill prevention procedures can reduce the risk of spills by establishing work practices that are less likely to result in the uncontrolled release of HAZMAT. Therefore it is important that spills are prevented, and where spills occur they are contained and cleanup to a standard as specified by the Environmental Flight.
RAF Menwith Hill has a proactive approach to spill management. Spill prevention and control measures are in place to reduce the potential of a spill. Spill prevention measures are detailed in Section 4 of this SPCC plan and in the RAF Menwith Hill Hazardous Waste Management Plan (EHSP-103, Revision A).
In the unlikely event of a spill, the risk of impact is reduced through spill control measures which are in operation at the Base. As identified in Section 3.3, the majority of RAF Menwith Hill is categorized as Vulnerability Zone II. There are significant spill hazards within these zones, however the receiving surface water drains are connected to interceptors, and therefore in the event of a spill, the spill could be contained at the interceptor and prevented from migrating off base. These interceptors along with the condition of the tanks, and the outfalls are regularly inspected and maintained to ensure effective containment of a spill.
Though there are areas within the installation which are vulnerable to spills, the actual risk of impact to the environment on-base and off-base is minimal.
3-10
4-1
SECTION 4
SPILL PREVENTION
4.1 INTRODUCTION
This section of the SPCC Plan provides procedures that are to be followed to prevent spills of HAZMAT within RAF Menwith Hill. The prevention of spills is the most important concept of this plan. Spill prevention requires a proactive approach by the various units/departments at the installation. By adhering to spill prevention procedures, the potential for spills is minimized.
There are various causes of spills, the most common being human error and structural failure.
The risk of spills can be reduced by establishing spill prevention procedures (work practices and spill containment structures) which will be implemented at RAF Menwith Hill. Many of the spill prevention procedures within this section are already being implemented at the installation. To date there has been very few spill incidents and no major spills. The installation will continue with current prevention methods and implement additional preventive measures as identified below.
The spill prevention programme described in this section consists of the following elements:
• General operating procedures for spill prevention;
• Spill prevention structures and equipment;
• Inspection and surveillance;
• Security measures; and
• Training and awareness.
4.2 GENERAL OPERATING PROCEDURES FOR SPILL PREVENTION
Storage, handling and transport of all HAZMAT will be conducted in accordance with the requirements of Chapters 5, 6, 9 and 19 of the FGS-UK. The Hazardous Waste Management Plan (EHSP-103, Revision A) also provides specific standards for environmental protection and spill prevention at RAF Menwith Hill. The Hazardous Waste Management Plan limits the potential for spills by providing technical guidance for effective management of hazardous wastes. General operating procedures for storage, handling, and transportation of HAZMAT to prevent spills are as follows:
4.2.1 Storage
• Secure area.
• Segregate chemicals as required.
• Label all HAZMATs.
• Provide Material Safety Data Sheets (MSDS) for all HMs. The MSDS provide information on how to transport, handle, store and dispose of individual HM.
• Seal and leak-proof floors of HAZMAT Storage Areas.
• Provide secondary containment based on the quantity/type of HAZMAT (e.g. 200L of oil).
• Provide additional storage requirements for toxic and flammable materials.
4-2
4.2.2 Handling
• Follow DoD Handling Requirements in Storage and Handling of Hazardous Materials, DLAI 4145.1 at all times.
• Maintain indoor and outdoor HM dispensing areas properly.
• Provide drip pans or absorbent materials at dispensing containers/fill points to collect drips or spills.
• Mark all dispensing container contents clearly.
• Locate dispensing areas away from catch basins and storm drains.
• Observe load capacity of tanks.
• Provide personnel training on handling of HAZMATs.
4.2.3 Transportation
• Transport HAZMAT in sealed containers.
• Use appropriate material handling equipment and vehicles.
4.3 SPILL PREVENTION STRUCTURES AND EQUIPMENT
The following spill prevention structures and equipment will be used for spill prevention:
• Secondary containment such as bunding.
- All Petroleum, Oils and Lubricants (POL) bulk storage aboveground storage tanks
(AST) must have secondary containment (bund) which is sufficient to hold 110% of the contents of the largest single tank. The bund base and wall must be impermeable to water and oil. There should be no direct outlet connecting the bund to any drain, sewer, watercourse or unmade ground.
• Double-walled tanks.
- All new underground storage tanks (USTs) will be double-walled. All old USTs were to be replaced by 1st October 2004.
• Leak detection systems on USTs and interceptors.
- All USTs must have leak detection systems, capable of detecting 0.1 gallon (0.38 litre) per hour. New USTs will use one of the following leak detection systems:
- Automatic tank gauging;
- Vapor monitoring;
- Groundwater monitoring; or
- Interstitial monitoring.
• Overfill protection on USTs.
- New USTs must be provided with spill and overfill prevention equipment, except where transfers are made in amounts of 25 gallons (95 liters) or less. Where spill and overfill protection are required, a spill containment box must be installed around the fillpipe. Overfill prevention must be provided by one of the following methods:
- Automatic shut-off device (set at 95% of tank capacity).
- High level alarm (set at 90% of tank capacity).
• Drip pans will be placed under any filling points which are not located within a bunded area.
• Maintain/repair tanks, secondary containment structures, interceptors.
4-3
4.4 INSPECTION AND SURVEILLANCE
• Conduct weekly inspections of tanks, interceptors, secondary containments and outfalls.
Additional inspections should be conducted following heavy rainfall.
- Tanks will be visually inspected where possible. The immediate area around a tank and filling point will be checked for staining or possible odours.
- Secondary containment will be checked for accumulated rainwater to prevent loss of spill containment capacity.
- Interceptors will be inspected for oil and sludge, and cleaned accordingly.
- Outfalls will be checked to ensure drainage system remains free from blockages.
• Conduct tank integrity testing at least every 5 years.
• Test leak detection systems/alarms monthly.
• Inspect HAZMAT storage areas monthly to ensure spill prevention measures as detailed in
3.2 are being implemented.
• Car parks (as identified in Table 3.3) will be visually checked monthly for staining.
• Records of inspections will be maintained.
4.5 SECURITY MEASURES
• Secure area.
- HAZMAT storage areas must be secured (e.g.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .